Statement of Work (SOW)

View the file

Other files

File Type Posted
SF30-Amendment_P00001.pdf PDF
Attach_09_Item_Trail_Summary.pdf PDF
Solicitation_12034319Q0047_Trail_Maintenance.pdf PDF
Attach_02_CZ_-_Item_Desc._8-11.pdf PDF
Attach_08_52.212-3_Offerors_Reps_&_Certs.pdf PDF
Attach_03_SZ_Maps_Items_12-16.pdf PDF
Attach_03_NZ_Maps_Items_1-7.pdf PDF
Attach_02_NZ_-_Item_Desc._1-7.pdf PDF
Attach_03_CZ_Maps_Items_8-11.pdf PDF
Attach_06_Minimum_Impact_Camping_Guidelines.pdf PDF
Attach_07_Idaho_Workers_Compensation.pdf PDF
Attach_04_Technical_Specs-Drawings.pdf PDF
Attach_01_Wage_Determination.pdf PDF
Attach_02_SZ_-_Item_Desc._12-16.pdf PDF
2019_SZ_LineItem13_RapidRiver.pdf PDF
ItemLP9TrailContract.pdf PDF
NFTrailMaint2019_Item3.pdf PDF
2019_SZ_LineItem14_WarmSpringsBar.pdf PDF
2019_SZ_LineItem15_Sourdough.pdf PDF
ItemLP8TrailContractL&PRD2019.pdf PDF
NFTrailMaint2019_Item4.pdf PDF
PalouseTrailMaint2019_Item7.pdf PDF
2019_SZ_LineItem12_GospelHumpNorth.pdf PDF
NFTrailMaint2019_Item6.pdf PDF
2019_SZ_LineItem16_AmericanRiver.pdf PDF
NFTrailMaint2019_Item1.pdf PDF
2019_SZ_Line_Item15_SourdoughWest.pdf PDF
2019_SZ_LineItem12_GospelHumpSouth.pdf PDF
ItemLRD11TrailContractwild2019.pdf PDF
ItemMC10TrailContractwild2019.pdf PDF
NFTrailMaint2019_Item2.pdf PDF
NFTrailMaint2019_Item5.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 05: Statement of Work

Solicitation No.: 12034319Q0047 / Forest Wide - Trail Maintenance / Nez Perce-Clearwater NF

The following is an Addendum to 52.212-4 Contract Terms and Conditions-Commercial Items (OCT 2018):

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SCOPE OF CONTRACT

The Nez Perce-Clearwater National Forest requires annual trail opening and maintenance on Forest Service trails.

The work includes logging out, drainage maintenance and rock removal on non-wilderness and wilderness trails as described in the technical specifications. Slide maintenance and tread repair are required in connection with uprooted trees. Contractors shall be held responsible for all downed trees; there will be NO tree counting. The Contractor(s) shall furnish all labor, supervision, equipment and materials to perform all operations necessary to accomplish the work in accordance with the contract terms, conditions, specifications, drawings and contract attachments/exhibits. (Refer to Technical Specifications-Drawings, Attachment 04 for additional information).

This solicitation will result in the award of multiple Firm-Fixed-Price contracts. Each resultant award will require performance of trail maintenance work for the Forest in a specific geographic area as defined by the Item descriptions and maps provided as attachments to the contract. Only one contractor will be awarded work for each geographic area.

This project is one of the implementation projects of the Collaborative Forest Landscape Restoration Project (CFLRP). The goal of the CFLRP project is to utilize collaborative, science based ecosystem restoration techniques to improve watershed function while encouraging ecological, economic and social sustainability with an emphasis on providing local employment opportunities.

PERFORMANCE DEADLINES

The starting dates in the table below are estimates of when work may begin on an Item; however, not all trail segments within an Item are expected to be open on that date. Regardless of actual starting date, all Trail Maintenance Items shall be completed no later than the dates shown in the table below for the year in which award or renewal was made.

The Contractor shall make progress at a rate that will assure completion of work by the required completion date for each Item. Award of more than one Item to a Contractor will not change the required performance period for each Item. If multiple Items are awarded to one Contractor, the respective performance times will run concurrently, not consecutively. Work may be performed on each Item in succession provided a rate of progress is maintained to ensure completion of all work by the required deadlines.

ITEM NO.

EST.

START

DATE

Base

REQUIRED

COMPLETION

EST.

Option Period 1

REQUIRED

Option Period 1

EST.

Period 2

REQUIRED

Option Period 2

#1 North Fork RD Non Wilderness Trail Mtce

6/15/2019 8/10/2019 6/15/2020 8/10/2020 6/15/2021 8/10/2021

#2 North Fork RD Non Wilderness Trail Mtce

6/15/2019 8/10/2019 6/15/2020 8/10/2020 6/15/2021 8/10/2021

#3 North Fork RD Non Wilderness Trail Mtce

5/15/2019 8/10/2019 5/15/2020 8/10/2020 5/15/2021 8/10/2021

ITEM NO.

EST.

REQUIRED

EST.

Period 1

REQUIRED

Option Period 1

EST.

Period 2

REQUIRED

Option Period 2

#4 North Fork RD Non Wilderness Trail Mtce

6/15/2019 8/10/2019 6/15/2020 8/10/2020 6/15/2021 8/10/2021

#5 North Fork RD Non Wilderness Trail Mtce

6/15/2019 8/10/2019 6/15/2020 8/10/2020 6/15/2021 8/10/2021

#6 North Fork RD Non Wilderness Trail Mtce

6/15/2019 8/10/2019 6/15/2020 8/10/2020 6/15/2021 8/10/2021

#7 Palouse RD Non Wilderness Trail Mtce

5/15/2019 8/01/2019 5/15/2020 8/01/2020 5/15/2021 8/01/2021

#8 Lochsa/Powell RD Non Wilderness Trail Mtce

6/15/2019 8/15/2019 6/15/2020 8/15/2020 6/15/2021 8/15/2021

#9 Lochsa/Powell RD Mixed Trail Mtce

6/15/2019 8/15/2019 6/15/2020 8/15/2020 6/15/2021 8/15/2021

#10 Moose Creek RD Mixed Trail Mtce

6/15/2019 8/15/2019 6/15/2020 8/15/2020 6/15/2021 8/15/2021

#11 Lochsa/Powell RD Mixed Trail Mtce

6/15/2019 8/15/2019 6/15/2020 8/15/2020 6/15/2021 8/15/2021

#12 Salmon River RD Wilderness Trail Mtce

6/15/2019 8/10/2019 6/15/2020 8/10/2020 6/15/2021 8/10/2021

#13 Salmon River RD NonWilderness Trail Mtce

5/01/2019 8/1/2019 5/01/2020 8/1/2020 5/01/2021 8/1/2021

#14 Red River RD Mixed Trail Mtce

6/15/2019 8/15/2019 6/15/2020 8/15/2020 6/15/2021 8/15/2021

#15 Red River RD Mixed Trail Mtce

6/15/2019 8/15/2019 6/15/2020 8/15/2020 6/15/2021 8/15/2021

#16 Red River RD NonWilderness Trail Mtce

6/01/2019 8/15/2019 6/01/2020 8/15/2020 6/01/2021 8/15/2021

Prior to commencement of work, the CO will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be discussed. The Contractor may begin work under the contract when conditions are suitable for access.

Trail Design Criteria

Any Level I, II, or III trail maintenance work that occurs within 300 feet of live water will need to follow new design criteria in order to proceed. The following design criteria have been extracted from the Programmatic Biological Assessment for Trail Maintenance.

1. Gravel Borrow: Borrowing gravel from gravel bars will only occur when an alternative site is not available AND the gravel bar is located well out of the existing stream, where there is little or no chance the gravel could be used by spring spawning salmonids. All gravel removed will be high and dry and as far away from live water as possible. Total gravel removed will be limited to 10 percent of less of the total gravel available to prevent changes in channel morphology, and will be well-distributed. Ideally if a site is known where gravel borrowing is necessary, review of the site by fisheries biologists prior to activity is strongly recommended.

2. Trail Clearing: Where woody materials have fallen across trails and extend into stream channels, only that portion of the material obstructing trail use will be removed. Leave the portion extending into the stream channel.

In-stream woody debris will not be cleared without prior review and approval by a fisheries biologist.

3. Trail Brushing: Brushing trails along streams and at stream crossings will be done in a way that maintains the plants for shade and stream bank stability, while allowing for safe passage. In most cases, brushing occurs on the uphill side of the trail, with the trail between the brushing and the stream. Brushing will be limited to cut slopes and within the trail head. Brush clearing standards will be modified to retain brush where it is providing shade to the stream within 25 feet of a stream and at all stream crossings.

4. Ford Maintenance or Work in Stream Channel: Avoid work in streamside areas where listed fish may be staging or spawning. Sensitive time periods include 15 March – 15 May for Steelhead, 15 August – 30 November for spring Chinook and Bull Trout. Exceptions to this may be granted where surveys for adult fish are conducted by a trained observer and no fish are found. Site-specific review of the activity and the site by a fisheries biologist will be conducted prior to any exceptions.

GOVERNMENT FURNISHED PROPERTY.

- NONE

USE OF MOTORIZED EQUIPMENT AND VEHICLES

It is the responsibility of the successful bidder to ensure that motorized equipment and/or transport/use is commensurate with the management directions for the areas in which the trails are located. The Nez Perce-Clearwater National Forest Motor Vehicle Use Map (MVUM) for the Clearwater NF and Forest Access guide for the Nez Perce NF provide information on roads and trails with motorized use restrictions. These guides are available from Nez Perce-Clearwater National Forest Supervisor’s and Ranger District Offices. All areas outside of wilderness provide for the use of chainsaws.

STOCK LIMITATIONS

In order to decrease chances for site degradation, the use of saddle and pack stock will be kept at the minimum necessary to accomplish the project. A maximum 6 head per trip addresses the initial camp and tool supply. Once tools and camp are transported into the job site, use of stock will be limited to 3 head* during the length of the project. At the end of the project and for complete camp movement during the project, stock shall not exceed 6 head. Stock not in use shall be removed from the National Forest until such time as they are required.

*Based on a 2 person crew – 2 riding and 1 pack animal. (Requests for additional stock will be submitted in writing and approved by the CO prior to use.)

CAMPING.

There are a limited number of campsites in some trail areas. Campsites shall be addressed and designated at the pre-work meeting. The Contractor's campsite will be subject to weekly inspections by a Government Inspector to assure that minimum impact requirements are met. (See Attachment 06: Minimum Impact Camping Guidelines)

CLEANUP OF WORK AND CAMP AREAS.

The project area(s) shall be restored to as close to its original natural appearance as possible. The work area impact must be kept to a minimum. All debris and litter shall be removed from site. Litter shall be packed out, and the native debris shall be scattered outside the trail clearing limit. No debris shall be scattered into any stream, lake, snow pond, meadow, or other water course. (See Attachment 06: Minimum Impact Camping Guidelines)

Noxious Weed Closure Order.

The contractor shall comply with the Special Order issued for all National Forest System Lands within the State of Idaho which prohibits the possession or storage of hay, straw or mulch that is not certified by an authorized official as being

Noxious weed or Noxious Weed Seed Free. A Contractor possessing hay, straw or mulch in the National Forest shall present the weed free certificate upon request.

Access and Equipment Drops in Wilderness:

Use of motor vehicles (including trail motorcycles, ATV’s) and motorized/mechanized equipment (such as chainsaws, generators, or bicycles) are prohibited in designated Wilderness Areas.

Use of helicopters for equipment/supply drops or for ferrying personnel into a Wilderness area will not be allowed.

In general, storing equipment, personal property or supplies at one cache site for more than 14 consecutive days within a 45 day period is prohibited in both Wilderness and Non Wilderness areas, subject to specific Wilderness stay limits.

STANDARD SPECIFICATIONS

“Standard Specifications for Construction of Trails and Trail Bridges on Forest Service Projects” (October, 2014) are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. Attached Standard Specifications 981, 982, 984, 987, and 991 have been modified to suit local needs and supersede the version in “Standard Specifications for Construction and Maintenance of Trails”. Copies of the “Standard Specifications for Construction and Maintenance of Trails” (September, 1996) are available on the Web at: http://www.fs.fed.us/recreation/programs/trail-management/trailplans/index.shtml.

KEY PERSONNEL

The key personnel specified in the Quoter(s) submittals are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer in advance and shall submit justification for the substitutions. No diversion shall be made by the Contractor without the written consent of the Contracting Officer.

GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Inspection Procedure. The Government will perform contract quality assurance as necessary to determine compliance with specifications and to provide the basis for computing the rate of payment. The Government may conduct visual observations and/or sample measurements to determine compliance with specifications. The Contractor shall notify the COR when each trail is complete and ready for inspection. The Government will conduct inspections within 5 days of notification of completion of work by the Contractor.

Re-inspection. If the original inspection results are unacceptable and a second or third inspection is required after rework, the inspection procedures will be the same as the first inspection. Requests for re-inspection must be made in writing. The cost of the re-inspection will be the inspector’s hourly wage applied to the time it takes to re-inspect the work. The contractor shall deduct the cost of the re-inspection from their invoice.

SAFETY

Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, and coordination with other users.

FIRE CONTROL

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The http://www.fs.fed.us/recreation/programs/trail-management/trailplans/index.shtml http://www.fs.fed.us/recreation/programs/trail-management/trailplans/index.shtml

Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with a 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan may be prepared upon request from the CO. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Pump and Trailer. NOT USED

(13) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Submit a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

BIOBASED PRODUCT UTILIZATION

The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.

The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).

The following is an example list of products that may be used in this contract for which biobased products are available.

The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

2-Cycle Engine Oil Chain Bar Lubricants Diesel Fuel Additives Penetrating Lubricants Greases Lube Chain Lubricants Multi-purpose Lubricants Degreasers All Purpose Cleaners

Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.

In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.

The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of this contract (See FAR 52.212-2).

http://www.biopreferred.gov/

Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).

Within thirty (30) days of contract award, the Contractor shall submit an Operation Plan. This submittal will be approved by the COR in writing. The Plan must be reviewed and updated annually, and as required by the COR. The Plan must contain and define the following elements:

• The Contractor’s written policy stating its commitment to the use of biobased products, employee health and safety, and sound environmental management practices.

• Detail on how the Contractor intends to keep abreast of the development and increasing availability of designated and non-designated biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance.

• Proposed biobased construction products which must be selected in accordance with the criteria included above.

At a minimum, the Plan must identify products by brand name for each of the product types.

NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.

• The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.

The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract. The data shall be submitted to the COR quarterly.

A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.

CONDITIONS ON USE OF PREMISES (Camping)

(a) Camping will be allowed only at the sites designated on the project maps or approved in advance by the COR.

(b) No improvements of a permanent nature shall be constructed without prior written approval of the Contracting officer.

Temporary structures such as tent frames, hitch racks, tents and tent pegs shall be removed at the end of the period of use, all evidence of the camp eliminated, and the site restored to its original condition. Final payment will not be authorized until the campsite has been cleaned up and the site is approved by the Contracting Officer or his designated representative. Reusable native material may be neatly stacked for future use.

(c) Livestock will not be permitted without written approval from the Contracting Officer.

(d) Vegetation shall be undisturbed to the maximum extent possible. The Contractor will be permitted to cut only those trees designated by the COR.

(e) Storage of petroleum products in excess of 50 gallons at the campsite will require the approval of the COR.

All petroleum spills shall be immediately cleaned up. All spills shall be reported immediatly to the CO via COR. Spills over 25 gallons or that cause a sheen on surface water shall be reported to the Idaho State

Department of Enviromental Quality. No waste disposal of petroleum product will be permitted on National Forest land.

(f) Chemical toilets are preferred for all campsites, however, the Contractor may be permitted to construct a slit trench when conditions warrant. Any slit trench constructed shall not be located closer than 400 feet to any live stream and is subject to approval of the COR. The trench shall be covered and the area restored to as natural a condition as possible when the camp is closed.

(g) Refuse including waste materials, garbage, and rubbish of all kinds, shall be disposed of in the following manner, and shall guard the purity of streams and living waters:

(h) Waste water shall be disposed of in a leach pit located at least 300 feet from springs, streams, and lakes. The pit shall be a minimum of 2 x 2 x 2 feet and shall be filled with rock two to eight inches in diameter. The leach pit shall be covered with at least two feet of compacted soil when the camp is closed.

(i) No waste or by-products shall be discharged if it contains any substances in concentrations which will result in substantial harm to fish and wildlife, or to human water supplies.

Storage facilities for materials capable of causing water pollution, if accidentally discharged, shall be located so as to prevent any spillage into waters, or channels leading into water, that would result in substantial harm to fish and wildlife or to human water supplies.

(j) The camp area shall be maintained to present a clean, neat, and orderly appearance. Disposal of trash and debris, unusable machinery, Forest Service authorized improvements, etc., shall be kept current. Building materials, firewood, etc., shall be neatly stacked.

The campsite shall be left in a clean condition. Any clean-up work not accomplished by the Contractor at time of camp closure will be done by the Forest Service, and the actual cost of such clean-up will be deducted from payment otherwise due the Contractor.

IDAHO WORKERS COMPENSATION LAW

(a) Prior to award of any contract subject to Idaho Workers' Compensation Laws, the contractor must provide (1) evidence that they have the required workers' compensation coverage or, (2) documentation from the State of Idaho exempting the contractor from such coverage. - Refer to Attachment 07 for State of Idaho Certificate of Verification of Workers’ Compensation Insurance Form.

(b) Contractors should obtain and complete a State of Idaho Certificate of Verification of Workers' Compensation Insurance as documentation of insurance coverage or exemption. These certificates may be obtained from and returned to the Employee Compliance Division of the Idaho Industrial Commission at the following offices:

North Idaho Southwest Idaho 1221 Ironwood Street, Suite 100 317 Main Street Coeur d'Alene, ID 83814 P.O. Box 83720

(208) 769-1565 Boise, ID 83720-0041 Fax No. (208) 769-1465 (208) 334-6032 Fax No. (208) 334-5145 Southeast Idaho 1070 Hiline, Suite 300 Pocatello, ID 83201

(208) 236-6366 Fax No. (208) 236-6040

Contractor Workforce Certification Upon the request of the Contracting Officer, the Contractor shall submit a written report containing the following elements:

• Contractor Name and Address

• Contract Number

• Date of Report

• Identification of individual Contractor and Subcontractor employees, and identification of the city and state in which each individual employee maintains a primary residence.

• The following statement: “I hereby certify that this list identifies all Contractor employees and subcontractor employees engaged in performance of this contract, and that the information contained in this report is accurate as of the date of this report.”

• Contractor signature and date of signature.

Permits and Responsibilities The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.