Dwg 2 - Zinc Ortho Inj Syst.pdf
PDF 12 MB Posted
- Attached to
- Zinc Orthophosphate Injection System
- Solicitation number
- 12305B24R0041
About this file
This document is a Request for Proposals (RFP) for a Zinc Orthophosphate Injection System at the USDA Agricultural Research Service's Beltsville, MD facility. The solicitation, number 12305B24R0041, is a total small business set-aside with a NAICS code of 236220 (Commercial and Institutional Building Construction) and a size standard of $45 million. The work includes installation, startup, testing, utility work, demolition, and a prefabricated building. The period of performance is 252 days after receipt of the Notice to Proceed. Bonds are required for awards over $150,000. A site visit on August 5 and 8, 2024 is optional but encouraged. Questions are due by August 23, 2024, and the contract will be awarded on a Lowest Price Technically Acceptable (LPTA) basis as a Firm-Fixed Price order. The procurement requires the use of biobased and recycled products to the extent feasible.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
..\Resources\Elements\1995-20 - Edited.tiff
A
B
C
D
DESIGN:
DRAWN:
REVIEW:
SHEET
SUBMITTAL
DESIGNER
REVISIONS
PROFESSIONAL SEAL
1 2 3 4
MACON, GEORGIA 31201
440 MARTIN LUTHER KING JR BLVD
478·743·8415
CN 9554
BARC
Zinc Orthophosphate Injection System
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS, INC.
N. VENKATESAN
P. WOLF
N. VENKATESAN
AS-BID -
MARCH 2024
EX. GENERATOR
EX. TRANSFORMER
30 GAL DRUM SPILL CONTAINMENT PALLET
PROPOSED CONNECTION POINT IN VERTICAL.
SEE DETAIL, THIS SHEET.
2 CONNECTION DETAIL
NOT TO SCALE
PLAN VIEW
4'4'
SCALE: 1/4"=1'-0'
EX. FLOW METER
PROPOSED ZINC
ORTHOPHOSPHATE
INJECTION POINT
MECHANICAL
PLAN
M-101
EX. WALL MOUNTED HVAC UNIT
'-0
10'-0"
CONTAINMENT BLADDER STORAGE
SPILL CONTAINMENT BOUNDS
SEE NOTE 5
RELOCATED 6" DI SURGE RELIEF DISCHARGE
WALL MOUNTED METERING
PUMP (TYP. OF 2)
MOUNTED 5' AFF
APPROX. EYE WASH SHOWER
LOCATION, SEE HP-101 FOR FINAL
LOCATION
1/2" ZINC ORTHOPHOSPHATE
FEED PIPING (SEE NOTE 2)
5' ABOVE GRADE
1 CHEMICAL INJECTION DETAIL
NOT TO SCALE
STRUCTURAL FOUNDATION, SEE S-101
PLAN NOTES:
1. SEE SHEET IP-100 FOR CHEMICAL FLOW SCHEMATIC.
2. INSULATE AND HEAT TRACE ALL SMALL DIAMETER CHEMICAL AND WATER
PIPING. SUPPORT PIPING OFF BUILDING WALLS. SLOPE PIPE TOWARDS
THE CHEMICAL FEED DRUM.
3. REMOVE EXISTING CLEANOUT (INV. 132.69±) AND CONNECT TO EXISTING
6" DI LINE. PROVIDE 6" MECHANICAL SLEEVE TYPE COUPLING AT
CONNECTION.
4. ZINC ORTHOPHOSPHATE SYSTEM PIPING SHALL BE SCH. 80 CPVC UNLESS
OTHERWISE NOTED.
5. EXTENTS OF CONTAINMENT BLADDER DEPLOYMENT AREA (66"x66"). TO BE
PAINTED WITH RED BORDER AND YELLOW LINES DIAGONALLY AT 12"
SPACING.
6. CONNECT TO EXISTING 6" LINE VIA 45° BEND. PROVIDE 6" MECHANICAL
SLEEVE COUPLING AT CONNECTION.
2"
TAP EX. WATER LINE
SEE NOTE 3
CLEANOUT, SEE DETAIL THIS SHEET
CLEANOUT, SEE DETAIL THIS SHEET
SEE NOTE 6
CONC. PAD, ROUND OR
SQ = PIPE ID+2'-0"
6"
DI BLIND FLANGE
DRILL AND TAP
FLANGE FOR CAP
SCREWS
FINISHED GRADE
2-#4 BARS,
CONCENTRIC, CENTER
IN SLAB
HAND TAMP BACKFILL
AROUND RISER
SECTION
DI PIPE
THRUST BLOCK
ALL MECH JOINT DI PROCESS
LINE. TEE OR WYE
ORIENTATION AS SHOWN ON
PLANS
DI PExFL CONNECTOR PIECE
NOTE:
RISER SECTION AND ELBOW SAME SIZE AS
PROCESS LINE, UNLESS NOTED OTHERWISE.
3 TYPICAL CLEAN-OUT DETAIL
NOT TO SCALE
LONG RADIUS DI
FLANGED 90-DEG.
BEND OR TEE-WYE
SUPPORT PIPE 5' AFF OFF
BUILDING WALL
EX. 6" SURGE
RELIEF DISCHARGE PROPOSED 6" SURGE
RELIEF DISCHARGE
2' SPOOL MIN.
4 CONNECTION DETAIL
NOT TO SCALE
PROFESSIONAL
CERTIFICATION:
I HEREBY CERTIFY THAT
THESE DOCUMENTS WERE
PREPARED OR APPROVED
BY ME, AND THAT I AM A
DULY LICENSED
PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE
STATE OF MARYLAND,
LICENSE NO.18299,
EXPIRATION DATE
06-13-2025
| BARC Zinc Orthophosphate Part 2 of 4 (Mech) |
| M-101MECHANICAL PLAN |
| HP-101 HVAC/PLUMBING PLAN |
| BARC Zinc Orthophosphate Part 3 of 4 (Elect)1 |
| E-101 ELECRRICAL NOTES, SYMBOLS & ABBREVIATIONS |
| E-102 POWER & CONTROL PLAN EXISITNG BLDG |
| E-103 PROJECT ELECTRICAL SITE PLAN AND BLDG PLAN |
| E-104 ELECTRICAL SCHEDULES, RISER DIAGRAM & DETAILS |
| BARC Zinc Orthophosphate Part 4 of 4 (P&ID) |
| I-100 PROCESS CONTROL AND INSTRUMENTATION SYMBOLS |
| IP-100 P&ID ZINC ORTHOPHOSPHATE INJECTION SYSTEM |
File details come from the government source that posted it. Updated .