About this file

Forest Service Supplemental Specifications

View the file

Other files

File Type Posted
12034318Q0017Amend005.pdf PDF
12034318Q0017Amend004.pdf PDF
12034318Q0017Amend003.pdf PDF
12034318Q0017Amend002.pdf PDF
12034318Q0017Amend001.pdf PDF
12034318Q0017WDs.pdf PDF
12034318Q0017.pdf PDF
12034318Q0017ExperienceQuestionaire.docx DOCX document
12034318!0017Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Helena National Forest Conveyance Property

Road and Fencing – Helena Service Site Supplemental Specifications to FP-03

Table of Contents Table of Contents

Preface

101 - Terms, Format, and Definitions

102 - Bid, Award, and Execution of Contract

103 - Scope of Work

104 - Control of Work

105 - Control of Material

106 - Acceptance of Work

107 - Legal Relations and Responsibility to the Public………………………..15

108 - Prosecution and Progress……………………………………………….17

109 - Measurement and Payment………………………………………………18

152 – Construction Survey and Staking

153 – Contractor Quality Control

155 - Schedules for Construction Contracts

156 - Public Traffic

157 - Soil Erosion Control

204 - Excavation and Embankment

301 - Untreated Aggregate Course……………………………………

625 – Turf Establishment

703 - Aggregate………………………………..……………………………….36

DIV 26 - Electrical Meters…………………………..…………………………49

Preface

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

http://www.nist.gov/

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

Deletions

Delete Sections 104.01, 104.02, and 104.04.

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02 Material Sources

Add the following before the first paragraph.

Sources have been designated for this project as follows:

Crushed Aggregate Source- Contractor Furnished. There is no available Government source for Crushed Aggregate for this project.

Waste Site – Government Furnished – A waste site for excess and unsuitable soils will be designated by the CO. The site shall be within 2 miles of the project. All other materials designated for removal and disposal must be disposed of away from Forest Land as per FP-03 Section 202.

Materials Stockpile Site- Government Furnished – The Contractor will be allowed to stockpile small amounts of materials at the site, just in advance of construction. Provide the CO 72 hours advance notification prior to stockpiling any materials at the site.

Add the following to section (b) Contractor-located sources.

Prior to any pit development or use of materials, the Contractor shall provide to the CO a State certification that the pit site is free of noxious weed as listed on the "All States Noxious Weeds List”.

106 - Acceptance of Work

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

Add the following Subsection:

109.10 Methods of Measurement

One of the following methods of measurement for determining final payment is DESIGNATED IN THE SCHEDULE OF ITEMS for each

PAY ITEM:

(a) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

(b) Contract Quantities (CQ). As defined in 109.02 (b) and supplemented above.

(c) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

152 – Construction Survey and Staking

152.01 (a) Personnel.

Add the following.

Conduct all construction staking under the direction of a licensed professional engineer or land surveyor who is closely associated and familiar with construction staking.

153 – Contractor Quality Control

Add the following.

153.07. Project Submittals

At a minimum the contractor shall provide project submittals as shown on the below Submittal Log. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.

(Text in italics is for example only. Replace all text in italics with project specific requirements.)

Submittal Log

Log No.

Incidental to

Pay Item(s)

Description of Submittal

Type of Submittal

Requirement found in

Specification No.

/Drawings

Additional Specification References

1 151

Weed Free Material Source Certification

Material Certification FSSS 105.02(b)

2 151 Hazardous Spill Plan Plan FSSS 107.10

3 151 Contractor Quality Control Plan

Plan 153.02 552.09

4 151 Traffic Control Plan Plan FSSS 156.03

5 157 Soil Erosion and Pollution Control Plan

Plan FSSS 157.03

6 204 Roadway Excavation and Backfill

Test Results 204.11, 208.12 703

7 301 Surface Course Material Certification 301.03 703, Drawings

8 301 Surface Course Test Results 301.05 703, Drawings

9 625 Fertilizer, Seed Mix, & Mulch

Material Certification 625.10 106, FSSS 625, 713

10 710 Fencing Material

Material Certification FSSS 710.03 710, Drawings

Submittal Log

Log No.

Incidental to

Pay Item(s)

Description of Submittal

Type of Submittal

Requirement found in

Specification No.

/Drawings

Additional Specification References

11 710 Gate Material Material Certification

Drawings

12 DIV26 Electrical Permit Permit FSSS DIV 26 City of Helena

13 DIV 26 Meter Base Cut Data Sheets FSSS DIV 26

155 - Schedules for Construction Contracts

155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic

156.03 Accommodating Traffic During Work.

Delete the first paragraph and replace with the following:

Accommodate traffic according to the requirements set forth below, MUTCD, and Section 635. Submit a traffic control plan for acceptance at least 30 days before intended use.

Add the following project specific requirements:

The Contractor will be allowed to close the access road to be reconstructed to thru traffic for a maximum of 1 week.

It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the construction can be substantially completed within the specified contract time. The Contractor shall give the CO at least two weeks advanced written notice prior to any road closure. The Contractor shall be responsible for providing, installing, maintaining, and removal of warning signs and barricades required for the road closure period in accordance with MUTCD as submitted and approved in the traffic control plan.

Delete the following from the last sentence of the last paragraph:

according to Subsection 106.07(b)

156.08 Traffic and Safety Supervisor.

Delete this subsection in its entirety.

157 - Soil Erosion Control

157.02 Materials

Add the following:

Provide bales, wattles, logs and rolls from a certified noxious weed free source.

157.03 General.

Delete the first two paragraphs and replace with the following:

Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction in accordance with the plans and storm water permits. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the CO for approval.

Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:

(a) The construction activities and sequence of implementation relating to specific erosion control measures.

(b) The location and type of permanent controls to be implemented during construction.

(c) The location and type of temporary controls to be implemented during construction.

(d) For work in stream channels with running water a detailed dewatering plan.

(e) For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.

(f) Description of the monitoring plan.

Add the following to the third paragraph:

Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property.

157.08 Water Crossings.

Add the following:

At any channel crossing where there is running water, dewater by rerouting water flow around the site before and during excavation and embankment operations.

204 - Excavation and Embankment

204.11 Compaction.

Delete section and add the following:

Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Maximum compacted lift depth is 6 inches. Adjust the moisture content to a level suitable for compaction. Operate Rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:

(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.

(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.

(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.

(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 lbs/inch of width of roller drum.

204.14 Disposal of Unsuitable or Excess Material.

Delete the text of the first paragraph and substitute the following:

Dispose of unsuitable or excess soils at designated sites approved by the

CO.

301 — UNTREATED AGGREGATE COURSES

Description

301.01 This work consists of constructing one or more courses of aggregate on a prepared surface.

Subbase and base aggregate grading is designated as shown in Table 703-2.

Material

301.02 Conform to the following Subsections:

Aggregate 703.05 Water 725.01

Construction Requirements

301.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.

After a representative quantity of aggregate is produced, submit proposed target values for the appropriate sieve sizes along with a representative 300-pound sample at least 14 days before incorporating the aggregate into the work.

Set target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading.

301.04 Mixing and Spreading. Determine the optimum moisture content according to AASHTO T 180, method D. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content within 2 percent of the optimum moisture content.

Spread and shape the mixture on the prepared surface in a uniform layer.

Do not place the mixture in a layer exceeding 6 inches in compacted thickness. When more than one layer is necessary, compact each layer according to Subsection 301.05 before placing the next layer. Route hauling equipment uniformly over the full width of the surface to minimize rutting or uneven compaction.

301.05 Compacting. Determine the maximum density of the mixture according to AASHTO T 180, method D.

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact each layer to at least 95 percent of maximum density. Determine the inplace density and moisture content according to AASHTO T 310 or other approved test procedures.

301.06 Surface Tolerance. If grade finishing stakes are required, finish the surface to within ±0.05 feet from staked line and grade elevation.

If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.

Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.

301.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 301.06.

301.08 Acceptance. See Table 301-1 for sampling and testing requirements and the acceptance quality characteristic category.

Aggregate gradation and surface course plasticity index will be evaluated under Subsection

106.05. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04.

(a) Aggregate gradation. The upper and lower specification limits are equal to the calculated mean of all test results plus or minus the allowable deviations shown in Tables 703-2 and 703-3, except as follows:

(1) If the calculated mean value for any tested sieve exceeds the maximum gradation value shown in Table 703-2 or 703-3, the upper specification is equal to the maximum gradation value plus the allowable deviation, and the lower specification is equal to the maximum gradation value minus the allowable deviation.

(2) If the calculated mean value for any tested sieve is less than the minimum gradation value shown in Table 703-2 or 703-3, the upper specification is equal to the minimum gradation value plus the allowable deviation and the lower specification is equal to the minimum gradation value minus the allowable deviation.

(b) Plasticity index. The upper and lower specification limits for surface courses are shown in Table 703-3.

Construction of untreated aggregate courses will be evaluated under Subsections 106.02 and 106.04.

Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.

Measurement

301.09 Measure the Section 301 items listed in the bid schedule according to Subsection

109.02 and the following as applicable.

Measure aggregate by the cubic yard in the hauling vehicle.

Measure square yard width horizontally to include the top of aggregate width including designed widenings. Measure the square yard length horizontally along the centerline of the roadway.

Payment

301.10 The accepted quantities will be paid at the contract price per unit of measurement adjusted according to Subsection 106.05 for the Section 301 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

T ab le

-1

Sa m pl in g an d

T es tin g

R eq ui re m en ts

R ep or tin g T im e

B ef or e us in g in w or k ho ur s

Sp lit pl e

Y es

, w he n re qu es te d

“ “ “ Y es

Po in t o f

Sa m pl in g

So ur ce o f m at er ia l

Fr om w in dr ow o r ro ad b ed a fte r pr oc es si ng pl g

Fr eq ue nc y pe r t yp e so ur ce o f m at er ia l pe r 1 to ns t M et ho ds ec ifi ca tio

A

SH

TO

T

A A

SH

TO

T

SH

TO

T

ST

M D

A A

SH

TO

T

T

C at eg or y

I I II

C ha ra ct er is tic

LA

a br as io n

(c oa rs e)

So di um su lfa te so un dn es s l os s fi

D ur ab ili ty in de x

(c oa rs e fi ne

Fr ac tu re d fa ce s

G ra da tio n

N o.

N

O th er sp ec ifi ed ev yp e of

A cc ep ta nc e

(S ub se ct io n)

M ea su re d an d te st fo r c on fo rm an ce

(1

.0

4&

St at is al

.0 5) at er ia l o r

Pr od uc t

A gg re ga te so qu ity

3.

(a

Su bb as e co ur se s gr ad in g

A

B le

-1

(c on tin ue d) pl in g an d T es tin g R eq ui re m or tin g T im e ho ur s ho ur s

B ef or e pl ac in g ne xt la ye r

(1

M in im um o f 5 p oi nt s p er p ro ct or pl e

Y t o f

Sa m pl in g

Fr om w in dr ow or ro ad be d af te r pr oc es om w in ad be d af te r pr oc es er ia l s ou rc e be fo re u

In -p pl ue nc y pe r 1 pe r r t yp e so o f m at er ia l pe r 5 t M et ifi ca

SH

TO

T

T

A A

SH

TO

T

A A

SH

TO

T m et ho d

D (1

A A

SH

TO

T o r ot he r a pp ro ve d pr oc ed eg or

I I I II

ra ct er

G ra da tio n

3/ ch er sp ec

Li id li m it

M oi st e-de

(m ax

. d en si ty

C om pa ct io n

T yp e of

A cc ep ta nc e

(S ub se ct

St is su re d an d te on fo rm

4) er ia l o r

Pr od uc t

B as e co se gr ad in g C

, D

E

Su bb as ba c ou rs e gr ad in g

A , B

, C

D

E le

-1

(c on tin d) pl in g an d T es tin g R eq ui re m or tin im e ho ur s

B ef or e us w or k

B ef or e pl ac in g n ex t l ay er

B ef or e us w or k

(1

M in im um o f 5 p oi nt s p er p ro ct pl e

“ “ Y t o f

Sa m pl in g

Fr om w in ad be d af te r pr oc es

So ur ce o f m at er ia l

In -p om w in on ad be d af te r pr oc es pl ue nc y pe r 1 pe r t yp e so of at er ia l pe r 5 r 1 t M et ifi ca

SH

TO

T

T

A A

SH

TO

T

A A

SH

TO

T

A A

SH

TO

T m et ho d

D (1

A A

SH

TO

T o r ot he r a pp ro ve d pr oc ed

ST

M D eg or

I I I II

II

I — ra ct er da tio n

N

N o.

er sp ec

Li id li m it

Pl as tic ity in de x

M oi st e-de

(m ax

. d en si ty

D en ty ac tu re d fa ce s

T yp e of

A cc ep ta nc e

(S ub se ct

St is su re d an d te on fo rm

4) er ia l o r

Pr od uc t

Su rfa ce c ou rs e ag gr eg

625 – Turf Establishment

625.04 Preparing Seedbed.

Delete entire subsection.

625.05 Watering

Delete entire subsection.

625.06 Fertilizing.

Delete entire section and replace with the following:

Apply fertilizer having a chemical analysis as listed below by the following method.

(a) Dry Method. Apply the fertilizer with approved power driven seeders, drills, fertilizer spreaders or other mechanical equipment. Hand operated methods are satisfactory on areas inaccessible to mechanical equipment.

Fertilizer. The fertilizer shall be a slow release organic fertilizer applied at the manufacturer’s recommended rate with an N-P-K formulation of:

Nutrient Percent Nitrogen, N . . . . . . . . . . . . . 6-8 % Phosphorus, P205 . . . . . . . . . 2-4 % Potassium, K . . . . . . . . . . . . . 3-4 %

625.07 Seeding.

(a) Dry method. Delete the third sentence.

Add the following after subsection (b).

Seed Mix. Furnish and apply the following kinds and amounts pure live seed:

Common Name Scientific Name Pure live Seed Lbs./Acre

Pryor slender wheatgrass Elymus trachycaulus 8 Bromar Mountain Brome Bromus Marginatus 10 Canbar Canby's bluegrass Poa Canbyi 2

Total 20

Seed Certification Certified, blue-tagged seed shall be used where a name variety or cultivar is specified. Blue tags that are removed to mix or spread the seed will be saved and provided to the Forest.

All seed purchased will be certified free of seeds from weeds listed on the current "All States Noxious Weeds List."

Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.

Example: (5 lbs. pure live seed/acre) = 6.55 lbs.

(0.90 x 0.85) commercial seed/acre where: purity = 90%; germination = 85%.

625.08 Mulching.

Delete the entire subsection and replace with the following:

Mulching:

Mulch material shall be weed free straw and shall be applied at a uniform rate to adequately cover the seed. The weed free straw shall be from a grain crop such as barley straw, wheat straw or oat straw.

Mulch will be applied in a one-step operation with the seed at the rate of 1 Ton per Acre.

703 — AGGREGATE

703.01 Fine Aggregate for Concrete. Furnish sand conforming to AASHTO M 6, class B including the reactive aggregate supplementary requirement, except as amended or supplemented by the following:

(a) Material passing No. 200 sieve, AASHTO T 11 3.0% max.

(b) Sand equivalent value, AASHTO T 176, 75 min.

alternate method no. 2, reference method

For lightweight fine aggregate, conform to AASHTO M 195.

703.02 Coarse Aggregate for Concrete. Conform to AASHTO M 80, class A, except as amended or supplemented by the following:

(a) Los Angeles abrasion, AASHTO T 96 40% max.

(b) Adherent coating, ASTM D 5711 1.0% max.

(c) Grading, AASHTO M 43 All sizes except numbers 8, 89, 9, or 10

For bridge decks or surface courses, do not use aggregates known to polish or carbonate aggregates containing less than 25 percent by mass of insoluble residue as determined by ASTM D 3042.

For lightweight coarse aggregate, conform to AASHTO M 195.

703.03 Granular Backfill. Furnish aggregate for the following installations.

(a) Underdrain pipe with geotextile. Furnish granular backfill conforming to AASHTO M 80, class E and AASHTO M 43, size number 3, 4, 5, 7, 57, or 67.

(b) Underdrain pipe without geotextile. Furnish granular backfill conforming to AASHTO M 6, except the soundness test is not required.

703.04 Permeable Backfill. Furnish either sand conforming to Subsection 703.15 or coarse aggregate consisting of sound, durable particles of gravel, slag, or crushed stone conforming to Table 703-1.

Table 703 - 1 Permeable Backfill Gradation

Sieve Size Percent by Mass

Passing Designated Sieve

(AASHTO T 27 & T

11)

3 inch 100

3/4 inch 50 – 90

No. 4 20 – 50

No. 200 0.0 – 2.0

703.05 Subbase, Base, and Surface Course Aggregate.

(a) General. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Los Angeles abrasion, AASHTO T 96 50% max.

(2) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(3) Durability index (coarse), AASHTO T 210 35 min.

(4) Durability index (fine), AASHTO T 210 35 min.

(5) Fractured faces, ASTM D 5821 50% min.

(6) Free from organic matter and lumps or balls of clay Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Subbase or base aggregate. In addition to (a) above, conform to the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

le

-2 ar ge t V al ue R an ge s f or

S ub ba se a nd

B as e G ra da tio n

Pe rc en t b y M as s P as si ng D es ig na te d Si ev e

(A A

SH

T

O T an d

T

1) di ng

D es ig na tio n

E (B as

0(1

(6

(6

(4

4.

7.

(3

(1

St at is tic al p ro ce du re s d o no t a pp ly

T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n

) f ro m th e ta rg et v al s..

D (B

(6

(6

(6

(4

4.

7.

(3

C (B

(6

(6

4.

–7 .0

(3

B (S ub ba

(8

4.

.0 (4

A (S ub ba se

0(1

(7

(6

(4

4.

8.

(3

Si ev e Si ze

2½

1½

3/

1/

3/

N o.

(c) Surface course aggregate. In addition to (a) above, conform to the following:

(1) Gradation and plasticity index, AASHTO T 90 Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

Do not furnish material that contains asbestos fibers.

Table 703-3 Target Value Ranges for

Surface Course Gradation and Plasticity Index

Sieve Size Percent by Mass Passing

Designated Sieve

(AASHTO T 27 & T 11)

1 inch 100(1)

3/4 inch 97 - 100(1)

No. 4 41 - 71 (7)

No. 40 12 - 28 (5)

No. 200 9 - 16 (4)

Plasticity index 8 (4)

(1) Statistical procedures do not apply.

( ) The value in the parentheses is the allowable deviation (±) from the target values.

703.06 Crushed Aggregate. Furnish hard, durable particles or fragments of crushed stone or gravel conforming to the size and quality requirements for crushed aggregate material normally used locally in the construction and maintenance of highways by Federal or State agencies. Furnish crushed aggregate with a maximum size of 1 inch as determined by AASHTO T 27 and T 11. Furnish crushed aggregate uniformly graded from coarse to fine and free of organic matter, lumps or balls of clay, and other deleterious matter.

703.07 Hot Asphalt Concrete Pavement Aggregate.

(a) Coarse aggregate (retained on a No. 4 sieve). Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming to the following:

(1) Los Angeles abrasion, AASHTO T 96 40% max.

(2) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(3) Fractured faces, ASTM D 5821 75% min.

(4) Durability index (coarse), AASHTO T 210 35 min.

For the surface course, do not use aggregates known to polish or carbonate aggregates containing less than 25 percent by mass of insoluble residue when tested according to ASTM D 3042.

(b) Fine aggregate (passing a No. 4 sieve). Furnish natural sand, stone screenings, slag screenings, or a combination thereof conforming to AASHTO M 29 including sulfate soundness and the following:

(1) Durability index (fine), AASHTO T 210 35 min.

(2) Sand equivalent value, AASHTO T 176, 45 min.

alternate method no. 2, reference method

(c) Composite aggregate blend. Size, grade, and combine the aggregate fractions in mix proportions conforming to the following:

(1) Gradation Table 703-4

(2) Clay lumps and friable particles, AASHTO T 112 1.0% max.

(3) Reasonably free from organic or other deleterious material

(d) Lightweight aggregate (slag). Furnish crushed slag conforming to the quality requirements of AASHTO M

195. Do not use any other kind or type of lightweight aggregate as defined in AASHTO M 195.

Table 703-4 Target Value Ranges for

Hot Asphalt Concrete Pavement Aggregate Gradation Sieve Size

Percent by Mass Passing Designated Sieve

(AASHTO T 27 & T 11)

Grading Designation A B C D E F 1½ inch 100(1)

1 inch 97- 100(1) 100(1) 100(1)

3/4 inch — 97- 100(1) 97-100(1) 100(1) 100(1)

1/2 inch — 76- 88(5) *(5) 97-100(1) 97-100(1)

3/8 inch 53- 70(6) — *(6) — *(5) 100(1)

No. 4 40- 52(6)

49- 59(7) *(7) 57-69(6) *(6) 33-47(6)

No. 8 25- 39(4)

36- 45(5) *(5) 41-49(6) *(6) 7-13(4)

No. 30 12- 22(4)

20- 28(4) *(4) 22-30(4) *(4) —

No. 50 8-16(3) 13- 21(3) *(3) 13-21(3) *(3) —

No. 200 3-8(2) 3-7(2) 3-8(2) 3-8(2) 3-8(2) 2-4(2)

(1) Statistical procedures do not apply.

* Contractor specified target value.

( ) The value in the parentheses is the allowable deviation (±) from the target values.

703.08 Open-Graded Asphalt Friction Course Aggregate. Conform to Subsection 703.07 grading F and the following:

(a) 2 or more fractured faces, ASTM D 5821 75% min.

(b) 1 or more fractured faces, ASTM D 5821 90% min.

(c) Flakiness index, ASTM D 4791 30 max.

703.09 and Tables 703-5 and 703-6 Reserved.

703.10 Asphalt Surface Treatment Aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel. Use only one type of aggregate on a project.

Size, grade, and combine the aggregate fractions in mix proportions conforming to the following:

(a) Gradation Table 703-7

(b) Los Angeles abrasion, AASHTO T 96 40% max.

(c) Sodium sulfate soundness loss, 12% max.

AASHTO T 104

(d) Fractured faces, ASTM D 5821 90% min.

(e) Flat and elongated particles, 10% max.

1:3 ratio & 3/8-inch sieve calculated by mass, weighted average, ASTM D 4791

(f) Durability index (coarse), AASHTO T 210 35 min.

(g) Durability index (fine), AASHTO T 210 35 min.

(h) Clay lumps and friable particles, AASHTO T 112 1.0% max.

Do not use lightweight aggregate according to AASHTO M 195.

Table 703-7 Target Value Ranges for

Single and Multiple Course Surface Treatment Aggregate Gradation

Sieve Percent by Mass Passing Designated Sieve

(AASHTO T 27 & T 11)

Size

Grading Designation

A B C D E F 1½ inch 100(1)

1 inch 90-100(3) 100(1)

3/4 inch 0-35(5) 90-100(3) 100(1) 1/2 inch 0-8(3) 0-35(5) 90-100(3) 100(1)

3/8 inch — 0-12(3) 0-35(5) 85-100(3) 100(1) 100(1) No. 4 — — 0-12(3) 0-35(5) 85-100(3) 85-100(1) No. 8 — — — 0-8(3) 0-23(4) —

No. 200 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-10(1)

(1) Statistical procedures do not apply.

( ) The value in the parentheses is the allowable deviation (±) from the target values.

703.11 Slurry Seal and Micro-Surfacing Aggregate. Furnish natural or manufactured sand, slag, crushed fines, or other mineral aggregate conforming to AASHTO M 29 and the following:

(a) Slurry seal aggregate.

(1) Gradation Table 703-8

(2) Los Angeles abrasion, AASHTO T 96 35% max.

(3) Sand equivalent value, AASHTO T 176, 45 min.

alternate method no. 2, reference method

(4) Smooth textured sand with < 1.25% 50% max.

water absorption content by weight of total combined aggregate

Table 703-8 Slurry Seal and Micro-Surfacing Aggregate

Gradation(1) and Application Rates(2)

Sieve Size

Percent by Mass Passing Designated Sieve

(AASHTO T 27 & T 11)

Slurry Seal Type

I II III

3/8 inch — 100 100

No. 4 100 90-100 70-90 No. 8 90-100 65-90 45-70 No. 16 65-90 45-70 28-50 No. 30 40-65 30-50 19-34 No. 50 25-42 18-30 12-25 No. 100 15-30 10-21 7-18 No. 200 10-20 5-15 5-15

Application rate(2) pounds per square yard 6 - 10 10 - 15 15 or more

(1) Statistical procedures do not apply.

(2) Based on the dry mass of the aggregate.

(b) Micro-surfacing aggregate.

(1) Gradation, type II or III Table 703-8

(2) Los Angeles abrasion, AASHTO T 96 30% max.

(3) Sand equivalent value, AASHTO T 176, 65 min.

alternate method no. 2, reference method

(4) Sodium sulfate soundness, AASHTO T 104

Using NA2SO4 15 max.

Using MgSO4 25 max.

703.12 Choker Aggregate. Furnish hard durable particles or fragments of crushed gravel or crushed stone conforming to the following:

(a) Gradation Table 703-9

(b) Sand equivalent value, AASHTO T 176, 75 min.

alternate method no. 2, reference method

(c) Free from organic matter and clay balls

Table 703-9 Choker Aggregate Gradation(1)

Sieve Size

Percent by Mass Passing

Designated Sieve

(AASHTO T 27 & T 11)

3/8 inch 100 No. 4 70 – 100

No. 200 0.0 - 5.0

(1) Statistical procedures do not apply.

703.13 Blotter. Furnish sound durable particles of gravel or crushed stone conforming to the following:

(a) Material passing 3/8-mm sieve, AASHTO T 27 100%

(b) Liquid limit, AASHTO T 89 25 max.

(c) Free of organic matter and clay balls

703.14 Aggregate for Aggregate-Topsoil Course. Conform to the following:

(a) Gradation AASHTO M 43, size number 57

(b) Quality AASHTO M 80, class E

703.15 Sand. Furnish clean material conforming to the following:

(a) Gradation AASHTO M 6

(b) Deleterious substances AASHTO M 6, class B

703.16 Aggregate for Lean Concrete Backfill. Furnish hard, clean, durable, nonplastic, nonorganic, nonreactive aggregate.

703.17 Superpave Asphalt Concrete Pavement Aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming to the following:

(a) Los Angeles abrasion, AASHTO T 96 35% max.

(b) Sodium sulfate soundness loss of coarse 12% max.

and fine aggregate (5 cycles), AASHTO T 104

(c) Fractured faces, ASTM D 5821 Table 703-10

(d) Fine aggregate angularity, AASHTO T 304, Table 703-11 method A

(e) Flat and elongated particles, 3 to 1 ratio, Table 703-11

ASTM D 4791

(f) Sand equivalent value, AASHTO T 176, Table 703-11 alternate method no. 2, reference method

(g) Gradation. See Table 703-12. Size, grade, and combine the aggregate fractions in mix proportions that result in a composite blend between the control points. Nominal maximum size is one sieve size greater than the first sieve to retain more than 10 percent of the combined aggregate. Test according to AASHTO T 27 and T 11.

For the surface course, do not use aggregates known to polish or carbonate aggregates containing less than 25 percent by mass of insoluble residue when tested according to ASTM D 3042.

Table 703-10 Fractured Faces Coarse Aggregate Requirement

Traffic ESALs (million)

Fractured Faces (1face % min. / 2 face % min.)

Depth from Surface ≤ 4 inch > 4 inch

< 0.3 55/- -/-

0.3 to < 3 75/- 50/- 3 to < 10 85/80 60/- 10 to < 30 95/90 80/75

≥ 30 100/100 100/100 Note: "85/80" denotes that a minimum of 85 percent of the coarse aggregate has one fractured face and a minimum of 80 percent has two fractured faces.

Table 703-11 Superpave Aggregate Requirements

Traffic ESALs

(million)

Uncompacted Void Content of Fine Aggregate (% minimum) Sand

Equivalent (minimum)

Flat and Elongated (% max.)

3:1 Ratio Depth from Surface

≤ 4 inch > 4 inch < 3 40 40 40

3 to < 10 45 40 45 10 to <

30 45 40 45

≥ 30 45 45 50

Table 703-12 Superpave Aggregate Gradation

Sieve Size

Nominal Maximum Aggregate Size – Percent Passing Grading Designation

1 inch 3/4 inch 1/2 inch 3/8 inch Min. Max. Min. Max. Min. Max. Min. Max.

1½ inch 100 1 inch 90 100 100

3/4 inch * * 90 100 100 1/2 inch * * * * 90 100 100 3/8 inch * * * * * * 90 100

No. 4 * * * * * * * * No. 8 * * * * * * * * No. 30 * * * * * * * * No. 50 * * * * * * * * No. 200 3 8 3 8 3 8 3 8

* Contractor specified target values. See Table 703-13 for allowable deviations.

Table 703-13 Allowable Deviations for Target Value Gradations

Gradation Range (inches)

Allowable Deviation (percent) Minimum Maximum

2.76 3.54 4

2.37 2.75 5

2.17 2.36 6

1.78 2.16 7

1.58 1.77 6

1.19 1.57 5

0.83 1.18 4

0.32 0.82 3

0 0.31 2

Table 703-14 Coarse and Fine Gradation Classification

Nominal Maximum

Aggregate Size

Primary Control Sieve (PCS) for Mixture Nominal Maximum Sieve Size

1 inch 3/4 inch 1/2 inch

3/8 inch

PCS No. 4 No. 4 No. 8 No. 8

PCS Control Point (% Passing)

40 47 39 47

703.18 Shotcrete Aggregate. For fine aggregate, furnish rounded particles conforming to Subsection 703.01. For coarse aggregate, conform to AASHTO M 80, class B, except as amended or supplemented by the following:

(a) Los Angeles abrasion, AASHTO T 96 40 % max.

(b) Adherent coating, ASTM D 5711 1.0 % max.

Combine the aggregates to meet the designated gradation in Table 703-15

Table 703 - 15 Shotcrete Gradation Limits for Combined Aggregates

Sieve Size

Percent by Mass Passing Designated Sieve

(AASHTO T 27 & T 11)

Grading Designation A B C

3/4 inch — — 100 1/2 inch — 100 80-95 3/8 inch 100 90-100 70-90

No. 4 95-100 70-85 50-70 No. 8 80-100 50-70 35-55 No. 16 50-85 35-55 20-40 No. 30 25-60 20-35 10-30 No. 50 10-30 8-20 5-17 No. 100 2-10 2-10 2-10

703.19 Recycled Asphalt Pavement. Furnish recycled asphalt pavement that is processed in some form (by crushing and screening) to produce a well graded gradation and asphalt content. Process recycled asphalt pavement so that no particle in the mixture made with recycled asphalt pavement will exceed the mixture maximum aggregate size at the time of production. Millings will be considered processed provided they have a uniform gradation and asphalt content.

Provide recycled asphalt pavement material with a maximum of 2 percent deleterious materials

DIVISION 26 00 00 – ELECTRICAL METERS

PART 1 – GENERAL

1.01 SUMMARY

A. The south property to be retained by the Forest Service receives power from two meter bases located on the north property planned for conveyance.

B. Contractor shall install two new electrical meter bases to provide service to the south property planned for retention by the Forest Service. Contractor shall ensure electrical services are separated, such that electrical supply to the south property is metered separately from the north property.

C. Work requires installation of two new meters and additional work necessary to complete the work in compliance with the 2014 National Electrical Code, City of Helena, and NorthWestern Energy standards.

D. New meter base installations shall include service disconnects and all associated cabinetry, hardware, conductors, breakers, or other components required to comply with the electrical permit requirements and building codes.

1.02 SUBMITTALS

A. Contractor shall provide the following submittals;

a. Electrical permit for two new 200-amp services

b. Meter Base product data for each meter

PART 2 – PRODUCTS

2.01 Contract shall submit meter base and panelboard product data that are UL listed and demonstrate compliance with outdoor use. Submittals shall be approved by the CO prior to ordering and installation.

PART 3 – EXECUTION

3.01 ELECTRICAL

A. Contractor shall coordinate with NorthWestern Energy (NWE) to complete this work.

B. Prior to NWE work to begin, contractor is responsible for the following;

a. Electrical permits and fees required to install two new 200-amp services

b. Install two new meter bases; one on building 5 and one next to the transformer south of building 7.

i. Contractor shall install a post or other approved base to permanently mount a meter base to next to the transformer.

ii. Meter base locations shall be “field fit” and approved by the CO prior to installation.

c. Clear access; clear trees, remove debris and other materials from the construction route, and complete the dirt work to sub grade.

d. Contact NWE when electrical meters are installed and ready for connection.

C. NWE Shall be contracted to provide all labor and materials to abandon the existing electric services on buildings 7 & 8 from the north property and replace them with 200-amp, 120v/240v single-phase electric services to provided meter bases on building 5 and next to the transformer south of building 7, as shown below;

Existing Meters (North)

New Meter Locations (South)

Helena National Forest
Conveyance Property
Road and Fencing – Helena Service Site
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
108 Delete.
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
109.10 Methods of Measurement
152 – Construction Survey and Staking
152.01 (a) Personnel.
153 – Contractor Quality Control
153.07. Project Submittals
155 - Schedules for Construction Contracts
155 Delete.
156 - Public Traffic
156.03 Accommodating Traffic During Work.
156.08 Traffic and Safety Supervisor.
157 - Soil Erosion Control
157.02 Materials
157.03 General.
157.08 Water Crossings.
204 - Excavation and Embankment
204.11 Compaction.
204.14 Disposal of Unsuitable or Excess Material.
301 — UNTREATED AGGREGATE COURSES
625 – Turf Establishment
625.04 Preparing Seedbed.
625.05 Watering
625.06 Fertilizing.
625.07 Seeding.
625.08 Mulching.
703 — AGGREGATE

File details come from the government source that posted it.