Amendment 0003_Questions & Answers

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 6/13/2018 914116

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA FOREST SERVICE

IDAHO MONTANA ACQUISITION TEAM

3815 SCHREIBER WA

COEUR D’ALENE, ID 83815-8363

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

12034318Q0196

9B. DATED (SEE ITEM 11)

6/13/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Question & Answers

See pages 2-3 for Questions and Answers.

Contact Darrin Jackson 208-765-7230 or by email darrinjackson@fs.fed.us if you have additional questions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

DARRIN JACKSON / Purchasing Agent

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

6/13/2018

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

mailto:darrinjackson@fs.fed.us

CONTINUATION OF SF30, BLOCK 14 / 12034318Q0196 / Amendment 0003

Question 1: Plans show gabion baskets and rock fill at each end of the bridges. I can provide with my quote the anchor bolts that secure the gabion to the sill, but do not have a way to provide a completed gabion with rock. The RFQ schedule of items indicated the scope to be “Supply all Timber and Hardware – Bundled and Marked”. Is this meant to include the gabion basket and rock?

Also, the Special Project Specifications indicates that installation is in the scope of work. Can you confirm that this is supply RFQ and does not include installation?

Answer 1: They have to supply the gabion baskets for all the bridges and the anchor rods (all-thread), nuts, and washers to fasten the sill to the baskets.

They DO NOT have to supply the rock.

This is supply only. The complete specs would be for construction as well, so that is why the mix-up. All they have to supply is the wood and metal. The rest we will do here.

Question 2: The elevation on sheet 2 of 5 shows three backing planks (3x12) at the end of each bridge extending almost to the bottom of the wood sill:

However the connection details for a wood sill on sheet 4 of 5 shows two backing planks to approximately the top of the wood sill:

Do you want 2 or 3 backing planks at each end of each bridge?

CONTINUATION OF SF30, BLOCK 14 / 12034318Q0196 / Amendment 0003

Answer 2: That is the problem with standard drawings. The drawing require the bidder to quantify the materials based on the size of the bridge described in sheet one. The depth of the stringers dictates the number of backing planks irrespective of how the typical drawing may depict it. All the bridges need three backing planks per side in this contract. Jonathan, COR