12318723R0002-0001.pdf
PDF 792 KB Posted
- Solicitation number
- 12318723R0002
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12318723R0002-Amendment 0003.pdf | ||
| 12318723R0002-0002.pdf | ||
| Attachment 3 - IP Services - QASP.docx | DOCX document | |
| Attachment 2 -Past Performance Questionnaire.pdf | ||
| Attachment 1- Sample Task Order - Laos.pdf | ||
| 12318723R0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12318723R0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20250-1138
1400 INDEPENDENCE AVE SW MS-1138
AQM PROC PROPERTY
USDA FOREST SERVICE
11/14/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/14/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is written as follows:
a. In anticipation of further amendments to this solicitation on or before December 16, 2022, this version shall now be considered draft and will be extended to the new dates herein to allow for future amendments.
b. Page 41 shall be replaced with the attached new page 41.
Period of Performance: 03/02/2023 to 03/01/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CASSANDRA N. CAREY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Section L – Instructions, Conditions and Notices to Offerors or Respondents This section contains the specific information and instructions needed to prepare a proposal submission for this anticipated award.
L.1.1 Instructions to the Offerors Offerors must comply with the detailed instructions for the format and content of the proposal; if the proposal does not comply with the detailed instructions for the format and content, the proposal may be considered non-responsive and may render the Offeror ineligible for award.
Procurement Milestones
Due Dates
Questions Due By 5 PM ET on December 28, Questions Answered By January 4, 2023
Proposals Due By 5PM ET on January 18, 2023
All questions shall be submitted to Ms. Cassandra Carey at cassandra.carey@usda.gov by the due date above. Please reference the RFP number/name in the subject line. Offers must be submitted electronically to cassandra.carey@usda.gov by the offer due date identified above. Technical and Cost Volumes shall be in separate word processing/data presentation files that are compatible with current Government computer software (i.e., Microsoft Office Suite). The Sample Task Order Cost must be submitted using spreadsheet software that is compatible with Microsoft Excel.
Proposal Format: In order to maximize efficiency and minimize the time for proposal evaluation, it is required that the Offeror submit the proposal in accordance with the format and content specified herein.
8.5 x 11 inch paper. Single-spaced typed lines . 1 inch margins. Commonly available type-face font not less than 11-point size to ensure the Proposal is legible. No hyperlinks.
Page Numbering: The Offeror shall use a standard page numbering system to facilitate proposal references. Charts, graphs and other insert materials shall be page-numbered as part of the page numbering system.
Page Limitations: Page limitations are identified for each volume/section of the proposal below and should be treated as maximums. If exceeded, excess pages will not be read or considered in proposal evaluation. Included in the page count are separate pages providing graphics, charts, illustrations and pictures.
| 2022-11-21T14:09:45-0500 | |
| CASSANDRA CAREY |
File details come from the government source that posted it. Updated .