12-086924 Construct RW_ SW_ HMA_ Pvmt_ Drainage_ and Elect Systems.pdf

PDF 1 MB Posted

Attached to
12-086924 Construct RW, SW, HMA, Pvmt, Drainage, and Elect Systems
Solicitation number
12-086924, Fed #ST-S074(078)
Issued by
Orange County, San Francisco City, California

About this file

This is a Notice to Bidders and Special Provisions document issued by the California Department of Transportation (Caltrans) for construction work on State Route 74 in Orange County, near San Juan Capistrano. The project involves constructing roadway improvements, sidewalks, hot mix asphalt pavement, drainage systems, and electrical systems along a 2.2-mile segment from 0.1 mile west of Calle Entradero to Reata Road. The work must be completed within 600 working days, excluding plant establishment and permanent erosion control work, with an additional 150 working days allocated for those tasks (250 working days each). Bids are due on Tuesday, November 10, 2026, with electronic sealed bid submission via the Bid Express website closing at 2:00 p.m. The project includes 143 bid line items covering demolition, earthwork, drainage infrastructure, retaining walls, sound walls, concrete structures, pavement markings, traffic control systems, signal and lighting systems, and landscaping. The estimated project cost is $47,000,000, and contractors must hold either a Class A license or a combination of Class C licenses (C-12 and C-8) constituting a majority of the work.

Bidders must submit a bid bond equal to at least 10 percent of their bid amount and are required to comply with federal and state prevailing wage requirements, with rates determined by the California Department of Industrial Relations and the U.S. Secretary of Labor. The contract is a federal-aid project (ST-S074(078)) subject to Buy America requirements for manufactured products, iron, steel, and certain construction materials. The Department will furnish specific traffic signal controller components and completely wired controller cabinets, which bidders must pick up at 691 S. Tustin Street, Orange, California. Environmental compliance includes requirements for lead compliance plans, stormwater pollution prevention, and management of unregulated earth material containing lead. The project involves coordination with multiple utility providers (AT&T, Cox, Crown Castle, Southern California Gas, SDG&E, and Santa Margarita Water District) requiring advance notice and extended working days for utility adjustments. The contract includes provisions for temporary construction easements on multiple private properties, with expiration dates set for March 6, 2030, and specifies dispute resolution board options and automated machine guidance requirements for earthwork operations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids open Tuesday, November 10, 2026 Dated September 21, 2026 OSD

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

NOTICE TO BIDDERS

AND

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN AND

NEAR SAN JUAN CAPISTRANO FROM 0.1 MILE WEST OF CALLE

ENTRADERO TO REATA ROAD

In District 12 On Route 74 Under

Bid book dated September 21, 2026 Standard Specifications dated 2025

Project plans approved June 16, 2026 Standard Plans dated 2025

Identified by Contract No. 12-086924

12-Ora-74-1.0/R2.2 Project ID 1200000051

Federal-Aid Project

ST-S074(078)

SPECIAL NOTICES

• See sections 2 and 3 for contractors' registration requirements.

• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.

• See section 2 for submittal requirements for DVBE quotes and Non–Small Business

Subcontractor Preference.

• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).

• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.

• The flagging and temporary traffic control requirements have been revised. See sections 7-

1.03, 7-1.04, and 12.

• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.

• See section 14-11.14 for changes to the management of treated wood waste.

• See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy

America/Build America for manufactured products.

• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.

Contract No. 12-086924 i

TABLE OF CONTENTS

NOTICE TO BIDDERS

BID ITEM LIST

SPECIAL PROVISIONS

ORGANIZATION

DIVISION I GENERAL PROVISIONS

1 GENERAL

2 BIDDING

5 CONTROL OF WORK

6 CONTROL OF MATERIALS

7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

8 PROSECUTION AND PROGRESS

9 PAYMENT

DIVISION II GENERAL CONSTRUCTION

11 WELDING

12 TEMPORARY TRAFFIC CONTROL

13 WATER POLLUTION CONTROL

14 ENVIRONMENTAL STEWARDSHIP

DIVISION III EARTHWORK AND LANDSCAPE

17 GENERAL

19 EARTHWORK

20 LANDSCAPE

21 EROSION CONTROL

DIVISION V SURFACINGS AND PAVEMENTS

39 ASPHALT CONCRETE

DIVISION VI STRUCTURES

46 GROUND ANCHORS AND SOIL NAILS

49 PILING

51 CONCRETE STRUCTURES

56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES

58 SOUND WALLS

59 STRUCTURAL STEEL COATINGS

DIVISION VIII MISCELLANEOUS CONSTRUCTION

73 CONCRETE CURBS AND SIDEWALKS

77 LOCAL INFRASTRUCTURE

78 INCIDENTAL CONSTRUCTION

80 FENCES

DIVISION IX TRAFFIC CONTROL DEVICES

ii

81 MISCELLANEOUS TRAFFIC CONTROL DEVICES

83 RAILINGS AND BARRIERS

84 MARKINGS

DIVISION X ELECTRICAL WORK

86 GENERAL

87 ELECTRICAL SYSTEMS

DIVISION XI MATERIALS

90 CONCRETE

iii

STANDARD PLANS LIST

The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.

RSP A3A Abbreviations (Sheet 1 of 3)

RSP A3B Abbreviations (Sheet 2 of 3)

RSP A3C Abbreviations (Sheet 3 of 3)

A10A Legend - Lines and Symbols (Sheet 1 of 5)

A10B Legend - Lines and Symbols (Sheet 2 of 5)

A10C Legend - Lines and Symbols (Sheet 3 of 5)

A10D Legend - Lines and Symbols (Sheet 4 of 5)

A10E Legend - Lines and Symbols (Sheet 5 of 5)

A10F Legend - Soil (Sheet 1 of 2)

A10G Legend - Soil (Sheet 2 of 2)

A10H Legend - Rock

A20A Pavement Markers and Traffic Lines - Typical Details

A20B Pavement Markers and Traffic Lines - Typical Details

A20C Pavement Markers and Traffic Lines - Typical Details

A20D Pavement Markers and Traffic Lines - Typical Details

A20E Traffic Lines - Typical Details for Contrast Striping

A24A Pavement Markings - Arrows

A24B Pavement Markings - Arrows and Symbols

A24C Pavement Markings - Symbols and Numerals

A24F Pavement Markings - Crosswalks

A62A Excavation and Backfill - Miscellaneous Details

A62B Limits of Payment for Excavation and Backfill - Bridge Surcharge and Wall

A62D Excavation and Backfill - Concrete Pipe Culverts

A62DA Excavation and Backfill - Concrete Pipe Culverts - Indirect Design Method

A62E Excavation and Backfill - Cast-In-Place Reinforced Concrete Box and Arch Culverts

A73B Markers

A85 Chain Link Fence

A85A Chain Link Fence Details

A85B Chain Link Fence Details

A87A Curbs and Driveways

A87B Hot Mix Asphalt Dikes iv

RSP A88A Curb Ramp Details

D71 Drainage Inlet Markers

D72D CIP Drainage Inlets - Types GT1, GT2, GT3 and GT4

D72E CIP Drainage Inlets - Types GO and GDO

D72G CIP Drainage Inlet Tables

D73F Precast Drainage Inlet Notes

D73G Precast Drainage Inlet Tables

D74 Drainage Inlet Details

D75B Concrete Pipe Inlets

D75C Pipe Inlets - Ladder and Trash Rack Details

D77A Grate Details No. 1

D77B Grate Details No. 2

D78A Gutter Depressions

D78B Inlet Depressions - Concrete Shoulders

D78C Inlet Depressions - Hot Mix Asphalt Shoulders

D80 Cast-In-Place Reinforced Concrete Single Box Culvert

D81 Cast-In-Place Reinforced Concrete Double Box Culvert

D82 Cast-In-Place Reinforced Concrete Box Culvert - Miscellaneous Details

D91A Cast-In-Place Reinforced Concrete Junction Structure

D91B Cast-In-Place Reinforced Concrete Junction Structure

D93C Pipe Riser with Debris Rack Cage

H1 Landscape and Erosion Control Symbols

H2 Landscape Details

H3 Landscape Details

H6 Landscape Details

RSP H8 Landscape Details

H9 Landscape Details

T3C Temporary Barrier System (Cross Bolt)

T3D Temporary Barrier System (Cross Bolt)

T3E Temporary Barrier System (Cross Bolt)

T3F Temporary Barrier System (Cal F-23)

T3F2 Temporary Barrier System (Cal F-23)

T3G Temporary Barrier System (Staking or Anchoring)

T3G2 Temporary Barrier System (Staking or Anchoring)

T9 Traffic Control System Tables for Lane and Ramp Closures v

RSP T13 Traffic Control System with Reversible Control on Two Lane Conventional Highways

T19 Traffic Control System - Construction Work Zone Speed Limit Reduction on Conventional Highways

T21 Traffic Control System - Construction Work Zone Speed Limit Reduction Twenty- Four Hours a Day 7 Days a Week (24/7)

T22 Traffic Control System for Construction Work Zone Speed Limit Reduction on Two Lane Conventional Highways

T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and Pedestrian Detour

T31 Temporary Pedestrian Access Routes - Typical Sidewalk Diversion Within Roadbed

T32 Temporary Pedestrian Access Routes - Typical Sidewalk/Crosswalk Closure and Pedestrian Detour

T51 Temporary Water Pollution Control Details (Temporary Silt Fence)

T53 Temporary Water Pollution Control Details (Temporary Cover)

T58 Temporary Water Pollution Control Details (Temporary Construction Entrance)

T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)

T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)

T65 Temporary Water Pollution Control Details (Temporary High-Visibility Fence)

B0-3 Bridge Details

B3-5 Retaining Wall Details No. 1

B3-6 Retaining Wall Details No. 2

B7-11 Utility Details

B11-47 Cable Railing

B15-3 Sound Wall Masonry Block on Pile Cap Details (1)

B15-4 Sound Wall Masonry Block on Pile Cap Details (2)

B15-5 Sound Wall Masonry Block on Pile Cap Details (3)

RS1 Roadside Signs - Typical Installation Details No. 1

RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2

RS4 Roadside Signs - Typical Installation Details No. 4

ES-1A Electrical Systems (Legend)

ES-1B Electrical Systems (Legend)

ES-1C Electrical Systems (Legend)

ES-2A Electrical Systems (Service Equipment)

ES-2E Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - B Series)

ES-3C2 Electrical Systems (Controller Cabinet Foundation Details) vi

ES-3K Electrical Systems (Electronics Assembly Connection Diagram) (Battery Backup System)

ES-4A Electrical Systems (Signal Head Mounting)

ES-4B Electrical Systems (Pedestrian Signal Heads)

ES-4C Electrical Systems (Signal Heads and Mountings)

ES-4D Electrical Systems (Signal Head Mounting)

ES-4E Electrical Systems (Signal Heads)

ES-5A Electrical Systems (Loop Detectors)

ES-5B Electrical Systems (Detectors)

ES-5C Electrical Systems (Accessible Pedestrian Signal and Push Button Assemblies)

ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details)

ES-5E Electrical Systems (Trench in Pavement and Piezoelectric Axle Sensor Details)

ES-6A Electrical Systems (Lighting Standard, Types 15 and 21)

ES-6B Electrical Systems (Electrolier Anchorage and Grouting for Type 15 and Type 21, Barrier Rail Mounted)

ES-7A Electrical Systems (Signal and Lighting Standard, Type TS, and Type 2 Post)

ES-7B Electrical Systems (Signal and Lighting Standard, Type 1 and Equipment Identification Characters)

ES-7C Electrical Systems (Signal and Lighting Standard, Case 1 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 15' to 30')

ES-7F Electrical Systems (Signal and Lighting Standard, Case 4 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 25' to 45')

ES-7G Electrical Systems (Signal and Lighting Standard, Case 5 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 50' to 55')

ES-7M Electrical Systems (Signal and Lighting Standard, Details No. 1)

ES-7N Electrical Systems (Signal and Lighting Standard, Details No. 2)

RSP ES-7O Electrical Systems (Signal and Lighting Standard, Details No. 3)

ES-7Q Electrical Systems (Pedestrian Barricades)

ES-7R Electrical Systems (Signal and Lighting Attachments)

ES-8A Electrical Systems (Non-Traffic Pull Box)

ES-8B Electrical Systems (Traffic Pull Box)

ES-11 Electrical Systems (Foundation Installations)

ES-13A Electrical Systems (Splice Insulation Methods Details)

ES-13B Electrical Systems (Kinking and Banding Detail)

ES-18A Temporary Wood Poles - General Notes

ES-18B Temporary Wood Poles - Non-Guyed - No Signals on Spans

ES-19A Temporary Wood Poles - Details No. 1

ES-19C Temporary Wood Poles - Details No. 3

ES-19D Temporary Wood Poles - Details No. 4 vii

CANCELED STANDARD PLANS LIST

The 2025 standard plan sheets listed below are canceled and not applicable to this contract.

Plan No. Date Canceled Plan No. Date

Canceled Plan No. Date Canceled

P8 04-20-26

NOTICE TO BIDDERS

Bids open Tuesday, November 10, 2026

Dated September 21, 2026

General work description: Construct RW, SW, HMA Pvmt, drainage, and Elect systems.

The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON

STATE HIGHWAY IN ORANGE COUNTY IN AND NEAR SAN JUAN CAPISTRANO FROM 0.1 MILE

WEST OF CALLE ENTRADERO TO REATA ROAD.

District-County-Route-Post Mile: 12-Ora-74-1.0/R2.2

Contract No. 12-086924

The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-12, C-8.

Federal-aid project no.:

ST-S074(078)

For the Federal training program, the number of trainees or apprentices is 28.

Bids must be on a unit price basis.

Complete the work, excluding plant establishment and permanent erosion control establishment work, within 600 working days.

Complete the work, including plant establishment and permanent erosion control establishment work, within 750 working days.

Complete the plant establishment work within 250 working days.

Complete the permanent erosion control establishment work within 250 working days.

The estimated cost of the project is $47,000,000.

The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.

The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.

For bid results go to:

https://ppmoe.dot.ca.gov/cc

Select Electronic Bidding under the Bidding tab.

District office addresses are provided in the Standard Specifications.

Present bidders' inquiries to the Department and view the Department's responses at:

https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries

Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.

Submit your bid with bidder's security equal to at least 10 percent of the bid.

Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.

The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.

If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.

The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.

Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.

Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.

Department of Transportation

BID ITEM LIST

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM

0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM

0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 600

0004 090205 DISPUTE RESOLUTION BOARD ON-SITE

MEETING

EA 13

0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-

BOARD-RELATED TASKS

HR 40

0006 100100 DEVELOP WATER SUPPLY LS LUMP SUM

0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM

0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM

0009 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 1,210

0010 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 39,800

0011 120165 CHANNELIZER (SURFACE MOUNTED) EA 410

0012 120207 PORTABLE RADAR SPEED FEEDBACK SIGN

SYSTEM

DAY 600

0013 120300 TEMPORARY PAVEMENT MARKER EA 960

0014 120320 TEMPORARY BARRIER SYSTEM LF 8,760

0015 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 6

0016 129105 TEMPORARY CRASH CUSHION TL-2 EA 40

0017 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN

SYSTEM

EA 4

0018 130100 JOB SITE MANAGEMENT LS LUMP SUM

0019 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM

0020 130312 PRE-STORM EVENT INSPECTION REPORT EA 23

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0021 130323 DURING-AND POST-STORM EVENT INSPECTION

REPORT

DAY 9

0022 130331 STORMWATER ANNUAL REPORT EA 3

0023 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 30

0024 130680 TEMPORARY SILT FENCE LF 1,060

0025 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 30

0026 130730 STREET SWEEPING LS LUMP SUM

0027 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM

0028 141120 TREATED WOOD WASTE LB 2,620

0029 153247 REMOVE CONCRETE (MISCELLANEOUS) (CY) CY 160

0030 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 4,320

0031 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM

0032 190101 ROADWAY EXCAVATION CY 40,500

0033 192037 (F) - STRUCTURE EXCAVATION (RETAINING

WALL)

CY 10,577

0034 193006 (F) - STRUCTURE BACKFILL (SLURRY CEMENT) CY 32

0035 193013 (F) - STRUCTURE BACKFILL (RETAINING WALL) CY 8,084

0036 193031 (F) - PERVIOUS BACKFILL MATERIAL

(RETAINING WALL)

CY 764

0037 194001 DITCH EXCAVATION CY 220

0038 198010 IMPORTED BORROW (CY) CY 3,730

0039 200002 ROADSIDE CLEARING LS LUMP SUM

0040 202006 SOIL AMENDMENT CY 16

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0041 202038 PACKET FERTILIZER EA 150

0042 204006 PLANT (GROUP F) EA 3,200

0043 204038 PLANT (GROUP U) EA 49

0044 204045 SOD SQYD 3,320

0045 204096 MAINTAIN EXISTING PLANTED AREAS LS LUMP SUM

0046 204099 PLANT ESTABLISHMENT WORK LS LUMP SUM

0047 205035 WOOD MULCH CY 67

0048 206300 TEMPORARY IRRIGATION SYSTEM LS LUMP SUM

0049 206559 CONTROL AND NEUTRAL CONDUCTORS

(ARMOR-CLAD)

LS LUMP SUM

0050 206562 1" REMOTE CONTROL VALVE EA 2

0051 206564 1 1/2" REMOTE CONTROL VALVE EA 2

0052 208220 (F) - 1/2" DRIP IRRIGATION TUBING LF 2,280

0053 208449 POP-UP SPRINKLER ASSEMBLY EA 30

0054 208595 (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY

LINE)

LF 495

0055 208596 (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40)

(SUPPLY LINE)

LF 180

0056 208601 (F) - 4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY

LINE)

LF 120

0057 208607 (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY

LINE)

LF 40

0058 208685 1 1/2" BALL VALVE EA 2

0059 208690 (F) - PVC PIPE CONDUIT (SLEEVE) LF 36

0060 210300 HYDROMULCH SQFT 41,600

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0061 210430 HYDROSEED SQFT 41,600

0062 210610 COMPOST (CY) CY 480

0063 211111 PERMANENT EROSION CONTROL

ESTABLISHMENT WORK

LS LUMP SUM

0064 260203 CLASS 2 AGGREGATE BASE (CY) CY 9,020

0065 390132 HOT MIX ASPHALT (TYPE A) TON 18,700

0066 013430 RUBBERIZED HOT MIX ASPHALT (GAP GRADED)

WITH 10% RAP

TON 4,690

0067 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 22

0068 397005 TACK COAT TON 27

0069 398000 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 5,430

0070 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 20,900

0071 460200 GROUND ANCHOR (VERTICAL) EA 266

0072 498016 16" CAST-IN-DRILLED-HOLE CONCRETE PILING

(SOUND WALL)

LF 2,435

0073 510060 (F) - STRUCTURAL CONCRETE, RETAINING

WALL

CY 4,461

0074 046510 (F) - STRUCTURAL CONCRETE, SOUND WALL

PILE CAP

CY 187

0075 048997 (F) - STRUCTURAL CONCRETE, SOUND WALL

PILASTER

CY 64

0076 510090 (F) - STRUCTURAL CONCRETE, BOX CULVERT CY 13.5

0077 510094 (F) - STRUCTURAL CONCRETE, DRAINAGE

INLET

CY 142

0078 510502 (F) - MINOR CONCRETE (MINOR STRUCTURE) CY 51.5

0079 048994 CONCRETE SURFACE TEXTURE (FORMED

RELIEF, DRY STACK ROCK, SPLITFACE BLOCK)

SQFT 29,053

0080 048995 CONCRETE SURFACE TEXTURE (DRY STACK

ROCK)

SQFT 1,058

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0081 520103 (F) - BAR REINFORCING STEEL (RETAINING

WALL)

LB 460,451

0082 048998 (F) - BAR REINFORCING STEEL (SOUND WALL

PILASTER)

LB 15,684

0083 568040 REMOVE PEDESTRIAN BARRICADE EA 3

0084 582001 (F) - SOUND WALL (MASONRY BLOCK) SQFT 19,166

0085 048996 TRANSPARENT PANEL (SOUND WALL,

ACRYLITE SOUNDSTOP XT BIRD GUARD)

SQFT 9,312

0086 600017 REMOVE RETAINING WALL (LF) LF 150

0087 600051 REMOVE SOUND WALL (LF) LF 1,840

0088 641101 12" PLASTIC PIPE LF 380

0089 650014 18" REINFORCED CONCRETE PIPE LF 300

0090 650018 24" REINFORCED CONCRETE PIPE LF 2,600

0091 650026 36" REINFORCED CONCRETE PIPE LF 240

0092 700617 DRAINAGE INLET MARKER EA 35

0093 707117 36" PRECAST CONCRETE PIPE INLET LF 26

0094 707217 36" PRECAST CONCRETE PIPE MANHOLE LF 5

0095 710132 REMOVE CULVERT (LF) LF 670

0096 710150 REMOVE INLET EA 6

0097 710152 REMOVE HEADWALL EA 3

0098 710162 REMOVE DRAINAGE JUNCTION STRUCTURE EA 1

0099 710260 REMOVE CONCRETE (CHANNEL) CY 52

0100 721430 CONCRETE (CHANNEL LINING) CY 1

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0101 730040 MINOR CONCRETE (GUTTER) (LF) LF 2,182

0102 730070 DETECTABLE WARNING SURFACE SQFT 180

0103 731502 MINOR CONCRETE (MISCELLANEOUS

CONSTRUCTION)

CY 690

0104 731780 REMOVE CONCRETE SIDEWALK (SQYD) SQYD 2,910

0105 731840 REMOVE CONCRETE (CURB AND GUTTER) LF 1,850

0106 733000 PRE/POST CONSTRUCTION SURVEYS EA 12

0107 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 14,314

0108 750500 (F) - MISCELLANEOUS METAL LB 452

0109 017074 TEMPORARY LIGHTING SYSTEMS (CITY) LS LUMP SUM

0110 015585 MODIFYING LIGHTING SYSTEMS (CITY) LS LUMP SUM

0111 018121 ADJUST SANTA MARGARITA WATER DISTRICT

FACILITIES

EA 60

0112 780440 PREPARE AND STAIN CONCRETE SQFT 26,251

0113 011216 TEMPORARY CHAIN LINK FENCE WITH PRIVACY

SCREEN (TYPE CL-6)

LF 2,200

0114 803015 REMOVE WOOD FENCE LF 530

0115 803050 REMOVE CHAIN LINK FENCE LF 290

0116 810120 REMOVE PAVEMENT MARKER EA 1,510

0117 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 870

0118 820113 TREATMENT BEST MANAGEMENT PRACTICE

MARKER

EA 10

0119 820250 REMOVE ROADSIDE SIGN EA 24

0120 820300 REMOVE ROADSIDE SIGN (STRAP AND SADDLE

BRACKET METHOD)

EA 14

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0121 820590 RELOCATE ROADSIDE SIGN-ONE POST EA 1

0122 820750 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.063"-UNFRAMED)

SQFT 240

0123 820760 FURNISH SINGLE SHEET ALUMINUM SIGN

(0.080"-UNFRAMED)

SQFT 24

0124 820840 ROADSIDE SIGN - ONE POST EA 20

0125 820850 ROADSIDE SIGN - TWO POST EA 1

0126 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET

METHOD)

EA 11

0127 839521 (F) - CABLE RAILING LF 2,182

0128 839752 REMOVE GUARDRAIL LF 45

0129 840516 THERMOPLASTIC PAVEMENT MARKING

(ENHANCED WET NIGHT VISIBILITY)

SQFT 3,700

0130 840517 PREFORMED THERMOPLASTIC PAVEMENT

MARKING

SQFT 12,400

0131 840617 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-

1)

LF 490

0132 846007 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 34,200

0133 846008 6" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-

4)

LF 3,380

0134 846009 8" THERMOPLASTIC TRAFFIC STRIPE

(ENHANCED WET NIGHT VISIBILITY)

LF 1,410

0135 846020 REMOVE PAINTED TRAFFIC STRIPE LF 39,800

0136 846025 REMOVE PAINTED PAVEMENT MARKING SQFT 660

0137 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 29,400

0138 846035 REMOVE THERMOPLASTIC PAVEMENT

MARKING

SQFT 1,660

0139 847213 6" TRAFFIC STRIPE TAPE (WARRANTY)

(BROKEN 17-7)

LF 9,500

0140 870400 SIGNAL AND LIGHTING SYSTEM LS LUMP SUM

Item No.

Item Code Item Description Unit of Measure Estimated Quantity

0141 871400 RADAR SPEED FEEDBACK SIGN SYSTEMS LS LUMP SUM

0142 872135 MODIFYING TRAFFIC MONITORING STATIONS LS LUMP SUM

0143 999990 MOBILIZATION LS LUMP SUM

SPECIAL PROVISIONS

ORGANIZATION

Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.

Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.

Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.

DIVISION I GENERAL PROVISIONS

1 GENERAL

Add to section 1-1.01:

Bid Items and Applicable Sections Item code

Item description Applicable section

090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING 5

090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED

TASKS

013430 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP 39

046510 STRUCTURAL CONCRETE, SOUND WALL PILE CAP 51

048997 STRUCTURAL CONCRETE, SOUND WALL PILASTER 51

048994

CONCRETE SURFACE TEXTURE (FORMED RELIEF, DRY STACK

ROCK, SPLITFACE BLOCK) 51

048995 CONCRETE SURFACE TEXTURE (DRY STACK ROCK) 51

048998 BAR REINFORCING STEEL (SOUND WALL PILASTER) 52

048996

TRANSPARENT PANEL (SOUND WALL, ACRYLITE SOUNDSTOP XT

BIRD GUARD) 58

017074 TEMPORARY LIGHTING SYSTEMS (CITY) 77

015585 MODIFYING LIGHTING SYSTEMS (CITY) 77

018121 ADJUST SANTA MARGARITA WATER DISTRICT FACILITIES 77

011216 TEMPORARY CHAIN LINK FENCE WITH PRIVACY SCREEN (TYPE

CL-6)

2 BIDDING

Add between the 1st and 2nd paragraphs of section 2-1.06B:

The Department makes the following supplemental project information available:

Supplemental Project Information Means Description

Included in the Information Handout 1.SMWD-Caltrans Cover Agreement, dated October 31, 2.Kinder Morgan-Caltrans Encroachment Agreement, dated June 19, 2026

3. Revised Foundation Report State Route 74 (SR-74) Gap Closure Project, dated March 10, 2026

4. Revised Addendum to Revised Foundation Report State Route 74 (SR-74) Gap Closure Project, dated June 19, 2026

5. Geotechnical Design Report for Signal and Light Poles, Dated April 19, 2024

6. ADL Report, Dated September 4, 2018

7. Warranty Bond Form (TOTE-1)

8. Department Furnished Materials and Expenses (DFME) Items Subject to BABA Requirements

Available as specified in the Standard Specifications

Bridge as-built drawings Cross sections (DGN and PDF) Existing Surface (DGN, XML, and DWG) Design Surface (DGN, XML, and DWG) Alignment (DGN, XML, and DWG) Pavement Profile Smoothness Data Files

Included with the project plans Logs of test borings

Delete section 2-1.20.

Delete section 2-1.33B(2)(b).

5 CONTROL OF WORK

Delete section 5-1.13B.

Replace section 5-1.13E with:

5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.

Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.

Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:

1. Subcontractor’s or entity’s business name

2. Description of work performed

2.1. Bid item numbers or change order numbers

2.2. Written narrative of work performed

3. Value of work performed

4. Amount paid to subcontractor or entity

5. Withhold amount, if applicable

6. Explanation of withhold reasoning, if applicable

Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.

If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:

1. Value of the disputed work

2. Amount of the withhold being taken

3. Bid item numbers or change order numbers associated with the disputed work

4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated

5. Corrective actions to be taken for release of withheld amount

The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.

The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:

1. Withhold was not applied in good faith

2. Requested additional withhold documentation records were not provided

3. Payment information was not submitted through the prompt payment monitoring system

4. Required withhold notification was not provided

The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.

Replace section 5-1.15 with:

5-1.15 SAFETY REPRESENTATIVE

5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.

The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.

The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.

Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.

5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.

Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:

1. Name of the entity providing certification

2. Name of the individual receiving certification

3. Date when the certification was provided

4. Expiration date, if applicable

Submit a copy of the SSSP as an informational submittal:

1. At least 15 days before starting work

2. At least 48 hours before starting work whenever a revision is made to the SSSP

5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.

The safety representative must have one of the following certifications:

1. Certified Safety Professional from the Board of Certified Safety Professionals

2. Construction Health and Safety Technician from the Board of Certified Safety Professionals

3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals

4. Safety Trained Supervisor from the Board of Certified Safety Professionals

5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals

6. Associate Safety Professional from the Board of Certified Safety Professionals

7. Master Safety Professional from the National Association of Safety Professionals

8. Certified Safety Director from the National Association of Safety Professionals

5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:

1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry

2. Knowledge in the area of safety procedure for all types of work being performed on this project

3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA

Code of Regs safety requirements

The safety representative must have completed safety training and maintain valid certifications for:

1. First aid

2. Cardiopulmonary resuscitation

5-1.15E Duties and Responsibilities The safety representative must be available by:

1. Cellular telephone

2. Two-way radio

3. Mobile internet access

The safety representative must:

1. Develop the SSSP

2. Conduct the on-site new project orientation for each worker assigned to the project

3. Review the construction work plans for each subcontractor before starting work

4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring

5. Conduct weekly job site safety meetings

6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues

7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards

8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures

9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs

10. Report all incidents to the Engineer immediately, including the investigation of any close calls

When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.

If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.

You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.

Add to the end of section 5-1.20A:

During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:

Coincident or Adjacent Contracts

Contract no. County–Route–Post Mile Location Type of work 12-0R9904 Ora-74-0.0/11.4 San Juan Capistrano Multi Asset, Overlay, remove and replace with scattered dig-outs (Class II)

Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.

Replace section 5-1.20I with:

5-1.20I Private Property Coordination Before you begin any roadway improvement work along Ortega Highway submit a temporary access plan to the Engineer. The plan must address necessary measures you will take to maintain access to private property during construction.

Work on private property is accessed by temporary construction easement (TCE). Notify the Engineer and obtain authorization before entering private property and beginning work.

You will have access to all TCEs starting on April 21, 2026. The expiration for each specific parcel is on the date shown in Section 5-1.20I(1).

Once you enter and begin work within private property, you must diligently prosecute the work within that property until completion. Maintain access to private property during business hours.

5-1.20I(1) Temporary Construction Easement Provide advance notification and complete work within the TCE before the expiration date according to the following table:

Parcel No. APN #/Address Expiration Date

Appraisal Map Advance Notice

104294-1 664-012-24

31062 Via Madera, San Juan Capistrano, CA 92675

03/06/2030 E120171-02 2 days

104295-1 664-012-23 03/06/2030 E120171-02 2 weeks

31051 Via Madera, San Juan Capistrano, CA 92675

104296-2 664-012-30

No Situs – 28080-28098, San Juan Capistrano, CA 92675

03/06/2030 E120171-02 72 hours

104297-2

664-012-90

No Situs – Via Cordova, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 72 hours

104298-2 664-012-89

28101 Paseo Azteca, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104299-2 664-012-88

28111 Paseo Azteca, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104300-2 664-012-87

28121 Paseo Azteca, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104301-1 664-031-11

31031 Via Solana, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104302-1 664-031-12

31023 Via Solana, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104303-1 664-031-13

31021 Via Solana, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104304-2 664-031-24,-25

31022 Via Solana, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 weeks

104306-1 664-031-26

30981 Via Cristal, San Juan Capistrano, CA 9267

03/06/2030 E120171-03,-08 30 days

104308-1 644-034-10

30991 Paseo Valencia, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104309-1 644-034-11

30981 Paseo Valencia, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104310-1 644-034-12 03/06/2030 E120171-03,-04 7 days

30982 Via Cristal, San Juan Capistrano, Ca 92675

104312-1 644-051-04

28331 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104313-1 664-051-05

PTR-No Situs; LV 28351 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104314-1 664-051-06

28361 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104315-1 664-051-07

28371 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104316-1 664-051-08

28381 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104317-1 664-051-09

28391 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104318-1 664-051-10

PTR-No Situs;LV 28411 Via Anzar, San Juan Capistrano, CA 92675

104319-1 664-051-11

PTR-No Situs;LV-28421 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104320-1 664-051-12

28431 Via Anzar, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104321-2,-3,-

125-201-38

PTR-No Situs;LV Vacant Land

03/06/2030 E120171-05 2 days

104324-5 650-171-20

Vacant Land – Palm Hill Dr., San Juan Capistrano, CA

92675

03/06/2030 E120171-03 2 days

104325-4 650-171-17 03/06/2030 E120171-03 2 days

28181 Ortega Highway, San Juan Capistrano, CA 92675

104326-5 650-171-14

28241 Ortega Highway, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104327-1 650-171-12

28281 Ortega Highway, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104328-1 650-171-11

28271 Ortega Highway, San Juan Capistrano, CA 92675

03/06/2030 E120171-03,-04 2 days

104329-2 650-181-12

PTR-No Situs;LV- 30741 Hilltop Way, San Juan Capistrano, CA 92675

104330-2 650-181-10

30742 Hilltop Way, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104331-5 650-181-04

28451 Ortega Highway, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104332-1 650-181-25

30621 Shadetree Lane, San Juan Capistrano, CA 92675

104333-4 650-181-02

28511 Ortega Hwy., San Juan Capistrano, CA 92675

03/06/2030 E120171-04, -05 2 days

104336-2,-3 650-331-03

30981 Hunt Club Dr., San Juan Capistrano, CA 92675

03/06/2030 E120171-02 2 days

104338-2 650-331-17

28101 Ascot Lane, San Juan Capistrano, CA 92675

03/06/2030 E120171-03 2 days

104339-1 650-331-02

30971 Hunt Club Dr., San Juan Capistrano, CA 92675

03/06/2030 E120171-02 2 days

104340-1 650-331-01

30961 Hunt Club Dr., San

104341-1 650-311-10

30981 Steeplechase Dr., San Juan Capistrano, CA 92675

03/06/2030 E120171-02 2 days

104342-1 650-311-11

30977 Steeplechase Dr., San Juan Capistrano, Ca 92675

104343-1 650-311-12

30971 Steeplechase Dr., San Juan Capistrano, CA 92675

03/06/2030 E120171-02 2 days

104344-1 650-311-13

30967 Steeplechase Dr., San Juan Capistrano, CA 92675

03/06/2030 E120171-02 2 days

104346-1 650-171-28

28333 Ortega Highway, San Juan Capistrano, CA 92675

03/06/2030 E120171-04 2 days

104348-1 125-172-27

28632 Ortega Highway, San Juan Capistrano, CA 92675

03/06/2030 E120171-05 2 days

104350-1 650-311-14

30961 Steeplechase Dr., San

To request extension of the expiration date for the temporary construction easement, submit an RFI at least 8 months before the date the temporary construction easement expires. You will be charged for costs incurred by the State for extending the expiration date of the temporary construction easement.

Coordinate the use of the TCE during stage construction.

You must not stockpile, store equipment, or park vehicles within the TCE except as necessary for immediate incorporation into the work.

You must not block or impede access to property except as reasonably necessary to conduct the work.

You must not block or impede more than one point of access to properties at any given time.

You must always provide access for deliveries.

You must secure properties to not allow pets from exiting properties.

You must protect in place masonry wall, wooden fence and metal fence for Parcel No. 104295-1.

You must protect in place concrete brick wall and irrigation backflow valve. Cut and cap only affected irrigation system removed in acquisition area for Parcel No. 104296-2, 104297-2 and 104308-1.

You must coordinate construction activities for Parcel No. 104336-A. Homeowners Association to relocate guardhouse, however should not affect your construction activities.

The areas listed below and shown on the plans are designated as "Work Around Areas".

You are not permitted to perform any work within these areas before the date listed below.

Appraisal Map Parcel No.

Estimated Date Available to Contractor

E120171-03 104307-1 11/13/2026

E120171-03,04 104311-1 11/13/2026

E120171-05 104334-1, -2 11/13/2026

E120171-05 104335-1, -2 11/13/2026

E120171-02,03 104337-1, -2, -3 11/13/2026

Replace section 5-1.24 with:

5-1.24 CONSTRUCTION SURVEYS

5-1.24A General The Department places stakes and marks under the chapter, "Construction Surveys," of the Department's Surveys Manual.

Submit construction staking request for Department-furnished stakes and ensure:

1. Area is cleared and prepared for stakes

2. Request For Construction Staking form is complete with project and contact information, reference alignment, offset and priorities listed, and completion dates

After submittal, the Department starts staking within 2 business days.

The Department will complete the requested staking. The Contractor must plan for the time required by Department surveyors to complete the staking.

Preserve stakes and marks placed by the Department. If the stakes or marks are destroyed the Department replaces them at their earliest convenience and deducts the cost.

5-1.24B Department Construction Surveys for Automated Machine Guidance The Department will provide a project control referenced to the State Plane Coordinate System compatible with the project datum. These physical points must be used by all positioning system users on the site.

The Department may provide grid coordinates for control points, at acceptable locations provided by the Contractor, where the Contractor can install the Contractor’s global navigation satellite system reference station receiver.

For slope stakes and rough grade stakes, the Department sets 6 survey control points or 2 per mile, whichever is greater.

The Department sets slope stakes and rough grade stakes at:

1. Conform stations

2. Beginning and end of each alignment

3. Midpoint or every 200 feet, whichever results in a greater number of stakes, on a curve of less than

1,500 feet

4. Every 500 feet on tangents and curves of 1,500 feet or more

For final grade, the Department sets stakes under the section, "Final Grade Stakes," of the Department's Surveys Manual, or at your request the Department sets survey control points under the sections, "Automated Machine Guidance (AMG)" and "Supplemental Project Control," of the chapter, "Construction Surveys," of the Department's Surveys Manual at:

1. Conform stations

2. Beginning and end of each alignment

3. Midpoint or every 100 feet, whichever results in the greater number of stakes, on a curve with a radius of 1,200 feet or less

4. Midpoint or every 200 feet, whichever results in the greater number of stakes, on a curve with a radius of more than 1,200 feet

5. Every 200 feet on a tangent

At your request and under the chapter, "Construction Surveys," of the Department's Surveys Manual, the Department provides (1) staking for intersections, clearing, fencing, drainage, curbs, structures, abutment fill, walls, and miscellaneous areas and (2) additional survey control or staking for earthwork in areas where global navigation satellite system coverage is inadequate for AMG.

Replace section 5-1.25 with:

5-1.25 AUTOMATED MACHINE GUIDANCE

5-1.25A General Automated machine guidance (AMG) must be used by and for the Department to perform earthwork. Any positioning equipment used for AMG must meet accuracy requirements to comply with staking tolerances specified in section titled "Typical Department-Furnished Construction Stakes" in the Department's Surveys Manual.

5-1.25B Definitions automated machine guidance: Technology that uses one or more positioning devices, such as GNSS, robotic total stations, or rotating laser levels, to determine line and grade, or control the real-time position of construction equipment using onboard computer equipment.

California Coordinate System of 1983 (CCS83): California Coordinate System as defined in Public Resource Code §8801.

Caltrans Spatial Reference Network: The Department owned and operated GNSS real-time positioning network. This network is used to collect data to be used for the design and construction of transportation improvement projects.

digital construction model: Electronic three-dimensional model of the project’s proposed design infrastructure used by the Contractor's AMG equipment.

digital design model: Electronic three-dimensional model consisting of roadway design elements including alignments, profiles, and cross sections representing the finished grade.

digital terrain model: Electronic three-dimensional model that represents the original ground before job site activities begin.

global navigation satellite system: Constellation of orbiting satellites used to determine the geographic location of a user's receiver on the surface of the earth.

GNSS base station: Single ground-based instrument consisting of a GNSS receiver, antenna, and telemetry equipment that provides GNSS corrections to other GNSS receivers. Base stations can be set up temporarily or permanently constructed. Multiple base stations can be combined into a GNSS real-time network.

GNSS correction service subscription: Subscription service to receive GNSS corrections for GNSS positioning through a private GNSS real-time network. Corrections are typically received via cellular wireless data services.

GNSS real-time network: Satellite-based correction service using a collection of ground-based receivers and a central processing center that provides highly accurate location services to users instantaneously over a broad geographic region.

GNSS rover: Portable GNSS antenna, receiver, rod, and data collector with telemetry equipment for real-time point measurements.

GNSS site calibration: Process that establishes the relationship between the observed control point coordinates and the established control point coordinates that define the project survey datum.

grid: General term for describing cartesian coordinates. For the purposes of this specification, grid references Northing (y) and Easting (x) coordinates based on CCS83.

National Spatial Reference System (NSRS): Nationwide network of vertical and horizontal control monuments in the United States. CCS83 is aligned to the NSRS.

project survey datum: Time-stamped reference to the NSRS, represented by CCS83 defined by geodetic survey control points on the surface of the earth.

robotic total station: Survey instrument capable of tracking an optical target and providing real-time coordinates of the target to the equipment operator and AMG equipment. A robotic total station unit can provide positioning for AMG if site conditions do not allow GNSS receivers to be used and must also be used where a higher accuracy is required than the GNSS provides, such as structural section elements.

5-1.25C Electronic Files Electronic design files include:

1. Digital terrain model as a TIN surface in DWG format

2. Digital design model representing the finished grade surface as a TIN surface in DWG format

3. Digital datum model representing any roadway prism structural section datum surfaces as a TIN surface in DWG format

4. Design features including the design alignments, profiles, superelevations, catch lines, hinge lines, grade changes, edge of pavement, edge of traveled way, and other elements used to facilitate project design, provided in DWG format

The Department makes electronic design files available as supplemental project information. This information is part of the bid package provided to the Bidders.

You must create the digital construction models (DCM) for use with your AMG system.

Convert the electronic design files to a format compatible with your AMG system.

Digital design model information may not exist for certain project features. The Department places stakes under these circumstances.

The Department provides you with updated electronic data whenever the Engineer determines a plan change materially affects the finished grade. For minor grade changes, the Department may place stakes and marks at the discretion of the Engineer.

5-1.25D Quality Control Plan Submit an AMG QC plan at least 15 days before starting work requiring AMG. The plan must include the following information:

1. Contract number.

2. Names, professional license numbers, and contact information of a person licensed to practice land surveying in the State in responsible charge of AMG and GNSS site calibration.

3. Limits of the area for which the AMG will be used.

4. Scope of work when AMG is to be used for any of the following work categories:

4.1. Earthwork

4.2. Rough grading

4.3. Subgrade

4.4. Subbase

4.5. Base

4.6. Trench excavation

4.7. Clearing and grubbing

4.8. Curb and gutter

4.9. Cold planing or milling existing pavement

4.10. Paving

4.11. Intelligent compaction

4.12. Concrete barrier

4.13. Finishing roadway

5. Project control plan sheet detailing control points covering the job site, including control points used in the GNSS site calibration.

6. List of GNSS equipment, including:

6.1. Type

6.2. Manufacturer

6.3. Model

6.4. Software version

7. Description of GNSS site calibration or robotic total station quality control validation methods, including:

7.1. List of equipment used for any GNSS site calibration

7.2. GNSS site calibration procedures

7.3. Estimated dates of any GNSS site calibration

7.4. Format of the report of the results of any GNSS site calibration and QC validation measurements, including:

7.4.1. Dates performed

7.4.2. Names of survey control points used in the GNSS site calibration

7.4.3. Difference between the survey control point coordinates and the GNSS site calibration results

7.4.4. GNSS equipment manufacturer and model

7.4.5. Accuracy statement of the GNSS site calibration or QC validation measurements

7.4.6. Name, stamp, and signature of the person licensed to practice land surveying in the

Statein responsible charge of performing the calibration or localization.

7.5. Estimated timeframe to submit the…