1205M618Q0015_FSR_3071_FAC_2005-97.pdf
PDF 1 MB Posted
- Attached to
- FSR 3071-32-3310 ROAD UPGRADES Federal contract opportunity
- Solicitation number
- 1205M618Q0015
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_1205M618Q0015.pdf | ||
| Copy_to_Submit_1205M618Q0015_FSR_3071.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 153
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
1205M618Q0015 03/23/2018 UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue Suite 3A.
Everett, WA 98201
See Section F.2
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
JORGE A SOMOZA 425 783-6053 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.
This request does not commit the Government to pay any costs incurred in the preparation of the
09 April 2018 by 2:00 PM submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
(a) (b) (c) (d) (e) (f) FSR 3071—32—3310 Road Upgrades
Mt. Baker-Snoqualmie National Forest
Mt. Baker Ranger District
Do Not Enter Prices Here
See Schedule of Items
Mail Quote to Contracting Officer Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue, Suite 3A
Everett, WA 98201 or e-mail to jsomoza@fs.fed.us or fax at
(425) 783-0129
Technical Point of Contact is Cort Anderson at (360) 854-2621 or e-mail cortanderson@fs.fed.us
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
DUNS:_______________
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121
STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a) mailto:jsomoza@fs.fed.us mailto:cortanderson@fs.fed.us
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
FSR 3071—32— 3310 ROAD UPGRADES
MT. BAKER-SNOQUALMIE NATIONAL FOREST
MT. BAKER RANGE DISTRICT
WHATCOM COUNTY
B.1 SCHEDULE OF ITEMS
Note: The offeror must provide a price on all items to be considered for task order award.
FSR 3071 - 32 - 3310 – Bid Schedule Item
Number Description Pay Unit Qty Unit Price Total
15101 Mobilization LS ALL $ $ 20301 Removal and Disposal of Culverts EA 1 $ $
*20950 Pipe Bedding Material, Government Furnished CY 9 $ $
*25101A Placed Riprap, Class 2, Commercial Source, Headwall and Ditch dam Ton 11 $ $
*25101B Placed Riprap, Class 4, Commercial Source, Splash Pad Ton 18 $ $
32451 Aggregate Surfacing, 1-1/4" Minus WSDOT, Commercial Source, Compaction Method A Ton 80 $ $
60275A 18" HDPE Pipe, Compaction Method B, Government Furnished LF 40 $ $
60275B 24" HDPE Pipe, Compaction Method B, Government Furnished LF 40 $ $
60275C 36" HDPE Pipe, Compaction Method B, Government Furnished LF 40 $ $
60513 Geotextile/Geofabric Material, Government Furnished SY 80 $ $
62201A Equipment Rental, Excavator 150 hp/with thumb (minimum) Hour 4 $ $
62201B Equipment Rental, Dump Truck, 10 C.Y. Capacity (minimum) Hour 2 $ $
62529 Seeding and Mulching, Seed Mix C-1 LS ALL $ $
Total= $
*Indicates contract quantity (See FP-03 Section 109.02) LS = Lump Sum; AC = Acre; CY = Cubic Yard; LF = Linear Foot; EA = Each; HR = Hour; SY=Square Yard
B.1 SCHEDULE OF ITEMS
(Continued):
FSR 32 MP 0.81 Option #1 – Bid Schedule Item
Number Description Pay Unit Qty Unit Price Total
20301 Removal and Disposal of Culverts EA 1 $ $ *20950 Pipe Bedding Material, Government Furnished CY 3 $ $
*25101A Placed Riprap, Class 2, Commercial Source, Headwall and Ditch dam Ton 5 $ $
*25101B Placed Riprap, Class 4, Commercial Source, Splash Pad Ton 10 $ $
60275D 36" (eq) Squash Pipe, Compaction Method B, Commercial Source LF 40 $ $
Total= $
*Indicates contract quantity (See FP-03 Section 109.02) LS = Lump Sum; AC = Acre; CY = Cubic Yard; LF = Linear Foot; EA = Each; HR = Hour; SY=Square Yard
TOTAL PRICE Base Bid Items = $ ______
TOTAL PRICE Option 1 - FSR 32 MP 0.81 Culvert = $
TOTAL PRICE ALL ITEMS = $ .
B.2 PAYMENT FOR BOND PREMIUMS
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed- Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
B.3 FAR 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY
PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within October 31, 2018. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
B.4 BID GUARANTEE, PAYMENT SECURITY, PAYMENT BONDS AND
PERFORMANCE BONDS
Bid Guarantee: If your company’s proposal is priced $150,000 or greater a bid guarantee is required (reference FAR 52.228-1). The bid guarantee must be received by the required closing date/time. Facsimile or e-mailed Bid Guarantees will not be accepted.
Payment Security: If the project is awarded with a total price greater than $35,000 and less than or equal to $150,000, payment security is required in the form of a Payment Bond or Letter of Credit at 100% of the total project price. Reference FAR 52.228-13.
Performance and Payment Bonds: If the project is awarded with a total price $150,000 or greater both payment and performance bonds are required. Reference FAR 52.228-15.
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed- Price Construction Contracts shall be included under 15101 Mobilization.
B.5 FUNDING NOTICE TO OFFERORS
Funds are not presently available for the option item. No award will be made for option item until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation’s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.
B.6 INCORPORATION OF TECHNICAL PROPOSAL
The Contractor’s technical proposal, including revisions and amendments made prior to contract award,will be incorporated into this contract upon award. The Contractor’s personnel shall meet or exceed the qualification standards, experience levels and trade background as set forth in the technical proposal and contract.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
This project includes, but is not limited to, the construction or reconstruction for repairs consisting of, vegetation removal, excavation, embankment and subgrade construction, aggregate surfacing, seeding and mulching, culvert removal/installation, and new culvert installation. The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the Contract. Contractor must verify that there are no utilities in the project site, before beginning excavation.
C.2 PROJECT LOCATION
The project work area is located east of Glacier, WA on FSR 3071 (Pinus Lake Rd, T39N-R8E-Sec 1), FSR 32 (Hannegan Rd, T40N-R9E-Sec 31), and FSR 3310 (Anderson Creek Rd, T39N-R8E-Sec 5). From Bellingham, WA, take State Hwy 542 east approximately 35 miles to the town of Glacier. From Glacier, take Hwy 542 east to the project site by travelling approximately: 7.4 miles to FSR 33 which connects to 3310 at MP2.00, 13.3 miles to FSR 32, and 13.5 miles to FSR 3071.
District maps showing the project road systems are available for viewing at the district office in Sedro-Woolley, WA. There is a locked gate which requires a Forest Service key on FSR 3071, at the start of the road, and on FSR 33 (Wells Creek Rd), prior to FSR 3310. A Forest Service key can be checked out from the Sedro-Woolley office.
C.3 PRICE RANGE
The Government's estimate is: less than $35,000.
C.4 APPLICABLE SPECIFICATIONS (ROAD PROJECTS)
Standard and Supplemental Specifications for FP-03 shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable.
The Supplemental Specifications shown on the specification list are physically attached.
C.5 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND
BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03)
These specifications are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resultant contract. They are available online at http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm
C.6 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.7 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF
WORK/SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.8 CONTRACT TIMING AND RESTRICTIONS
Wildlife: From April 1st to September 23rd, all activities that generate noise levels above 92 decibels shall occur between 2 hours after sunrise and 2 hours before sunset.
FSR 33 road system has a seasonal wildlife closure from 11/1 through 7/1. No motorized use during that time.
Sediment reduction: Construction sites shall be dewatered or isolated from flowing waters to prevent generation of sediment and minimize turbidity. Every effort shall be made to avoid stream crossings with heavy equipment. A single round-trip equipment crossing of the stream channel shall be allowed, if necessary. Equipment operation within the stream channel inside of the approximate culvert footprint is permissible so long as the stream has been dewatered.
Culvert Installations (60275 A, B, C & D): The in-stream water work window for this project is July 16th-October 15th. The in-stream water work window will apply to the sites on FSR 3071 and FSR 32.
FSR 3071 and 3310 may be closed on weekdays (Monday through Friday), at the beginning of the road or at the work site(s), from 0800 to 1700 during the duration of the work. FSR 3310 is a road which is used by WSDOT for access to their communications tower and repeater site. WSDOT shall be allowed to pass if emergency tower access is necessary, during any part of construction.
FSR 32 (Hannagan Road) may be closed mid-week (Tuesday through Thursday) at the work site from 0800 to 1700 during the duration of this work. Road closures on FSR 32 must be submitted at least 3-weeks in advance of the closure date(s), to the Contracting Officer.
If more closure time is desired for any of these sites, the contractor should identify each location and time required to the Contracting Officer at the pre-work meeting, for approval.
For all other work as described in this project: The roads may be closed for up to 2 hrs at a time during performance of this work.
No work is allowed on Weekends or Federal Holidays without written request by the Contractor to the CO for review and approval.
All work related to signage and traffic control is incidental to Item 15101, Mobilization.
C.9 WDFW-USFS INTERIM MOU PROVISIONS (JAN 2012)
A copy of this MOU must be on site at all times when work is conducted under the provisions of Appendix A. A full copy of the WDFW-USFS MOU will be provided at the pre-work meeting.
The following provisions are applicable to this contract:
GENERAL PROVISIONS APPLICABLE TO ALL APPENDIX A
PROJECTS
Fish-bearing Waters
1. Streams which meet the Washington State Forest Practices Act physical criteria for fish presence (WAC 222-16-031 Interim Water Typing System) are assumed to be fish- bearing unless documented survey information is available that provides evidence of a lack of fish presence.
2. The Forest Service will consult with WDFW to agree on the status of streams that meet the physical criteria for fish presence but where biological information is incomplete, inconclusive, or not well documented.
Timing
1. Freshwater hydraulic projects conducted under Appendix A in fish-bearing streams or in tributary streams within ¼ mile of fish-bearing streams will be implemented only during the work periods outlined in Appendix D unless the Forest Service fisheries biologist and the WDFW Area Habitat Biologist agree that implementing the activity outside of the normal work period would be unlikely to cause negative impacts to fish and fish habitat. The location of the project within a watershed, site-specific conditions, circumstances, nature of the proposed work, and fish species and life stages actually present at the project site may make alternative instream work periods acceptable for many projects. Any agreements to modify the work periods in Appendix D for specific projects or specific sites shall be documented by WDFW.
2. Those portions of hydraulic project work that occur outside or above the bankfull channel and have little or no potential to negatively affect fish or fish habitat are not subject to the work periods specified in Appendix D. Examples of such work include replacing bridge decking, constructing a bridge superstructure after footings are in place, and building up the fill over a culvert that is in place. These projects are still bound by the other provisions in Appendix A.
3. Hydraulic projects conducted in intermittent non-fish-bearing streams that are dry during the proposed work are not subject to the work periods specified in Appendix D unless the USFS fish biologist determines the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.
4. Hydraulic projects conducted in wetted non-fish-bearing streams that are greater than ¼ mile from fish-bearing waters are not subject to the work periods specified in Appendix D unless the USFS fish biologist determines the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.
Fish Protection
1. The intake on any pump used for diverting water from a fish-bearing waterbody shall be screened with material that has openings no larger than 5/64 inch for square openings, measured side to side, or 3/32 inch diameter for round openings, and the screen must have at least one square inch of functional screen area for every gallon per minute (gpm) of water drawn through it. For example, a 100 gpm-rated pump would require at least a 100 square inch screen. Screen maintenance shall be adequate to prevent injury or entrapment to juvenile fish and shall remain in place whenever water is withdrawn from the waterbody through the pump intake.
2. Fish within construction sites that will be dewatered or isolated from the main waterbody shall be captured and safely moved from the job site. Fish capture and transportation equipment shall be available on the job site during all in-water activities.
3. If at any time, as a result of project activities, a fish kill occurs, fish are observed in distress, or water quality problems develop that may present a threat to fish life, the Forest Service shall immediately notify the Washington Military Department’s Emergency Management Division at 1-800-258-5990.
Erosion Control
1. Alteration or disturbance of the bed, banks, and bank vegetation of waterbodies shall be minimized and limited to that necessary to construct the project.
2. Erosion prevention and control methods shall be used as necessary during and immediately after project implementation to minimize loss or displacement of soils and to prevent delivery of sediment into waterbody. These may include, but are not limited to, operational techniques, straw bales, silt fencing, erosion control blankets, temporary sediment ponds, and/or immediate mulching of exposed areas. Disturbed ground with the potential to deliver sediment into waterbodies shall be revegetated or protected from surface erosion by seeding, mulching, or other methods prior to the fall rainy season.
3. After project completion, disturbed streambanks and lakeshores shall be revegetated with site-appropriate vegetation to maintain soil stability and provide shade and future sources of large wood. Revegetation can be accomplished by planting or natural reproduction, depending on site conditions.
Dewatering
1. Where the project-specific provisions require worksite isolation from flowing waters and/or dewatering, a written dewatering plan shall be prepared prior to the start of the instream work that describes the method of bypass, location and construction of any coffer dams or diversion dams, the number and size of pumps to be used, and backup plans in place in case of mechanical failure or unanticipated storm events. The dewatering plan does not require review or approval by WDFW.
2. The dewatering system will be designed and installed to minimize erosion and sediment delivery to watercourses and to withstand all streamflows anticipated during the construction period.
3. Water bypassed around the site will be returned to the stream channel downstream of the work site. The bypass discharge point shall be designed to minimize erosion and scour of the stream channel, banks, and vegetation.
4. Wastewater from project activities within the dewatered area shall be routed to an area outside the bankfull channel to allow removal of fine sediment and other contaminants prior to infiltrating back into waterbodies.
5. Water shall be reintroduced back into the channel in a manner that minimizes the mobilization of fines and sediment into downstream waters.
6. Any materials used to construct the dewatering system will be removed prior to the completion of the project.
Heavy Equipment
1. The use of heavy equipment within the bankfull channel in streams and below the ordinary high water line in lakes is discouraged. If such work is necessary, operation of heavy equipment in these areas shall be minimized and appropriate measures shall be taken to minimize damage to streambanks and streambed.
2. Accumulations of soil or debris shall be removed from drive mechanisms (wheels, tires, tracks, etc.) and undercarriage of all heavy equipment prior to its working within the bankfull channel in streams or below the ordinary high water line in lakes.
3. To prevent contamination, equipment used around waterbodies shall be free of external petroleum-based products. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities. All machinery fueling and maintenance involving petroleum products shall occur at a sufficient distance from stream channels, waterbodies, or wetlands to prevent delivery of potential contaminants. Spill containment equipment and material shall be on site.
Concrete and Treated Wood
1. Fresh concrete, concrete by-products, or other chemical contaminants shall not be allowed to enter waterbodies. Structures containing concrete shall be sufficiently cured to prevent leaching prior to contact with the waterbody.
2. Wood treated with creosote or with pentachlorophenol in heavy oil solvent may not be used for wood components that will be over or in contact with water in hydraulic projects. Wood treated with any pentachlorophenol formulation may not be used for in-water contact (i.e., within the 100 year floodplain). All treated wood used for hydraulic projects shall meet or exceed the criteria and guidance established in the most current edition of 'Best Management Practices For the Use of Treated Wood in Aquatic and Other Sensitive Environments' developed by the Western Wood Preservers Institute, Wood Preservation Canada, Southern Pressure Treaters' Association, and Timber Piling Council, and any current amendments or addenda to it. Current amendments and addenda include but may not be limited to 'Amendment #1: CCA - Chromated Copper Arsenate', dated October 25, 2006; and 'Addendum #1: ACC - Acid Chromated Copper', dated February 28, 2007.
Invasive Species Control
1. All materials and equipment used in the construction of hydraulic projects shall be free of aquatic invasive species and noxious weeds. Materials and equipment used at a project site at which aquatic invasive species are already established shall be decontaminated so that no viable aquatic invasive species are transported from the job site.
Other
1. A copy of this MOU shall be available on site at all times when work is conducted under the provisions of Appendix A.
C.10 FOREST SERVICE NATIONAL CORE BEST MANAGEMENT PRACTICES
(BMP’S) NONPOINT SOURCE POLLUTION CONTROL FOR WATER
QUALITY MANAGEMENT ON NATIONAL FOREST LANDS (2010)
The BMP’s are a part of this Contract for all the related items listed herein. The Contractor have a copy of the BMP’s available and on-site at all times and shall make them available to the Contracting Officer and/or his/her Representative upon request.
C.11 BIOBASED PRODUCTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases
Dust suppressant 2-cycle engine oil Absorbents
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements
(AUG 1996)
http://www.arnet.gov/far/
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/?q=browsefar
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31st 2018. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by August 1st 2018. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
F.3 NOTICE TO PROCEED
A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer’s Representative (COR). No work shall begin until receipt of this notice.
Contract time shall commence on the day indicated on the Notice to Proceed.
F.4 REQUIRED SUBMITTALS
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Referenced By
Specification
Submittal Date
Schedule of Work FAR 52.236-15 Include with Bid Proposal
Job Specific Safety Plan FAR 52.236-13 Prior to Work Starting
Copy of Required Insurance Coverage FAR 52.228-5 Prior to Work Starting https://www.acquisition.gov/?q=browsefar
Notification of Subcontracting FAR 52.222.11 Prior to Subcontractor Starting Work
Fire Plan R6-FS-6300-52 Prior to Work Starting
Camping Permit SECTION H.6 Prior to Camping
Release of Claims Form FAR 52.232-5 Prior to Final Payment
Bio-based or Bio-preferred Products FAR 52.223-2 With Proposal and in accordance with Clause
Hazardous Spill Plan FSSS 107.20 Prior to Work Starting
Quality Control Plan FP-03 153.02 Prior to Work Starting
Other Submittals FP-03 & FSSS As required in specifications
F.5 MATERIAL CERTIFICATIONS, INVOICES, TESTING REPORTS & OTHER
SUBMITTALS
Submit the following certificates, test reports, samples and test data for this project (1 set each). See FP-03 sections 104, and 106 for timely submittal and approval by the Contracting Officer. Materials associated with the following Pay Items will require certifications and/or testing reports submitted to the Contracting Officer Representative prior to implementation on the project:
ITEM DESCRIPTION SUBMITTAL TIME FOR
GOVERNMENT
APPROVAL
15101 Mobilization Traffic Control Plan 7 days Road Closure Request (FSR 32) 7 days Equipment Cleaning Notification 7 days 25101 A&B Riprap Material Certification 7 days Gradation Report 7 days Weed Free Certification 7 days 32451 Aggregate Surfacing Material Certification 7 days
Gradation Report 7 days Weed Free Certification 7 days Angularity Confirmation 7 days 60275 Culverts Length and placement Survey 7 days Dewatering Plan 7 days Erosion Control Plan 7 days
36” squash submittals 7 days 62529 Seed and Weed Free Straw Mulch Seed Mix 7 days
Weed Free Certification 7 days
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at 810 SR 20, Sedro-Woolley, WA 98284. (Mt. Baker Ranger Station).
Addendum to Post Award Conference
The Contractor shall meet with the Government to discuss contract terms and work performance requirements, Work Progress Schedule, and Fire Prevention and Suppression Plans.
Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the conference.
End of Addendum
G.2 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Item No. Description Quantity Source Location
*20905 Pipe Bedding As Required Culvert Excavation
60275 A, B, C HDPE Culverts As Required Glacier Boneyard
60513 Geotextile 80 SY Glacier Boneyard
G.3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract.
In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly.
(This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits.
Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.4 NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The Contractor and subcontractor shall fill out the SF 1413, Statement and Acknowledgement and submit to the Contracting Officer. Other written notification shall include as a minimum:
a. The name, address and telephone number of the subcontractor.
b. The date upon which the subcontract was entered into and its duration.
c. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
d. Documentation of the subcontractor's representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
G.5 INVOICE PROCESSING PLATFORM (IPP)
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP).
Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted. The Contractor must also attach a detailed invoice in IPP.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information.
The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observation and measurements.
(b) Weather conditions Seasonal. (Varies by the Season).
(c) Transportation facilities: Road Access is good to all sites. A Forest Service key is required for access to FSR 3310. See Section C.2 for gate/key information.
(d) Elevation: 2,100’ to 2,400’.
(e) Other Physical Data: None
H.2 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
H.3 SAFETY PLAN
Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the Contracting Officer that is in accordance with OSHA Regulations.
Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The safety plan shall include the Personal Protective Equipment (PPE) that the Contractor provides for his/her employees at no cost to them. It shall include how often the PPE is inspected to insure that it is not defective or damaged. It shall include steps the Contractor takes to insure that his/her workers are using the PPE on the worksite and what steps the Contractor uses if an employee is found to be working without the required PPE. The Contractor shall include any safety training he/she provides to his/her employees.
H.4 SAFETY ITEMS
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards:
[X] Temporary excavation/deep trenching/slope stability.
[X] Tree Felling.
[X] Heavy equipment operation.
[X] Fire hazards.
[X] Hydraulic and/or pneumatic and/or other high pressure hazards.
[X] Power tool operation including eye protection.
H.5 FSAR 4G52.222-704 PERSONAL PROTECTIVE EQUIPMENT (FEB 2007)
1. The Contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The Contractor shall provide, at no cost to the employee, to each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. These chaps must be approved by Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh to the top of the boot on each leg.
5. The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
6. The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
7. The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
8. The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
H.6 USE OF PREMISES
A. The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
B. Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Forest Service land or lands administered by the Forest Service, the Contractor shall obtain written permission from the appropriate Ranger District. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a work order will specify all conditions and requirements.
Sanitation facilities shall be provided for all employees of the Contractor and members of the campsite.
C. It is further stipulated that in addition to clean-up of any campsites, the Contractor shall remove his equipment from National Forest Service land before final acceptance and payment of the contract.
D. The Contractor shall provide and maintain sanitary facilities. There shall be a minimum of one toilet for each ten employees. Solid waste shall be dispose of in accordance with applicable Federal, State and local regulations.
H.7 CONTRACTOR’S USE OF EXISTING ROADS
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
H.8 LOAD LIMITS
All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, over width permits. Forest Service overload permits for this project may be obtained from the Supervisor’s Office.
Overload Permits must be obtained for all vehicles exceeding posted bridge weight limits. Contractors should anticipate up to 14 days to secure needed overload permits.
H.9 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
H.10 AGAR 452.236-73 ARCHAEOLOGICAL OR HISTORIC SITES (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
H.11 AGAR 452.236-74 CONTROL OF EROSION, SEDIMENTATION AND
POLLUTION (FEB 1988)
A. Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
B. Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged on the ground; into or near rivers, streams, and impoundments; or into natural or manmade channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
C. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H.12 RIGHTS IN AND USE OF MATERIALS
A. The Contractors, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand or other material found in the excavation.
Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace without additional compensation sufficient suitable materials to complete the portion of work which was originally contemplated to be constructed with such material.
B. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government.
The Government is not obligated to reimburse the Contractor for the cost of their production.
H.13 STORAGE AND STOCKPILING OF MATERIALS
Material shall be stored to assure the preservation of quantity and fitness for the work.
Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land, approved by Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by Forest
Service shall be restored at Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered land.
H.14 AGAR 452.236-77 EMERGENCY RESPONSE (NOV 1996)
A. Contractor's Responsibility for Fighting Fire. (1) The Contractor, under the provision of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish, all fires on the work site other than those fires in use as a part of the work. (2) The contractor may be held liable for all damages and for all costs incurred by the Government for labor subsistence, equipment, supplies, and transportation deemed necessary to suppress a fire set or caused by the Contractor or the Contractor's agent or employees.
B. Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
C. Contractor's Responsibility for Responding to Emergency. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
H.15 LANDSCAPE PRESERVATION
A. The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
B. Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products onsite, appropriate preventive measures shall be taken to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states.
a. Servicing of all equipment…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.