Attachment 2 Technical Requirements.pdf
PDF 440 KB Posted
- Solicitation number
- 1232SA25Q0400
About this file
This is a Statement of Work (SOW) for the replacement of a main air compressor at the USDA Eastern Regional Research Center (ERRC) in Wyndmoor, Pennsylvania. The project involves removing an antiquated Gardner Denver air compressor and installing a new oil-free two-stage rotary screw compressor with specific technical specifications. The new compressor must be a Gardner Denver brand or equal, rated at minimum 40HP (30kW) with at least 192 CFM @ 125 PSIG, 460V/3PH/60Hz operation, water-cooled heat exchanger, wye-delta reduced voltage starter, and full synthetic oil with 8000-hour lifetime comparable to AEON 9000SP. The unit must feature zero contamination risk, ODP high efficiency motor, and an 80°C mixing valve temperature with water temperature regulator, water shutoff valve, and moisture separator.
The contractor is responsible for removing and properly disposing of the existing compressor, providing all installation materials, completing discharge and cooling water piping tie-ins with flow rate verification, connecting electrical systems to verify proper voltage and amperage, testing the unit for proper operation, providing onsite end-user training, delivering user manuals and warranty registration, and ensuring Buy American Act compliance. The contractor must notify the USDA ARS ERRC representative upon work completion before invoicing. No specific contract vehicle, set-aside, response deadline, or award date is specified in this SOW document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 RFQ Combined Synopsis Soliciation 1232SA26Q0400.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
USDA, ERRC Main Air Compressor Replacement
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Deliverables / Schedule
Project USDA, Eastern Regional Research Center, Wyndmoor, PA Pathogen Lab Main Air Compressor Replacement
General Information
1.0 Scope of Work
ERRC Upgrade and modernize main HP Air Compressor.
2.0 Background
The Eastern Regional Research Center (ERRC) is one of four Regional Research Centers of the Agricultural Research Service, U.S. Department of Agriculture. The ERRC is home to the nation’s leading scientists and engineers who solve problems facing the U.S. today and tomorrow with fundamental, applied, and developmental research on agricultural commodities. Most of this research is conducted in the main building within two laboratory wings. The original building was constructed in 1940. Due to continuous upgrades and renovations, ERRC is very modern with respect to laboratory design and system condition.
Contractor Requirements
3.0 Technical Requirements / Tasks
1. Remove an antiquated Gadner Denver air compressor and properly dispose.
2. Supply and install the new compressor in the same area. The new compressor shall be one (1) Gardner
Denver OIL-FREE TWO-STAGE FIXED SPEED (or variable speed) ROTARY SCREW COMPRESSOR or EQUAL, with the following salient characteristics:
• at least 40HP (30kW)
• at least 192 CFM @ 125 PSIG
• 460V/3PH/ 60Hz (Less Enclosure)
• Water-Cooled Heat Exchanger
• Wye-Delta Reduced Volt Start
• With Starter
• Zero Risk of Contamination
• ODP High Efficiency Motor
• Full Synthetic oil with at least 8000 Hours lifetime comparable to the AEON 9000SP 8000 Hour Lube STD
• 80°C (176°F) Mixing Valve Temp (with Water Temp Regulator, Water Shutoff Valve, and Moisture Separator)
3. Provide material needed for installation tie in / cut over.
4. Complete discharge, cooling water and condensate piping tie-in to new unit and verify proper flow rates.
5. Tie new air compressor into existing electrical and verify proper voltage/amperage received.
6. Verify all hook ups and test unit for proper operation as designed.
7. Provide notification when all systems are operating as designed and work is complete.
8. Provide onsite end user training for the new equipment.
9. Provide user manuals and warranty registration.
10. By American Act Compliant
4.0 Deliverables / Schedule
1. The Contractor shall notify the USDA ARS ERRC representative when work is complete and before invoicing.
Timothy.Toal Highlight
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Deliverables / Schedule |
| 1. The Contractor shall notify the USDA ARS area office representative when work is complete and before invoicing. |
File details come from the government source that posted it. Updated .