Attachment 1 - Statement of Work.pdf

PDF 113 KB Posted

Attached to
USDA-AFRS Inspection and Certification of Underground Storage Tank
Solicitation number
1232SA25Q0740
Issued by

About this file

This document is a Statement of Work (SOW) for Underground Storage Tank (UST) Inspection and Certification services at the USDA Appalachian Fruit Research Station in Kearneysville, WV. The scope of work requires a contractor to perform comprehensive regulatory inspections, including hydro testing and certification of spill buckets, dispenser pan/sump containment, overflow restrictions, and the Veeder Root Monitoring System, all in compliance with West Virginia Department of Environmental Protection (WV DEP) regulations.

The contractor must provide all necessary labor, insurance, tools, materials, and equipment, with work to be completed during normal business hours (7:00 am to 4:00 pm, Monday through Friday). The contractor must be a WV DEP Certified Class E UST Operator with qualified personnel capable of meeting manufacturer-recommended maintenance standards. Upon completion, the vendor must provide a detailed document outlining pass/fail results, including facility location, inspection date, equipment identification, testing techniques, and next required testing date.

View the file

Other files

File Type Posted
RFQ 1232SA25Q0740 - Terms and Conditions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSPECTION AND CERTIFICATION OF UNDERGROUND STORAGE TANK COMPONETS

AND SPILL PROTECTION EQUIPMENT

The USDA Appalachian Fruit Research Station (AFRS) requires all labor, insurance, tools, material, equipment, and travel be provided to perform 3-year WV Department of Environmental Protections (WV DEP from this point on) Regulatory Inspections on Underground Storage Tank (UST) components and Spill Protection Equipment.

Work will take place at the USDA, Appalachian Fruit Research Station (AFRS), Farm Center Complex, 2217 Wiltshire Road, Kearneysville, WV 25430. All certifications must be done by a WV DEP Certified Class E UST Operator, and all other work shall be performed by a properly training and licensed contractor in accordance with the terms, conditions, and specifications contained in this document.

1. SCOPE OF WORK: The Contractor shall provide all labor, insurance, tools, material, equipment, and travel necessary to provide the following:

a. Hydro Test, Inspect and Certify two Spill Bucket in accordance with WV DEP required regulations. Water

Source is provided within 20-feet of Spill Buckets.

b. Hydro Test, Inspect and Certify two dispenser pan / sump containment for existing Fuel Pumps in accordance with WV DEP required regulations. Water Source is provided within 5-feet of fuel pumps.

c. Vendor will be responsible for removal of all water used for Hydro Testing of equipment in accordance with WV DEP required regulations.

d. Inspect and certify two Overflow Restrictions on Fill Drop Tubes and verify High Product Limit Alarm

Operation at 90% and Overfill Alarm Operation at 95% capacity with Audible Alarm announcement at the fuel pumps and in the Farm Center Office at the Veeder Root Monitoring System to meet WV DEP UST required regulations.

e. Annual Inspection and certify Veeder Root Monitoring System Operation including proper placement of probes for monitoring in accordance with WV DEP required regulations.

f. Vendor will provide a document providing pass / fail on items (a, b, d, and e) containing facility location, inspection date, equipment identification / serial number if applicable, testing technique used, and expiration date when testing is required next. Include Item (c) of who handled (pumping company and processing facility) and copy of manifest if applicable.

2. CONTRACTOR REQUIREMENTS: The contractor shall provide trained WV UST Class E Certified and qualified service personnel to provide inspection and certification on specified equipment. The quality of service provided shall meet or exceed Manufacturer recommended maintenance and service work standards.

3. MANAGEMENT: Contractor shall manage total work effort associated with the control of personnel providing services required to assure fully adequate/timely completion of services. Included in this function will be a full range of management duties including, but not limited to, planning, scheduling, and quality control. Contractor shall only provide trained/ qualified personnel supported by necessary management expertise to assure the performance of work in accordance with sound and efficient commercial business practices.

4. WORK SCHEDULE: The Contractor shall all work during normal hours of operation from 7:00 am to 4:00 pm, Monday through Friday with the exception of official federal holidays.