A-7_Amend1.doc
DOC document 88 KB Posted
- Solicitation number
- 12034318R0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SiteTourNotes.docx | DOCX document | |
| A-7RFP.docx | DOCX document | |
| A-7AttachmentJ6_AerialPhotos.pdf | ||
| A-7AttachmentJ2_Drawings_Pages15_21.pdf | ||
| A-7AttachmentJ9_AD3031.pdf | ||
| A-7AttachmentJ3_TempBridgeDrawings.pdf | ||
| A-7AttachmentJ2_Drawings_Pages8_14.pdf | ||
| A-7AttachmentJ8_AD3030.pdf | ||
| A-7AttachmentJ2_Drawings_Pages1_7.pdf | ||
| A-7AttachmentJ4CrookedRiver_Tech_Specs_DRAFT5-FINAL.docx | DOCX document | |
| A-7AttachmentJ5_SWPPPTemplate.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 1 |
| 5/15/2018 |
| 895736 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530 USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| X |
| 12034318R0012 |
9B. DATED (SEE ITEM 11)
4/24/2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 1 and 2.
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
CROOKED RIVER VALLEY REHABILITATION PHASE 1
Nez Perce-Clearwater National Forests; Red River Ranger District
1. Amend the solicitation to add Attachment J-10 - Electronic GPS Data, in support of the design drawings. The electronic files include alignments, surfaces, survey control and linework for the design. Contractors may access the data within the USDA Cloud Vault. To access the data follow this Hyperlink: View it! - Password: Crooked. If you have trouble with the link, email kruklic@fs.fed.us and the hyperlink will be emailed direct.
2. Amend Schedule of Items B-1 to change the estimated quantities for the Equipment Rental Items 12 and 13. An amended Schedule of Items has been provided on page three (3). Utilize this form for your offer. Amendment continues on page 2.
Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
KAREN RUKLIC
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION: 12034318R0012
Crooked River Valley Rehabilitation – Phase 1
Amendment 1, Page 2 of 3 Dated 5/15/2018
3. Amend solicitation Attachment J-4: Technical Specifications, Section 02140 Water Management, page 28, paragraph two (2) as follows. Strike sentence 7 and replace with the folowing 2 sentences:
“Dewatering and fish salvage may take up to 5 weekdays. Dewatering shall begin no later than August 6th, to allow for completion by the August 15th US Fish and Wildlife Service fish salvage deadline.”
SOLICITATION: 12034318R0012
Crooked River Valley Rehabilitation – Phase 1
Amendment 1, Page 3 of 3
Dated 5/15/2018
B- 1 Schedule of Items (Version 2 changed via Amendment 1)
| PAY ITEM |
| DESCRIPTION |
| METH. MEAS. |
| PAY UNIT |
| EST. QTY |
| UNIT PRICE |
| TOTAL PRICE |
| 1 |
| Mobilization and Demobilization |
| LSQ |
| LS |
| 1 |
| XXXX |
| Water Management and Environmental Controls |
| LSQ |
| LS |
| 1 |
| XXXX |
| 3 |
| Temporary Bypass Channel Bridge |
| LSQ |
| LS |
| 1 |
| XXXX |
| 4 |
| Survey and Staking |
| LSQ |
| LS |
| 1 |
| XXXX |
| 5 |
| Construct Diversion Structure and Activate Bypass Channel |
| LSQ |
| LS |
| 1 |
| XXXX |
| 6 |
| Earthwork- Excavate, Fill, and Grade Channel and Floodplain |
| DQ |
| CUBIC |
YARDS
50,200
| 7 |
| Earthwork- Import Fill from South Staging Area |
| AQ |
| CUBIC YARDS |
| 6,200 |
| Earthwork- Salvage and Stockpile Vegetative Fill Material |
| AQ |
| CUBIC YARDS |
| 4,100 |
| 9 |
| Earthwork- Construct Riffles |
| DQ |
| LINEAR FOOT |
| 2,263 |
| 10 |
| Floodplain Roughness - Wood and Slash Placement |
| DQ |
| ACRE |
| 10 |
| 11 |
| Seeding |
| DQ |
| ACRE |
| 22 |
| Equipment Rental Rate for Excavator and Operator |
| AQ |
| HOURS |
| Amended to |
| Equipment Rental Rate for Dump Truck and Operator |
| AQ |
| HOURS |
| Amended |
to 16
| 14 |
| Equipment Rental Rate for Bulldozer and Operator |
| AQ |
| HOURS |
| 8 |
TOTAL (All Base Items 1-14): $_____________________________________________
ADDITIVE ITEM DESCRIPTION
| 15 |
| Large Wood Structure – Type 1 |
| AQ |
| EACH |
| 19 |
TOTAL (All Base + Additive Item 1-15): $_____________________________________
* Designated Method of Measurement: DQ – Designed Quantities; AQ - Actual Quantities, LSQ - Lump Sum Quantities
RESPONDENT SHALL ACKNOWLEDGE RECEIPT OF THIS AMENDMENT BY ONE OF THE METHODS OUTLINED IN BLOCK 11 OF THE SF-30 FORM. DEADLINE FOR RECEIPT OF OFFERS REMAINS UNCHANGED.
File details come from the government source that posted it.