Facility O&M
Year One – Facility Operations and Maintenance Services
| Service Contract Act (SCA) and Collective Bargaining Agreement (CBA) |
| Provide the SCA or CBA Labor Category selected to meet the contract Labor Category. |
| Provide a fully burdened labor rate for the categories provided and any subcontractor rates that may be required in order to perform any work required in performance of this contract IAW Sections C.1 through C.2.4.17 excluding Section C.2.4.13 for Snow Removal |
| Labor Category | SCA/CBA Labor Category | Estimated Hours | SCA or CBA | Fully Burdened Hourly Rate | Total Price |
| Off-Site Project Manager | 2080 | $0.00 | $0.00 | ||
| Lead Engineer | 2080 | CBA | $0.00 | $0.00 | |
| Engineer | 1560 | CBA | $0.00 | $0.00 | |
| General Maintenance Worker | 393 | CBA | $0.00 | $0.00 |
| Total Price | |
| Subcontractor Totals | $0.00 |
| Material Totals | $0.00 |
Year One Total $0.00
Year Two – Facility Operations and Maintenance Services
| Service Contract Act (SCA) and Collective Bargaining Agreement (CBA) |
| Provide the SCA or CBA Labor Category selected to meet the contract Labor Category. |
| Provide a fully burdened labor rate for the categories provided and any subcontractor rates that may be required in order to perform any work required in performance of this contract IAW Sections C.1 through C.2.4.17 excluding Section C.2.4.13 for Snow Removal |
| Labor Category | SCA/CBA Labor Category | Estimated Hours | SCA or CBA | Fully Burdened Hourly Rate | Total Price |
| Off-Site Project Manager | 2080 | $0.00 | $0.00 | ||
| Lead Engineer | 2080 | CBA | $0.00 | $0.00 | |
| Engineer | 1560 | CBA | $0.00 | $0.00 | |
| General Maintenance Worker | 393 | CBA | $0.00 | $0.00 |
| Total Price | |
| Subcontractor Totals | $0.00 |
| Material Totals | $0.00 |
| Year Two Total | $0.00 |
| Year Three – Facility Operations and Maintenance Services |
| Service Contract Act (SCA) and Collective Bargaining Agreement (CBA) |
| Provide the SCA or CBA Labor Category selected to meet the contract Labor Category. |
| Provide a fully burdened labor rate for the categories provided and any subcontractor rates that may be required in order to perform any work required in performance of this contract IAW Sections C.1 through C.2.4.17 excluding Section C.2.4.13 for Snow Removal |
| Labor Category | SCA/CBA Labor Category | Estimated Hours | SCA or CBA | Fully Burdened Hourly Rate | Total Price |
| Off-Site Project Manager | 2080 | $0.00 | $0.00 | ||
| Lead Engineer | 2080 | CBA | $0.00 | $0.00 | |
| Engineer | 1560 | CBA | $0.00 | $0.00 | |
| General Maintenance Worker | 393 | CBA | $0.00 | $0.00 |
| Total Price | |
| Subcontractor Totals | $0.00 |
| Material Totals | $0.00 |
| Year Three Total | $0.00 |
| Year Four – Facility Operations and Maintenance Services |
| Service Contract Act (SCA) and Collective Bargaining Agreement (CBA) |
| Provide the SCA or CBA Labor Category selected to meet the contract Labor Category. |
| Provide a fully burdened labor rate for the categories provided and any subcontractor rates that may be required in order to perform any work required in performance of this contract IAW Sections C.1 through C.2.4.17 excluding Section C.2.4.13 for Snow Removal |
| Labor Category | SCA/CBA Labor Category | Estimated Hours | SCA or CBA | Fully Burdened Hourly Rate | Total Price |
| Off-Site Project Manager | 2080 | $0.00 | $0.00 | ||
| Lead Engineer | 2080 | CBA | $0.00 | $0.00 | |
| Engineer | 1560 | CBA | $0.00 | $0.00 | |
| General Maintenance Worker | 393 | CBA | $0.00 | $0.00 |
| Total Price | |
| Subcontractor Totals | $0.00 |
| Material Totals | $0.00 |
| Year Four Total | $0.00 |
| Year Five – Facility Operations and Maintenance Services |
| Service Contract Act (SCA) and Collective Bargaining Agreement (CBA) |
| Provide the SCA or CBA Labor Category selected to meet the contract Labor Category. |
| Provide a fully burdened labor rate for the categories provided and any subcontractor rates that may be required in order to perform any work required in performance of this contract IAW Sections C.1 through C.2.4.17 excluding Section C.2.4.13 for Snow Removal |
| Labor Category | SCA/CBA Labor Category | Estimated Hours | SCA or CBA | Fully Burdened Hourly Rate | Total Price |
| Off-Site Project Manager | 1734 | $0.00 | $0.00 | ||
| Lead Engineer | 1734 | CBA | $0.00 | $0.00 | |
| Engineer | 1300 | CBA | $0.00 | $0.00 | |
| General Maintenance Worker | 328 | CBA | $0.00 | $0.00 |
| Total Price | |
| Subcontractor Totals | $0.00 |
| Material Totals | $0.00 |
| Year Five Total | $0.00 |
| Year Five – Phase in/Phase out Services |
| Service Contract Act (SCA) and Collective Bargaining Agreement (CBA) |
| Provide the SCA or CBA Labor Category selected to meet the contract Labor Category. |
| Provide a fully burdened labor rate for the categories provided and any subcontractor rates that may be required in order to perform any work required in performance of this contract IAW Sections C.2.4.18 Contractor Transition |
| Labor Category | SCA/CBA Labor Category | Estimated Hours | SCA or CBA | Fully Burdened Hourly Rate | Total Price |
| Off-Site Project Manager | 347 | $0.00 | $0.00 | ||
| Lead Engineer | 347 | CBA | $0.00 | $0.00 | |
| Engineer | 260 | CBA | $0.00 | $0.00 |
| Total Price | |
| Subcontractor Totals | $0.00 |
| Material Totals | $0.00 |
Year Five Total $0.00
Material
| Year One - Materials | ||
| Provide pricing total for materials listed in PWS APPENDIX I: Furnished Supplies | ||
| Description | Quantity | Total Price |
| Materials | ||
| Air Filters | 859 | |
| Air Handler Belts | 94 | |
| Exhaust Fan Belts | 40 | |
| Filtrine Drinking Water System | 38 | |
| LED Light Bulbs | 3660 | |
| Year Two - Materials | ||
| Provide pricing total for materials listed in PWS APPENDIX I: Furnished Supplies | ||
| Description | Quantity | Total Price |
| Materials | ||
| Air Filters | 859 | |
| Air Handler Belts | 94 | |
| Exhaust Fan Belts | 40 | |
| Filtrine Drinking Water System | 38 | |
| LED Light Bulbs | 3660 | |
| Year Three - Materials | ||
| Provide pricing total for materials listed in PWS APPENDIX I: Furnished Supplies | ||
| Description | Quantity | Total Price |
| Materials | ||
| Air Filters | 859 | |
| Air Handler Belts | 94 | |
| Exhaust Fan Belts | 40 | |
| Filtrine Drinking Water System | 38 | |
| LED Light Bulbs | 3660 | |
| Year Four - Materials | ||
| Provide pricing total for materials listed in PWS APPENDIX I: Furnished Supplies | ||
| Description | Quantity | Total Price |
| Materials | ||
| Air Filters | 859 | |
| Air Handler Belts | 94 | |
| Exhaust Fan Belts | 40 | |
| Filtrine Drinking Water System | 38 | |
| LED Light Bulbs | 3660 | |
| Year Five - Materials | ||
| Provide pricing total for materials listed in PWS APPENDIX I: Furnished Supplies | ||
| Description | Quantity | Total Price |
| Materials | ||
| Air Filters | 859 | |
| Air Handler Belts | 94 | |
| Exhaust Fan Belts | 40 | |
| Filtrine Drinking Water System | 38 | |
| LED Light Bulbs | 3660 |
Additional Task Work
Year One – Additional Task Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 120 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 120 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 80 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 120 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 75 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 165 | $0.00 | $0.00 | |
| Boiler Tender | 40 | $0.00 | $0.00 |
Total Work Year One $0.00
Year Two – Additional Task Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 120 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 120 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 80 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 120 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 75 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 165 | $0.00 | $0.00 | |
| Boiler Tender | 40 | $0.00 | $0.00 |
Total Work Year Two $0.00
Year Three – Additional Task Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 120 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 120 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 80 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 120 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 75 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 165 | $0.00 | $0.00 | |
| Boiler Tender | 40 | $0.00 | $0.00 |
Total Work Year Three $0.00
Year Four – Additional Task Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 120 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 120 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 80 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 120 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 75 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 165 | $0.00 | $0.00 | |
| Boiler Tender | 40 | $0.00 | $0.00 |
Total Work Year Four $0.00
Year Five – Additional Task Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 120 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 120 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 80 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 120 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 75 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 165 | $0.00 | $0.00 | |
| Boiler Tender | 40 | $0.00 | $0.00 |
Total Work Year Five $0.00
Emergency Work
Year One – Emergency Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 80 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 80 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 40 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 80 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 80 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 80 | $0.00 | $0.00 | |
| Boiler Tender | 80 | $0.00 | $0.00 |
Total Work Year One $0.00
Year Two – Emergency Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 80 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 80 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 40 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 80 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 80 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 80 | $0.00 | $0.00 | |
| Boiler Tender | 80 | $0.00 | $0.00 |
Total Work Year Two $0.00
Year Three – Emergency Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 80 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 80 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 40 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 80 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 80 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 80 | $0.00 | $0.00 | |
| Boiler Tender | 80 | $0.00 | $0.00 |
Total Work Year Three $0.00
Year Four – Emergency Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 80 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 80 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 40 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 80 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 80 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 80 | $0.00 | $0.00 | |
| Boiler Tender | 80 | $0.00 | $0.00 |
Total Work Year Four $0.00
Year Five – Emergency Work
Provide a fully burdened labor rate for the categories that may be required in order to perform any additional task work required in performance of this contract IAW Section C.3 of the PWS. Either Attachment 2 - Collective Bargaining Agreement or Attachment 5 - SCA Wage Determination are applicable to these labor categories
| Item No. | Labor Category | Estimated Hours | Fully Burdened Hourly Rate | Total Price |
| Project Manager | 80 | $0.00 | $0.00 | |
| Lead Engineer (CBA) | 40 | $0.00 | $0.00 | |
| Engineer (CBA) | 40 | $0.00 | $0.00 | |
| General Maintenance Worker (CBA) | 80 | $0.00 | $0.00 | |
| Laborer, Grounds Maintenance | 40 | $0.00 | $0.00 | |
| Tractor Operator | 40 | $0.00 | $0.00 | |
| Electrician, Maintenance | 80 | $0.00 | $0.00 | |
| HVAC Mechanic (CBA) | 80 | $0.00 | $0.00 | |
| Fire Alarm System Mechanic | 40 | $0.00 | $0.00 | |
| Plumber, Maintenance | 80 | $0.00 | $0.00 | |
| Boiler Tender | 80 | $0.00 | $0.00 |
Total Work Year Five $0.00
Snow Removal Year One – Snow Removal Services (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any reimbursable work required in performance of this contract IAW Section C.2.4.13 of the PWS.
| Item No. | Snow Removal Areas | Estimated Hours | Unit | Fully Burdened Hourly Rate/Price Per Unit |
| Pick-up w/snow blade | 40 | Hour | $0.00 | |
| Large Truck with Salt Spreader | 25 | Hour | $0.00 | |
| Skidsteer w/bucket or snow pusher | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/bucket | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/pusher | 5 | Hour | $0.00 | |
| Large 12-Wheel Dump Truck for Hauling Snow/Salt | 10 | Hour | $0.00 | |
| Laborer - By Hand Removal | 75 | Hour | $0.00 | |
| Salt Per Bag Used | 300 | Bag | $0.00 |
Total Work Year One $0.00
Year Two – Snow Removal Services (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any reimbursable work required in performance of this contract IAW Section C.2.4.13 of the PWS.
| Item No. | Snow Removal Areas | Estimated Hours | Unit | Fully Burdened Hourly Rate/Price Per Unit |
| Pick-up w/snow blade | 40 | Hour | $0.00 | |
| Large Truck with Salt Spreader | 25 | Hour | $0.00 | |
| Skidsteer w/bucket or snow pusher | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/bucket | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/pusher | 5 | Hour | $0.00 | |
| Large 12-Wheel Dump Truck for Hauling Snow/Salt | 10 | Hour | $0.00 | |
| Laborer - By Hand Removal | 75 | Hour | $0.00 | |
| Salt Per Bag Used | 300 | Bag | $0.00 |
Total Work Year Two $0.00
Year Three – Snow Removal Services (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any reimbursable work required in performance of this contract IAW Section C.2.4.13 of the PWS.
| Item No. | Snow Removal Areas | Estimated Hours | Unit | Fully Burdened Hourly Rate/Price Per Unit |
| Pick-up w/snow blade | 40 | Hour | $0.00 | |
| Large Truck with Salt Spreader | 25 | Hour | $0.00 | |
| Skidsteer w/bucket or snow pusher | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/bucket | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/pusher | 5 | Hour | $0.00 | |
| Large 12-Wheel Dump Truck for Hauling Snow/Salt | 10 | Hour | $0.00 | |
| Laborer - By Hand Removal | 75 | Hour | $0.00 | |
| Salt Per Bag Used | 300 | Bag | $0.00 |
Total Work Year Three $0.00
Year Four – Snow Removal Services (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any reimbursable work required in performance of this contract IAW Section C.2.4.13 of the PWS.
| Item No. | Snow Removal Areas | Estimated Hours | Unit | Fully Burdened Hourly Rate/Price Per Unit |
| Pick-up w/snow blade | 40 | Hour | $0.00 | |
| Large Truck with Salt Spreader | 25 | Hour | $0.00 | |
| Skidsteer w/bucket or snow pusher | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/bucket | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/pusher | 5 | Hour | $0.00 | |
| Large 12-Wheel Dump Truck for Hauling Snow/Salt | 10 | Hour | $0.00 | |
| Laborer - By Hand Removal | 75 | Hour | $0.00 | |
| Salt Per Bag Used | 300 | Bag | $0.00 |
Total Work Year Four $0.00
Year Five – Snow Removal Services (Service Contract Act (SCA))
Provide a fully burdened labor rate for the categories that may be required in order to perform any reimbursable work required in performance of this contract IAW Section C.2.4.13 of the PWS.
| Item No. | Snow Removal Areas | Estimated Hours | Unit | Fully Burdened Hourly Rate/Price Per Unit |
| Pick-up w/snow blade | 40 | Hour | $0.00 | |
| Large Truck with Salt Spreader | 25 | Hour | $0.00 | |
| Skidsteer w/bucket or snow pusher | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/bucket | 5 | Hour | $0.00 | |
| Rubber Tire Loader w/pusher | 5 | Hour | $0.00 | |
| Large 12-Wheel Dump Truck for Hauling Snow/Salt | 10 | Hour | $0.00 | |
| Laborer - By Hand Removal | 75 | Hour | $0.00 | |
| Salt Per Bag Used | 300 | Bag | $0.00 |
Total Work Year Five $0.00