12 Passenger GO ME VAN 12-08 approved equals.doc

DOC document 31 KB Posted

Attached to
Van- Extended Length center aisle 12 passenger gas engine
Solicitation number
RFQ - 17A - 08120400000000000394
Issued by
Maine

About this file

This document is a responses to exceptions and approved equal requests for RFQ-17A-081204000000000000394 issued by the State of Maine Department of Transportation (MaineDOT) for a 12-passenger center aisle van, dated January 5, 2009. The solicitation requests one vehicle with specific technical and safety requirements, including dimensions (overall height not to exceed 85 inches, interior height not less than 52 inches), a roll stability control feature, a 135-amp alternator, passenger windows, flooring systems, a rear safety sensor system, and a two-way radio. The document addresses bidder requests for approved equal substitutions and specification clarifications submitted during the bidding process.

MaineDOT denied the request to accept lead weights as an alternative to the specified safer material requirement and will not accept vehicles with lead weights. The agency approved multiple equal product substitutions, including Mor-Ryde for roll stability control, a 120-amp alternator for the E350 Ford chassis, Ford OEM passenger windows, Altro rubber flooring with alternative thickness specifications, and a Ford OEM rear bumper safety system in lieu of the Echo Vision Sensor System. MaineDOT clarified that flooring materials will be accepted if they are the only type offered by the factory or conversion company, provided detailed information is submitted on all subflooring and flooring materials used. Regarding two-way radio specifications, MaineDOT indicated it would accept an estimated price as an option pending identification of end-user agencies. For any additional units ordered beyond the initial purchase, bidders must maintain the original bid price for one year, with responsibility to provide written proof of chassis price increases from the original equipment manufacturer if additional orders cannot be placed within that timeframe. MaineDOT awards contracts based on lowest responsive bidder consideration, evaluating bid price, specification compliance, product support, vendor history, and delivery capability.

View the file

Other files

File Type Posted
Bureau of Purchases bid package Center Aisle Vans (12-08)[1].rtf RTF text file
12 Passenger Center Isle Van 12-2008.doc DOC document
PO_Terms.doc DOC document
go maine vans 12236[1].pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RFQ-17A-081204000000000000394

CENTER AISLE VAN

January 5, 2009

RESPONSES TO EXCEPTIONS AND APPROVED EQUAL REQUESTS

Part I General

Safer Matrerial Alternatives

Item II – Lead Weights Request: Since wheels are balanced at factory with no option available for alternatives, bidder would have to change out weights in field, dispose of lead weights and thereby negate any gain in environmental impact. Request deletion of requirement.

Accepted_____________

Denied______X________

The background on this requirement has been explained in Section I, State Purchasing

Of Safer Material Alternatives. Vehicles with lead weights will not be accepted.

Section 1.O Dimensions

Request: Clarification on overall height, interior height Response: Overall height of van, without raised roof not to exceed 85”, Interior height without raised roof, not to be less that 52” Measurements with raised roof may vary depending on height of roof used.

Section 2.4 Control

Specified Roll Stability Control feature.

Request: Accept Mor-Ryde in lieu of specified control

Accepted_____X_______

Denied_____________

Request Stability Control Feature be deleted. Not available from OEM

Accepted_____X_________

Denied_____________

Section 2.10 Alternator

Specified 135 Amp, 12V Request: Accept 120 Amp Standard alternator on E350 Ford chassis

Accepted_____X________

Denied____________

Section 3.7 Windows

Request: Acceptance of FORD OEM Passenger Windows

Accepted______X________

Denied_____________

Section 4.1 Walls/Headlining

Clarification of executive type interior.

Response: The term “executive type” was a reference to the style of raised roof, “sport” or “executive” type whichever style is offered by conversion company.

Section 4.2 Floor/Floor Covering

Specified Lonseal’s Loncoin non-skid rubber transit flooring

Request: Acceptance of Altro Rubber Flooring 2.2 mm thickness, slip resistant

Accepted_____X________

Denied_____________

Request: Acceptance of finished subfloor of ¾” thick fiberglass reinforced plywood.

Accepted______X________

Denied___________

Request: Acceptance of black, 1/89” thick transit type smooth rubber w/3/16” ribbed in entry way and aisle.

Accepted______X_________

Denied___________

Will accept flooring if only type offered by factory, or conversion company. MaineDOT preference is to have a heavy duty, high quality floor, and floor covering. Bid must provide detailed information on the all sub flooring and flooring material used.

Section 5.0 (n) Miscellaneous

Specified Echo Vision Sensor System

Request: Acceptance of FORD OEM rear bumper safety system

Accepted_______X_______

Denied_____________

Section 6.0.3 Two Way Radio Request clarification information on two way radio

Response: At this time, the end user agencies are unknown. We will accept an estimated price as an option based on past bids and use.

ADDITIONAL REQUESTS

Request(s) for acceptance of an escalation clause to cover increases in pricing of chassis that are beyond the control of the bidding vendor and would need to be passed on to State of Maine. All costs within their control, would be held for a period of one year.

Response:

Bidder shall be expected to hold bid price for up to one year on any additional units, as long as chassis price remains stable. It will be the responsibility of the bidder to provide Maine DOT with written proof of chassis price increase from OEM if additional units can not be ordered within a year from date of original Purchase Order.

Section 1.8 Clarification of “best value consideration” and “lowest responsible bidder.”

Response: Historically, MaineDOT has always awarded bids to the lowest responsive bidder, considering bid price, compliance to specifications, product support, history and delivery of product..

File details come from the government source that posted it. Updated .