A-7_Amend1.doc

DOC document 88 KB Posted

Attached to
Nez Perce-Clearwater NFs - Crooked River Valley Rehabilitation Phase 1
Solicitation number
12034318R0012
Issued by

View the file

Other files

File Type Posted
SiteTourNotes.docx DOCX document
A-7RFP.docx DOCX document
A-7AttachmentJ6_AerialPhotos.pdf PDF
A-7AttachmentJ2_Drawings_Pages15_21.pdf PDF
A-7AttachmentJ9_AD3031.pdf PDF
A-7AttachmentJ3_TempBridgeDrawings.pdf PDF
A-7AttachmentJ2_Drawings_Pages8_14.pdf PDF
A-7AttachmentJ8_AD3030.pdf PDF
A-7AttachmentJ2_Drawings_Pages1_7.pdf PDF
A-7AttachmentJ4CrookedRiver_Tech_Specs_DRAFT5-FINAL.docx DOCX document
A-7AttachmentJ5_SWPPPTemplate.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
1
5/15/2018
895736
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530 USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
X
12034318R0012

9B. DATED (SEE ITEM 11)

4/24/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 1 and 2.

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

CROOKED RIVER VALLEY REHABILITATION PHASE 1

Nez Perce-Clearwater National Forests; Red River Ranger District

1. Amend the solicitation to add Attachment J-10 - Electronic GPS Data, in support of the design drawings. The electronic files include alignments, surfaces, survey control and linework for the design. Contractors may access the data within the USDA Cloud Vault. To access the data follow this Hyperlink: View it! - Password: Crooked. If you have trouble with the link, email kruklic@fs.fed.us and the hyperlink will be emailed direct.

2. Amend Schedule of Items B-1 to change the estimated quantities for the Equipment Rental Items 12 and 13. An amended Schedule of Items has been provided on page three (3). Utilize this form for your offer. Amendment continues on page 2.

Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

KAREN RUKLIC

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION: 12034318R0012

Crooked River Valley Rehabilitation – Phase 1

Amendment 1, Page 2 of 3 Dated 5/15/2018

3. Amend solicitation Attachment J-4: Technical Specifications, Section 02140 Water Management, page 28, paragraph two (2) as follows. Strike sentence 7 and replace with the folowing 2 sentences:

“Dewatering and fish salvage may take up to 5 weekdays. Dewatering shall begin no later than August 6th, to allow for completion by the August 15th US Fish and Wildlife Service fish salvage deadline.”

SOLICITATION: 12034318R0012

Crooked River Valley Rehabilitation – Phase 1

Amendment 1, Page 3 of 3

Dated 5/15/2018

B- 1 Schedule of Items (Version 2 changed via Amendment 1)

PAY ITEM
DESCRIPTION
METH. MEAS.
PAY UNIT
EST. QTY
UNIT PRICE
TOTAL PRICE
1
Mobilization and Demobilization
LSQ
LS
1
XXXX
Water Management and Environmental Controls
LSQ
LS
1
XXXX
3
Temporary Bypass Channel Bridge
LSQ
LS
1
XXXX
4
Survey and Staking
LSQ
LS
1
XXXX
5
Construct Diversion Structure and Activate Bypass Channel
LSQ
LS
1
XXXX
6
Earthwork- Excavate, Fill, and Grade Channel and Floodplain
DQ
CUBIC

YARDS

50,200

7
Earthwork- Import Fill from South Staging Area
AQ
CUBIC YARDS
6,200
Earthwork- Salvage and Stockpile Vegetative Fill Material
AQ
CUBIC YARDS
4,100
9
Earthwork- Construct Riffles
DQ
LINEAR FOOT
2,263
10
Floodplain Roughness - Wood and Slash Placement
DQ
ACRE
10
11
Seeding
DQ
ACRE
22
Equipment Rental Rate for Excavator and Operator
AQ
HOURS
Amended to
Equipment Rental Rate for Dump Truck and Operator
AQ
HOURS
Amended

to 16

14
Equipment Rental Rate for Bulldozer and Operator
AQ
HOURS
8

TOTAL (All Base Items 1-14): $_____________________________________________

ADDITIVE ITEM DESCRIPTION

15
Large Wood Structure – Type 1
AQ
EACH
19

TOTAL (All Base + Additive Item 1-15): $_____________________________________

* Designated Method of Measurement: DQ – Designed Quantities; AQ - Actual Quantities, LSQ - Lump Sum Quantities

RESPONDENT SHALL ACKNOWLEDGE RECEIPT OF THIS AMENDMENT BY ONE OF THE METHODS OUTLINED IN BLOCK 11 OF THE SF-30 FORM. DEADLINE FOR RECEIPT OF OFFERS REMAINS UNCHANGED.

File details come from the government source that posted it.