2019 PILING DETAILED INFORMATION SHEET
Solicitation 1205G11910008
Potential Task Order #1
PEND OREILLE VALLEY
SUB
ITEM
NO.
UNIT NAME/
NUMBER ACRE
DIFFI-
CULTY
RATING
AVG.
EST %
SLOPE
PRIMARY
PURPOSE AVG.
PLANTING
SPOT SPAC-
ING for
REFOREST-
ATION (acre)
MAX
.DIA
MET
ER
TO
PILE
(INCH
ES)
SEE
FOOT-
NOTES REMARKS
REFOR
- EST
FIRE/
FUELS
1 Renshaw 65 29 2 5-25 X 300 7” Whip felled, Long Machine walk in to unit, .67 mi.
2 Power Lake 67 38 3 20-30 X N/A 6” *6 Needs whip felled 3 Power Lake 69 34 3 25 X N/A 7” *6 Needs whip felled 4 Power Lake 681 24 3 20 X X 300 7” *6 Needs whip felled 5 Power Lake 683 17 3 30 X X 300 7” *6 Needs whip felled 6 Middle Fk 70 28 3 30 X N/A 7” *6 Needs whip felled 7 Middle Fk 82 16 1 25 X N/A 7” Whip Felled 8 Middle Fk 394 18 3 20 X X 300 7” *6 Needs Whip Felled 9 Middle Fk 136 39 2 25 X X 300 7” *6 Needs Whip Felled
Total 243
**Units that say “Needs whip felled” in remarks will be whip felled by a separate contract before piling can begin.
Footnotes: Items *1 Average spacing is for plantable spots to plant seedlings.
*2 Cull standing green trees 1” to 5.9” DBH shall be felled/pulled and piled.
*3 Area has a “No Pile Area” in it.
*4 Operating dates: July 1 – April 1 *5 Operating dates: Oct. 15 – April 1 *6 Will be whip felled by separate contract before piling begins.