FR152_PreBid_6_24_19.pdf

PDF 386 KB Posted

Attached to
FR152 Road Reconstruction Federal contract opportunity
Solicitation number
1224H819R0003
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

FR152 Pre-Bid 6 24 19

View the file

Other files for this federal contract opportunity

Other files attached to FR152 Road Reconstruction, newest first.
File Type Posted
Attach_4_FR152_MAP.pdf PDF
1224H819R0003_Solicitation.pdf PDF
Attach_1_FR152_Bid_Schedule.docx DOCX document
Attach_6_DBWD_PA190002_051719__PA2_Heavy_and_Highway-Warren-Elk-McKean-Forest.docx DOCX document
Attach_7_GovtProvidedTechnicalProposalForms.docx DOCX document
Attach_5_Contractor_Safety_Highlights.docx DOCX document
Attach_2_FR152_Work_Description.pdf PDF
Attach_3_FR152_FP-14_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA - Forest Service 1. FOREST:

PREWORK MEETING Allegheny NF

(Reference FSH 6309.11 I

2. CONTRACT NO:

RFP

3. PROJECT: FR152 Road Reconstruction 2019

4. CONTRACTOR:

5. CONTRACTOR'S REPRESENTATIVE ON SITE:

NA

NA

6. GOVERNMENT OFFICIALS ON SITE:

William Printup

7. DATE 8. DAY OF WEEK 9. TIME ARRIVED 10. TIME Departed 11. Weather:

6/24/19 Monday 0935 1050 Light Rain

12. TEMPERATURE °F 13. GROUND COND. 14. CONTRACT TIME

15. DAYS

16. COMPLETION DATE

USED

Min. 64 Max. 66 wet

17. TIME USED(%) 18. WORK COMPLETED(%) 19. WORK ON SCHEDULE 20. CONTRACTOR'S WORK [X) YES [) NO [X )Acceptable [ ]Unacceptable

21. CHANGE ORDERS/AMMENDMENTS ISSUED 22. WORK ORDERS ISSUED (Include SUSPEND/RESUME)

23. MATERIALS FURNISHED TO JOB SITE (G-Govt.; C-Cont.; S-Subcont.)----------- 24. LIST EQUIPMENT ON SITE (G-Govt.; C-Cont.; S-Subcont.)--------------------------- ----v ----v

C mg Contract Item Number and Location of Hours

Use Used

25. LIST CONTRACT PAYMENTS, REPORTS, CORRESPONDENCE, ETC. 26. WORKERS ON SITE Number

Item Ei]Q Submit Classification Prime Sub

27. GOVERNMENT PROVIDED SERVICES ADEQUATELY AND TIMELY

[ ]YES [] NO, Explain in Narrative

"28.NARRATIVE REPORT: A Pre-Bid meeting was held on FR152 at the intersection with FR327. The attendees are as follows: Craig Dean of Craig Dean Construction. Rob Eaton of Duffy, Inc. Jerry Auman of Auman Brothers Construction.

I reviewed the RFP, and information requested for the Project. The requirement for having certified equipment operators for working around utility lines was reviewed, and the need to supply proper certificates. The Following Questions were asked, and will need clarification posted on the online system.

1. Q: The Casing pipe size of 22" A: was determined very difficult to find. We will allow for 20" or 24" casing to be acceptable.

2. Q: Can the casing pipe be used, and if so does certification of the Buy USA stand since it cannot be verified for each individual culvert. A: We have in the past allowed used casing pipe for culverts, and each one gets inspected for soundness and stability.

3. Q: What is the wall thickness requirement for the steel casing? A: Minimal pipe wall thickness of.250 steel casing Item #60201-C Can be 20”, 22”, or 24” Diameter

4. Q: The millings of pavement included in the 20404 Roadway Excavation line item may they be used in the road base areas. A: We could allow this, and may be helpful given the recent storms added to damages near that work area. The removal of the pavement is listed in the work description and could be used on site.

I explained the Erosion control, the additional Excavation, and Roadway excavation items. The contractors reviewed the work in the field and may have additional questions prior to submitting.

Recent storms have caused erosion and several additional culverts to become plugged in the work area included in the RFP. The forest leadership may want to complete a modification after award to include this work.

29. SIGNATURE

j p w.J:tJ· v�- DislribuUon: Original• CO !week�): copies: COR, SO, PROJ VlG- Previous editions of this form are obsolete.

30. TITLE

Civil Engineering

Tech. /COR

31. ADDL SPACE NEEDED []

(continued on 6300-21)

FS-6300-20112185

File details come from the government source that posted it.