Amend1.doc
DOC document 72 KB Posted
- Solicitation number
- 12034319R4001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend2.doc | DOC document | |
| SiteTourNotes.docx..docx | DOCX document | |
| AttachmentJ3_DrawingsPart2.pdf | ||
| AttachmentJ3_DrawingsPart1.pdf | ||
| AttachmentJ2_SpecialProvisions_2019-06-05.docx | DOCX document | |
| FinalRFP.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 1 |
| 6/25/2019 |
| 958697 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530 USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| X |
| 12034319R4001 |
9B. DATED (SEE ITEM 11)
6/10/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 1 and 2.
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
TWO-MILE MEADOW RESTORATION PHASE 2
Nez Perce-Clearwater National Forests; Red River Ranger District
1. Strike the word “Tarp” wherever found in the solicitation and replace with the words “tarp(s)/reinforced plastic”.
2. Strike the Size Specification for Waterproof Tarps in its entirety from the Special Provisions, Table 2. Project Materials List. Also, strike the words “(50 tarps)” from this row under the Estimated Quantity column.
Continue Amendment on page 2.
Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
KAREN RUKLIC
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION: 12034319R4001
Two-Mile Meadow Restoration – Phase 2 Amendment 1, Page 2 of 2 Dated 6/25/2019
3. Amend the Special Provisions, Subpart entitled Bid Item 8 – Sod Harvest and Store, as follows. Strike the Materials description under the second bullet “Tarps” and replace with the following specification.
Waterproof Material
Minimum weave count: 10 X 8 (if material is woven)
Minimum thickness: 6 mil. with scrim reinforcement (if plastic sheeting is used) Size of tarp/reinforced plastic sheet shall be determined by contractor but one consistent size shall be used.
4. Strike the Size Specification for Rock Armoring in its entirety from the Special Provisions, Table 2. Project Materials List and replace with the following specification.
50% 3”-6”
45% 6”-12”
5% 12”-18”
(Intermediate diameter)
5. Amend the Special Provisions, Table 2. Project Materials List, row entitled Boulders. Strike the words 100- EA specified under the Estimated Quantity column and replace with 160- EA.
6. Amend the Special Provisions, Subpart entitled Bid Item 10 – Channel Diversion Structure, Materials as follows. Strike the third bullet that addresses rock armoring in its entirety and replace with the following.
Rock armoring gradation shall be 50% 3”-6”, 45% 6”-12”, and 5% 12”-18” (preferably angular). Rock armoring shall be larger rock taken from the channel diversion structure excavation footprint, railroad berm removal, from alluvium harvest areas, imported from along the 3227 road, or elsewhere as approved by the CO.
7. Amend the Special Provisions, Subpart entitled Bid Item 14 – Habitat Structures, Materials as follows. Strike the fifth bullet that addresses 18-inch boulders in its entirety and replace with the following.
18-inch minimum diameter boulders sourced from alluvium harvest areas, imported from along the 3227 road, or elsewhere as approved by the CO.
8. Amend the Special Provisions, Subpart entitled Bid Item 15 – In-stream Rock and Wood Structures, Materials as follows. Strike the second sentence of the third bullet that addresses large boulder sources and replace with the following.
Import boulders if needed from along the 3227 road or elsewhere as approved by the CO.
RESPONDENT SHALL ACKNOWLEDGE RECEIPT OF THIS AMENDMENT BY ONE OF THE METHODS OUTLINED IN BLOCK 11 OF THE SF-30 FORM. DEADLINE FOR RECEIPT OF OFFERS REMAINS UNCHANGED.