12305B23R00280002.pdf

PDF 128 KB Posted

Attached to
Repair/Replace Reverse Osmosis (RO) Systems Federal contract opportunity
Solicitation number
12305B23R0028
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

About this file

This document contains an amendment to a solicitation for repair and replacement of reverse osmosis systems at two buildings on the Agricultural Research Service campus in Beltsville, Maryland. The amendment provides responses to contractor questions to clarify the statement of work. It confirms the scope involves repairing leaks in the RO system piping in one building and replacing the entire system in the other building. The storage tanks will remain, and isolation valves exist to work on systems by floor and wing. Water testing is required after installation at four locations for one building and three for the other. Access to work areas one floor at a time will be coordinated with the contracting officer's representative. A list of specific rooms and areas receiving new undercounter RO lines is also provided.

The related federal contract opportunity is solicitation number 12305B23R0028 for repair and replacement of the reverse osmosis systems. The work will be performed at buildings on the Agricultural Research Service field campus in Beltsville, Maryland. The agency is the Department of Agriculture.

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Replace Reverse Osmosis (RO) Systems, newest first.
File Type Posted
Attachment 11 - Submittal Register Bldgs 010AB RO System Replacements 22AUG2023.pdf PDF
Attachment 12 - WD Prince George s County MD Building MD20230044 04AUG2023.pdf PDF
Attachment 1 - SOW Bldgs 010AB RO System Replacements 22AUG2023.pdf PDF
12305B23R00280001.pdf PDF
Attachment 1 - SOW Bldgs 010AB RO System Replacements 01AUG2023.pdf PDF
Attachment 12 - WD Prince George s County MD Building MD20230044 28JUL2023.pdf PDF
Attachment 11 - Submittal Register Bldgs 010AB RO System Replacements 01AUG2023.pdf PDF
Attachment 2 - Building 010A P105 Riser Diagrams 15OCT1992.pdf PDF
Attachment 3 - Building 010A P201 Basement Floor Plan 15OCT1992.pdf PDF
Attachment 4 - Building 010A P202 1st Floor Plan 15OCT1992.pdf PDF
Attachment 8 - Building 010B Mechanical Plans 28JUN1996.pdf PDF
Attachment 11 - Submittal Register Bldgs 010AB RO System Replacements 01AUG2023.pdf PDF
Attachment 12 - WD Prince George s County MD Building MD20230044 28JUL2023.pdf PDF
12305B23R0028.pdf PDF
Attachment 1 - SOW Bldgs 010AB RO System Replacements 01AUG2023.pdf PDF
Attachment 6 - Building 010A P204 3rd Floor Plan 15OCT1992.pdf PDF
Attachment 7 - Building 010B Electrical Plans 28JUN1996.pdf PDF
Attachment 10 - Building 010B Plumbing Plans 28JUN1996.pdf PDF
Attachment 5 - Building 010A P203 2nd Floor Plan 15OCT1992.pdf PDF
Attachment 9 - Building 010B One Line Riser 28JUN1996.pdf PDF
Attachment 13 - USDA Forms 02AUG2023.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12305B23R0028 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12305B

BELTSVILLE MD 20705

BLDG 003, RM 223, BARC-WEST

10300 BALTIMORE AVENUE

USDA ARS NEA AAO ACQ/PER PROP

08/03/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/03/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Repair of RO systems, BARC, Beltsville, MD

1. The 15 Questions and Answers on the last two pages are hereby incorporated.

2. Attachment 1 has been updated to Attachment 1 - SOW Bldgs 010AB RO System Replacements

22AUG2023 - 21 pages.

3. Attachment 11 has been updated to Attachment 11 - Submittal Register Bldgs 010AB RO

System Replacements 22AUG2023 - 22 lines.

4. Department of Labor General Decision Number is updated to MD20230044 04AUG2023.

Attachment 12 has been updated accordingly to Attachment 12 - WD Prince George s County MD

Building MD20230044 04AUG2023 - 8 pages.

END

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JASON ROBBINS

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Question 1: Please confirm this job involves repairing leaks only throughout the R.O. System in both buildings 10A/B.

Answer 1: The only pipes that will get repaired are only on the RO water system flex lines in B010A. The main lines have no issues in building 010A. 010B only has 1 broken main line pipe.

Question 2: Will the storage tanks for R.O. water remain in place?

Answer 2: Yes, the storage tanks will remail in place.

Question 3: Please confirm if all floors have Isolation Valves to allow each floor to be worked on independently.

Answer 3: All floors in building 010A have isolation valves on all floors (1-3) in each wing and the basement only has the main shut off valve for the entire system. In building 010B, the system will be replaced and a broken pipe inside the building will be repaired. The entire system can be shut down to make the repair to the broken pipe in building 010B.

Question 4: For each of the R.O. faucets in each lab, do you want a shut-off valve under the sink so faucets can be fixed independently and in groups?

Answer 4: Yes, it’s stated in the SOW pg3 (BUILDING 010A paragraph 2; sentence 4).

Question 5: Do you want a maintenance contract and warranty for the new systems?

Answer 5: Warranty must be in accordance with FAR Clause 52.246-21 Warranty of Construction. The Government is not requesting a maintenance contract.

Question 6: Are you purchasing the DI tanks or are these part of an exchange program?

Answer 6: The DI tanks are part of an exchange program.

Question 7: Is there 3 phase available for the RO or is 110v an option?

Answer 7: 3 phase is available (277/480v) & existing 120v available for each location.

Question 8: Are there existing storage tanks that will be used if so what proximity to the RO system?

Answer 8: The storage tanks are less than 20’ from the current RO systems in both buildings. These tanks will remain in place and used with the new systems being installed.

Question 9: Will there be a dumpster on site for use?

Answer 9: There are dumpsters onsite throughout the campus. COR will show the contractor what dumpsters are BARC managed.

Question 10: SOW paragraphs 1.2A on pages 3 and 7 state that water testing will be required. How many locations of random water tests are required at B10A & B10B after the new RO system is installed?

Answer 10: 4 for 010A & 3 for 010B-updated SOW.

Question 11: SOW page 3 indicates "contractor shall valve off each wing". Please confirm there is a valve existing to valve off each wing (north and south) for building 10A. Please confirm there is a valve at each floor for each wing. We understand that we are only installing shut off valves at supply lines before they branch off to the RO water faucets in each lab.

Answer 11: There are valves on each floor at each wing.

Question 12: SOW page 7 requires a start up report for B10B. What information should be included in this report? Note B10A does not require a report.

Answer 12: Included reports for both in updated SOW. Included information will be per manufacturer’s recommendations, will be determined by the manufacturer of the system the contractor choses to install.

Question 13: SOW page 11, 1.2 B states that the contractor shall furnish floor plans that reflect the engineer's original design. Please clarify what part of the submittal this is referring to. This contractor is prepared to supply the product data specified as there will be no change to the floor plans.

Answer 13: Updated language in SOW & Submittal Register to as-builts of new RO system.

Question 14: Please confirm that with proper coordination, the contractor will have access to one floor of one wing at a time of B10A to conduct flex piping replacement.

Answer 14: Updated SOW to notify COR 7 days in advance with a schedule to replace flex piping.

Question 15: SOW page 6 states "install new RO water flexible supply tubing, valves and connections inside each lab". Please confirm that the labs are only those that are labeled with the word "lab" on the drawings. If not, please provide a list of drawing room numbers.

Answer 15: List of rooms is as follows:

Building 010A Rooms with Undercounter RO Water Lines Basement - Room 008 is where the R/O storage tank and equipment is located. Room 014 First floor - Rooms –

1. S Wing - 107, 108, 115, 116, 117,

2. N Wing - 118, 119, 120, 121, 122, 123, 130, 130A, 131, 132, 137, and 138.

Second floor - Rooms –

1. S Wing - 206, 215, 216, 217, 218

2. N Wing - 219, 220, 221, 222, 223, 230, 236, and 237.

Third floor - Rooms –

1. S Wing - 308, 315, 316, 317, 318

2. N Wing - 320, 321, 322, 323, 324, 331, 331A, 337, and 338.

There are no labs in building 010B. The RO system is only run to the growth chambers in building 010B.