RFI QandA 9.22.2022.pdf

PDF 123 KB Posted

Attached to
Growth Chambers Federal contract opportunity
Solicitation number
12305B22Q0157-C
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

View the file

Other files for this federal contract opportunity

Other files attached to Growth Chambers, newest first.
File Type Posted
Combined SynopSolict Growth Chamber-C.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers to Request for Information (RFI) questions.

The cabinet depth specification was set as the maximum which would allow chambers to be placed back-to-back with adequate access and air space around the chambers, and between parallel aisles – so an increase of 0.6 inch per chamber would mean an extra 1.2 inches with the chambers back-to-back, reducing working space and/or reducing ventilation. I’m not an engineer, so I don’t know how significant an effect that might be. However, my lab building currently has no air conditioning, and our ultralow freezers are struggling because the heat is not being dispersed; two freezers belonging to another lab broke down as a result. Reducing the space between chambers could result in similar stress upon the growth chambers.

Regarding the light intensity, there is a target noted in the “Specs-SOW from PM Growth Chamber.docx” file – “a maximum of 750 μmol m-2 s-1 Photosynthetic Photon Flux Density (PPFD) in the Photosynthetically Active Radiation (PAR) range (400-700 nm) in two tier mode [minimum growth height 31” per tier], or a maximum of 1500 μmol m-2 s-1 PPFD in tall plant mode [minimum full growth height 65”], with light intensity measured at 6” below the light canopy at 25℃ and averaged across the light canopy.

The lighting intensities are to allow separate dimming of PhysioSpec Indoor broad spectrum and PfrSpec far-red spectrum, are to be controlled via the control panel or remotely by the Ethernet connection via LAN or internet; light intensity to be user-controlled by dimming over the range of 10% to 100% of the maximum output for dual-tier or single tier set-up, as appropriate.

-End-