1232SA19B0003_AMD_01.pdf
PDF 521 KB Posted
- Attached to
- Modernization of the Grassland, Soil, and Water Research Laboratory (GSWRL) in Temple, Texas.
- Solicitation number
- 1232SA19B0003
About this file
This document provides details for a federal contract opportunity to modernize the Grassland, Soil, and Water Research Laboratory in Temple, Texas. The U.S. Department of Agriculture Agricultural Research Service intends to issue a two-step invitation for bids for the project, which includes renovating approximately 35,000 square feet of administrative and laboratory space, demolishing and replacing a greenhouse with a new 6,000 square foot research building addition. The period of performance is approximately 630 calendar days after notice to proceed. The estimated value of construction is over $10 million. The NAICS code is 236220 and it is a total small business set-aside. Bids are due around July 2, 2019 and award will be to the responsive, responsible bidder offering the lowest price meeting the technical acceptability criteria. The contract will require the use of biobased products when reasonably available and designated through the USDA BioPreferred Program.
Amendment 1 - RFIs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1232SA19B0003_GSWRL_Temple_Solicitation_Step_1.pdf | ||
| Temple_sign_in.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Responses for GSWRL Temple
QUESTION ANSWER
Attachment A (proposal cover sheet) and Attachment B (experience in relevant projects) do not appear to have been included in the solicitation PDF file. Please provide these attachments so that we can complete our Step One Technical Proposal.
Attachments added. Note, as stated in paragraph
5.1.1 (General) Offerors are not required to use the form itself as part of their proposal, but the information requested on the form must be in the offeror’s proposal and should be in the same format as the form.
The first paragraph in Subsection 5.2.5 mentions a project manager, but not a project engineer.
The next paragraph mentions a project engineer, but not a project manager. Are the project manager and the project engineer the same position?
The two terms are meant to be interchangeable.
For clarity, the reference to project engineer should be changed to project manager.
ATTACHMENT A
PROPOSAL COVER SHEET
1. Name, Address, and DUNS Number of Prime Contractor
2. Telephone Number:
3. Solicitation Number:
4. Title of Project:
5. Name and Title of Person Authorized to Sign Bid: Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
6. Names, titles, and telephone and email addresses of persons authorized to negotiate on the bidder’s behalf with the Government in connection with this solicitation:
7. The bidder agrees to perform the required work according to the proposed technical approach in strict accordance with the terms and conditions of this solicitation.
8. Signature:_______________________________________________
9. Bid Date: _______________________________________________
10. Amendments (Number & Date of Acknowledgement):
ATTACHMENT B
Experience in Relevant Projects
<<Picture>>
Prime Contractor’s Name (Who performed the work?):
Project Title: Project Location:
City, State
Project Owner: Point of contact information (owner name, POC name, address, and phone minimum) If Government Contract, additionally provide the contract number and contracting office)
Scope Description: Provide a description of the project. Include features that are comparable in type or nature to the solicited project.
Narrative Explanation of Relevancy to the solicited project (Bullets are not permitted):
Narrative Explanation of Management and Control of Project providing explanation of the prime contractor’s role and approach to managing and controlling project start to completion.
Problems encountered and solutions developed during project performance:
Lessons learned:
Project Size: XXX,XXX Lost Time Accidents:
Schedule:
Start Date:
MM-DD-YYYY
Original Completion:
MM-DD-YYYY
Final Contract Completion:
MM-DD-YYYY
Beneficial Occupancy Date:
MM-DD-YYYY
Cost Original Project Cost:
Final Project Cost:
Cost Difference
*Original Subcontractor Cost:
*Final Subcontractor Cost:
*Cost Difference
Cost and Time Growth Discussion: Reason(s) for differences between original and final schedule or costs. This section can be excluded if not applicable to the project. Response should contain more detail than “Owner requested/initiated changes”. Provide examples to support growth.
*Only to be completed if the experience was performed as a subcontractor on the submitted project.
| 1232SA19B0003 1442 amd 1 |
| RFI Responses for GSWRL Temple |
| Sol Attachment A |
| Sol Attachment B |