This is a Performance Work Statement (PWS) issued by the U.S. Department of Agriculture for the removal of all furniture, furnishings, and garbage from a dedicated suite (approximately 10,000 square feet) on the third floor of the OGC 3201 Federal Office Building located at 700 West Capitol Avenue, Little Rock, Arkansas 72201. The removal is necessitated by the USDA's reorganization of multiple agencies and relocation of personnel, with facilities being returned to the General Services Administration (GSA).

The Contractor must complete a site visit within four (4) days of contract award to provide the Government with a removal timeframe, coordinating with the Government Point of Contact. The Contractor will then have four (5) days to fully remove all furniture, furnishings, and garbage from the suite, with all work required to be completed by 25 September 2026 and the onsite work commencing 21 September 2026. Upon completion, the Government escort will conduct a 100% empty verification walk-through, after which the Contractor must remove all receptacles the same day. The Contractor is responsible for supplying all receptacles and manpower and must exercise caution to avoid damage beyond normal wear and tear; damage to Government property may result in a monetary deduction from the total contract cost. All travel costs must be included in the firm fixed price quote, with no extraneous costs to be incurred by the Government. No security clearances are required, though personnel must provide identification for day passes, and the Contractor must submit a crew roster prior to work commencement. Performance will be measured by the Government escort's verification that the suite is completely empty of all furniture, furnishings, and garbage, with potential penalties of 1-10% deducted from the total contract cost for each day the work extends beyond the allotted timeframe.

View the file

Other files

File Type Posted
Little Rock Furniture List (003).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Performance Work Statement

Removal of Furniture, furnishings and garbage from OGC 3201 Federal

Office Building, 700w. Capitol Ave, Little Rock, AR 72201

Contents Project Title

General Information

1.0 Background and Purpose

2.0 Definitions

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Deliverable / Schedule

5.0 Government Furnished

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 - Electronic and Information Technology Standards

11.0 Performance Requirement Measures

Attachment ............................................................................................................................................. Error! Bookmark not defined.

Project Title

Furniture, furnishings and garbage removal from the U. S. Dept of Agriculture, Office of General Counsel, 3201 Federal Office Building, 700w. Capitol Ave, Little Rock, AR 72201

General Information

1.0 Background and Purpose

The U.S. Department of Agriculture has executed a reorganization of multiple agencies. These agencies such as the Organization of Defense Counsel (OGC) are in the process of relocating personnel and turning facilities back to the General Services Administration (GSA). To successfully turnover facilities, the buildings must be free and clear of all furniture, furnishings and garbage.

2.0 Definitions

OGC – Office of General Counsel

GSA – Government Services Administration

Contractor Requirements

3.0 Technical Requirements / Tasks

The Contractor’s task is to remove all furniture, furnishings, and garbage from the dedicated suite (about

10,00sqft) on the third floor of building 700 by 25 September 2026. The requirement will be considered complete when the entire suite is totally empty and all receptacles used to haul the furniture, furnishings and garbage are removed from the contracted location.

4.0 Deliverable / Schedule

• Upon execution of award, the Contractor will have four (4) days to perform a site visit to provide the

Government with a timeframe for removal. Contractor will need to coordinate site visit with

Government POC.

• The Contractor will be allotted four (4) or five (5) days to fully remove all furniture, furnishings and garbage from the suite on the third floor of building 700. The Government will walk through the entire suite to verify 100% empty. Once the suite is completely empty, the Contractor will remove all garbage receptacles the same day.

• The Contractor must use caution and care during the removal of furniture, furnishings and garbage.

Normal wear and tear are acceptable; however, anything beyond normal scratches and nicks to walls and doorframes will be addressed as damage to Government property, and a possible monetary % deduction from the total contract cost will be implemented.

Example 1

Key Deliverables

Item

No.

Deliverable Objective Due

1 Removal of furniture/furnishings/garbage

All furniture/furnishings must be removed by 25 September 2026.

No later than five (5) business days after contract award

Insert Deliverables / Schedule Here

Contractor will be onsite on 21 September 2026. An escort will meet them and provide clearance to building

700. There is one suite to be completely cleared of all furniture, furnishings and waste. The Contractor will be responsible for supplying the receptacles and manpower for removal of all items, and the removal of all items must be completed by 25 September 2026.

5.0 Government Furnished

The Government will provide an escort for the facility who will verify each contracted personnel’s identification and provide day passes for the duration of the removal process.

6.0 Travel

If the Contractor is commuting to the D.C. area, the costs of travel must be included in the firm fixed price. No extraneous costs will be incurred by the Government. All expenses must be included in the firm fixed price quote by the Contractor.

7.0 Contractor’s Key Personnel

No security clearance is required. Each person working on this project must provide identification to the

Government building escort so they can provide Contractors with a day pass. Prior to work commencement, the

Contractor will provide a list of names of the project crew so the escort can ensure they are added to the authorized access list.

8.0 Security Requirements

No special security requirements or clearances apply to this contract.

9.0 Data Rights

N/A

10.0 Section 508 - Electronic and Information Technology Standards

N/A

11.0 Performance Requirement Measures

The Government escort will measure the contractor's performance for this requirement by walking through the entire suite to ensure the space is empty, and once all receptables are gone, the deliverables will be considered fully met.

• Performance Requirement Measure and Surveillance:

Performance

Objective

Required Task or Deliverable

Performance Standard Method of

Surveillance

Positive/Negative

Incentive

% for NOT meeting the

Task

Empty suite Entire suite must be completely empty of all furniture, furnishings and garbage.

All rooms in the suite are

100% empty

The escort will ensure the suite is completely empty of furniture, furnishings and garbage.

This is left for customer to decide. If you want to say 1-10% deducted from total contract cost for every day over the allotted timeframe.

File details come from the government source that posted it. Updated .