Attach 2 Submittal Log Sanitary Sewer Repairs (02MAY24).xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- 12305B24R0010
About this file
This document is a Submittal Log for a Sanitary Sewer Repairs project at the University of Maine in Orono, Maine. The project involves the removal and replacement of an underground sanitary sewer line, replacement of toilets with low-flow units, replacement of floor tile in the men's restroom, and installation of a new cleanout and floor drain.
The project was awarded on May 2, 2024 under Contract Number 12305B24R0010, which was issued by the U.S. Department of Agriculture, Agricultural Research Service, New England Plant, Soil and Water Research Laboratory (NEPSWL) as a Request for Proposals (RFP). The project has a 30-calendar day period of performance. Key submittals required include the construction project schedule, safety plan, security plan, material submittals, shop drawings, O&M manuals, testing results, and warranty information. The project is a Total Small Business Set-Aside under NAICS code 237110, with a $45 million size standard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SUBMITTAL LOG | Status |
| Pending |
| Project Name | Sanitary Sewer Repairs | Award Date | 2-May-24 | |||||
| Address | Portage Road, University of Maine | Project Number | ||||||
| City | Orono | State | ME | Zip | 04469 | Contract Number |
| Line Item Number | Submittal Number | Submittal Date | Specification Number Dwg Number | Specification Name | Item Description | Type Of Submittal | Status | Date Approved/Rejected | Resubmittal Due Date | Remarks | |||||||||||
| P | I | C | |||||||||||||||||||
| R | N | E | O | I | |||||||||||||||||
| O | S | S | R | & | N | ||||||||||||||||
| D | T | S | T | T | M | F | |||||||||||||||
| U | D | R | C | A | I | O | |||||||||||||||
| C | R | U | H | T | R | F | S | R | M | R | |||||||||||
| T | A | C | E | E | E | I | A | E | A | M | |||||||||||
| W | T | D | M | P | C | M | C | N | A | ||||||||||||
| D | I | I | U | E | O | A | P | O | U | T | |||||||||||
| A | N | O | L | N | R | T | L | R | A | I | |||||||||||
| T | G | N | E | T | T | E | E | D | L | O | |||||||||||
| A | S | S | S | S | S | S | S | S | S | N | |||||||||||
| 1 | Division 1 | GENERAL REQUIREMENTS | |||||||||||||||||||
| 2 | 1.1 GENERAL INTENTION | D. Training Records of 10-hour OSHA courses for all project employees; 30-hour OSHA Training for supervisors. | X | ||||||||||||||||||
| 3 | 1.2 PROJECT COORDINATION | A. Construction Project Schedule | X | ||||||||||||||||||
| 4 | 1.2 PROJECT COORDINATION | B. Contract Inspector's Daily Report | X | ||||||||||||||||||
| 5 | 1.4 SAFETY SUBMITTALS | A. | "Site Specific" Safety Plan | X | |||||||||||||||||
| 6 | 1.4 SAFETY SUBMITTALS | C. DAILY INSPECTION FORM | X | ||||||||||||||||||
| 7 | 1.4 SAFETY SUBMITTALS | E. Written notice for High Risk Work (If applicable) | X | ||||||||||||||||||
| 8 | 1.4 SAFETY SUBMITTALS | F. Material Safety Data Sheets (MSDS) | X | ||||||||||||||||||
| 9 | 1.5 CONSTRUCTION SECURITY REQUIREMENTS | A. Security Plan (May be incorporated into Safety Plan) | X | ||||||||||||||||||
| 10 | PWS | MATERIAL SUBMITTALS | |||||||||||||||||||
| 11 | PWS | PVC PIPING AND FITTINGS | X | ||||||||||||||||||
| 12 | SHOP DRAWINGS | X | |||||||||||||||||||
| 13 | FLOOR TILE | X | x | ||||||||||||||||||
| 14 | CLEANOUT | X | |||||||||||||||||||
| 15 | FLOOR DRAIN | X | |||||||||||||||||||
| 16 | O&M MANUALS | X | |||||||||||||||||||
| 17 | TESTING RESULTS | X | |||||||||||||||||||
| 18 | WARRANTY | X |
File details come from the government source that posted it. Updated .