Telcomm_Submittal_-_cable_runs_ph1.pdf
PDF 923 KB Posted
- Attached to
- Camera Security for Region One Regional Office
- Solicitation number
- 12034318Q0068
About this file
Map for cable runs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Telecom_-_cable_run_ph2.pdf | ||
| BLDG26_Phase3_Wiring_layout.pdf | ||
| Placement_Drawings.pdf | ||
| A-7_Solicitation.pdf | ||
| 15-5393.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-hook pathway routing to rack
Work Area Outlet(WAO) will be labeled by:
Room Number, WAO #, Patch Panel Letter, then by Patch panel port #.
Example: 001-01A01
This would be: Room 001, WAO# 01, Patch panel A and port #01.
WAO's are to be labeled from left to right at the entry to each room.
Telcommunications Shop Drawings
Telcommunications Shop Drawings
February 2015
(1) 12 Strand fiber to first floor
(1) 12 Strand fiber to second floor
J-hook Pathways
102-05-A01/A02/A03
102-06-A04/A05/A06
Labeling example
Telcommunications Shop Drawings
Telcommunications Shop Drawings
February 2015
(1) 12 Strand fiber to basement.
(1) 12 Strand fiber to the 2nd level
1-
-A
/A
/A
1-
-A
/A
/A
Labeling Example
12 Strand fiber down to 1st level.
J-hook Pathway for cat 6 cabling
Telcommunications Shop Drawings
February 2015
File details come from the government source that posted it.