Amendment 0002
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12034319R0009 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
MISSOULA MT 59804
26 FORT MISSOULA ROAD
R1 REGIONAL OFFICE
USDA FOREST SERVICE
07/03/20190002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/03/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE ATTACHED CONTINUATION SHEET
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CHAD B. SANTONE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation 12034319R0009, Amendment 0002, SF30 Continuation Page(s)
The following clarifications and changes are hereby incorporated into the solicitation and any subsequent contract:
1. Are any of the bridges in designated U.S. Wilderness Areas?
Response: No
2. Do the seed projects need to be completed in sequence 1-4?
Response: No
3. Please provide a weight limit for the current bridges in seed 1 and 2.
Response: The truck’s specific axle weights and spacing are needed to provide the upper weight limit that could be allowed through our overload permitting process. However, neither bridge is currently load-posted so highway-legal trucks may cross them without an overload permit. This includes all vehicles with a GVW up to 120,000 pounds that comply with the Federal Bridge Formula.
4. Please provide an approximate size of the diaphragms under Keep Kool-Copper.
Response: The requirement to replace the diaphragms has been removed from the seed project.
5. What is the performance period for the seed projects? If it is for 2020 that will make a difference with our supplier quotes, etc.
Response:
Seed Project #1, Lincoln Area Bridge Repairs: Estimated start date June 2020 with anticipated completion by September 30, 2020. (See Scope of Work)
Seed Project #2, E Fork Reservoir Bridge Repair: Construction during 2020 field season with anticipated completion not later than September 24th. (See Scope of Work)
Seed Project #3, NFSR 9790D Road Construction: Period of performance is 45 calendar days.
Work is required to be completed not later than September 2020. (See Scope of Work)
Seed Project #4, East Fork Chicken Creek Bridge Construction: Period of Performance is 60 calendar days. Construction may take place during field season of 2021. (See Scope of Work)
6. Seed Project #4, East Fork Chicken Creek Bridge Construction, Attachment 4.1, Paragraph 7, Work Schedule is hereby changed to read
FROM:
“The period of performance for this work is 60 calendar days. All work shall be completed prior to August 30, 2020.”
TO:
“The period of performance for this work is 60 calendar days. All work shall be completed prior to August 30, 2021.”
7. Concerning Seed Project No. 3, confirm that there is no planned import material to be used for the construction of the new road? It appears that there will be hauling of excavated material from within the project site and placement of that material at other locations along the new road, but I want to make sure the contractor will not be required to purchase import material for placement (site balance).
Response: As described in FSSS 105.02 and as shown on the project plans, embankment materials and structure backfill material will be utilized from on-site material or at the borrow source location at the Mystic Lake trailhead.
8. Concerning Seed Project No. 4, can you please confirm if the embankment, riprap and crushed aggregates are to government furnished?
Response: Embankment & riprap are to be government furnished as shown in the plans and specifications. Crushed aggregate and coarse granular backfill are contractor furnished, as described in FSSS 105.02.
9. On the Keep Cool Copper seed project, there is a work item to replace diaphragms "in kind”, schedule of items shows 14 each, estimated quantities sheet 2/5 shows 16 each. Nowhere that I can find does it describe the diaphragms and I cannot tell from the picture if it is a glu-lam or solid sawn piece. Do you have any information to help me estimate the diaphragms?
Response: The requirement to replace the diaphragms has been removed from the seed project.
10. Seed Project #4: East Fork Chicken Creek Bridge Construction specification section 151.01 Description, paragraph 1 is hereby changed to read
FROM:
“This site is solely accessed by the West Rosebud Road (County Road 425). A bridge crossing West Rosebud Creek on West Rosebud Road is located approximately 12 miles northeast of the project site. This bridge is currently posted at 25 tons for a Type 3 truck.
Based on the Montana Department of Transportation load rating, the bridge has the capacity to handle legal loads (25/36/43 tons) for the Inventory Rating.”
TO:
“This site is solely accessed by the West Rosebud Road (County Road 425). A bridge crossing West Rosebud Creek on West Rosebud Road is located approximately 12 miles northeast of the project site. This bridge has been improved and no longer has a posted load restriction. This bridge is open to any type of highway legal traffic”
11. Seed Project #1: Lincoln Area Bridges Repair Schedule of Items, Item No. 557(06) is hereby deleted in its entirety. Sheet 3 of 5, Work Item number 5 is hereby deleted in its entirety.
12. The following paragraph is added to section M-2
“In accordance with FAR 16.505(b)((2)(D), the government may determine, in order to meet a minimum guarantee, to limit the number of seed project awards to any given MATOC awardee.
Based on this the Government may award to other than the lowest price per any given seed project.”
13. The solicitation due date is hereby extended by 7 calendar days. The new due date is August 14, 2019 at 3:00 PM MT.
14. Attachments:
Attachment 1.0 Seed Project 1, Schedule of Items Attachment 4.1 Seed Project 4, Scope of Work Pre-Proposal Sign-in Sheets