BASE Contractor

ITEM

NO. DESCRIPTION QTY UNIT UNIT TOTAL MANHOUR

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

AMOUNT

15101 MOBILIZATION 1 L.S.

15221 CONSTRUCTION SURVEY AND STAKING 1 L.S.

15401 CONTRACTOR TESTING 1 L.S.

15730

DEWATERING, SOIL EROSION & POLLUTION

CONTROL 1 L.S.

20303A

REMOVAL OF 18" HDPE CULVERT, REMOVE

FROM PROJECT 194 L.F.

20303B

REMOVAL OF CONCRETE CURB, STORE ON

SITE 805 L.F.

20410 SUBEXCAVATION 3717 C.Y.

20701A

EARTHWORK GEOSYNTHETICS,TYPE

PERMEABLE FABRIC 12173 S.Y.

30101 AGGREGATE BASE, GRADING D 767 C.Y.

30120

AGGREGATE SUBBASE, 3" CRUSHED

WASHED 3453 C.Y.

40305 ASPHALT CONCRETE, IDAHO DOT, TYPE II 4899 S.Y.

60201A

4" PIPE CULVERT, CORRUGATED

POLYETHYLENE DRAINAGE TUBING 673 L.F.

60201B 18" PIPE CULVERT, CORRUGATED METAL 30 L.F.

60201C 24" PIPE CULVERT, CORRUGATED METAL 112 L.F.

60220 PRECAST CHANNEL, GRATE, GEO. DRAIN 1256 L.F.

60501 STANDARD UNDERDRAIN SYSTEM 1988 L.F.

63307 PLASTIC OBJECT MARKER 39 EA

Sub Total

Sub Total

TOTAL

MATERIAL COST LABOR COSTS

Overhead %

Profit %

Attachment #4-12026119R0002

Base Option Contractor:

NO. DESCRIPTION QTY UNIT UNIT TOTAL MANHOUR

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

AMOUNT

15221 CONSTRUCTION SURVEY AND STAKING 1 L.S.

15401 CONTRACTOR TESTING 1 L.S.

15730

DEWATERING, SOIL EROSION & POLLUTION

CONTROL 1 L.S.

20102 CLEARING AND GRUBBING 1 L.S.

20303A

REMOVAL OF 18" HDPE CULVERT, REMOVE FROM

PROJECT 30 L.F.

20303C

REMOVAL OF 24" HDPE CULVERT, REMOVE FROM

PROJECT 40 L.F.

20303D

REMOVAL OF 6" PIPE DRAINS, REMOVE FROM

PROJECT 20 L.F.

20401 ROADWAY EXCAVATION 100 C.Y.

20404 UNCLASSIFIED BORROW 3234 C.Y.

20410 SUBEXCAVATION 1394 C.Y.

20701A

EARTHWORK GEOSYNTHETICS,TYPE PERMEABLE

FABRIC 3871 S.Y.

20701B EARTHWORK GEOSYNTHETICS,TYPE GEOGRID 350 S.Y.

25208 ROCK BUTTRESS 23 S.Y.

25501 MECHANICALLY STABLIZED EARTH WALL, TYPE 48 S.Y.

25502 SELECT GRANULAR BACKFILL 232 C.Y.

30101 AGGREGATE BASE, GRADING D 509 C.Y.

301120 AGGREGATE SUBBASE, 3" CRUSHED WASHED 978 C.Y.

40305 ASPHALT CONCRETE, IDAHO DOT, TYPE II 2688 S.Y.

60201C 24" CULVERT, CORRUGATED METAL 30 L.F.

60201D 48" CULVERT, CORRUGATED METAL 86 L.F.

61801 CONCRETE BARRIER 30 L.F.

63308 PLASTIC DELINEATOR POST 9 EA

Sub Total

Sub Total

TOTAL

MATERIAL COST LABOR COSTS

Overhead %

Profit %

PNF Option I Contractor:

NO. DESCRIPTION QTY UNIT UNIT TOTAL MANHOUR

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

TOTAL

15101 MOBILIZATION 1 L.S.

15221 CONSTRUCTION SURVEY AND STAKING 1 L.S.

15401 CONTRACTOR TESTING 1 L.S.

15730

DEWATERING, SOIL EROSION & POLLUTION

CONTROL 1 L.S.

20303A

REMOVAL OF 18" HDPE CULVERT, FROM

PROJECT 60 L.F.

20430 ROCK SCALING 100 C.Y.

25103 PLACED RIPRAP, CLASS 5 377 S.Y.

30101 AGGREGATE BASE, GRADING D 4 C.Y.

40305 ASPHALT CONCRETE, IDAHO DOT, TYPE II 9662 S.Y.

40603 FOG SEAL 17083 S.Y.

40704 CHIP SEAL, TYPE 1A, GRADING A 17083 S.Y.

41202 ASPHALT TACK COAT, TYPE A 693 Gal.

41301 ASPHALT PAVEMENT MILLING, 2 INCH DEPTH 1376 S.Y.

60201C 24" PIPE CULVERT, CORRUGATED METAL 60 L.F.

Sub Total

Sub Total

TOTAL

MATERIAL COST LABOR COSTS

Overhead %

Profit %

Boise Option II Contractor:

NO. DESCRIPTION QTY UNIT UNIT TOTAL MANHOUR

MANDAYS

AVERAGE

RATE TOTAL

OTHER

DIRECT

COSTS

AMOUNT

15101 MOBILIZATION 1 L.S.

15221 CONSTRUCTION SURVEY AND STAKING 1 L.S.

15401 CONTRACTOR TESTING 1 L.S.

15713

DEWATERING, SOIL EROSION & POLLUTION

CONTROL 1 L.S.

20410 SUBEXCAVATION 2233 C.Y.

20701A

EARTHWORK GEOSYNTHETICS,TYPE

PERMEABLE FABRIC 4661 S.Y.

20701B EARTHWORK GEOSYNTHETICS,TYPE GEOGRID 3480 S.Y.

25208 ROCK BUTTRESS 20 S.Y.

25502 SELECT GRANULAR BACKFILL 192 C.Y.

30101 AGGREGATE BASE, GRADING D 421 C.Y.

30120 AGGREGATE SUBBASE, 3" CRUSHED WASHED 1125 C.Y.

40305 ASPHALT CONCRETE, IDAHO DOT, TYPE II 9180 S.Y.

40603 FOG SEAL 9180 S.Y.

40704 CHIP SEAL, TYPE 1A, GRADING A 9180 S.Y.

41202 ASPHALT TACK COAT, TYPE A 458 Gal.

41301 ASPHALT PAVEMENT MILLING, 2 INCH DEPTH 2430 S.Y.

60201A

4" PIPE CULVERT, CORRUGATED

POLYETHYLENE DRAINAGE TUBING 48 L.F.

60501 STANDARD UNDERDRAIN SYSTEM 100 L.F.

60912 PLACE STORED CURB 805 L.F.

61805 MOVE AND RESET CONC. BARRIERS 940 L.F.

63307 PLASTIC OBJECT MARKERS 2 EA

Sub Total

Sub Total

TOTAL

MATERIAL COST LABOR COSTS

Overhead %

Profit %

Base
Base Option
Payette Option 1
Boise Option II