Exhibits 1 - 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCHEDULE_OF_ITEMS.pdf | ||
| SF30.pdf | ||
| IdahoWorkersCompForm.pdf | ||
| ID_WD_15-5511_Rev_5_2018.pdf | ||
| Solicitation_12034318Q0061.pdf | ||
| Dust_Abatement_Specification.pdf | ||
| Vicinity_Maps.pdf | ||
| MT_WD_15-5399_Rev_5_2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1
DUST ABATEMENT
QUALITY ASSURANCE PLAN
Contractor Performance Checklist
DISTRIBUTION EQUIPMENT
Tasks and Critical
Subtasks Quality Standards
Acceptable Quality
Level Method of Inspection Penalties Incentives
Shall be equipped and operated so that material may be applied uniformly on variable widths of surface.
Shall be able to determine and control rates from
0..96 to
1.65lbs/sq.yd with even spread.
Weight of product in the distribution truck shall be accurately determined prior to application.
Trailer application equipment shall refer to Work List, Exhibit 3.
Spread pattern shall be uniform across the road at the required application rate.
Variation from specified application rate shall not exceed
10% of the individual loads, and
2% rate for the entire project.
The weight of the material placed shall be easily determined during application.
All spreading and hauling equipment shall comply with
State and Federal requirements including GVW.
Visual verification Contractor may be required to re-work, at their expense, the unacceptable section.
Government may withhold compensation.
Contractor may receive poor performance rating.
Contractor would receive a superior performance rating.
EXHIBIT 1
DUST ABATEMENT
QUALITY ASSURANCE PLAN
Contractor Performance Checklist
APPLICATION
Tasks and Critical
Subtasks Quality Standards
Acceptable Quality
Level Method of Inspection Penalties Incentives
Application rates will be as specified on the task order.
Rates expressed as lbs./sq.yd.
Accidental spillage or area of excess material that are traffic hazard will be covered with road surface material at the
Contractor’s expense.
Reference Work
List, Exhibit 3.
If application rate used by the
Contractor is greater than that specified, the additional material needed to complete coverage will be at the
Contractor’s expense.
Will be based on concentration shown on the manufacturer’s certificate and test results.
Adjacent structures and trees shall be protected from spattering and marring.
Material shall only be discharged in approved areas and not be allowed to flow into ditches and streams.
If the Contractor exceeds the specified rate or total quantity per Subitem by more the 5%, no compensation will be made for the additional quantity.
If the Contractor’s application is below the specified rate or total quantity per
Subitem, the remaining amount will be applied at locations and rate directed by the COR.
Visual verification.
Will inspect completed application as the work progresses.
Field samples taken from the distributor or hauling vehicles.
Field sample prior to application to make sure the products meets minimum concentrations specified.
Laboratory Quality
Assurance Test done by the Forest Service.
Contractor may be required to re-work, at their expense, the unacceptable portions of work.
Contractor may receive poor performance rating.
Contract may be terminated with repeated deficiencies.
Pay Adjustment for
Sub-Standard
Materials. (Ref. FAR
52.212-4)
Contractor would receive a superior performance rating.
Full compensation for the applied product.
EXHIBIT 2
EXAMPLE BILL OF LADING AND CERTIFICATE OF
COMPLIANCE
Consignee _________________________ Destination ______________________
Contract Number ____________________ Date ___________________________
Identification (Truck no., Car No., etc.) ________________________________________
Material composition by weight:
Calcium Chloride ________percent
Net weight of total shipment __________________
This shipment of chloride material covered by this Bill of Lading complies with
Forest Service Specifications contained in this contract.
Producer __________________________________
Signed ____________________________________
EXHIBIT 3
Example Work List
(Actual Roads on will be listed on Individual Task Orders)
Worklist
Subitem Road Name & Number
Length of
Road
Segment
No Tractor-
Trailor
Application
Application
Required
Difficult
Access
Width in
Feet
Lolo N.F.
US Plywood Rd. No. 9991
(5 mi SE of Thompson Falls, Mt.)
2.0 20
Falks Farm Rd. No. 18475
(2 mi. NW of Plains, Mt.)
0.3 X X 12
Finley Flat Rd. No. 7654
(9 mi NW of Thompson Falls, Mt.)
1.0 X X 15
Forest Highway No. 56
(6 mi E of Thompson Falls, Mt.)
2.3 X X 12
St. Regis Work Center
(St. Regis, Mt.)
0.6 X X 14
Trout Creek Rd. No. 250
(6 mi SE of Superior, Mt)
1.0 20
Randolph Creek Rd. No. 286
(2 mi N of I-90)
3.8 X 16
Rainy Creek Rd. No. 506
(0.3 mi. S of I-90)
4.4 X X 14
East Portal Rd. No. 18720
(3.0 mi S of I-90)
0.5 X X 14
EXHIBIT 4
Example Dust Abatment Application Calculations
(Actual Roads on will be listed on Individual Task Orders) (Length in Miles x Width in Feet) x 5280 = Total Square Feet
Total Square Feet
9= Total Square Yards
Product
Application Rate
Residual Application
Application Rate
New Application
CaCl Pellets 0.96 Lbs/Sq. Yd. 1.65 Lbs/Sq. Yd.
Lolo N.F.
Roads
Residual
Applicatoin
New Application CaCl. Pellets Est.
Quantity Tons
US Plywood, 9991 X 11
Falks Farm, 18475 X 1
Finley Flats, 7654 X 4
Thompson River, 56 X 8
St. Regis Work
Ctr.,19129
X 2
Rainy Cr., 506 X 17
Trout Cr., 250 X 6
Randolph Cr., 286 X 17
E. Portal ,18720 X 2