Appendix L BPA Call Sample.doc

DOC document 77 KB Posted

Attached to
Central Oregon Restoration Project CORP 2. 0 Federal contract opportunity
Solicitation number
1204N020Q0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Central Oregon Restoration Project CORP 2. 0, newest first.
File Type Posted
Appendix B Grapple Piling.doc DOC document
Appendix M Wage Determination.pdf PDF
Appendix I Hazard Danger Tree.docx DOCX document
Appendix D Planting.doc DOC document
Appendix N Fire Clauses.pdf PDF
Appendix C Mastication.doc DOC document
Appendix F SubsoilingTillage.docx DOCX document
Appendix O EQUIPMENT CLEANING form.doc DOC document
Appendix K Snag Creation.docx DOCX document
Appendix H Invasive Plant Control.doc DOC document
Appendix A Thinning.doc DOC document
Appendix E Stand Exams.docx DOCX document
Appendix G Handpiling.docx DOCX document
Appendix J Stocking Surveys.docx DOCX document
CORP solicitation.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2020 CORP 2.0

Appendix L BPA Call Sample

Issue Date:

Contract No.

Project Name

BPA Call No.

Issuing and Billing Office:

Contractor:

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

Amount

AC

Remarks: See Attachments for additional terms and conditions. The Period of Performance for this BPA call is from the Date of Award through .
Total Price:

Contractor: (Name and Signature)

Requested By: (Name and Signature)

COR:

Ordered By: (Name and Signature)

Contracting Officer

1.

DESCRIPTION OF WORK:

General Guidelines:

The overall objectives of the project are:

1. Improve and protect:

a. The vitality and resiliency of forest and range ecosystems to threats from fire, insect, disease and invasive and noxious species, including maintaining soil productivity and the use of prescribed fire or vegetation removal to promote healthy forests and rangelands;

2. Reduce:

a. Hazardous forest fuels on federal lands;

b. Fire hazards to private lands, at-risk communities and municipal water supplies; and other improvements

c. Threat of catastrophic fire to T&E species habitat.

This shall be achieved through >>>>>>>>>>>>>>>>

SPECIFICATIONS

Specifications for each Contract Activity individually described by an item number in the Schedule of Service Items can be found in Appendix A-K or attached to individual BPA Calls

2. PROJECT LOCATIONS:

(a) Project Location: Attached vicinity and project area maps show general locations.

(b) Accessibility: The project areas may be reached by the Forest roads suitable for hauling of heavy equipment during the normal operating season. The Forest Service assumes no obligation to plow snow or to perform special maintenance to keep roads open. It is the Contractor's obligation to verify and get approval from Forest Service on travel routes.

(c) Boundaries:

(1) The boundaries, other than for easily identified ground features shown on the contract map, have been plainly marked by the Forest Service as follows:

Contract unit boundaries are usually obvious on the ground. Boundaries, which are not obvious, will be marked with either _________ or _________ flagging and or blue timber boundary tags and _______ tree paint.

(2) There may be portions of other lines or boundaries in the area. These may be marked with flagging, aluminum tags, different posters, or a combination of flagging, tags, and posters. These should be disregarded by the Contractor and only boundaries marked as described above shall be

3. SPECIFIC WORK REQUIREMENT:

Please refer to the detailed unit information sheets attached for specific contract unit requirements.

4. FAR 52.211-10 COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than __________. The time stated for completion shall include final cleanup of the premises. Work is estimated to begin _____________.

5. GOVERNMENT FURNISHED PROPERTY:

Description
Location
Remarks

6. CONTRACTING OFFICER’S REPRESENTITIVE:

Name:

Telephone Number:

7. LIST OF ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract. Also note that if resulting contract award is being made under the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act), additional requirements for disclosure shall be referenced in Attachment X.

Title
Pages
Project Specifications (not Appendix A)
x
Detailed Unit Information Sheets
x
Project Drawings
x
Attachment X
x

8. EVALUATION CRITERIA:

Price, Availability and Relevant Past Performance will be considered for the “Best Value” evaluation. The order of importance corresponds with each criteria’s preceding order of appearance.