1232SA22Q0006 Amendment 0001.pdf

PDF 208 KB Posted

Attached to
Network Cabling and Data Port Installation Federal contract opportunity
Solicitation number
1232SA22Q0006
Issued by
Department of Agriculture Agricultural Research Service

View the file

Other files for this federal contract opportunity

Other files attached to Network Cabling and Data Port Installation, newest first.
File Type Posted
1232SA22Q0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1232SA22Q0006

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-1232SA

BELTSVILLE MD 20705

RM 3-2102

5601 SUNNYSIDE AVENUE

USDA ARS ACQUISITION AND PROPERTY D

12/13/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

12/13/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0001 to solicitation 1232SA22Q0006 is to provide Government responses to Contractor questions. All other terms and conditions remain applicable and unchanged. The quote due date remains Monday, December 27, 2021 at 2:00 PM Eastern Time.

Period of Performance: 12/31/2021 to 12/30/2022

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JESSICA A. EDWARDS

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Question 1: We are hoping to find out if there is (was) an incumbent contractor performing these services, or if this is a brand-new contract. If there is an incumbent, could you please provide the current / previous contract number?

Answer 1: This is a new service and there is no incumbent contractor.

Question 2: I was reaching out to see if there were any drawings of the construction plans. I do see the building location in the attachment. Could you advise if these are available?

Answer 2: Any blueprints we have were included in the contract request for quote.

Question 3: We have a couple questions per Blueprint Visio attachment.

Contractor will install 2 data/LAN ports in each workstation/office total of 338.

-2 data/ 2 lan= 4 drops per workstation/office?

For above question per phase 1 asks for 40 drops. With 8 cubicles (32x), 3 offices (12x), and 1

Lab (4) = (48) drops

Phase I Cubes drops office-5219 1 4 office-5221 1 4 office-5223 1 4 cubes-5225 4 16 lab-5220 1 4 cubes-5222 2 8 cubes-5224 2 8

Per the scope of this project, are drops firm in count (40) or be adjusted as per allocation (48)?

Answer 3: See attached spreadsheet for a listing of all required drops.

Question 4 (Follow-up to question 3): For above question per phase 1 asks for 40 drops. With

8 cubicles (32x), 2 offices (8x), and 1 Lab (4) = (44) drops...

Which locations will not receive drops (5219 or 5220)? There are 4 open offices, 3 offices have cubes.

Answer 4: All cubicles/desks will need the drops and an ethernet cable.

Question 5: Are we going to remove all old existing cables from the ceilings and patch panels or the cables will be abandoned in the ceilings and patch panels?

Answer 5: The contractor shall remove the old cables and patch panels.

Question 6: Are the new patch panels for the new drops will be mount on the existing old racks where all existing cables are right now?

Answer 6: The new patch panels will need to go where the cubicles are going to located after the renovation. There will be some major changes to the floorplans, so the existing racks may not be able to be used.

Question 7: Is the new cables will be the same color of the existing cables to match? Or different color of cable will be install to be easy to ID the new drops?

Answer 7: The old cables shall be removed.

Question 8: Are there existing patch panels to be utilized, or is the contractor responsible for supplying any necessary patch panels?

Answer 8: The contractor shall provide all new cabling and shall provide any required patch panels.

Question 9: Will the contractor be responsible for any demolition or removal of old cabling?

Answer 9: Yes.

Question 10: Is the designated pathway to the cubicles dropping down from the ceiling or coming up from the floor?

Answer 10: The ceiling.

Question 11: Is there an existing cable tray in the ceiling that can be utilized, or will the contractor be responsible for installing new pathways or J-Hooks?

Answer 11: There are existing cable trays. However, the condition is unknown and the contractor shall not assume they are usable.

Question 12: If holes in the walls need to be made or modified, do we need to obtain architectural/engineering/historical reviews?

Answer 12: No reviews will be needed. The space will undergo a major renovation.

Question 13: Can we demo old cables first? Before new cables are run ? will someone be available to identify cables to be demolished?

Answer 13: There will be building IT staff available to help identify the cables to be removed.

The order of demolition/installation is up to the contractor.

Question 14: Is there a timetable for employees to return/ occupy offices? Lag time between construction/ remodel and employee return?

Answer 14: None that will impact this contract.

Question 15: Will the offices be occupied during the new cable install?

Answer 15: No

Question 16: If asbestos is found who does abatement?

Answer 16: Asbestos abatement is being handled by the South Building facilities staff and is no longer present in this space.

Question 17: Is surface mount conduit / Panduit style required?

Answer 17: Cabling will come from ceiling and be hidden.

Question 18: Can you provide a furniture plan or break out of how many drops per room?

Answer 18: The break out of how many drops per room has been provided. A furniture plan will be provided at a later date to the awardee.

Question 19: Are we dropping the Cat6 to just the face plate? Or, are we required to provide patch cables from the face plate to the desks within the office spaces?

Answer 19: Cables are to be run to the desks.

Question 20: We intend to provide patch panels and cable management. Are the switches and racks/rack space government furnished?

Answer 20: Switches and racks shall be provided by the contractor.

Question 21: What standard are we to follow (i.e. BICSI/ANSI)?

Answer 21: ANSI

Phase Room(s) Cubes Data Drops LAN Drops Total Drops Notes 1 5219 3 0 0 0 Secure Data Lab. Room must be Air-Gapped (i.e. no internet or LAN access).

1 5221 0 0 0 0 Secure egress for 5219 and 5223. Will not be used as office space.

1 5223 3 6 0 6 Secure Data Lab. Room requires internet access but LAN access is prohibited.

1 5225/5227/5229 8 16 16 32 3 Door Suite, standard drops.

Total 14 22 16 38

2 5202/5204 0 0 0 0 Break Room. No Data Drops or LAN Feeds.

2 5206 1 2 2 4 Single Office, standard drops.

2 5208/5210/5212 8 16 16 32 3 Door Suite, standard drops.

2 5214/5216/5218 8 16 16 32 3 Door Suite, standard drops.

2 5101 1 2 2 4 Single Office, standard drops.

2 5001 1 2 2 4 Single Office, standard drops.

Total 19 38 38 76

3 5203 1 2 2 4 Single Office, standard drops.

3 5205 1 2 2 4 Single Office, standard drops.

3 5207/5209/5211 8 16 16 32 3 Door Suite, standard drops.

3 5213/5215/5217 8 16 16 32 4 Door Suite, standard drops.

Total 18 36 36 72

4 5008 1 2 2 4 Single Office, standard drops.

4 5010 1 2 2 4 Single Office, standard drops.

4 5212/5214 2 4 4 8 Double Office, standard drops.

4 5216/5218 1 2 2 4 Single Office, standard drops.

4 5020 1 2 2 4 Single Office, standard drops.

Total 6 12 12 24

5 5231/5233/5235 6 12 12 24 2 Door Suite, standard drops.

5 5239/5239 6 12 12 24 2 Door Suite, standard drops.

5 5241/5243 6 12 12 24 2 Door Suite, standard drops.

5 5245/5247 6 12 12 24 2 Door Suite, standard drops.

Total 24 48 48 96

6 5220/5222/5224 8 16 16 32 3 Door Suite, standard drops.

6 5226/5228/5230 7 14 14 28 3 Door Suite, standard drops.

6 5232 1 2 2 4 Single Office, standard drops.

6 5234/5236 1 1 0 1 Secure VTC, data drop to monitors, no LAN access.

Total 17 33 32 65

7 5238/5240 1 1 0 1 Secure VTC, data drop to monitors, no LAN access.

7 5242 1 2 2 4 Single Office, standard drops.

7 5244 1 2 2 4 Single Office, standard drops.

7 5246/5248/5250/5252 12 24 24 48 4 Door Suite, standard drops.

Total 15 29 28 57

8 5003/5005 1 1 0 1 Secure VTC, data drop to monitors, no LAN access.

8 5007/5009/5011/5013 14 28 28 56 4 Door Suite, standard drops.

8 5017 1 2 2 4 Single Office, standard drops.

8 5019 1 2 2 4 Single Office, standard drops.

8 5021 1 2 2 4 Single Office, standard drops.

Total 18 35 34 69

Grand Total 114 220 212 432