A-7_AttachmentJ3TMM_Drawings_2018-01-02_Part2.pdf
PDF 5 MB Posted
- Solicitation number
- 12034318R0010
About this file
Attachment J-3 Drawings Part 2
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0+00
1+00
2+00
4+00
4+50
0+00
1+00
3+00
4+00
5+00
0+00
1+00
2+00
3+00
4+00
5+00
5+25
HS 1
HS 2
HS 3
HS 4
HS 5
HS 6
HS7
DITCH PLUG 5
N: 1872793.82
E: 2460119.02
DITCH PLUG 2
N: 1873480.18
E: 2460413.04
DITCH PLUG 3
N: 1873290.01
E: 2460309.24
DITCH PLUG 4
N: 1873047.08
E: 2460204.71
DITCH PLUG 6
N: 1872773.66
E: 2459913.87
DITCH PLUG 1
N: 1873577.83
E: 2460451.64
CHANNEL DIVERSION STRUCTURE
N: 1873696.78
E: 2460375.36
POOL
POOL
POOL
E L E
V A
T I O
N
F
T
STATION (FT)
13+60 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50
E L E
V A
T I O
N
F
T
STATION (FT)
21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50
0.0%
-0.3%
-0.2%
HS 1
HS 2
HS 3
HS 4
HS 5
HS 6HS7
-0.0%
-0.1%
-0.3%
0.0%
0.0%
SCALE:
0 50 100
1" = 100'
N
W
E
S
CONSTRUCTED
CHANNEL 4 (STA
16+77 TO 15+15)
FILL AREA 4. FILL EXISTING
DITCH WITH MATERIAL
REMOVED FROM BERM
REMOVE EXISTING BERM &
SALVAGE MATERIAL (TYP). USE
BR 7 & BR 8 (SEE SHEET C10)
FOR ADDITIONAL PHASE 1 FILL.
F
L
O
W
UPPER TWO-MILE MEADOW
EAST FORK POTLATCH RIVER
EXISTING ACTIVE CHANNEL
DVSL 2
FILL AREA 2
OFF-CHANNEL
HABITAT 1 (SEE
SHEET C7)
FILL AREA 3
OFF-CHANNEL
HABITAT 2 (SEE
SHEET C7)
P H
A S
E
N D
CONSTRUCTED
CHANNEL 2 (STA
23+33 TO 21+75)
DES. CHANNEL
ALIGNMENT
DVSL 1
SB 1
(70 LF)
SB 3
(70 LF)
SB 2
(140 LF)
CONSTRUCTED
CHANNEL 5 (STA
14+60 TO 13+85)
DATE:
CHECKED:
ENGINEER:
DRAWN BY:
B. DAVIS
S. FIROR
D. GILLEN
SHEET NAME:
SHEET:
PROJECT NO.:
DATE:
C4
NO. DATE REVISIONS BY CHK
6/16/2016
COORDINATE SYSTEM:
SCALE:
APPROVED:
DATE:
ISP, NAD 83, US FT, WEST
1" = 100'
S. FIROR
12/20/2017
UPPER TMM PLAN &
PROFILE
12/31/2017
17089
PROFILE
SCALE: 1" = 100' HORIZONTAL, 1" = 12.5' VERTICAL
HISTORIC CHANNEL INVERT
CONSTRUCTED
CHANNEL INVERT
CONSTRUCTED CHANNEL 4
CONSTRUCTED
CHANNEL 5
CONSTRUCTED CHANNEL 3
CONSTRUCTED
CHANNEL 2
CONSTRUCTED
CHANNEL 3 (STA
20+50 TO 19+02)
C
FILL AREA 1B
C
C
C
C
BR 1
BR 2
BR 3
BR 4
BR 5
D6
1-3
D10
D8
1-2
D3
1-5
D3
1-5
D3
1-5
D3
1-5
DVSL (TYP)
D4
3-4
STICK BERM
(TYP)
D1
3-4
INSTALL LOG
"V" WEIRS
(3 TOTAL)
HABITAT
STRUCTURE
(TYP)
D1
1-2
CONSTRUCTED
CHANNEL INVERT
HISTORIC CHANNEL INVERT
INSTALL LOG "V"
WEIRS (3 TOTAL)
HARVEST ALLUVIUM
FROM EXISTING CHANNEL
AND BANKS (TYP)
HISTORIC CHANNEL TOB
HISTORIC CHANNEL TOB
BRUSH
FASCINE
(TYP)
D7
1-3
D7
1-3
D7
1-3
D7
1-3
D8
1-2
D8
1-2
BF 1
BF 2
BF 4
BF 5
D5
1-2
D5
3-4
FILL AREA 1A
D8
1-2
D8
1-2
BF 3
BF 6
NOTES:
1. HARVEST SOD FROM BERM REMOVALS, FILL
AREAS, & CONSTRUCTED CHANNELS AT THE
DIRECTION OF GOV'T.
2. SEE SHEET C6 FOR CONSTRUCTED CHANNEL
CROSS-SECTION SEQUENCING, STREAMBANK
TREATMENTS, & MATERIAL QUANTITIES
TABLES.
3. THIS PROJECT IS DESIGNED FOR AN
EARTHWORK BALANCE. MORE RAILROAD
BERM MAY BE REMOVED IF NEEDED UPON
APPROVAL FROM GOV'T.
PLACE LOOSE LOGS IN
CHANNEL AT DIRECTION OF
GOV'T (STA 28+00 TO 24+50)
APPROX. 7 LOGS TOTAL
D7
1-3
D7
1-3
C
TWO-MILE MEADOW
RESTORATION PROJECT
NEAR HELMER, ID
Science & Engineering, Inc.
CONSTRUCTED
CHANNEL 1 (STA
28+85 TO 28+25)
CONSTRUCTED
CHANNEL 1
CONSTRUCTED
CHANNEL INVERT
D3
1-5
L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+25
DATE:
CHECKED:
ENGINEER:
DRAWN BY:
B. DAVIS
S. FIROR
D. GILLEN
SHEET NAME:
SHEET:
PROJECT NO.:
DATE:
C5
NO. DATE REVISIONS BY CHK
6/16/2016
COORDINATE SYSTEM:
SCALE:
APPROVED:
DATE:
ISP, NAD 83, US FT, WEST
1" = 50'
S. FIROR
12/20/2017
UPPER TMM
CROSS-SECTIONS
12/31/2017
17089
DITCH PLUG 2
BERM REMOVAL 1.
REMOVE EXISTING BERM
& SALVAGE MATERIAL.
HISTORIC
CHANNEL
C4
CROSS-SECTION 1
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
C4
CROSS-SECTION 2
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
C4
CROSS-SECTION 3
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
FILL AREA 4. FILL EXISTING
DITCH WITH MATERIAL
REMOVED FROM BERM.
CONSTRUCTED
CHANNEL 1
BRUSH
FASCINE 2
FILL AREA 2
CONSTRUCTED
CHANNEL 3
DVSL 2
FILL AREA 3
FILL AREA 4. FILL EXISTING DITCH WITH
MATERIAL REMOVED FROM BERM.
BERM REMOVAL 4.
REMOVE EXISTING BERM
& SALVAGE MATERIAL.
D4
3-4
D8
1-2
D10
D8
1-2
D10
D7
1-3
D5
1-2
D3
1-5
D3
1-5
BERM REMOVAL 3.
REMOVE EXISTING BERM
& SALVAGE MATERIAL.
D10
D8
1-2
D8
1-2
HARVEST ALLUVIUM
FROM EXISTING CHANNEL
AND BANKS AS NEEDED
HARVEST ALLUVIUM
FROM EXISTING CHANNEL
AND BANKS AS NEEDED
HARVEST ALLUVIUM
FROM EXISTING
CHANNEL AND BANKS
TWO-MILE MEADOW
RESTORATION PROJECT
NEAR HELMER, ID
Science & Engineering, Inc.
DATE:
CHECKED:
ENGINEER:
DRAWN BY:
B. DAVIS
S. FIROR
D. GILLEN
SHEET NAME:
SHEET:
PROJECT NO.:
DATE:
C6
NO. DATE REVISIONS BY CHK
6/16/2016
COORDINATE SYSTEM:
SCALE:
APPROVED:
DATE:
ISP, NAD 83, US FT, WEST
N/A
S. FIROR
12/20/2017
UPPER TMM
TABLES
12/31/2017
17089
CONSTRUCTED CHANNEL CROSS-SECTION SEQUENCING
CONSTRUCTED
CHANNEL NO.
CROSS-SECTION START STA END STA
LENGTH (FT)
BANK
1 RUN 28+85 28+25 60 N/A
2 RIFFLE 23+33 22+81 52 N/A
2 RUN 22+81 22+65 16 LEFT
2 POOL 22+65 22+17 48 LEFT
2 RIFFLE 22+17 21+75 42 N/A
3 RIFFLE 20+50 20+07 43 N/A
3 POOL 20+07 19+57 50 RIGHT
3 RIFFLE 19+57 19+02 55 N/A
4 RIFFLE 16+77 16+36 41 N/A
4 RUN 16+36 16+10 26 RIGHT
4 POOL 16+10 15+68 42 RIGHT
4 RIFFLE 15+68 15+15 53 N/A
5 RIFFLE 14+60 13+85 75 N/A
STREAMBANK TREATMENTS
TREATMENT NO. START STA END STA
LENGTH (FT)
BANK
BF 1 28+91 27+27 180 LEFT
DVSL 1 23+89 23+20 80 LEFT
BF 2 23+20 21+73 170 LEFT
BF 3 20+93 20+13 100 RIGHT
BF 4 19+85 18+26 200 LEFT
BF 5 17+32 16+77 60 RIGHT
DVSL 2 17+01 16+10 120 LEFT
BF 6 16+06 14+69 160 RIGHT
PHASE 1 UPPER MEADOW ESTIMATED MATERIAL QUANTITIES
FEATURE
FILL MATERIAL
QUANTITY
GENERATED ON SITE
(CY)
ALLUVIUM
GENERATED ON SITE
(CY)
TOPSOIL REQ'D (CY)
ROCK/SOIL
(COMPACTED) FILL
REQ'D (CY)
ALLUVIUM REQ'D (CY)
CHANNEL DIVERSION
STRUCTURE
- 105 100 300 50
DITCH PLUG 1 - 45 40 110 10
DITCH PLUG 2 - 35 40 120 5
DITCH PLUG 3 - 30 30 70 5
DITCH PLUG 4 - 40 60 160 10
DITCH PLUG 5 30 40 110 5
DITCH PLUG 6 55 70 200 15
FILL AREA 1A - - 360 - -
FILL AREA 1B - 310 - -
FILL AREA 2 - - 160 - -
FILL AREA 3 - - 400 - -
FILL AREA 4 - - 450 - -
BERM REMOVAL 1 170 - - - -
BERM REMOVAL 2 270 - - - -
BERM REMOVAL 3 110 - - - -
BERM REMOVAL 4 100 - - - -
BERM REMOVAL 5 320 - - - -
BERM REMOVAL 7 (SEE
SHEET C11)
680 - - - -
BERM REMOVAL 8 (SEE
SHEET C11)
290 - - - -
OFF-CHANNEL HABITAT 1 290 - - - -
OFF-CHANNEL HABITAT 2 500 - - - -
CONSTRUCTED CHANNEL 2 420 - - - 87
CONSTRUCTED CHANNEL 3 130 - - - 91
CONSTRUCTED CHANNEL 4 230 - - - 87
CONSTRUCTED CHANNEL 5 120 - - - 70
ALLUVIUM HARVEST AREAS - 95 - - -
TOTALS 3630 435 2060 1070 435
NOTE:
BANK DESIGNATIONS ARE
FACING DOWNSTREAM.
TWO-MILE MEADOW
RESTORATION PROJECT
NEAR HELMER, ID
Science & Engineering, Inc.
LOG REQUIREMENTS
ELEMENT STATION LOGS BOULDERS BANK
HS1 24+00 3 (MIN) 2 LEFT
HS2 21+75 3 (MIN) 2 LEFT
HS3 20+10 3 (MIN) 2 LEFT
HS4 18+20 3 (MIN) 2 RIGHT
HS5 17+45 3 (MIN) 2 LEFT
HS6 16+15 3 (MIN) 2 RIGHT
LOOSE LOGS 24+50 - 27+00 7 (MIN) 0 N/A
FLOODPLAIN N/A 152 (MIN) 0 N/A
OFF-CHANNEL
HABITAT
N/A 8 0 N/A
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+25
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00
SCALE:
0 25 50
1" = 50'
N
W
E
S
UPPER TWO-MILE MEADOW
OFF-CHANNEL HABITAT 1
OFF-CHANNEL HABITAT 2 DES. CHANNEL ALIGNMENT
DATE:
CHECKED:
ENGINEER:
DRAWN BY:
B. DAVIS
S. FIROR
D. GILLEN
SHEET NAME:
SHEET:
PROJECT NO.:
DATE:
C7
NO. DATE REVISIONS BY CHK
6/16/2016
COORDINATE SYSTEM:
SCALE:
APPROVED:
DATE:
ISP, NAD 83, US FT, WEST
1" = 50'
S. FIROR
12/20/2017
OFF-CHANNEL HABITAT
PLAN, PROFILES, &
CROSS-SECTIONS
12/20/2017
17089
OCH 2 PROFILE
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
OCH 1 PROFILE
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
EXISTING GROUND
- 1
LOGS WITH ROOTWADS.
BURY 50% OF TRUNK
LENGTH IN FLOODPLAIN
(4 TOTAL FOR OCH 2).
EXISTING GROUND
LOGS WITH ROOTWADS.
BURY 50% OF TRUNK
LENGTH IN FLOODPLAIN
(4 TOTAL FOR OCH 1).
OFF-CHANNEL HABITAT BOTTOM
OFF-CHANNEL
HABITAT BOTTOM
OCH 2 CROSS-SECTION
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
OCH 1 CROSS-SECTION
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
EXISTING GROUND
OFF-CHANNEL HABITAT BOTTOM
OFF-CHANNEL
HABITAT BOTTOM
EXISTING GROUND
HISTORIC CHANNEL
HISTORIC
CHANNEL
HISTORIC CHANNEL
LOCATION
NOTE:
1. HARVEST SOD FROM THOSE
AREAS STAKED BY GOV'T.
TWO-MILE MEADOW
RESTORATION PROJECT
START ALGN
N: 1870222.0
E: 2459077.5
END ALGN
N: 1869993.8
E: 2459361.0
0+00
1+00
2+00
3+00
0+00
1+00
2+00
3+00
E L E
V A
T I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00
E L
E V
A T
I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50
E L E
V A
T I O
N
F
T
STATION (FT)
0+00 0+50 1+00 1+50 2+00 2+50 3+00
SCALE:
0 50 100
1" = 100'
N
W
E
S
REMOVE EXISTING BERMS &
SALVAGE MATERIAL (TYP).
FILL AREA 9. FILL
EXISTING DITCH WITH
MATERIAL REMOVED
FROM BR9 & BR10.
DEWATER AT
DIRECTION OF GOV'T.
PRESERVE &
PROTECT EXISTING
HISTORIC CHANNEL
F
L
O
W
LOWER TWO-MILE
MEADOW
EAST FORK
POTLATCH RIVER
EXISTING ACTIVE
CHANNEL
DATE:
CHECKED:
ENGINEER:
DRAWN BY:
B. DAVIS
S. FIROR
D. GILLEN
SHEET NAME:
SHEET:
PROJECT NO.:
DATE:
C8
NO. DATE REVISIONS BY CHK
6/16/2016
COORDINATE SYSTEM:
SCALE:
APPROVED:
DATE:
ISP, NAD 83, US FT, WEST
AS SHOWN
S. FIROR
12/20/2017
LOWER TMM PLAN,
PROFILE, &
CROSS-SECTIONS
12/31/2017
17089
F
L
O
W
CROSS-SECTION 2
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
BERM REMOVAL 9.
REMOVE EXISTING BERM
& SALVAGE MATERIAL.
PERSUASION
CHANNEL (STA
0+76 TO 2+36)
PERSUASION CHANNEL
D10
D8
1-2
BR 10
BR 9
D8
NOTES:
1. ALL BERM REMOVAL AND AND BORROW DITCH
FILL AREAS SHALL INCORPORATE FLOODPLAIN
MICROTOPOGRAPHY, LOGS, & SLASH ON THE
FINISHED GRADE (SEE SHEET C9 AND SHEET D9).
2. HARVEST SOD FROM PERSUASION CHANNEL,
BERM REMOVALS, & FILL AREAS FOOTPRINT IN
THOSE AREAS STAKED BY GOV'T.
EXISTING
CHANNEL
PROFILE
SCALE: 1" = 100' HORIZONTAL, 1" = 12.5' VERTICAL
PERSUASION CHANNEL
EXISTING GROUND
EXISTING GROUND
CROSS-SECTION 1
SCALE: 1" = 50' HORIZONTAL, 1" = 12.5' VERTICAL
FILL AREA 9. FILL EXISTING
DITCH WITH MATERIAL
REMOVED FROM BR9 & BR10.
BERM REMOVAL 10.
REMOVE EXISTING BERM
& SALVAGE MATERIAL
EXISTING
CHANNEL
EXISTING GROUND
PHASE 1 LOWER MEADOW ESTIMATED
MATERIAL QUANTITIES
FEATURE
FILL MATERIAL
GENERATED
ON SITE (CY)
TOPSOIL
REQ'D (CY)
FILL AREA 9
- 740
BERM REMOVALS
9 & 10
725 -
PERSUASION
CHANNEL
15 -
TOTALS 740 740
TWO-MILE MEADOW
RESTORATION PROJECT
SCALE:
0 50 100
1" = 100'
N
W
E
S
DATE:
CHECKED:
ENGINEER:
DRAWN BY:
B. DAVIS
S. FIROR
D. GILLEN
SHEET NAME:
SHEET:
PROJECT NO.:
DATE:
C9
NO. DATE REVISIONS BY CHK
6/16/2016
COORDINATE SYSTEM:
SCALE:
APPROVED:
DATE:
ISP, NAD 83, US FT, WEST
1" = 100'
S. FIROR
12/20/2017
FLOODPLAIN
MICROTOPOGRAPY,
LOGS, & SLASH PLAN
12/20/2017
17089
PHASE 1 DES
CHANNEL
ALIGNMENT
FLOODPLAIN MICROTOPOGRAPHY
AND SLASH (TYP)
FLOODPLAIN LOGS (TYP)
LEGEND:
FLOODPLAIN MICROTOPOGRAPHY & SLASH
FLOODPLAIN LOGS
NOTES:
1. NO FLOODPLAIN LOGS SHALL BE PLACED
WITHIN 10 FEET OF NEW LIVESTOCK FENCE.
REFER TO SHEET C11 FOR FENCING PLAN.
2. FLOODPLAIN MICROTOPOGRAPHY TO BE
APPLIED WHEREVER ACCESS ROUTES ARE
UTILIZED AS REQUESTED BY GOV'T.
D9
D9
3-4
SCALE:
0 50 100
1" = 100'
N
W
E
S
UPPER MEADOW
LOWER MEADOW
FLOODPLAIN LOGS (TYP)
D9
FLOODPLAIN MICROTOPOGRAPHY
AND SLASH (TYP)
D9
3-4
F
L
O
W
F
L
O
W
PLACE SLASH
AROUND DITCH
PLUGS (TYP)
LEGEND:
FLOODPLAIN MICROTOPOGRAPHY & SLASH
FLOODPLAIN LOGS
PLACE SLASH AROUND
CHANNEL DIVERSION
STRUCTURE
TWO-MILE MEADOW
RESTORATION PROJECT
HS 9
0+00
1+00
2+00
3+00
4+00
4+25
POOL
SCALE:
0 50 100
1" = 100'
N
W
E
S
BR 8 USE AS NEEDED
DURING PHASE 1
F
L O
W
UPPER TWO-MILE MEADOW
(PHASE 2)
EAST FORK POTLATCH RIVER
EXISTING ACTIVE CHANNEL
DVSL 4
F L O
W
DATE:
CHECKED:
ENGINEER:
DRAWN BY:
B. DAVIS
S. FIROR
D. GILLEN
SHEET NAME:
SHEET:
PROJECT NO.:
DATE:
C10
NO. DATE REVISIONS BY CHK
6/16/2016
COORDINATE SYSTEM:
SCALE:
APPROVED:
DATE:
ISP, NAD 83, US FT, WEST
1" = 100'
S. FIROR
12/20/2017
PHASE 2 - UPPER TMM
PLAN
12/20/2017
17089
S H
E E
T
C
M A
T C
H
L
I N
E
PHASE 2 PLAN SHOWN FOR LOCATIONS OF BERM REMOVAL AREAS ONLY
PRESERVE & PROTECT
EXISTING HISTORIC
SIDE CHANNEL
PRESERVE & PROTECT
EXISTING HISTORIC CHANNEL
C
C
BR 7
BR 8
NOTES:
1. HARVEST SOD FROM BERM REMOVALS,
FILL AREAS, & CONSTRUCTED CHANNELS
AT THE DIRECTION OF GOVERNMENT.
2. THIS PROJECT IS DESIGNED FOR AN
EARTHWORK BALANCE. MORE RAILROAD
BERM MAY BE REMOVED IF NEEDED UPON
APPROVAL FROM GOV'T.
BR 7 USE AS NEEDED
DURING PHASE 1
TWO-MILE MEADOW
RESTORATION PROJECT
| 6_TWO-MILE MEADOW_90% DESIGN_UPPER MEADOW_2017-12-18-PH 1 - UPPER PLAN & PROF_C4 |
| Sheets and Views |
| PH 1 - UPPER PLAN & PROF_C4 |
| 7_TWO-MILE MEADOW_90% DESIGN_UPPER MEADOW_2017-12-18-PH 1 - SECTIONS_C5 |
| Sheets and Views |
| PH 1 - SECTIONS_C5 |
| 8_TWO-MILE MEADOW_90% DESIGN_UPPER MEADOW_2017-12-18-PH 1 TABLES_C6 |
| Sheets and Views |
| PH 1 TABLES_C6 |
| 9_TWO-MILE MEADOW_90% DESIGN_UPPER MEADOW_2017-12-18_BTD-PH 1 - SIDE CHANNEL_C7 |
| Sheets and Views |
| PH 1 - SIDE CHANNEL_C7 |
| 10_TWO-MILE MEADOW_90% DESIGN_LOWER MEADOW_2017-12-13-PH 1 - LOWER PLAN & PROF_C8 |
| Sheets and Views |
| PH 1 - LOWER PLAN & PROF_C8 |
| 11_TWO-MILE MEADOW_90% DESIGN_UPPER MEADOW_2017-12-18_BTD-PH 1 - FP ROUGHNESS_C9 |
| Sheets and Views |
| PH 1 - FP ROUGHNESS_C9 |
| 12_TWO-MILE MEADOW_90% DESIGN_UPPER MEADOW_2017-12-18_BTD-PH 2 - UPPER P&P (CONT)_C10 |
| Sheets and Views |
| PH 2 - UPPER P&P (CONT)_C10 |
File details come from the government source that posted it.