2019 PILING DETAILED INFORMATION SHEET

Solicitation 1205G11910008

Potential Task Order #1

PEND OREILLE VALLEY

SUB

ITEM

NO.

UNIT NAME/

NUMBER ACRE

DIFFI-

CULTY

RATING

AVG.

EST %

SLOPE

PRIMARY

PURPOSE AVG.

PLANTING

SPOT SPAC-

ING for

REFOREST-

ATION (acre)

MAX

.DIA

MET

ER

TO

PILE

(INCH

ES)

SEE

FOOT-

NOTES REMARKS

REFOR

- EST

FIRE/

FUELS

1 Renshaw 65 29 2 5-25 X 300 7” Whip felled, Long Machine walk in to unit, .67 mi.

2 Power Lake 67 38 3 20-30 X N/A 6” *6 Needs whip felled 3 Power Lake 69 34 3 25 X N/A 7” *6 Needs whip felled 4 Power Lake 681 24 3 20 X X 300 7” *6 Needs whip felled 5 Power Lake 683 17 3 30 X X 300 7” *6 Needs whip felled 6 Middle Fk 70 28 3 30 X N/A 7” *6 Needs whip felled 7 Middle Fk 82 16 1 25 X N/A 7” Whip Felled 8 Middle Fk 394 18 3 20 X X 300 7” *6 Needs Whip Felled 9 Middle Fk 136 39 2 25 X X 300 7” *6 Needs Whip Felled

Total 243

**Units that say “Needs whip felled” in remarks will be whip felled by a separate contract before piling can begin.

Footnotes: Items *1 Average spacing is for plantable spots to plant seedlings.

*2 Cull standing green trees 1” to 5.9” DBH shall be felled/pulled and piled.

*3 Area has a “No Pile Area” in it.

*4 Operating dates: July 1 – April 1 *5 Operating dates: Oct. 15 – April 1 *6 Will be whip felled by separate contract before piling begins.