Forest Service Supplemental Specifications Hawks Rest Trail Bridge
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_02_17_2005
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).
101.03_nat_us_02_17_2005
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI Symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_02_22_2005
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse http://www.nist.gov/ public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.00_nat_us_02_17_2005
Deletions
Delete sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_04_27_2005
107.06 Contractor’s Responsibility for Work.
Delete the following:
“except as provided in Subsection 106.07”.
107.09_nat_us_05_11_2004
107.09 Legal Relationship of the Parties.
Delete the entire subsection:
107.10_nat_us_02_23_2005
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_02_23_2005
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
109.02 Measurement Terms and Definitions.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.02_0114_us_05_16_2005
109.02 Measurement Terms and Definitions.
Add the following definition:
(q) Actual quantity. (AQ) These quantities are determined from measurements of completed work.
151 - Mobilization 151.01_0105_us_02_23_2005
151.01 Description
Add the following at the end of the last sentence:
“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area.”
156 - Public Traffic 156.00_nat_us_04_06_2005
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and with the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633 Retroreflective sheeting 718.01 Temporary concrete barrier 618 Temporary plastic fence 710.11 Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1.
The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1 – Temporary Road Closures
Road Number
From Terminus To Terminus Maximum Consecutive
Days of Closure
Minimum Consecutive Days Open
Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
171 - Weed and Disease Prevention 171.00_nat_us_03_30_2005
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.
Material
171.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment. Use a high pressure washing system.
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner.
Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.
552 – Structural Concrete 552_forest_03_11_2005
Delete Table 552-3 and substitute the following:
Table 552-3 Required Average Compressive Strength
Table 552-3 Required Average Compressive Strength When Data Are Not Available to Establish a Standard Deviation
Specified Compressive Strength (f’c)
(pounds per square inch)
Required Average Compressive Strength
(f’cr) (pounds per square inch)
Less than 3000 f’c + 1000 3000 to 5000 f’c + 1200
Over 5000 1.10f’c + 700
552.19 Acceptance
Delete the fourth and fifth paragraph and substitute the following:
Concrete compressive strength will be evaluated as follows:
Ensure that the average of all the strength tests representing the concrete in each structural element meets the following requirements:
Not more than 10 percent of the strength tests shall have values less than the specified strength, and the average of any three consecutive strength tests shall be equal to or greater than the specified strength. In applying this requirement to prestressed members, the strength tests performed on all similar members, such as beams, shall be grouped together for purposes of counting the number of tests available. The abutments shall be considered one structural element, and the diaphragms shall be considered one structural element.
If concrete strength tests fail to meet the requirements of this specification, the CO may order the Contractor to have a testing laboratory that is acceptable to the Forest Service take and test core samples of questionable concrete, in accordance with AASHTO T-24.
The COR may order all low-strength concrete removed and replaced if core strengths are below specified strengths. All costs connected with concrete coring and removal and replacement of concrete that fails to meet these requirements shall be borne by the Contractor.
Table 552-9 Sampling and Testing Requirements:
Delete the third row, which is the row that refers to Produced aggregate (fine and Coarse) Delete the fifth row, second column that says “Statistical (106.05)” Add the following:
Concrete compressive strength will be evaluated according to this supplemental specification.
Payment Delete Section 552.21 and add the following:
552.21. The accepted quantities will be paid at the contract price per unit of measurement for the Section 552 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
556 - Bridge Railing 556.01_1005_us_05_23_2005
556.01 Replace the first sentence with the following:
This work consists of furnishing, erecting, removing, and installing new bridge railing and approach railing.
556.02 Add the following to the table:
Guardrail Section 617
556.05 Steel Railing Replace this subsection with the following:
556.05 Steel Railing and Approach Railing. Construct bridge railing and approach railing according to Sections 555 and 617. Approach railing includes terminal ends, railing, and transitions to bridge railing. Provide railing as shown on plans.
Use hand methods to clean erected steel railing of all oil, dirt, grease, mortar, and other foreign substances.
571 - Prefabricated Bridges 308.01_forest_03_11_2005
571.01 This work consists of designing, fabricating, delivering, and installing a prefabricated modular bridge superstructure AS SHOWN IN THE PLANS. The work includes appurtenances such as anchorages, connections, curbs, decking, bearings, shop drawings, sampling and testing, and other incidentals as required.
Materials
571.02 Requirements. Furnish materials that meet the requirements specified in the following sections:
Bridge Railing 556
Structural Metal 717
Prestressed Concrete 553
Reinforcing Steel 554
Steel Structures 555
Structural Concrete 552
Timber Structures 557
Material for Timber Structures 716
Concrete compressive strength, structural steel tensile strength, finish and designation, timber species, grade, and treatment, and other material specifications shall be as listed in the contract documents or if not listed in the contract documents, shall be taken from manufacturer’s drawings that have been approved by the CO prior to fabrication.
Maintain adequate records of all inspections and tests. Submit quality control records as required in Section 153.
Construction Requirements
571.03 Design Requirements. For required loadings use the most recent AASHTO LRFD Bridge Design Specifications and the design loads shown on the drawings.
When design of the structure is required, submit plans and calculations signed by a professional engineer registered in the state where the bridge will initially be located or in the state where the fabricator’s offices are located.
Use durable materials to allow removal, transportation, and re-installation without using specialized construction equipment. When required, design bridges to allow transportation by air or pack animals and complete construction by manual labor. Use design techniques and fabrication methods to minimize field installation difficulties.
Fabricate primary components from steel.
Provide permanent lifting devices on main superstructure to facilitate efficient installation and removal of these items. Place lifting devices so as not to interfere with traffic.
571.04 Design Drawings. When furnishing a prefabricated bridge superstructure, submit design drawings, calculations, or shop drawings at least 21 days in advance of the start of fabrication to allow time for review and correction of any changes and approval by the CO. Include plan, elevation, and section views of the modular bridge superstructure, dimensions of all components, welding and connection details, and general and specific notes regarding design and construction.
When Government-furnished prefabricated bridge superstructure components are specified, material lists, installation information, and manufacturer’s instructions will be furnished by the Government.
571.05 General. Perform excavation, backfill, and embankment work under Sections 208- Structural Excavation, 251 Riprap, and 308 Minor crushed aggregate.
Dispose of all debris resulting from operations in accordance with Section 203, Method
(a) Remove from project.
571.06 Performance. Notify the CO at least 7 days before delivering the bridge.
If the precast /prestressed concrete superstructure components are not installed immediately upon delivery to the project site, provide appropriate equipment and labor to unload and stack, support, and store all material at the delivery point. Support and stack all components to prevent damage. Furnish and install blocking to support all components at least 12 inches above the ground.
Measurement
571.12 Measure the Section 571 items listed in the bid schedule according to Subsection 109.02.
Payment
571.13 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 571 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05
| Preface |
| 101 - Terms, Format, and Definitions |
| 101.01 Meaning of Terms. |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid, Award, and Execution of Contract |
| 102 Bid, Award, and Execution of Contract |
| 103 - Scope of Work |
| Deletions |
| 104 - Control of Work |
| Deletions |
| 104.06 Use of Roads by Contractor |
| 107 - Legal Relations and Responsibility to the Public |
| 107.05 Responsibility for Damage Claims. |
| 107.06 Contractor’s Responsibility for Work. |
| 107.09 Legal Relationship of the Parties. |
| 107.10 Environmental Protection. |
| 108 - Prosecution and Progress |
| 108 Delete. |
| 109 - Measurement and Payment |
| 109 Deletions |
| 109.02 Measurement Terms and Definitions. |
| 109.02 Measurement Terms and Definitions. |
| 151 - Mobilization |
| 151.01 Description |
| 156 - Public Traffic |
| 156.01 This work consists of controlling and protecting public traffic adjacent to and with the project. |
| 156.02 Conform to the MUTCD and the following Sections and Subsections: |
| 156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. |
| 156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows: |
| 156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during clo... |
| Table 156-1 – Temporary Road Closures |
| 156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment. |
| 171 - Weed and Disease Prevention |
| 171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands. |
| 171.02 Conform to the following Subsection: |
| 171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the c... |
| 171.04 Equipment. Use a high pressure washing system. |
| 171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. |
| 171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed. |
| 171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02. |
| 171.08 Do not measure weed prevention for payment. |
| 171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization. |
| 552 – Structural Concrete |
| Table 552-3 Required Average Compressive Strength |
| 552.19 Acceptance |
| Table 552-9 Sampling and Testing Requirements: |
| 556 - Bridge Railing |
| 556.01 |
| 556.02 Add the following to the table: |
| 556.05 Steel Railing Replace this subsection with the following: |
| 556.05 Steel Railing and Approach Railing. Construct bridge railing and approach railing according to Sections 555 and 617. Approach railing includes terminal ends, railing, and transitions to bridge railing. Provide railing as shown on plans. |
| 571 - Prefabricated Bridges |
| 571.01 This work consists of designing, fabricating, delivering, and installing a prefabricated modular bridge superstructure AS SHOWN IN THE PLANS. The work includes appurtenances such as anchorages, connections, curbs, decking, bearings, shop dra... |
| 571.02 Requirements. Furnish materials that meet the requirements specified in the following sections: |
| 571.03 Design Requirements. For required loadings use the most recent AASHTO LRFD Bridge Design Specifications and the design loads shown on the drawings. |
| 571.04 Design Drawings. When furnishing a prefabricated bridge superstructure, submit design drawings, calculations, or shop drawings at least 21 days in advance of the start of fabrication to allow time for review and correction of any changes and a... |
| 571.05 General. Perform excavation, backfill, and embankment work under Sections 208- Structural Excavation, 251 Riprap, and 308 Minor crushed aggregate. |
| 571.06 Performance. Notify the CO at least 7 days before delivering the bridge. |
| 571.12 Measure the Section 571 items listed in the bid schedule according to Subsection 109.02. |
| 571.13 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 571 pay items listed in the bid schedule. Payment will be full compensation for the work p... |