Dwg 2 - Zinc Ortho Inj Syst.pdf

PDF 12 MB Posted

Attached to
Zinc Orthophosphate Injection System
Solicitation number
12305B24R0041
Issued by

About this file

This document is a Request for Proposals (RFP) for a Zinc Orthophosphate Injection System at the USDA Agricultural Research Service's Beltsville, MD facility. The solicitation, number 12305B24R0041, is a total small business set-aside with a NAICS code of 236220 (Commercial and Institutional Building Construction) and a size standard of $45 million. The work includes installation, startup, testing, utility work, demolition, and a prefabricated building. The period of performance is 252 days after receipt of the Notice to Proceed. Bonds are required for awards over $150,000. A site visit on August 5 and 8, 2024 is optional but encouraged. Questions are due by August 23, 2024, and the contract will be awarded on a Lowest Price Technically Acceptable (LPTA) basis as a Firm-Fixed Price order. The procurement requires the use of biobased and recycled products to the extent feasible.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

..\Resources\Elements\1995-20 - Edited.tiff

A

B

C

D

DESIGN:

DRAWN:

REVIEW:

SHEET

SUBMITTAL

DESIGNER

REVISIONS

PROFESSIONAL SEAL

1 2 3 4

MACON, GEORGIA 31201

440 MARTIN LUTHER KING JR BLVD

478·743·8415

CN 9554

BARC

Zinc Orthophosphate Injection System

RAMBOLL AMERICAS

ENGINEERING SOLUTIONS, INC.

N. VENKATESAN

P. WOLF

N. VENKATESAN

AS-BID -

MARCH 2024

EX. GENERATOR

EX. TRANSFORMER

30 GAL DRUM SPILL CONTAINMENT PALLET

PROPOSED CONNECTION POINT IN VERTICAL.

SEE DETAIL, THIS SHEET.

2 CONNECTION DETAIL

NOT TO SCALE

PLAN VIEW

4'4'

SCALE: 1/4"=1'-0'

EX. FLOW METER

PROPOSED ZINC

ORTHOPHOSPHATE

INJECTION POINT

MECHANICAL

PLAN

M-101

EX. WALL MOUNTED HVAC UNIT

'-0

10'-0"

CONTAINMENT BLADDER STORAGE

SPILL CONTAINMENT BOUNDS

SEE NOTE 5

RELOCATED 6" DI SURGE RELIEF DISCHARGE

WALL MOUNTED METERING

PUMP (TYP. OF 2)

MOUNTED 5' AFF

APPROX. EYE WASH SHOWER

LOCATION, SEE HP-101 FOR FINAL

LOCATION

1/2" ZINC ORTHOPHOSPHATE

FEED PIPING (SEE NOTE 2)

5' ABOVE GRADE

1 CHEMICAL INJECTION DETAIL

NOT TO SCALE

STRUCTURAL FOUNDATION, SEE S-101

PLAN NOTES:

1. SEE SHEET IP-100 FOR CHEMICAL FLOW SCHEMATIC.

2. INSULATE AND HEAT TRACE ALL SMALL DIAMETER CHEMICAL AND WATER

PIPING. SUPPORT PIPING OFF BUILDING WALLS. SLOPE PIPE TOWARDS

THE CHEMICAL FEED DRUM.

3. REMOVE EXISTING CLEANOUT (INV. 132.69±) AND CONNECT TO EXISTING

6" DI LINE. PROVIDE 6" MECHANICAL SLEEVE TYPE COUPLING AT

CONNECTION.

4. ZINC ORTHOPHOSPHATE SYSTEM PIPING SHALL BE SCH. 80 CPVC UNLESS

OTHERWISE NOTED.

5. EXTENTS OF CONTAINMENT BLADDER DEPLOYMENT AREA (66"x66"). TO BE

PAINTED WITH RED BORDER AND YELLOW LINES DIAGONALLY AT 12"

SPACING.

6. CONNECT TO EXISTING 6" LINE VIA 45° BEND. PROVIDE 6" MECHANICAL

SLEEVE COUPLING AT CONNECTION.

2"

TAP EX. WATER LINE

SEE NOTE 3

CLEANOUT, SEE DETAIL THIS SHEET

CLEANOUT, SEE DETAIL THIS SHEET

SEE NOTE 6

CONC. PAD, ROUND OR

SQ = PIPE ID+2'-0"

6"

DI BLIND FLANGE

DRILL AND TAP

FLANGE FOR CAP

SCREWS

FINISHED GRADE

2-#4 BARS,

CONCENTRIC, CENTER

IN SLAB

HAND TAMP BACKFILL

AROUND RISER

SECTION

DI PIPE

THRUST BLOCK

ALL MECH JOINT DI PROCESS

LINE. TEE OR WYE

ORIENTATION AS SHOWN ON

PLANS

DI PExFL CONNECTOR PIECE

NOTE:

RISER SECTION AND ELBOW SAME SIZE AS

PROCESS LINE, UNLESS NOTED OTHERWISE.

3 TYPICAL CLEAN-OUT DETAIL

NOT TO SCALE

LONG RADIUS DI

FLANGED 90-DEG.

BEND OR TEE-WYE

SUPPORT PIPE 5' AFF OFF

BUILDING WALL

EX. 6" SURGE

RELIEF DISCHARGE PROPOSED 6" SURGE

RELIEF DISCHARGE

2' SPOOL MIN.

4 CONNECTION DETAIL

NOT TO SCALE

PROFESSIONAL

CERTIFICATION:

I HEREBY CERTIFY THAT

THESE DOCUMENTS WERE

PREPARED OR APPROVED

BY ME, AND THAT I AM A

DULY LICENSED

PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE

STATE OF MARYLAND,

LICENSE NO.18299,

EXPIRATION DATE

06-13-2025

BARC Zinc Orthophosphate Part 2 of 4 (Mech)
M-101MECHANICAL PLAN
HP-101 HVAC/PLUMBING PLAN
BARC Zinc Orthophosphate Part 3 of 4 (Elect)1
E-101 ELECRRICAL NOTES, SYMBOLS & ABBREVIATIONS
E-102 POWER & CONTROL PLAN EXISITNG BLDG
E-103 PROJECT ELECTRICAL SITE PLAN AND BLDG PLAN
E-104 ELECTRICAL SCHEDULES, RISER DIAGRAM & DETAILS
BARC Zinc Orthophosphate Part 4 of 4 (P&ID)
I-100 PROCESS CONTROL AND INSTRUMENTATION SYMBOLS
IP-100 P&ID ZINC ORTHOPHOSPHATE INJECTION SYSTEM