(x)

1232SA19B0004

x x

5 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-1232SA

BELTSVILLE MD 20705

RM 3-2102

5601 SUNNYSIDE AVENUE

USDA ARS ACQUISITION AND PROPERTY D

09/16/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/27/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to incorporate RFI responses into the solicitation. There is no time extension as a result of this extension.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STEPHEN STOLTE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

RFI Responses for GSWRL Riesel

QUESTION ANSWER

Attachment A (proposal cover sheet) and Attachment B (experience in relevant projects) do not appear to have been included in the solicitation PDF file. Please provide these attachments so that we can complete our Step One Technical Proposal.

Attachments added. Note, as stated in paragraph

5.1.1 (General) Offerors are not required to use the form itself as part of their proposal, but the information requested on the form must be in the offeror’s proposal and should be in the same format as the form.

The first paragraph in Subsection 5.2.4 mentions a project manager, but not a project engineer.

The next paragraph mentions a project engineer, but not a project manager. Are the project manager and the project engineer the same position?

The two terms are meant to be interchangeable.

For clarity, the reference to project engineer should be changed to project manager.

Should the Representations and Certifications section be provided in offerors’ Step One Technical Proposals?

Yes. Please refer to paragraph K.2 "Annual Representations and Certifications"

Subsection 6.1 instructs offerors to “provide a letter of commitment and authorization form from each proposed key subcontractor.” Are the letter and commitment and authorization form two separate things or can this information be combined in one letter of commitment that is signed by an authorized representative? If the “authorization form” is something different from the letter of commitment, please clarify what this form should include.

This information can be provided in one document.

ATTACHMENT A

PROPOSAL COVER SHEET

1. Name, Address, and DUNS Number of Prime Contractor

2. Telephone Number:

3. Solicitation Number:

4. Title of Project:

5. Name and Title of Person Authorized to Sign Bid: Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

6. Names, titles, and telephone and email addresses of persons authorized to negotiate on the bidder’s behalf with the Government in connection with this solicitation:

7. The bidder agrees to perform the required work according to the proposed technical approach in strict accordance with the terms and conditions of this solicitation.

8. Signature:_______________________________________________

9. Bid Date: _______________________________________________

10. Amendments (Number & Date of Acknowledgement):

ATTACHMENT B

Experience in Relevant Projects

<<Picture>>

Prime Contractor’s Name (Who performed the work?):

Project Title: Project Location:

City, State

Project Owner: Point of contact information (owner name, POC name, address, and phone minimum) If Government Contract, additionally provide the contract number and contracting office)

Scope Description: Provide a description of the project. Include features that are comparable in type or nature to the solicited project.

Narrative Explanation of Relevancy to the solicited project (Bullets are not permitted):

Narrative Explanation of Management and Control of Project providing explanation of the prime contractor’s role and approach to managing and controlling project start to completion.

Problems encountered and solutions developed during project performance:

Lessons learned:

Project Size: XXX,XXX Lost Time Accidents:

Schedule:

Start Date:

MM-DD-YYYY

Original Completion:

MM-DD-YYYY

Final Contract Completion:

MM-DD-YYYY

Beneficial Occupancy Date:

MM-DD-YYYY

Cost Original Project Cost:

Final Project Cost:

Cost Difference

*Original Subcontractor Cost:

*Final Subcontractor Cost:

*Cost Difference

Cost and Time Growth Discussion: Reason(s) for differences between original and final schedule or costs. This section can be excluded if not applicable to the project. Response should contain more detail than “Owner requested/initiated changes”. Provide examples to support growth.

*Only to be completed if the experience was performed as a subcontractor on the submitted project.

1232SA19B0004 amd 1
RFI Responses for GSWRL Riesel
Sol Attachment A
Sol Attachment B

File details come from the government source that posted it.