This is an Erosion and Sediment Control Plan (ESCP) document prepared for the Port of Newport's Dredge Disposal Site in Newport, Oregon, in compliance with the National Pollution Discharge Elimination System (NPDES) Storm Water Erosion Control Permit 1200-CA issued by the Oregon Department of Environmental Quality. The plan addresses stormwater management and pollution prevention at a 3-acre confined dredge disposal facility operated by the Port of Newport in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Marine Operations Center-Pacific. The facility operates in two phases: during dredging operations, which occur every 3 to 5 years, the site functions as a settling pond for dredge material removed from the Port's marine facilities, and during non-dredging years, it operates as a clean sand stockpile for material sales to customers. The ESCP identifies dredge sediment placement and removal as the primary industrial activities with potential to impact stormwater through suspended solids and turbidity, and establishes a comprehensive framework for preventing and controlling pollution discharges to Yaquina Bay.
The plan establishes Jim Durkee, NOAA Facility Manager, as the ESCP Coordinator responsible for implementing best management practices (BMPs), overseeing employee training, and conducting monthly visual inspections during the rainy season from July through August and winter months. Key BMPs include spill prevention and response procedures, good housekeeping practices, temporary soil stabilization measures, silt fencing around bermed disposal basins, settlement ponds with gravel check dams, and proper material handling during loading and unloading operations. The facility maintains compliance records for three years beyond the permit issuance date and requires all employees to participate in annual refresher training within one week of hire. The plan includes provisions for amendment if facility operations change significantly or if monitoring reveals BMPs are ineffective, with revisions related to site contact changes, pollutant level increases, discharge volume changes, or monitoring location modifications requiring submission to ODEQ within 30 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOAA_MOC-P_CutFillReport February.pdf | ||
| NOAA Eelgrass Mitigation Area Photos document.pdf | ||
| 1200ca Permit PON.pdf | ||
| NOAA_MOC-P_Conditions and Profiles 2026 February.pdf | ||
| NOAA Dredging RFQ February 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Erosion and Sediment Control Plan
Dredge Disposal Site Port of Newport
Newport, Oregon
Prepared by
July 28, 2020
PORT OF NEWPORT, DREDGE DISPOSAL AREAL EROSION & SEDIMENT CONTROL PLAN
i
Record of Amendments to the ESCP Date Change
Name Section Modified
Modifications/Changes ii
Table of Contents Page
1 Introduction
1.1 Background
2 ESCP Coordinator and Duties
2.1 Contact Information/Responsible Parties
3 Operator Certification
4 Facility Description
4.1 Facility Location
4.1.1 General Site Description
4.1.2 Industrial Activities
4.2 Storm Water Drainage System
5 Identification of Potential Storm Water Contaminants
5.1 Significant Material Inventory
5.2 Potential Area for Storm Water Contamination
6 Storm Water Management Controls
6.1 Compliance with Other Regulatory Programs
6.1.1 Endangered Species Protection
6.1.2 Historic Preservation
6.2 Storm Water Management Practices
6.3 Storm Water Treatment
7 Inspection, Reporting, and Record Keeping
7.1 ESCP Summary
7.2 Compliance Monitoring Plan
7.3 Employee Training
7.4 Implementation Schedule
7.5 Record Retention Requirements
7.6 Provisions for Amendment of the Plan
8 Spill Response and Prevention
8.1 Spill Prevention
8.2 Spill Response
8.3 Notification
9 Baseline BMPs
9.1 Activity-Specific Best Management Practices
9.2 BMPs for Stockpile
iii
List of Tables
Table 1: Significant Materials and Potential Pollutants Table 2: Implementation Schedule
List of Figures Following Page
Figure 1: Site Location end of text
Figure 2: Erosion and Sediment Control Plan end of text
Drawing C1.0 end of text
Drawing C2.0 end of text
Appendices
Appendix A: Training Log Appendix B: Annual Inspection Log Appendix C: 1200-CA Permit
PORT OF NEWPORT, DREGE DISPOSAL AREA EROSION AND SEDIMENT CONTROL PLAN
1 Introduction
1.1 Background
In 1972, Congress passed the Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), to restore and maintain the quality of the nation’s waterways.
The CWA recognized the need to control pollution that couldn’t be traced to a pipe – nonpoint pollution in storm water that drains into water bodies from diffuse locations dispersed over the existing terrain and surfaces.
The United States Environmental Protection Agency (USEPA) published the final reissuance of the National Pollution Discharge Elimination System (NPDES) Storm Water General Permit for Construction Activities, which included provisions for the development of an Erosion and Sediment Control Plan (ESCP) for construction activity discharging storm water. The USEPA defines storm water as “storm water runoff, snowmelt runoff, and surface runoff and discharges” (Code of Federal Regulation [CFR] Title 40, Part 122, Section 26 (b)(14) (i-xi)).
In general, the NPDES stormwater program requires permits for discharges from construction activities that disturb one or more acres. A permit is required because the facility may discharge storm water potentially impacted by construction activities (e.g.
grading, stockpiling material) to public waters. To protect public waters from runoff potentially impacted by pollutants, the Permit requires that an ESCP be developed for each facility covered by the permit.
The ESCP outlines construction/industrial activities that could potentially contribute to storm water pollution and the management practices to be used by Port of Newport (PON) employees to reduce this potential. The industrial activities performed at the facility which have the potential to impact storm water discharges include the following:
Material storage and handling – the dredge disposal facility handles and stockpiles dredge sediment removed from PON operated marine facility to maintain navigable passage and mooring. These materials and activities do not meet the industrial activities definition of the regulation but are an important part of the site activities and, therefore, are considered here. BMPs are described below.
This ESCP is to be used as an active reference guide for PON personnel, and is to be reviewed and modified, as necessary, at least annually. The plan specifies requirements to be followed by all personnel at the facility. The ESCP has been developed to reduce or eliminate storm water pollution from the above listed activities and was prepared in accordance with the requirements outlined in the Permit
Development, implementation, and maintenance of the ESCP will provide PON with tools to reduce pollutants contained in storm water discharges and comply with the requirements of the NPDES Storm Water Erosion Control Permit 1200-CA issued by Oregon Department of Environmental Quality (ODEQ) for the International Terminals (File No.113354). A copy of the 1200-CA is attached as Appendix D. The primary goals of the ESCP will be to:
Identify contact information and responsible parties;
Describe the best management practices (BMPs) that will be implemented to prevent or control the release of pollutants in storm water discharges; and Create an implementation schedule to ensure that the practices described in this ESCP are in fact implemented and to evaluate the plan’s effectiveness in reducing the pollutant levels in storm water discharges (if necessary).
Provide Inspection and Corrective Action Provide personnel training
2 ESCP Coordinator and Duties
The ESCP coordinator for the facility is Mr. Jim Durkee, Facility Manager (phone number
(541) 270-0545). Mr. Durkee responsibilities and duties include the following:
Create a ESCP team to aid in the implementation of the ESCP Oversee maintenance practices identified as BMP’s in the ESCP Implement and oversee employee training Conduct and/or provide for inspection and/or monitoring activities Identify other potential pollutant sources and make sure they are amended to the
ESCP
Ensure that any changes to the facility operation are addressed as amendments to the ESCP.
To aid in the implementation of the ESCP, Mr. Durkee (Facility Manager) will ensure that all housekeeping and monitoring procedures are implemented and documented.
2.1 Contact Information/Responsible Parties
Facility Owner:
Port of Newport 600 SE Bay Blvd Newport, Oregon 97365 Telephone: (541) 265-7758 Contact: Aaron Bretz, Director of Operations
Facility Operator:
Port of Newport, National Oceanic and Atmospheric Administration (NOAA) Marine Operations Center – Pacific (MOC-P) 2002 SE Marine Science Drive Newport, Oregon 97365 Telephone: (541) 270-0545 Contact: Mr. Jim Durkee, NOAA Facility Manager
3 Operator Certification
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”
Name (printed)*
Signature
Title
Date
* Federal regulations require this document to be signed as follows:
For a corporation, by a principal executive officer of at least the level of vice president;
For a partnership or sole proprietorship, by a general partner or the proprietor, respectively; or for a municipality, state, federal, or other public facility, by either a principal executive officer or ranking elected official.
4 Facility Description
4.1 Facility Location
The Port’s dredge disposal area is located west of and adjacent to the NOAA MOC-P facility on the southern coast of Yaquina Bay in Newport, Oregon (see Figure 1). The facility is located in Lincoln County, in Section 9 of Township 11 South, Range 11 West, Willamette Meridian. The facility is on tax lot 400 which is approximately 62 acres (the Dredge Disposal site is approximately 3 acres). The site is situated in an area zoned W- 2 Water Related (W-2). The site is bounded to the north by Yaquina Bay, NOAA MOC-P facilities to the east and the Port’s recreational marina and RV Park to the west and south.
Facility Information
4.1.1 General Site Description
The site is a confined dredge (sediment) disposal facility which has been constructed with soil berms as a basin to contain sediment slurry discharged from dredging operations (see Figure 2). The basin has been designed to control the discharge of settled water drained from the dredge material through settling weirs.
4.1.2 Industrial Activities
There are two general phases of operation for the site. The first is when dredging operations are underway, at which time the site operates as a settling pond for dredge material that discharges water from the ditch located on the northeast corner. Dredging activity is covered under a 401 certification from the Oregon Department of Environmental Quality (ODEQ), which the Port attains through the U.S. Army Corp of Engineers (USACE) nationwide permit process each time the Port dredges one of its docks and/or mooring facilities. Dredging and dredge material placement happens once every 3-5 years, depending on how much sediment collects in the Port’s maintained facilities.
The second phase is during non-dredging years, when this site operates as a clean sand stockpile that the Port sells to various customers. At those times, customers come in and remove dewatered dredge material from the east side of the stockpile, but we do not disturb more than our permit allows. The entire site is approximately 3 acres. During those years, the Port maintains a constructed entrance (using roughly 6” rock) at the southeast corner, and maintain a rock road along the north side of the pile to the east end where trucks can load up with stockpiled material from an excavator or front-end loader that customers provide.
Name of Facility: Port of Newport Dredge Disposal Area
Address: 2120 SE Marine Science Drive Newport, Oregon 97365 Lincoln County
Latitude/Longitude:
Latitude: 44 37’ 27.49”N (degrees, minutes, seconds)
Longitude: -124 03’ 00.35” W
Estimated area of construction activity at the site exposed to storm water: 3 (acres)
4.2 Storm Water Drainage System
The Dredge Disposal area is bermed to collect storm water run-off and gravity direct it to the several settling area through a finger dike. The settling area allows for the capture and settling of total suspended solids and reduce turbid stormwater from discharging to Yaquina Bay. The stormwater drainage system eventually enters Yaquina Bay at one outfall.
5 Identification of Potential Storm Water Contaminants
5.1 Significant Material Inventory
The dredge disposal area will be used to place dredged sediments permitted through the U.S. Army Corp of Engineers from the Ports facilities.
Table 1: Significant Materials and Potential Pollutants
Trade Name Material Chemical/Physical Description
Storm Water Pollutant
Dredge Sediments Primarily clean sand Turbidity, TSS
5.2 Potential Area for Storm Water Contamination
The following potential source areas of storm water contamination were identified:
Stockpile Material Storage and Handling: Dredge material placement and removal has the potential to impact discharge for the storage area with potential contaminants may include suspended solids and turbidity.
6 Storm Water Management Controls
6.1 Compliance with Other Regulatory Programs
6.1.1 Endangered Species Protection
Consultation between the USFWS and NMFS under section 7 of the ESA has a Biological opinion from USFWS and NMFS that concludes that the action in question is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat. This evaluation was completed during the application for the initial dredging and dock construction permit for the NOAA MOC-P facility.
6.1.2 Historic Preservation
This evaluation was completed during the application for the initial dredging and dock construction permit for the NOAA MOC-P facility that concludes that the action in question is not likely to jeopardize any historical sites.
6.2 Storm Water Management Practices
Upon reviewing the potential pollutants at the facility and the facility operations, a summary of existing Best Management Practices (BMPs) and proposed BMPs has been prepared. Existing BMPs include:
Spill prevention and response;
BMPs for outdoors materials storage and handling are included at the end of this document.
A significant potential for storm water impact at the site is from sheet flow across the paved parking lots. Drainage from these areas flow directly into catch basins that make up the storm water sewer system. Sheet flow discharges eventually enter The Yaquina Bay.
6.3 Storm Water Treatment
Sheet flows off the dredge material that does not infiltrate could create rills and gullies down the slope the stockpile creating erosion feature that can transport sediment. The dredge disposal area is a bermed structure is design for retention of expose stormwater to allow settlement of suspended solids and turbidity. The final settlement pond and gravel check dams provide additional erosion control measure for reducing the potential of turbid and TSS laden stormwater discharge. The perimeter silt fencing installed around the bermed dredge disposal basins is a secondary measure to prevent siltation.
7 Inspection, Reporting, and Record Keeping
7.1 ESCP Summary
As per the requirements of PON’s NPDES Storm Water Erosion Control Permit 1200-CA issued by ODEQ (File No.113354), PON is required to prepare an ESCP. The ESCP will be kept at each facility and will be made available to state and federal compliance officers upon request.
7.2 Compliance Monitoring Plan
Visual inspections of storm water as sheet flow off the paved lots will occur during the rainy season (July through August and winter months). Inspections will be conducted monthly during rain events to look for evidence of storm water contamination. Inspections will be conducted within the first 12 hours of discharge event, during normal business/working hours. The visual inspections shall include any observations of color (i.e. rainbows on water surface), odor, turbidity, floating solids, foam, oil sheen, or other obvious indicators of storm water pollution. Information recorded during the monthly inspection shall include: date of inspection, observation location, visual quality of storm water discharge, and potential significant sources of storm water contaminants, if discovered. The visual inspection will be completed by an employee under the ESCP Coordinators’ direction. Appendix B includes a blank monthly inspection form.
7.3 Employee Training
An employee training program will be developed and implemented to educate employees about the requirements of the ESCP. This education program will include background on the components and goals of the ESCP, including good housekeeping, proper material handling, disposal and control of waste, and proper storage, washing and inspection procedures. All new employees will be trained within one week of their start date.
Additionally, all employees will be required to participate in an annual refresher training course. The training program will be reviewed annually by the ESCP coordinator to determine its effectiveness and make any necessary changes to the program.
7.4 Implementation Schedule
The ESCP implementation schedule is presented in Table 6 and is effective as of the date of this ESCP. BMP’s are currently in-place as well as employee training.
Table 2: Implementation Schedule
Storm Water Pollution Prevention Action Implementation Date
Employee Training Conducted currently
Monthly visual monitoring Sept thru July
Implementation of BMP’s In place currently
Annual facility site compliance inspection End of third quarter
7.5 Record Retention Requirements
Records described in the ESCP must be retained on site for 3 years beyond the date of the NPDES Erosion Control permit issued by the ODEQ, notifying the facility of coverage under the permit. The records shall be made available to ODEQ or a federal compliance inspection officer upon request. Additionally, employee training records and waste recycling receipts shall also be maintained.
7.6 Provisions for Amendment of the Plan
If the facility expands, experiences any significant process modifications or changes, any significant fuel handling or storage practices, which could impact storm water, the ESCP will be amended appropriately. The amended ESCP will have a description of the new activities that contribute to the increased pollutant loading and planned source control activities. Submission of all revisions to the ESCP is not required. Revisions for changes in site contact, changes to site control that may significantly increase the pollutant(s) levels, changes to discharge volume, and changes to monitoring locations must be submitted to the ODEQ within 30 days of making the revisions.
The ESCP will also be amended if the ODEQ or federal compliance inspection officer determines that BMPs are ineffective in controlling storm water pollutants discharged to waters of the State.
8 Spill Response and Prevention
8.1 Spill Prevention
Spill prevention is accomplished through the development and proper implementation of Best Management Practices (BMPs). BMPs have been developed for the facility and are discussed in the Best Management Practices section of this plan. BMPs are covered in the annual ESCP training.
8.2 Spill Response
Spill
SPILL
CONTAINMENT
ATTEMPT TO HALT THE SPILL OR LEAK BY:
• CALL 911 IF THERE IS AN IMMINENT DANGER TO HUMAN LIFE
AND/OR THE ENVIRONMENT
• CLOSING OFF CONNECTING VALVES.
• PLUGGING THE HOLE(S) WITH WOOD OR ANY OTHER AVAILABLE
MATERIALS. CARE MUST BE TAKEN TO USE SPARK RETARDANT
TOOLS.
• POSITION SOME TYPE OF CONTAINER/TRASH CAN UNDER THE
LEAK OR RUPTURE.
• ENCLOSE THE SPILLED FUEL WITH A DIKE OF CLAY ABSORBENT OR
AN ABSORBENT SOCK.
CLEANUP
USE ENOUGH ABSORBENT TO SOAK UP ALL THE SPILLED LIQUID. SINCE
MOST ORGANIC LIQUIDS ARE VERY FLAMMABLE, AVOID ALL SOURCES OF
IGNITION OR SPARKING. SCOOP UP SPENT SOLID ABSORBENT WITH A NON‐
SPARKING SHOVEL WITH A LONG HANDLE. PLACE ABSORBENT IN 55‐
GALLON DRUMS LABELED “WASTE SPILL MATERIAL,” OR “DIESEL,”
DEPENDING ON THE CONTAMINANT.
PERSONAL
PROTECTIVE
EQUIPMENT
PERSONNEL INVOLVED IN CLEANING UP A FUEL/FUEL
PRODUCT SPILL MUST WEAR THE FOLLOWING
PERSONAL PROTECTION EQUIPMENT (PPE):
• TYVEK COVERALL
• NITRILE GLOVES
• GOGGLES/SAFETY GLASSES
• BOOTS WITH CHEMICAL‐RESISTANT
OVERSHOES
8.3 Notification
Emergency response procedures are developed to ensure that emergency incidents are responded to quickly, safely and effectively, and are properly reported and documented.
Emergency incidents include pollutant releases to the environment resulting from spills, as well as explosions, fires and other dangerous incidents. Releases may be more or less severe. Some will require emergency assistance and notification, while facility personnel can handle others. Below are the notification requirements.
State
The following release scenarios require notification to the State of Oregon:
• If spilled into waters of the state, or escape into waters of the state, is likely, any quantity of oil that would produce a visible oily slick, oily solids, or coat aquatic life, habitat or property with oil;
• If spilled on the surface of the land, any quantity of oil over one barrel (42 gallons);
and
• An amount equal to or greater than the quantity listed in 40 CFR Part 302 -- Table
302.4 (List of Hazardous Substances and Reportable Quantities) and amendments adopted prior to July 1, 2002.
The State of Oregon requires immediate verbal notification to the Oregon State Emergency Response System (OERS) if any of the above applies for an incident.
OERS (24 hours) (800) 452-0311
Federal
The enactment of the Comprehensive Environmental, Response, Compensation, and Liability Act (CERCLA) created a listing of hazardous substances designated for special consideration under other major environmental legislative enactments (such as the Clean Air Act), as well as other substances that may present substantial danger to human health and the environment. Reportable quantities were established for specific hazardous substances and waste streams. A spill to the environment of any of the identified substances in quantities greater than its assigned reportable quantity must be immediately reported to the NRC by the EC.
National Emergency Response Center (24 hour) (800) 424-8802
9 Baseline BMPs
Baseline BMPs are cost effective and easily implemented measures that are applicable facility-wide. Many of these BMPs have been used in the past or are currently being used (for example) for product loss prevention, worker health and safety, or to comply with other environmental regulations. The following presents a discussion of the baseline BMPs.
Good Housekeeping
Good housekeeping practices are designed to maintain a clean and orderly work environment and involve the following control practices implemented at the facility:
• Ground surfaces are kept clean using brooms, shovels or sweeping machines from tracked sediments;
• Adequate space is provided to facilitate material transfer (loading and unloading) and easy access for inspections;
• Any detected spill will be attended to immediately;
• Spill cleanup materials and equipment will be readily accessible and all personnel will be knowledgeable in their location and proper use;
• All work areas will be "policed" at least once a day when there are activities occurring on the site;
9.1 Activity‐Specific Best Management Practices
Whereas baseline BMPs can be applied facility wide, activity-specific BMPs are particular to an identified potential pollutant source. Activity-specific BMPs incorporate some of the baseline BMPs where applicable. The following subsections present activity-specific BMPs that are implemented at the facility.
9.2 BMPs for Stockpile
This primarily addresses erosion control procedures for stockpile soil/dredge material that are either placed during dredging or removed as fill materials (product). BMPs discussed address storage areas of both newly dredge sediment placement and handling materials (product) for removal from the dredge disposal area.
Material stockpiled should be located within the property boundaries and the bermed dredge placement area of the site. All dredged material stockpiled should remain in a free-draining condition to avoid long-term saturation.
Stockpile Management Procedures
Potential Pollutant Generating Sources:
1. Turbidity and TSS of stormwater and drainage water from placement of dredge sediment.
2. Erosion of exposed sloped surface of place dredge sediment during rain events resulting in turbidity and TSS is discharge.
3. Loading and unloading area, tracking sediment material onto surface streets adjacent to the dredge disposal are.
General
• The dredge sediments shall be placed into the stockpile at the location designated on the plans. Stockpiled dredge sediments should be treated with temporary soil stabilization and erosion control measures. Stockpile height should not exceed 10 feet.
• A temporary soil stabilization and erosion control treatment shall be applied to the exposed dredge sediment areas to protect from erosion prior to permanent seeding.
• Promptly repair any deterioration threatening the structural integrity of the dredge sediment storage basin. These include replacement of clean-out discharge pipe of sediment build-up, re-install silt fencing as necessary, and re-construct.
• Emphasis will be placed on good housekeeping. Workers will clean up after themselves. Spillage from leaking containers or equipment will be attended to immediately and/or reported.
• All personnel will be trained in proper handling, containment, cleanup, and reporting procedures.
• Contaminated material and soil should be cleaned up and disposed of in accordance with applicable regulations. The PON will coordinate and/or contract for the disposal of all contaminated material and soil.
Unloading and Loading Procedures
• Activities will be conducted in areas where appropriate containment or diversionary structures are present to contain a spill. If none are present, temporary provisions such as portable berms may need to be provided.
• At least two persons will be present at all times during operations; one person will be responsible for directing the driver.
• Spill containment equipment will be readily accessible.
• When feasible, outdoor loading operations will not be performed during rain events.
• Constructed road entrance should provide for tracked sediments to be captured before entering paved surface streets.
• Truck wheels should be inspected before entering the paved surface street and be free of soil.
Visual Inspections
• Conduct inspections as required by the NPDES permit.
• Conduct inspections during dredge sediment placement to make sure erosion control measures are effective.
• Periodic inspection and maintenance will be required based on post-placement site conditions.
• Make any repairs necessary to ensure the measure is operating properly. Repair and reseed if necessary to control erosion and loss of topsoil.
• This periodic maintenance procedure applies to either temporary soil stabilization or permanent seeding application.
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community, Copyright:© 2013 National Geographic Society, i-cubed
0 1,200 2,400 3,600 4,800600 Feet
Port of Newpor, Dredge Disposal Site
Legend Project Site
Figure 1
Project Site Location
APPENDIX A
Training Log
Employee Log Sheet
Annual Training
Date Employee Name (print) Employee Signature
APPENDIX B
Annual Inspection Log
Annual Facility Site Compliance Inspection Log
Date Drainage Area
Changes in Drainage
(Requires revision of ESCP)
BMP
Effective
(Y/N)
Proposed BMPs
(Requires revision of ESCP)
Implementation schedule for Proposed BMPs
Qtr. 1
DA-1
Qtr. 2
Qtr. 3
Qtr. 4
Inspector’s Name