Lift_Station_Check_list.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Maintenance of the Sewage Lift Station AFD
- Solicitation number
- 12034319Q0122
About this file
Lift Station Check List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation.pdf | ||
| Wage_Determination.pdf | ||
| Generator_Check_list.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Monthly Checklist | |||||
| Sewer Lift Station | |||||
| Electrical Power and Control Systems | |||||
| USFS Aerial Fire Depot | |||||
| Performed by: | Date: | ||||
| Company: | |||||
| Lift Station | |||||
| Device | Item | Normal Status | Status | Action Taken | Action Date |
| Main Disconnect | |||||
| Ground Rod and connections intact | |||||
| Electrical Panel | |||||
| Clear of debris | |||||
| Are covers on | |||||
| GFCI receptacle for generator | |||||
| Pump Control Panel | |||||
| Motor 1,2 run pilot light | |||||
| Test Alarms | |||||
| Check panel for condensation | |||||
| Panel heater | |||||
| Air Pump 1 working | |||||
| Air Pump 2 working | |||||
| Air Pump 1 filter (6 months) | |||||
| Air Pump 2 filter (6 months) | |||||
| Air bubbler piping cleaned at wet well (monthly) | |||||
| Pump 1 hours | |||||
| Pump 2 hours | |||||
| Pump 1 amps (<12 amps) | |||||
| Pump 2 amps (<12 amps) | |||||
| Motor 1 | Vents clear of debris | ||||
| Motor 2 | Vents clear of debris | ||||
| Pump 1 | Bearing oil level (SAE30 non-detergent) | ||||
| Test pump | |||||
| Check for leaks | |||||
| Pump 2 | Bearing oil level (SAE30 non-detergent) | ||||
| Test pump | |||||
| Check for leaks | |||||
| Wet Well | Vent Fan working | ||||
| Heater receptacle working | |||||
| Heater working | |||||
| Review weedly check list | |||||
| Reviewed by: | Date: |
File details come from the government source that posted it.