DUIS_CCRD_MeadowMaintenance_DUIS.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Meadow Maintenance and Mowing Federal contract opportunity
- Solicitation number
- 1204R419Q0033
About this file
Detailed Unit Information sheet (DUIS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ1204R419Q0033.pdf | ||
| ReturnPacket.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final_2019Contract
| Schedule of Items- 1 Mow | Acres | Mow Timing | Remarks |
| Blackberry Meadow | 9 | August 6 - September 15 | Protect planted trees. Cut to 4" height. |
| Enchanted Valley Complex | 50 | August 6 - September 15 | Gate, Thick Reed Canary Grass, Acres include roadside mowing. Cut to 4" height. |
| Drift Creek-Oxbow | 18 | August 6 - September 15 | Mow north half of meadow- avoid wet areas. Yale lock. |
| Five Rivers Complex | 26 | August 6 - September 15 | Guard rail. Thick Grass ; Grass/Bracken Ferns. Cut to 4" height. |
| Gopher Creek Complex | 15 | August 6 - September 15 | Riparian meadow. Avoid alders and conifers. Mow blackberry. |
| Johnstons | 2 | August 6 - September 15 | Grasses/forbs/shrubs. |
| Lily Lake | 10 | August 6 - September 15 | Thick Grass; blackberries/grass/forbs/other shrubs. Cut to 4" height. |
| Mann Creek Complex | 8 | August 6 - September 15 | Protect planted trees, do not mow knotweed patch (mapped). Cut to 4" height. |
| Paradise Meadow | 4 | August 6 - September 15 | Yale lock on road with waterbars. Tall braken fern and grass. Cut to 4" height. |
| Taylors | 12 | August 6 - September 15 | Thick Grass; grass/forbs/shrubs. Cut to 4" height. |
| Tenmile Complex | 11 | August 6 - September 15 | grasses/forbs/shrubs, protect planted trees. Cut to 4" height. |
| Sams Meadow | 4 | August 6 - September 15 | Yale lock on gate. Do not mow blackberry along road. |
| Eaton's Complex | 6 | August 6 - September 15 | Grass, forbs, shrubs. |
| OSB Rock Creek Area 1A | 0.5 | September 15- October 15 | All of meadow. Contact COR before mowing. |
| OSB Rock Creek Area 1B | 1 | September 15- October 15 | All of meadow. Avoid planted beds. Contact COR. |
| OSB Rock Creek Area 2A | 0.5 | September 15- October 15 | All of meadow. Contact COR before mowing. |
| OSB Rock Creek Area 3 | 4 | September 15- October 15 | All of meadow. Avoid planted beds. Contact COR. |
| OSB Rock Creek Area 4 | 3 | September 15- October 15 | All of meadow. Contact COR before mowing. |
| OSB Rock Creek Area 7 | 4.5 | September 15- October 15 | All of meadow. Contact COR before mowing. Guardrail. |
| OSB Rock Creek Area 7a | 1.5 | September 15- October 15 | All of meadow. Avoid planted beds and wood stakes. Contact COR. Guardrail. |
| 190 | |||
| Item 2- Mow w/Tracks | |||
| Seitz* | 4 | August 6 - September 15 | Yale lock. Mow grass, shrubs, blackberry in meadow, not along road. |
| Denzer* | 8 | August 6 - September 15 | Goes through private. Contact COR before mowing. |
| Wilson* | 3 | August 6 - September 15 | Salal/blackberries/grasses/forbs/other shrubs |
| Pitchfork | 4 | August 6 - September 15 | Yale lock on road. Mow small seedlings if possible. |
| Upper Bailey | 10 | August 6 - September 15 | Gate, Access road also may need mowed/brushed, dry conditions only |
| OSB Rock Creek Area 8 | 2.5 | September 15- October 15 | Mow salal on slope, upper terrace and south end. Contact COR before starting work. |
| 31.5 |
| Item 3 - Mastication Work | |||
| Camp Creek | 6 | September 15th - October 31 | Masticate/ mulch shrubs, small hardwoods to 5" depth. 1 mile walkin access. |
| Total Acres | 227.5 |
File details come from the government source that posted it.