LowerClearCreek_AmendedSheet2.pdf

PDF 244 KB Posted

Attached to
Lower Clear Creek Trail Bridge Replacement Project on the Bridger-Teton National Forest
Solicitation number
1202NV190004
Issued by

About this file

Amended drawing page 2 of 7

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text DIMENSIONS 1. ALL LONGITUDINAL DIMENSIONS FOR THE STRUCTURE ARE MEASURED HORIZONTALLY AND INCLUDE NO CORRECTION ALL LONGITUDINAL DIMENSIONS FOR THE STRUCTURE ARE MEASURED HORIZONTALLY AND INCLUDE NO CORRECTION FOR GRADE. DEWATERING AND SOIL EROSION CONTROL 1. PROTECT AGAINST SOIL EROSION AND SEDIMENTATION DURING CONSTRUCTION IN ACCORDANCE WITH FP-14, PROTECT AGAINST SOIL EROSION AND SEDIMENTATION DURING CONSTRUCTION IN ACCORDANCE WITH FP-14, SECTION 157 AND THE PROJECT PERMITS. 2. ALL WORK SHALL BE COMPLETED PER THE CONTRACT SPECIFICATIONS AND STANDING OR RUNNING WATER IN THE ALL WORK SHALL BE COMPLETED PER THE CONTRACT SPECIFICATIONS AND STANDING OR RUNNING WATER IN THE WORK AREA DOES NOT RELIEVE THE CONTRACTOR FROM MEETING THE SPECIFICATIONS.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) AND STANDARD STANDARD SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS, AutoCAD SHX Text PREFABRICATED FIBERGLASS BRIDGE SUPERSTRUCTURE: PREFABRICATED FIBERGLASS SUPERSTRUCTURE DESIGN MUST BE A TRUSS PREFABRICATED FIBERGLASS SUPERSTRUCTURE DESIGN MUST BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN ON THE DRAWINGS. THE BRIDGE CROSS-SECTION SHALL BE DETERMINED BY THE CONTRACTOR BUT SHALL PROVIDE THE WIDTH AND RAILING DETAILS INDICATED ON THE BRIDGE TYPICAL SECTION. OVERHEAD LATERAL BRACING IS UNACCEPTABLE. ALL RELATED COMPONENTS SUCH ABUTMENT FOUNDATIONS, BEARINGS, AND TIMBER ELEMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FINALIZE AND CONSTRUCT. THE PREFABRICATED FIBERGLASS BRIDGE SUPERSTRUCTURE, ABUTMENT FOUNDATIONS, AND ASSOCIATED DETAILS INCLUDING TIMBER COMPONENTS SHALL BE DESIGNED UNDER THE DIRECTION OF A REGISTERED PROFESSIONAL ENGINEER. THE COMPLETED DESIGN, DRAWINGS, AND SPECIFICATION PACKAGE SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL.

AutoCAD SHX Text DESIGN: THE DESIGN OF ALL PREFABRICATED FIBERGLAS BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE AASHTO LRFD THE DESIGN OF ALL PREFABRICATED FIBERGLAS BRIDGE SUPERSTRUCTURE ELEMENTS SHALL COMPLY WITH THE AASHTO LRFD GUIDE SPECIFICATION FOR DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION AND AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CURRENT EDITION. PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION PLUS 1% OF BRIDGE SPAN. SUBMIT SHOP DRAWINGS AND CALCULATIONS FOR APPROVAL AND MUST BE APPROVED BEFORE FABRICATION.

AutoCAD SHX Text ERECTION PLAN: THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED FIBERGLASS BRIDGE SUPERSTRUCTURE THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED FIBERGLASS BRIDGE SUPERSTRUCTURE TO THE C.O. FOR APPROVAL 14 DAYS BEFORE ERECTION IS SCHEDULED. IF NECESSARY, TEMPORARY IN-STREAM SUPPORT BENTS MAY BE USED FOR THE ERECTION. THE IN-STREAM BENTS SHALL BE CRIBBING, SILLS, OR OTHER SUPPORTS AND SHALL BE PLACED WITH MINIMAL DISTURBANCE WITHIN THE STREAM. ALL MATERIALS TO CONSTRUCT THE TEMPORARY IN-STREAM BENTS SHALL BE REMOVED. THE SUBMITTALS SHALL INCLUDE DRAWINGS INDICATING TEMPORARY BENT LOCATIONS AND DETAILS. THE CONTRACTOR SHALL INDICATE THE EQUIPMENT AND METHODS PROPOSED TO INSTALL AND REMOVE THE TEMPORARY BENTS AND ERECT THE NEW PREFABRICATED FIBERGLASS TRUSS SUPERSTRUCTURE. PRIOR TO DELIVERY, THE COMPLETE BRIDGE SYSTEM SHALL BE DRY FIT AND ALL HOLES PRE-DRILLED. ALL BRIDGE MEMBERS SHALL BE MARKED IN A WAY THAT THEY CAN BE INSTALLED IN THEIR SAME LOCATION IN THE FIELD AS THEY WERE DURING THE DRY FIT SO THAT ALL HOLES ALIGN.

AutoCAD SHX Text TIMBER FABRICATION: SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS. SHOW ALL DIMENSIONS AND SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS. SHOW ALL DIMENSIONS AND SUBMIT SHOP DRAWINGS FOR ALL TIMBER BRIDGE COMPONENTS. SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER. ALL HOLES SHALL BE DRILLED PRIOR TO PRESERVATIVE TREATMENT APPLICATION. FIELD DRILLING OF HOLES WILL NOT BE ALLOWED.FIELD DRILLING OF HOLES WILL NOT BE ALLOWED..

AutoCAD SHX Text FIELD TREATMENT: COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED FOR FIELD TREATING OF WOOD. ALL COPPER NAPHTHENATE (2% SOLUTION) SHALL BE FURNISHED FOR FIELD TREATING OF WOOD. ALL ABRASIONS AND FIELD CUTS - APPROVED BY THE C.O.R. - SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE FASTENERS.

AutoCAD SHX Text MATERIALS: USE HIGH STRENGTH BOLTS CONFORMING TO AASHTO M164, (ASTM A325), TYP 3, UNLESS NOTED OTHERWISE. USE USE HIGH STRENGTH BOLTS CONFORMING TO AASHTO M164, (ASTM A325), TYP 3, UNLESS NOTED OTHERWISE. USE USE HIGH STRENGTH BOLTS CONFORMING TO AASHTO M164, (ASTM A325), TYP 3, UNLESS NOTED OTHERWISE. USE MALLEABLE IRON WASHERS AGAINST WOOD. HARDWARE SHALL BE HOT DIPPED GALVANIZED.

AutoCAD SHX Text TREATMENT: PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) "BEST MANAGEMENT PRACTICES FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS". DECKING, RUNNING PLANKS, AND RUB RAILS - AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE GROUND - EXPOSED (UC3B) - AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 3B ABOVE GROUND - EXPOSED (UC3B) - PENTACHLOROPHENOL IN LIGHT OIL (TYPE C SOLVENT) - COPPER NAPHTHENATE (CuN) IN LIGHT OIL (TYPE C SOLVENT) - COPPER NAPHTHENATE (CuN) IN LIGHT OIL (TYPE C SOLVENT) SILLS, BACKING PLANKS - AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4B GROUND CONTACT - HEAVY DUTY (UC4B) - AWPA USE CATEGORY SYSTEM (U1) FOR USE CATEGORY 4B GROUND CONTACT - HEAVY DUTY (UC4B) - PENTACHLOROPHENOL IN HEAVY OIL (TYPE A SOLVENT) - COPPER NAPHTHENATE (CuN) IN HEAVY OIL (TYPE A SOLVENT)- COPPER NAPHTHENATE (CuN) IN HEAVY OIL (TYPE A SOLVENT)

AutoCAD SHX Text TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE GRADING RULES SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE GRADING RULES AGENCY FOR THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW. GLULAM MEMBERS SHALL CONFORM TO THE AMERICAN NATIONAL STANDARD, STANDARD SPECIFICATIONS FOR STRUCTURAL GLUED LAMINATED TIMBER OF SOFTWOOD SPECIES (ANSI 117) FOR THE COMBINATION, SPECIES, USE, AND APPEARANCE SPECIFIED BELOW. SILLS, DECKING, AND BACKING PLANKS - COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN NO.1 GRADE, GRADING RULES AGENCY - WWPA, WCLIB RUNNING PLANKS - COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN NO.2 GRADE, GRADING RULES AGENCY - WWPA, WCLIB COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN NO.2 GRADE, GRADING RULES AGENCY - WWPA, WCLIB RUB RAILS - DOUGLAS FIR, S4S, NO.1 GRADE GRADING RULES AGENCY - WWPA, WCLIB

AutoCAD SHX Text

SLOPE ROUNDING IN COMMON MATERIAL (TYPICAL)

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

3H:1V (MAX)

AutoCAD SHX Text

EXISTING GROUND

AutoCAD SHX Text

SUITABLE EXCAVATED OR BORROW MATERIAL FROM ONSITE TO USE AS TRAIL EMBANKMENT

AutoCAD SHX Text

2% (MAX)

AutoCAD SHX Text

3H:1V (MAX)

AutoCAD SHX Text

NATIVE SURFACE TRAIL FREE OF LARGE ROCKS, ROOTS OR OTHER DEBRIS

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGN

AutoCAD SHX Text

DRAWING

AutoCAD SHX Text

BY:

AutoCAD SHX Text

CHECK:

AutoCAD SHX Text

BY:

AutoCAD SHX Text

CHECK:

AutoCAD SHX Text APPROVED:%%u %%u DATE %%u

AutoCAD SHX Text for DIRECTOR, ENGINEERING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text U. S. Department of Agriculture

AutoCAD SHX Text

FOREST SERVICE

AutoCAD SHX Text Intermountain Region 4 Engineering

AutoCAD SHX Text

LOWER CLEAR CREEK TRAIL BRIDGE

AutoCAD SHX Text BRIDGE No. 7094-79.0

AutoCAD SHX Text

GENERAL NOTES, SCHEDULE OF ITEMS AND TRAIL SECTION

AutoCAD SHX Text

BRIDGER-TETON NATIONAL FOREST

AutoCAD SHX Text

C.PORTER

AutoCAD SHX Text

B.RICHINS

AutoCAD SHX Text

B.RICHINS

AutoCAD SHX Text

C.PORTER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G-048

AutoCAD SHX Text /s/ Chad Porter PE

AutoCAD SHX Text 12/21/2018

AutoCAD SHX Text PEDESTRIAN LIVE LOAD = 90 PSF 90 PSF GROUND SNOW LOAD = 160 PSF 160 PSF 60' TOTAL BRIDGE LENGTH 5'-6" CLEAR WIDTH TREATED TIMBER SILLS, BACKING PLANKS, DECKING, RUNNING PLANKS, AND RUB RAILS SEE ADDITIONAL DESIGN CRITERIA IDENTIFIED UNDER SPECIFICATION SECTION 571.

AutoCAD SHX Text

SCHEDULE OF ITEMS:

AutoCAD SHX Text

PROJECT DESIGN CRITERIA:

AutoCAD SHX Text

TYPICAL TRAIL SECTION NOT TO SCALE

AutoCAD SHX Text

AMENDMENT REVISION 4/5/2019

Sheets and Views
G-048LowerClearCreekTrailBridge-2. Gen. Notes...SOI & Trail Section

File details come from the government source that posted it.