12168119Q0006 FR24B-0.55 AOP Culvert Replacement Q&A-4 02/28/2019

1. Neither of them can find the information in the plans for a concrete footer for the hoops to be bolted to.

There is not a concrete footer. The box culvert has a full aluminum invert. The connection of the box culvert to the invert is to be provided by the manufacturer.

1. Would concrete be the entire bottom of the culvert?

No concrete, there is a full aluminum invert across the bottom of the box culvert.

1. Or are there to be concrete walls for the sections to be bolted to?

No concrete, the box culvert is bolted to the aluminum invert.

1. Or is there an aluminum edge that front to back of the span for the sections to be bolted to?

The box culvert is bolted to the aluminum invert.

1. Are we to over dig, place 3” materials in for under the toe and span sides of the culvert?

See sheet 4 for Culvert and Earthwork Typical Sections for limits of excavation and select granular backfill. For the toe wall, install that in accordance with manufactures recommendations.