12034318Q0320.pdf
PDF 666 KB Posted
- Attached to
- CUSTER GALLATIN NATIONAL FOREST Hebgen Ranger District Bunkhouse Siding and Deck Replacement
- Solicitation number
- 12034318Q0320
About this file
Primary Solicitation Document
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-4_Additional_Photos.pdf | ||
| J-3_Project_Specifications_and_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. REQUEST NO.
12034318Q0320 5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
08/22/2018
3. REQUISITION/PURCHASE REQUEST NO.
1 69
09/15/2018
Hebgen Lake RD
b. STREET ADDRESS
District Office PO Box 520 US HWY 91 N West Yellowstone, MT 59758
West Yellowstone
MT
406 624-3443WESLEY DUDLEY
09/15/2018 1900 ET
FOB DESTINATION
OTHER
(See Schedule)
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Pine-Bear Trails Project Period of Performance: 09/15/2018 to 11/15/2018
Construction Siding and Deck Replacement
Delivery: 09/15/2018
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
Hebgen Triplex Siding and Deck Replacement Construction Project
RFQ/Solicitation #: 12034318Q0320
SECTION B - SERVICES AND PRICES
Triplex Bunkhouse Siding, Window, Insulation and Deck Upgrades
B1 - Schedule of Items
Pay Item
Number Description Method of
Measurement Pay
Unit
Estimated
Quantity Unit Price Total Price
01000 Mobilization LSQ LS 1 XXXXXX $
01100 Demolition and
Disposal
LSQ LS 1 XXXXXX $
061001 Sheathing - Supply and Install
LSQ LS 1 XXXXXX $
061002 Deck Replacement CQ SF 800 $ $
072100 Rigid Insulation LSQ LS 1 XXXXXX $
072500
Moisture Barrier and Roofing Felt -
Supply and Install
LSQ LS 1 XXXXXX $
074600
Prefinished Fiber
Cement Board-and-
Bat Siding and
Trim
LSQ LS 1 XXXXXX $
074643
Prefinished
Compostion
Horizontal Lap
Siding and Trim
LSQ LS 1 XXXXXX $
076200
Flashing per
Drawings - Supply and Install
CQ LS 1 XXXXXX $
085650 Windows - Supply and Install
CQ EA 18 $ $
Total
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price
Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01
Mobilization.
NOTE: Abbreviations used in Bid Schedule
* LSQ = Lump Sum Quantity ** LS = Lump Sum
* CQ = Contract Quantity ** CY = Cubic Yard
* AQ = Actual Quantity ** SY = Square Yard
** SF = Square Foot
** LF = Linear Foot
NOTE: The pay items in the Schedule of Items may have suffixes that do not appear on the pay items in the specifications. They pertain only to sizes, classes, and/or types indicated in the item "Descriptions,” and are used by the Government for computer tabulation of bid schedules.
NOTE: The quoter must quote all items. Round to the nearest cent.
NOTE: The Government may award all, some, or none of the items depending on determination of best value as detailed in Section M and funds available for each item. Priority in awards are 1) Base; 2) Additive #1; 3)
Additive #2; 4) Additive #3.
This is a Request for Quotation (RFQ); therefore, no public opening will be held. The results will not be made public prior to award. Quotes submitted in response to this RFQ will not be returned, but will be retained by the U.S. Forest Service for official record purposes. The RFQ does not commit the Government to pay any costs incurred in the preparation or the submission of this quote, or to make any award.
Vendor shall have a DUNS number and be registered in the System for Award Management (www.sam.gov) prior to award.
The Forest Service utilizes an electronic invoice system called Invoice Processing Platform (IPP). Awardee is required to set-up an account at www.ipp.gov in order to submit invoices.
Price Quotation furnished by:
Name: _______________________________ Phone: ____________________________
Address: ______________________________ Cell: ____________________________
______________________________ FAX: ____________________________
E-Mail: ________________________________ DUNS # ___________________________ http://www.ipp.gov/
SECTION C—DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C1 - PROJECT DESCRIPTION AND LOCATION
C.1.1 Intent of Contract – The intent of the contract is to provide for the completion of the work described below. The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
C1.2 Scope of Contract. The work shall consist of removing and disposing of existing siding, soffit and facia and exterior doors; furnishing and installing new metal siding, insulation and exterior doors.
The Contractor shall ensure that door, window, and all other openings are enclosed before close of business daily.
The Contractor shall be responsible for verifying all door, window, and building measurements to determine necessary quantities and sizes of materials to be furnished.
ITEM 01000, Mobilization: Work shall consist of preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.
ITEM 01100, Demolition and Disposal: Work shall consist of removal and disposal of existing materials on Hebgen Lake RS Triplex to include but not limited to siding, trim, windows, and decks.
ITEM 061001, Sheathing: Work shall consist of supplying and installing sheathing per the Plans and
Section 061000. Irregular surfaces will be encountered.
ITEM 061002, Deck Replacement: Work shall consist of supplying and installing materials for reconstructing the decks, stairs, landings, and ramps per the Plans and Section 061000.
ITEM 072100, Rigid Insulation: Work shall consist of the contractor supplying and installing 1/2” insulation board. Installation shall follow manufacturer’s recommendations, the Plans, and Section
072100.
ITEM 072500, Moisture Barrier and Roofing Felt: Work shall consist of the contractor supplying and installing moisture barrier and roofing felt. Installation shall follow manufacturer’s recommendations, the
Plans, and Section 072500.
ITEM 074600, Prefinished Fiber Cement Board-and-Bat Siding and Trim: Work shall consist of the installing prefinished siding per manufacturer’s recommendations, the Plans and Section 074600.
ITEM 074643, Prefinished Composition Horaizontal Lap Siding and Trim: Work shall consist of installing prefinished siding per manufacturer’s recommendations, the Plans and Section 074643.
ITEM 076200, Flashing: Work shall consist of supplying and installing flashing and related appurtenances per the Plans and Section 076200.
ITEM 085650, Windows: Work shall consist of supplying and installing existing windows and related appurtenances per manufacturer’s recommendations, the Plans and Section 085000.
C.1.3 Project Location – This project is located at the West Yellowstone Compound, Hebgen Lake Ranger
District of the Custer Gallatin National Forest in West Yellowstone, Montana.
C.1.4 Price Range – Between $25,000 and $100,000
C.1.5 Pre-bid Tour - No pre-bid tour of the project will be conducted.
Prospective bidders wishing to visit the site on their own may obtain information by contacting Zac
Hiedeman at the Bozeman Office, Custer Gallatin National Forest, Bozeman, Montana, telephone (406)
587-6729.
C.1.6 Start Work - It is estimated that work will begin in July 2018.
C.1.7 Period of Performance – Contract to be completed in 30 calendar days.
C.1.8 Government Furnished Materials – NA
C.1.09 Submittals- The contractor shall submit a Work Schedule and all material to be used on the project as specified in the specifications
C.1.10 Disturbances –No work shall be permitted before 0700 or after 1800. Keep access to all Units of the
Triplex Bunkhouse available at all times, except for minor interruptions while construction is actively occurring. Limit periods of inaccessibility to 4 hours, and notify Tenants 24 hours in advance (written notice on doors to units is preferred, verbal notice is acceptable) when access will be limited.
C.1.11 Staging Area - The Contractor shall coordinate with the CO on a staging area location. The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, buildings, parking lots, and landscaping. Access must be maintained to the residence, and other facilities on the site.
C.1.13 Potable Water- The contractor may use the water on-site.
C.1.14 Wastewater Facilities – The Contractor may use the restrooms on site. The Contractor shall be responsible for cleaning and/repairing the restroom if necessary as a result of the Contractor’s operations.
C.1.15 Electrical – The Contractor may use on-site electrical service for operation of small power tools.
C.2 – CLEANUP AND DISPOSAL
C.2.1 Cleanup and Disposal – The Contractor shall be responsible for solid waste disposal. The Contractor shall at all times keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.
C.3 – SECURITY AND PROTECTION
C.3.1 Security and Protection – Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The
Contractor shall be responsible for all costs required to provide such protection.
The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.
C-4 – OTHER RELATED DOCUMENTS AND DRAWINGS
C4.1 The following CSI formatted specifications are part of this solicitation and any resulting contract.
Section Description
01000 Mobilization
01025 Measurement and Payment
01400 Quality Control and Quantity Measurement
061000 Rough Carpentry
072100 Building Insulation
072500 Weather Barriers
074600 Fiber Cement Board Siding
074643 Composition Siding
076200 Sheet Metal Flashing and Trim
085650 Windows
C4.2 The following Plans are part of this solicitation and any resulting contract.
Plans for Hebgen Lake Ranger Station Triplex Siding Replacement
- Sheet 1 – Cover Sheet
- Sheet 2 – Vicinity Map
- Sheet 3 – General Notes
- Sheet 4 – Photos
- Sheet 5 – Plan and Profile
- Sheet 6 – Profile and Cutaway View
- Sheet 7 – Window Schedule
- Sheet 8 – Details
- Sheet 9 – Deck Replacement
SECTION 01000
MOBILIZATION
PART I: GENERAL
1.1 SUMMARY
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.
PART II: PRODUCTS
(There are no applicable requirements.)
PART III: EXECUTION
(There are no applicable requirements.)
PART IV: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: Progress payments will be made as follows:
1. When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
2. When 10% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 10% of the original Contract amount, whichever is lesser, will be paid.
3. Upon completion of work for the project, payment of the amount bid for mobilization in excess of
10% of the original Contract amount will be paid.
4. The total sum of all payments shall not exceed the original Contract amount bid for mobilization, regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.
4.2 BASIS OF PAYMENT:
Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the bid price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
(01000) Mobilization. . . . . . . . . . . . . . . . . Lump Sum
END OF SECTION
SECTION 01025
MEASUREMENT AND PAYMENT
PART I - GENERAL
1.1 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.
When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between items to be bid.
1.2 Determination of Quantities - The following methods of measurement are used to determine contract quantities for payment.
For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding will be along slope lines.
Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the
COR in writing to fit field conditions.
For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.
1.3 Units of Measurement - Payment will be by units defined and determined according to U.S. Standard measure as follows:
A. Acre – Make longitudinal and transverse measurements for area computations horizontally.
B. Cubic Yard - A measurement computed by one of the following methods:
1. Excavation, Embankment, or Borrow - The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
2. Material in Place or Stockpile - The measurement computed with dimensions of the in-place material.
3. Material in the Delivery Vehicle - The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
C. Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile.
D. Each - One complete unit, which may consist of one or more parts.
E. Gallon – The quantity may be measured by any of the following methods:
1. Measured volume container.
2. Metered volume. Use an approved metering system
3. Commercially packaged volumes.
F. Hour – Measurement will be for the actual number of hours ordered and performed by the
Contractor.
G. Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal.
H. MFBM - One thousand board feet measure based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job.
I. Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp.
J. Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.
K. Square Foot - Measure on a plane parallel to the surface being measured or horizontal.
L. Square Yard – Measure on a plane parallel to the surface being measured or horizontal.
M. Station - One hundred linear feet measured horizontally.
N. Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.
O. Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile.
P. Ton - Short ton consisting of 2,000 pounds.
Q. Ton Mile - A combination of linear and weight measurement meaning the movement of 1 ton of material 1 mile.
1.4 Methods of Measurement - One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:
A. Contract Quantities (CQ) AND Design Quantities (DQ) - These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
1. As a result of changes in the work authorized by the Contracting Officer.
2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by more than
15 percent.
3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by more than 15%. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
B. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction.
C. Actual Quantities (AQ) - These quantities are determined from measurements of completed work.
D. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles.
E. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
PART II - PRODUCTS (Not Applicable)
PART III - EXECUTION (Not Applicable)
SECTION 01400
QUALITY CONTROL AND QUANTITY MEASUREMENT
PART I - GENERAL
1.1 Scope - This work shall consist of providing quality control in conformance with the Inspection of
Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 Measurement and Payment - No separate payment will be made for the work included under this section.
Payment for this work is considered incidental to other items of work.
PART II - PRODUCTS (Not Applicable)
PART III – EXECUTION (Not Applicable)
SECTION 06100 - ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes all work necessary or required for rough framing of the project, as indicated on the drawings. Such work includes, but is not necessarily limited to, framing, blocking and backing, furring, sheathing, and building wrap.
1.2 DEFINITIONS
A. Rough Carpentry: Carpentry work concealed by other construction and not specified in other Sections.
B. Lumber grading agencies, and the abbreviations used to reference them, include the following:
1. NELMA - Northeastern Lumber Manufacturers Association.
2. NLGA - National Lumber Grades Authority.
3. WCLIB - West Coast Lumber Inspection Bureau.
4. WWPA - Western Wood Products Association.
1.3 SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details.
1. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Indicate type of preservative used, net amount of preservative retained, and chemical treatment manufacturer's written instructions for handling, storing, installing, and finishing treated material.
2. For products receiving a waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.
3. Include copies of warranties from chemical treatment manufacturers for each type of treatment.
1.4 QUALITY ASSURANCE
A. Source Limitations for Engineered Wood Products: Obtain each type of engineered wood product through one source from a single manufacturer.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Stack lumber, plywood, and other panels; place spacers between each bundle to provide air circulation.
Provide for air circulation around stacks and under coverings.
1.6 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of lumber grading agencies certified by the American Lumber
Standards Committee Board of Review.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on end or back of each piece.
3. Provide dressed lumber, S4S, unless otherwise indicated.
4. (Sill Plates, Joists & Planks, Light Framing Members, Pressure Treated Faming) Provide dry lumber with 19 percent maximum moisture content at time of dressing, unless otherwise indicated.
5. (All other Framing Members) Provide dry lumber with 15 percent maximum moisture content at time of dressing, unless otherwise indicated.
B. Engineered Wood Products: Provide engineered wood products acceptable to authorities having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project.
1. Allowable Design Stresses: Provide engineered wood products with allowable design stresses, as published by manufacturer, that meet or exceed those indicated. Manufacturer's published values shall be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency.
C. Wood Structural Panels:
1. Plywood: DOC PS 1.
2. Oriented Strand Board: DOC PS 2.
3. Thickness: As needed to comply with requirements specified but not less than thickness indicated.
4. Comply with "Code Plus" provisions in APA Form No. E30K, "APA Design/Construction Guide:
Residential & Commercial."
5. Factory mark panels according to indicated standard.
2.2 WOOD-PRESERVATIVE-TREATED MATERIALS
A. Preservative Treatment by Pressure Process: AWPA C2 (lumber) and AWPA C9 (plywood), except that lumber that is not in contact with the ground and is continuously protected from liquid water may be treated according to AWPA C31 with inorganic boron (SBX).
1. Preservative Chemicals: Acceptable to authorities having jurisdiction and one of the following:
a. Chromated copper arsenate (CCA).
b. Ammoniacal copper zinc arsenate (ACZA).
c. Ammoniacal, or amine, copper quat (ACQ).
d. Copper bis (dimethyldithiocarbamate) (CDDC).
e. Ammoniacal copper citrate (CC).
f. Copper azole, Type A (CBA-A).
g. Oxine copper (copper-8-quinolinolate) in a light petroleum solvent.
2. For exposed items indicated to receive a stained or natural finish, use chemical formulations that do not require incising, contain colorants, bleed through, or otherwise adversely affect finishes.
B. Kiln-dry material after treatment to a maximum moisture content of 19 percent for lumber and 15 percent for plywood. Do not use material that is warped or does not comply with requirements for untreated material.
C. Mark each treated item with the treatment quality mark of an inspection agency approved by the American
Lumber Standards Committee Board of Review.
1. For exposed lumber indicated to receive a stained or natural finish, mark end or back of each piece, or omit marking and provide certificates of treatment compliance issued by inspection agency.
D. Application: Treat items indicated on Drawings, and the following:
1. Wood sills, sleepers, blocking, furring, stripping, and similar concealed members in contact with masonry or concrete.
2. Wood framing members less than 6 inches above grade.
3. Wood floor plates that are installed over concrete slabs directly in contact with earth.
2.3 DIMENSION LUMBER
A. General: Provide dimension lumber of grades indicated according to the American Lumber Standards
Committee National Grading Rule provisions of the grading agency indicated.
B. Non-Load-Bearing Interior Partitions: Stud grade and the following species:
1. Western woods; WCLIB or WWPA.
C. Framing Other Than Non-Load-Bearing Partitions: No. 2 grade and any of the following species:
1. Douglas fir-larch; WCLIB or WWPA.
2. Hem-fir; WCLIB or WWPA.
D. Exposed Exterior Framing: Provide material hand-selected for uniformity of appearance and freedom from characteristics that would impair finish appearance.
1. Species and Grade: Douglas fir-larch, Douglas fir-larch (north), or Douglas fir-south; No. 1 grade;
NLGA, WCLIB, or WWPA.
2.4 MISCELLANEOUS LUMBER
A. General: Provide lumber for support or attachment of other construction, including the following:
1. Framing.
2. Decking.
3. Blocking.
4. Nailers.
5. Furring.
6. Sheathing.
B. For items of dimension lumber size, provide No. 2 grade lumber with 15 percent maximum moisture content and the following species:
1. Western woods; WCLIB or WWPA.
C. For exposed boards, provide lumber with 15 percent maximum moisture content and the following species and grades:
1. Douglas fir-larch, Hem-fir; No.1 grade; NELMA, NLGA, WCLIB, or WWPA.
D. For concealed boards, provide lumber with 15 percent maximum moisture content and the following species and grades:
1. Western woods, [Construction or No. 2 Common] [Standard or No. 3 Common] grade; WCLIB or
WWPA.
E. For furring strips for installing plywood or hardboard paneling, select boards with no knots capable of producing bent-over nails and damage to paneling.
2.5 SHEATHING
A. Plywood Wall Sheathing: Exterior, Structural I Exposure 1, Structural I sheathing.
1. Span Rating: Not less than 16/0.
2. Thickness: Not less than 1/2 inch.
2.6 PLYWOOD BACKING PANELS
A. Telephone and Electrical Equipment Backing Panels: DOC PS 1, Exposure 1, C-D Plugged, fire-retardant treated, in thickness indicated or, if not indicated, not less than 1/2 inch thick.
2.7 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this
Article for material and manufacture.
1. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.
B. Nails, Brads, and Staples: ASTM F 1667.
C. Power-Driven Fasteners: CABO NER-272.
D. Wood Screws: ASME B18.6.1.
E. Lag Bolts: ASME B18.2.1.
F. Bolts: Steel bolts complying with ASTM A 307, Grade A; with ASTM A 563 hex nuts and, where indicated, flat washers.
2.8 MISCELLANEOUS MATERIALS
A. Building Paper: Asphalt-saturated organic felt complying with ASTM D 226, Type II (No. 30 asphalt felt), unperforated.
B. Building Wrap: Air-retarder sheeting made from polyolefins; cross-laminated films, woven strands, or spun-bonded fibers; coated or uncoated; with or without perforations; and complying with ASTM E 1677, Type I.
1. Thickness: Not less than 3 mils.
2. Permeance: Not less than 10 perms.
3. Flame-Spread Index: 25 or less per ASTM E 84.
4. Allowable Exposure Time: Not less than three months.
C. Building Wrap Tape: Pressure-sensitive plastic tape recommended by building wrap manufacturer for sealing joints and penetrations in building wrap.
D. Sheathing Tape: Pressure-sensitive plastic tape for sealing joints and penetrations in sheathing and recommended by sheathing manufacturer for use with type of sheathing required.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry to other construction; scribe and cope as needed for accurate fit. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.
B. Do not use materials with defects that impair quality of rough carpentry or pieces that are too small to use with minimum number of joints or optimum joint arrangement.
C. Apply field treatment complying with AWPA M4 to cut surfaces of preservative-treated lumber and plywood.
D. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. CABO NER-272 for power-driven fasteners.
2. Published requirements of metal framing anchor manufacturer.
3. Table 23-II-B-1, "Nailing Schedule," and Table 23-II-B-2, "Wood Structural Panel Roof Sheathing
Nailing Schedule," in the Uniform Building Code.
4. Table 2305.2, "Fastening Schedule," in the BOCA National Building Code.
5. Table 2306.1, "Fastening Schedule," in the Standard Building Code.
6. Table 602.3(1), "Fastener Schedule for Structural Members," and Table 602.3(2), "Alternate
Attachments," in the International One- and Two-Family Dwelling Code.
E. Use common wire nails, unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood; predrill as required.
F. Use finishing nails for exposed work, unless otherwise indicated. Countersink nail heads and fill holes with wood filler.
3.2 WOOD, BLOCKING, AND NAILER INSTALLATION
A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.
B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces, unless otherwise indicated. Build anchor bolts into masonry during installation of masonry work. Where possible, secure anchor bolts to formwork before concrete placement.
3.3 WOOD FRAMING INSTALLATION, GENERAL
A. Framing Standard: Comply with AFPA's "Manual for Wood Frame Construction," unless otherwise indicated.
B. Framing with Engineered Wood Products: Install engineered wood products to comply with manufacturer's written instructions.
C. Do not splice structural members between supports.
3.4 STAIR FRAMING INSTALLATION
A. Provide stair framing members of size, space, and configuration indicated or, if not indicated, to comply with the following requirements:
1. Stringer Size: 2-by-12-inch nominal- size, minimum.
2. Notching: Notch stringers to receive treads, risers, and supports; leave at least 3-1/2 inches (89
mm) of effective depth.
3. Stringer Spacing: At least 3 stringers for each 36-inch clear width of stair.
B. Provide stair framing with no more than 3/16-inch variation between adjacent treads and risers and no more than 3/8-inch variation between largest and smallest treads and risers within each flight.
3.5 BUILDING PAPER APPLICATION
A. Apply building paper horizontally with 2-inch overlap and 6-inch end lap; fasten to sheathing with galvanized staples or roofing nails. Cover upstanding flashing with 4-inch overlap.
3.6 BUILDING WRAP APPLICATION
A. Cover wall sheathing with building wrap as indicated.
1. Comply with manufacturer's written instructions.
2. Cover upstanding flashing with 4-inch overlap.
3. Seal seams, edges, and penetrations with tape.
4. Extend into jambs of openings and seal corners with tape.
END OF SECTION 061000
SECTION 072100 - BUILDING INSULATION
PART 4 - GENERAL
4.1 SUMMARY
A. This Section includes the following:
1. Perimeter wall insulation (supporting backfill).
2. Cavity-wall insulation.
3. Concealed building insulation.
4. Loose-fill building insulation.
5. Vapor retarders.
4.2 DEFINITIONS
A. Mineral-Fiber Insulation: Insulation composed of rock-wool fibers, slag-wool fibers, or glass fibers;
produced in boards and blanket with latter formed into batts (flat-cut lengths) or rolls.
4.3 PERFORMANCE REQUIREMENTS
A. Plenum Rating: Provide [glass]-fiber insulation where indicated in ceiling plenums whose test performance is rated as follows for use in plenums as determined by testing identical products per
"Erosion Test" and "Mold Growth and Humidity Test" described in UL 181, or on comparable tests from another standard acceptable to authorities having jurisdiction.
1. Erosion Test Results: Insulation shows no visible evidence of cracking, flaking, peeling, or delamination of interior surface of duct assembly, after testing for 4 hours at 2500-fpm air velocity.
2. Mold Growth and Humidity Test Results: Insulation shows no evidence of mold growth, delamination, or other deterioration due to the effects of high humidity, after inoculation with
Chaetomium globosium on all surfaces and storing for 60 days at 100 percent relative humidity in the dark.
4.4 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of building insulation through one source from a single manufacturer.
B. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-test-response characteristics indicated, as determined by testing identical products per test method indicated below by
UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.
1. Surface-Burning Characteristics: ASTM E 84.
2. Fire-Resistance Ratings: ASTM E 119.
3. Combustion Characteristics: ASTM E 136.
4.5 DELIVERY, STORAGE, AND HANDLING
A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.
B. Protect plastic insulation as follows:
1. Do not expose to sunlight, except to extent necessary for period of installation and concealment.
2. Protect against ignition at all times. Do not deliver plastic insulating materials to Project site before installation time.
3. Complete installation and concealment of plastic materials as rapidly as possible in each area of construction.
4.6 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price as shown on the Schedule of Items for the building.
PART 5 - PRODUCTS
5.1 FOAM-PLASTIC BOARD INSULATION
A. Extruded-Polystyrene Board Insulation: ASTM C 578, of type and density indicated below, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively:
1. Available Manufacturers:
a. DiversiFoam Products.
b. Dow Chemical Company.
c. Owens Corning.
d. Pactiv Building Products Division.
e. Amvic
2. Type VII, 2.20 lb/cu. ft..
B. Molded-Polystyrene Board Insulation: ASTM C 578, of type and density indicated below, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively:
1. Available Manufacturers:
a. DiversiFoam Products.
b. Manufacturers with a third-party certification program satisfying model building code mandatory requirements for foam plastics.
2. Type II, 1.35 lb/cu. ft..
5.2 AUXILIARY INSULATING MATERIALS
A. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by insulation manufacturers for sealing joints and penetrations in vapor-retarder facings.
B. Adhesive for Bonding Insulation: Product with demonstrated capability to bond insulation securely to substrates indicated without damaging insulation and substrates.
PART 6 - EXECUTION
6.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements of Sections in which substrates and related work are specified and for other conditions affecting performance.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
6.2 PREPARATION
A. Clean substrates of substances harmful to insulation or vapor retarders, including removing projections capable of puncturing vapor retarders or of interfering with insulation attachment.
6.3 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and application indicated.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any time to ice, rain, and snow.
C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
D. Water-Piping Coordination: If water piping is located within insulated exterior walls, coordinate location of piping to ensure that it is placed on warm side of insulation and insulation encapsulates piping.
E. For preformed insulating units, provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness.
6.4 INSTALLATION OF INSULATION
A. On vertical surfaces, set insulation units in adhesive applied according to manufacturer's written instructions. Use adhesive recommended by insulation manufacturer.
1. If not otherwise indicated, extend insulation a minimum of 24 inches below exterior grade line.
B. On horizontal surfaces, loosely lay insulation units according to manufacturer's written instructions.
Stagger end joints and tightly abut insulation units.
C. Protect below-grade insulation on vertical surfaces from damage during backfilling by applying protection course with joints butted. Set in adhesive according to insulation manufacturer's written instructions.
6.5 INSTALLATION OF VAPOR RETARDERS
A. General: Extend vapor retarder to extremities of areas to be protected from vapor transmission. Secure in place with adhesives or other anchorage system as indicated. Extend vapor retarder to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation.
B. Seal vertical joints in vapor retarders over framing by lapping not less than two wall studs. Fasten vapor retarders to wood framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints.
Space fasteners 16 inches o.c.
C. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarder.
D. Repair tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarder.
6.6 PROTECTION
A. Protect installed insulation and vapor retarders from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.
END OF SECTION 072100
SECTION 072500 - WEATHER BARRIERS
GENERAL
SUMMARY
Section Includes:
Building wrap.
Flexible flashing.
Roofing felt
ACTION SUBMITTALS
Product Data: For each type of product.
INFORMATIONAL SUBMITTALS
Evaluation Reports: For water-resistive barrier and flexible flashing, from ICC-ES.
PRODUCTS
WATER-RESISTIVE BARRIER
Building Wrap: ASTM E 1677, Type I air barrier; with flame-spread and smoke-developed indexes of less than
25 and 450, respectively, when tested according to ASTM E 84; UV stabilized; and acceptable to authorities having jurisdiction.
Products: Subject to compliance with requirements, available products that may be incorporated into the
Work include, but are not limited to, the following:
Dow Chemical Company (The); Styrofoam Weathermate Plus Brand Housewrap.
DuPont (E. I. du Pont de Nemours and Company); Tyvek CommercialWrap.
Ludlow Coated Products; Barricade Building Wrap.
Pactiv, Inc.; GreenGuard Ultra Wrap.
Raven Industries Inc.; Fortress Pro Weather Protective Barrier.
Reemay, Inc.; Typar HouseWrap.
Water-Vapor Permeance: Not less than 50 g through 1 sq. m of surface in 24 hours per
ASTM E 96/E 96M, Desiccant Method (Procedure A).
Building-Wrap Tape: Pressure-sensitive plastic tape recommended by building-wrap manufacturer for sealing joints and penetrations in building wrap.
MISCELLANEOUS MATERIALS
Flexible Flashing: Self-adhesive butyl rubber or rubberized-asphalt compound, bonded to a high-density polyethylene film, aluminum foil, or spunbonded polyolefin to produce an overall thickness of not less than 0.025 inch.
Products: Subject to compliance with requirements, available products that may be incorporated into the
Work include, but are not limited to, the following:
DuPont (E. I. du Pont de Nemours and Company); DuPont Flashing Tape.
Grace Construction Products, a unit of W. R. Grace & Co. - Conn.; Vycor Butyl Self Adhered
Flashing.
Protecto Wrap Company; BT-25 XL.
Raven Industries Inc.; Fortress Flashshield.
Advanced Building Products Inc.; Wind-o-wrap.
Carlisle Coatings & Waterproofing; CCW-705-TWF Thru-Wall Flashing.
Fiberweb, Clark Hammerbeam Corp.; Aquaflash 500.
Fortifiber Building Systems Group; Fortiflash 40.
Grace Construction Products, a unit of W. R. Grace & Co. - Conn.; Vycor V40 Self-Adhered
Flashing.
MFM Building Products Corp.; Window Wrap.
Polyguard Products, Inc.; Polyguard JT-30 Tape.
Sandell Manufacturing Co., Inc.; Presto-Seal.
Roofing Felts: ASTM D 226 or ASTM D 4869 Type II, asphalt-saturated organic felts.
http://www.specagent.com/LookUp/?ulid=965&mf=04&mf=95&src=wd&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816361&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816362&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816363&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816364&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816365&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816366&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?ulid=966&mf=04&mf=95&src=wd&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816368&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816369&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816369&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816370&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816371&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816373&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816374&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816375&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816376&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816377&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816378&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816379&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816380&mf=04&&mf=04&src=wd
EXECUTION
WATER-RESISTIVE BARRIER INSTALLATION
Cover sheathing with water-resistive barrier as follows:
Cut back barrier 1/2 inch on each side of the break in supporting members at expansion- or control-joint locations.
Apply barrier to cover vertical flashing with a minimum 4-inch overlap unless otherwise indicated.
Building Wrap: Comply with manufacturer's written instructions.
Seal seams, edges, fasteners, and penetrations with tape.
Extend into jambs of openings and seal corners with tape.
FLEXIBLE FLASHING INSTALLATION
Apply flexible flashing where indicated to comply with manufacturer's written instructions.
Lap seams and junctures with other materials at least 4 inches except that at flashing flanges of other construction, laps need not exceed flange width.
Lap flashing over water-resistive barrier at bottom and sides of openings.
Lap water-resistive barrier over flashing at heads of openings.
END OF SECTION 072500
SECTION 074600 - SIDING
PART 7 - GENERAL
7.1 SUMMARY
A. Section includes fiber-cement siding.
7.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1. For vinyl siding, include VSI's official certification logo printed on product data.
B. Samples: For siding including related accessories.
7.3 INFORMATIONAL SUBMITTALS
A. Product certificates.
B. Product test reports.
C. Research/evaluation reports.
D. Warranty: Sample of special warranty.
7.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
7.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Furnish full lengths of siding including related accessories, in a quantity equal to 2 percent of amount installed.
7.6 QUALITY ASSURANCE
A. Labeling: Provide fiber-cement siding that is tested and labeled according to ASTM C 1186 by a qualified testing agency acceptable to authorities having jurisdiction.
B. Source Limitations: Obtain each type, color, texture, and pattern of siding, including related accessories, from single source from single manufacturer.
C. Preinstallation Conference: Conduct conference at Project site.
7.7 WARRANTY
A. Special Warranty: Standard form in which manufacturer agrees to repair or replace siding that fail(s) in materials or workmanship within specified warranty period.
1. Warranty Period: 25 years from date of Substantial Completion.
PART 8 - PRODUCTS
8.1 FIBER-CEMENT SIDING
A. General: ASTM C 1186, Type A, Grade II, fiber-cement board, noncombustible when tested according to ASTM E 136; with a flame-spread index of 25 or less when tested according to ASTM E 84.
1. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on
Drawings or comparable product by one of the following:
a. James Hardie.
2. Panel Texture: 48-inch- wide sheets with wood-grain texture.
3. Factory Priming: Manufacturer's standard acrylic primer.
8.2 ACCESSORIES
A. Siding Accessories, General: Provide starter strips, edge trim, outside and inside corner caps, and other items as recommended by siding manufacturer for building configuration.
1. Provide accessories made from same material as adjacent siding unless otherwise indicated.
B. Flashing: Provide stainless-steel flashing complying with Section 076200 "Sheet Metal Flashing and
Trim" at window and door heads and where indicated.
C. Fasteners:
1. For fastening to wood, use ribbed bugle-head screws of sufficient length to penetrate a minimum of 1 inch into substrate.
2. For fastening fiber cement, use stainless-steel fasteners.
PART 9 - EXECUTION
9.1 EXAMINATION
A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting performance of siding and related accessories.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
9.2 INSTALLATION
A. General: Comply with siding manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
1. Do not install damaged components.
2. Center nails in elongated nailing slots without binding siding to allow for thermal movement.
B. Install fiber-cement siding and related accessories.
1. Install fasteners no more than 24 inches o.c.
C. Install joint sealants as specified in Section 079200 "Joint Sealants" and to produce weathertight installation.
http://www.specagent.com/LookUp/?ulid=997&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456798860&mf=04&src=wd
9.3 ADJUSTING AND CLEANING
A. Remove damaged, improperly installed, or otherwise defective materials and replace with new materials complying with specified requirements.
B. Clean finished surfaces according to manufacturer's written instructions and maintain in a clean condition during construction.
END OF SECTION 074600
SECTION 074643 - COMPOSITION SIDING
PART 10 - GENERAL
10.1 SUMMARY
A. Section Includes:
1. Engineered wood cladding.
2. Trim.
3. Sealant.
4. Weather barrier.
5. Flashing.
10.2 COORDINATION
A. Coordinate installation with flashings, weather barriers, and other adjoining construction to ensure proper sequencing for weathertight performance.
B. Coordinate with finish coat to be applied over primed cladding, soffits, and trim. Comply with coating manufacturer's written requirements for substrate primer.
10.3 ACTION SUBMITTALS
A. Product Data:
1. Engineered wood cladding.
2. Trim.
3. Sealant.
4. Weather barrier.
5. Flashing.
B. Samples: For each exposed product and texture specified, 12 inches long.
10.4 INFORMATIONAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.