This is an amendment to a solicitation for repair work at the Redmond Air Center Air Tanker Base ramp. The solicitation seeks quotes to perform improvements to aviation facilities at the Deschutes National Forest, including repairs to the ramp at the Redmond Air Center. This amendment changes the type of asphalt material specified for a fog seal from what was originally stated to now require emulsified asphalt CSS-1H that complies with AASHTO M 208. The due date for quotes remains unchanged at April 20, 2020 by close of business. The amendment is issued by the contracting officer for the Forest Service Pacific Northwest Region in response to a vendor question.

View the file

Other files

File Type Posted
Amendment Three.docx DOCX document
Amendment Two.docx DOCX document
Amendment One.docx DOCX document
RAC Air Tankerbase Concrete Pad and Ramp Maintenance Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE
PAGE OF PAGES

1 1

2 AMENDMENT NO.

#3

3. EFFECTIVE DATE

04/08/2020

4. REQUISITION/PUCHASE REQ. NO.

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Ochoco National Forest – Cyndy Armour

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)

9A.Amend Solicitation. 1204N020Q0005

9B.Dated: 03/09/2020

10A.Mod Contract/

10B.Dated (see Item 13)

code
facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority)

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ X ] is required to sign this document and return 1_ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT

This is an Amendment to solicitation 1204N020Q0005 Redmond Air Center Air Tanker Base Ramp Repair. This is in response to a question by a vendor who had an individual site visit with the COR.

This amendment is issued to amend the type of Asphalt Material that is being specified in the contract for Pay Item 40603 – FOG SEAL. The Asphalt Material for application of a Fog Seal under this contract shall be Emulsified Asphalt CSS-1H and shall comply with ASSHTO M 208. All other requirements of FP-14 Sections 406 and 702 are still apllicable as written. The date that quotes are due is NOT extended with the amendment. Quotes are still due to be in by April 20, 2020 close of business at my office.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Cynthia B. Armour - Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED
16B.UNITED STATES OF AMERICA

16C.DATE SIGNED

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

File details come from the government source that posted it. Updated .