12 538-25-206 - Evaluation Criteria.pdf

PDF 150 KB Posted

Attached to
C219--538-25-206 AE CONTRACT REPAIR CLC SHOWER ACCESS
Solicitation number
36C25025Q0086
Issued by

About this file

This is an evaluation criteria document for contract 36C25025Q0086, detailing how the VA will evaluate SF-330 submissions for architectural/engineering services to repair shower access at the Chillicothe VA Medical Center's Community Living Center. The document outlines seven weighted evaluation factors: Professional Qualifications (15%), Specific Experience (20%), Firm's Capacity (15%), Past Performance (15%), Geographic Location (10%), Construction Period Services (15%), and Use of SDVOSB/VOSB/Small Business (10%).

Key requirements include a Professional Engineer or Licensed Architect with healthcare facility and government project experience, Structural Engineer, Plumbing Engineer, Medical Equipment Specialist, Cost Engineer, and Certified Industrial Hygienist. Firms must demonstrate experience with five healthcare-related designs (three must have entered construction), be located within 1.5-3 hours of the Chillicothe VAMC, and show construction period services capabilities. The solicitation is a 100% SDVOSB set-aside, requiring SBA VetCert certification. Responses using SF-330 forms are limited to 35 pages and must be submitted by January 8, 2025 at 4PM EST.

View the file

Other files

File Type Posted
B210-211 Repair CLC Showers AE Scope of Work R2.pdf PDF
36C25025Q0086.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

538-25-206 REPAIR CLC SHOWER ACCESS

Proposed Evaluation Criteria

Firms responding to this notice shall do so using Standard Form (SF-330) and will be evaluated and ranked using the selection criteria listed below. The evaluation factors are to be addressed in Part H of the SF-330 unless otherwise listed below. The evaluation will consider how each factor is addressed to coincide with the selection criteria. The factors are individually weighted as indicated. SF-330 responses shall be no longer than 35 standard 8.5”x11” pages; SF-330 Part II and Past Performance documents such as CPARS are excluded from the page limitation.

A. Professional qualifications necessary for satisfactory performance of required services (weighting 15%)

All key personnel listed below for whom resumes shall be provided are the minimum required and shall be shown on an organizational chart. Personnel may fill multiple roles if qualified. All architects and engineers performing work on this project are required to be licensed, registered or certified by a US State, the District of Columbia or a US territory. Personnel shall provide professional license jurisdiction of issue and license numbers and/or proof of licensure. Any additional staff beyond the below minimum key personnel being made available for work shall also be indicated on the chart. Proposed team member experience shall be relevant within the last three (5) years.

Personnel Qualifications and Experience as required by this criterion shall be located in Section E – Resumes of Key Personnel.

Organizational Chart shall be located in Section D – Organizational Chart.

a. One (1) Professional Engineer or Licensed Architect with experience in:

i. Healthcare Facility Design and Construction

ii. U.S. Government Project Management

iii. Quality Assurance and Quality Control (QA/QC)

iv. Showers and bathing facilities for residential care

b. One (1) Structural Engineer/Designer

c. One (1) Engineer with experience in:

i. Sewer plumbing

ii. Showers and bathing facilities for residential care

d. One (1) Medical Equipment Specialist with experience in:

i. Showers and bathing facilities for residential care

e. One (1) Certified Cost Engineer/Estimator with experience in:

i. Healthcare Facility Design and Construction

ii. U.S. Government Projects

f. One (1) Certified Industrial Hygienist

B. Specific experience and qualifications of personnel proposed for assignment to the contract and their record of working together as a team (weighting 20%)

Include specialized experience and technical competence with healthcare related designs.

Demonstrate successful completion of five (5) separate designs, three (3) of which have entered construction period services. List completion dates for professional services and/or construction for all projects. If completion dates are not available, provide a status update that includes a brief description of the project, including scope, size, cost, principal elements, special features, and relevance of the example project to this contract.

Firm Experience as required by this criterion shall be located in Section F – Example Projects. Federal Government CPARS may also be considered, in conjunction.

a. Include specialized experience and technical competence with residential healthcare-related designs, including bathrooms, showers, and layouts.

b. All projects provided in the SF-330 must involve some effort or contribution from the prime firm (or former firm names as listed in Part II – General Qualifications).

i. Include no more than five (5) Government and/or private experience projects completed within the past eight (8) years that best illustrate specialized experience as listed above, with at least 95% of the design completed.

ii. Include at least three (3) of these projects having entered Construction Period Services.

C. Firm’s capacity (weighting 15%)

Describe the firm’s ability to accomplish the work in the required time, including existing workload from all private and public clients and awards with similar scope requirements that may limit capacity to perform project work expeditiously.

a. Provide a list of current contractual obligations from all public and private clients of the firm and/or key personnel with periods of performance extending up to one

(1) calendar year from SF330 submission. Provide project title, estimated construction costs (if applicable), and period of performance dates for the contractual obligations.

b. Provide evidence supporting the firm’s ability to perform work in the required time, such as execution of simultaneous task orders with construction costs equal to or greater than this solicitation.

D. Past performance (weighting 15%)

Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with schedules.

a. Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided via the Contractor Performance Assessment Reports System (CPARS) for projects listed in Section F of the SF- 330 as well as any other projects contained in the database and may include review of information obtained via customer inquiries, other Government databases, and any other relevant other information available to the Government.

b. Preferred to have past performance with Federal Government agencies.

E. Location in the general geographical area of the project and knowledge of the locality of the project (weighting 10%)

Project designated staff shall provide travel times from primary place of work to the Chillicothe VAMC. Project designated staff shall be assigned a score based on the criteria below. SF-330 shall achieve a score based on the average score of project designated staff.

Examples of knowledge of the locality of the project include: knowledge of geographical features, climatic conditions, unusual or unique local construction methods, or previous work on the station.

a. Greatest preference will be for locations within 1.5-hour travel time of the Chillicothe VA Medical Center.

b. Preferred to have a physical presence within 3-hour travel time.

F. Construction Period Services (weighting 15%)

Experience in construction period services to:

a. Professional Field Inspections

b. Review of Construction Submittals

c. RFI Support

d. Support Construction Contract Changes to Include Drafting Statements of Work and Cost Estimates

G. The extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors (weighting 10%).

Firms (Prime and Subcontractor(s)) shall be SBA Certified (aka VetCert) if SDVOSB or VOSB. To be considered, SDVOSB/VOSB firms must be listed in the SBA Certification database at https://veterans.certify.sba.gov/ (see 13 CFR 128).

All other small business firms shall be certified by SAM.gov or Fed Data Check.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fveterans.certify.sba.gov%2F&data=05%7C01%7C%7C60bfb01aa1bc4c93f27f08db20cf04c2%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638139845731169535%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=pDlkJPbDAWjDFZvThb%2FQhzH0yEd0JqQM1xZzVu%2BbOso%3D&reserved=0

Estimated percent of project overall workload shall be designated for each firm (prime and sub).

a. SDVOSB shall be given greatest preference.

b. VOSB shall be given great preference.

c. All other small businesses to be preferred.

File details come from the government source that posted it. Updated .