Self Performed Work worksheet.docx
DOCX document 18 KB Posted
- Attached to
- Greenhouse Controls Bldg 11 Federal contract opportunity
- Solicitation number
- 12305B22R0023
About this file
This document provides details for a federal contract solicitation to upgrade greenhouse controls at a USDA research facility. The solicitation seeks proposals to upgrade controls in Building 11 at the USDA Beltsville Agricultural Research Center in Beltsville, Maryland. Interested vendors must submit offers by August 25th. Evaluation will use the Lowest Price Technically Acceptable method. The contract is set aside entirely for small businesses and has a magnitude between $250,000 and $500,000. The work must be completed within 120 days of award. The required controls must interface with an existing Wadsworth system. The NAICS code is 238210 and small business size standard is $16.5 million. The pre-solicitation site visit will take place on August 22nd and questions are due by August 25th. Biobased products must be utilized where reasonably available and priced.
The solicitation provides the submission address, evaluation factors, bonding requirements, and other standard contract terms. Interested vendors should review solicitation amendments and monitor the website for updates.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for NAICS 236xxx must provide 15%, NAICS 237xxx and 238xxx 25% of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible small business concerns. Below is a suggested format.
| Specification Division |
| SB Vendor (Y or N) |
| Personnel Cost |
| Material/Equipment Costs |
Division 01
| $ |
| $ |
Division 02
| $ |
| $ |
Division 03
| $ |
| $ |
(Add additional lines as necessary for each Division applicable to this project)
| $ |
| $ |
| $ |
| $ |
Sub Total (Personnel Costs, Material/Equipment Costs)
| Profit |
| $ |
| Home Office Overhead |
| $ |
| Bond |
| $ |
| Grand Total |
| $ |
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self-performed under the
| Contract’: | $ | |
| 4. Self-performed work = Line 3/Line 1 x 100 = | % |
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .