12-086924 Construct RW_ SW_ HMA_ Pvmt_ Drainage_ and Elect Systems.pdf
PDF 1 MB Posted
- Solicitation number
- 12-086924, Fed #ST-S074(078)
- Issued by
- Orange County, San Francisco City, California
About this file
This is a Notice to Bidders and Special Provisions document issued by the California Department of Transportation (Caltrans) for construction work on State Route 74 in Orange County, near San Juan Capistrano. The project involves constructing roadway improvements, sidewalks, hot mix asphalt pavement, drainage systems, and electrical systems along a 2.2-mile segment from 0.1 mile west of Calle Entradero to Reata Road. The work must be completed within 600 working days, excluding plant establishment and permanent erosion control work, with an additional 150 working days allocated for those tasks (250 working days each). Bids are due on Tuesday, November 10, 2026, with electronic sealed bid submission via the Bid Express website closing at 2:00 p.m. The project includes 143 bid line items covering demolition, earthwork, drainage infrastructure, retaining walls, sound walls, concrete structures, pavement markings, traffic control systems, signal and lighting systems, and landscaping. The estimated project cost is $47,000,000, and contractors must hold either a Class A license or a combination of Class C licenses (C-12 and C-8) constituting a majority of the work.
Bidders must submit a bid bond equal to at least 10 percent of their bid amount and are required to comply with federal and state prevailing wage requirements, with rates determined by the California Department of Industrial Relations and the U.S. Secretary of Labor. The contract is a federal-aid project (ST-S074(078)) subject to Buy America requirements for manufactured products, iron, steel, and certain construction materials. The Department will furnish specific traffic signal controller components and completely wired controller cabinets, which bidders must pick up at 691 S. Tustin Street, Orange, California. Environmental compliance includes requirements for lead compliance plans, stormwater pollution prevention, and management of unregulated earth material containing lead. The project involves coordination with multiple utility providers (AT&T, Cox, Crown Castle, Southern California Gas, SDG&E, and Santa Margarita Water District) requiring advance notice and extended working days for utility adjustments. The contract includes provisions for temporary construction easements on multiple private properties, with expiration dates set for March 6, 2030, and specifies dispute resolution board options and automated machine guidance requirements for earthwork operations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids open Tuesday, November 10, 2026 Dated September 21, 2026 OSD
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
AND
SPECIAL PROVISIONS
FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN AND
NEAR SAN JUAN CAPISTRANO FROM 0.1 MILE WEST OF CALLE
ENTRADERO TO REATA ROAD
In District 12 On Route 74 Under
Bid book dated September 21, 2026 Standard Specifications dated 2025
Project plans approved June 16, 2026 Standard Plans dated 2025
Identified by Contract No. 12-086924
12-Ora-74-1.0/R2.2 Project ID 1200000051
Federal-Aid Project
ST-S074(078)
SPECIAL NOTICES
• See sections 2 and 3 for contractors' registration requirements.
• The Department advises bidders that potential claim records must be submitted by the contractor using the Department's Internet potential claim system.
• See section 2 for submittal requirements for DVBE quotes and Non–Small Business
Subcontractor Preference.
• For work plan for local material from (1) a noncommercial source or (2) a source not regulated under California jurisdiction, see section 6-1.03B(2).
• See section 7-1.02K(3) for the requirements for electronic submittal of certified payroll records using LCPtracker Pro.
• The flagging and temporary traffic control requirements have been revised. See sections 7-
1.03, 7-1.04, and 12.
• See sections 2-1.11 and 2-1.33B for in-use off-road diesel-fueled vehicle requirements regarding Certificate of Reported Compliance submittals.
• See section 14-11.14 for changes to the management of treated wood waste.
• See section 6-1.01 and 6-1.04 of these Special Provisions for the requirements of Buy
America/Build America for manufactured products.
• See section 6-1.08 for the requirements for environmental product declarations for hot mix asphalt and concrete materials and products.
Contract No. 12-086924 i
TABLE OF CONTENTS
NOTICE TO BIDDERS
BID ITEM LIST
SPECIAL PROVISIONS
ORGANIZATION
DIVISION I GENERAL PROVISIONS
1 GENERAL
2 BIDDING
5 CONTROL OF WORK
6 CONTROL OF MATERIALS
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
8 PROSECUTION AND PROGRESS
9 PAYMENT
DIVISION II GENERAL CONSTRUCTION
11 WELDING
12 TEMPORARY TRAFFIC CONTROL
13 WATER POLLUTION CONTROL
14 ENVIRONMENTAL STEWARDSHIP
DIVISION III EARTHWORK AND LANDSCAPE
17 GENERAL
19 EARTHWORK
20 LANDSCAPE
21 EROSION CONTROL
DIVISION V SURFACINGS AND PAVEMENTS
39 ASPHALT CONCRETE
DIVISION VI STRUCTURES
46 GROUND ANCHORS AND SOIL NAILS
49 PILING
51 CONCRETE STRUCTURES
56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES
58 SOUND WALLS
59 STRUCTURAL STEEL COATINGS
DIVISION VIII MISCELLANEOUS CONSTRUCTION
73 CONCRETE CURBS AND SIDEWALKS
77 LOCAL INFRASTRUCTURE
78 INCIDENTAL CONSTRUCTION
80 FENCES
DIVISION IX TRAFFIC CONTROL DEVICES
ii
81 MISCELLANEOUS TRAFFIC CONTROL DEVICES
83 RAILINGS AND BARRIERS
84 MARKINGS
DIVISION X ELECTRICAL WORK
86 GENERAL
87 ELECTRICAL SYSTEMS
DIVISION XI MATERIALS
90 CONCRETE
iii
STANDARD PLANS LIST
The standard plan sheets applicable to this Contract include those listed below. The applicable revised standard plans (RSPs) listed below are included in the project plans.
RSP A3A Abbreviations (Sheet 1 of 3)
RSP A3B Abbreviations (Sheet 2 of 3)
RSP A3C Abbreviations (Sheet 3 of 3)
A10A Legend - Lines and Symbols (Sheet 1 of 5)
A10B Legend - Lines and Symbols (Sheet 2 of 5)
A10C Legend - Lines and Symbols (Sheet 3 of 5)
A10D Legend - Lines and Symbols (Sheet 4 of 5)
A10E Legend - Lines and Symbols (Sheet 5 of 5)
A10F Legend - Soil (Sheet 1 of 2)
A10G Legend - Soil (Sheet 2 of 2)
A10H Legend - Rock
A20A Pavement Markers and Traffic Lines - Typical Details
A20B Pavement Markers and Traffic Lines - Typical Details
A20C Pavement Markers and Traffic Lines - Typical Details
A20D Pavement Markers and Traffic Lines - Typical Details
A20E Traffic Lines - Typical Details for Contrast Striping
A24A Pavement Markings - Arrows
A24B Pavement Markings - Arrows and Symbols
A24C Pavement Markings - Symbols and Numerals
A24F Pavement Markings - Crosswalks
A62A Excavation and Backfill - Miscellaneous Details
A62B Limits of Payment for Excavation and Backfill - Bridge Surcharge and Wall
A62D Excavation and Backfill - Concrete Pipe Culverts
A62DA Excavation and Backfill - Concrete Pipe Culverts - Indirect Design Method
A62E Excavation and Backfill - Cast-In-Place Reinforced Concrete Box and Arch Culverts
A73B Markers
A85 Chain Link Fence
A85A Chain Link Fence Details
A85B Chain Link Fence Details
A87A Curbs and Driveways
A87B Hot Mix Asphalt Dikes iv
RSP A88A Curb Ramp Details
D71 Drainage Inlet Markers
D72D CIP Drainage Inlets - Types GT1, GT2, GT3 and GT4
D72E CIP Drainage Inlets - Types GO and GDO
D72G CIP Drainage Inlet Tables
D73F Precast Drainage Inlet Notes
D73G Precast Drainage Inlet Tables
D74 Drainage Inlet Details
D75B Concrete Pipe Inlets
D75C Pipe Inlets - Ladder and Trash Rack Details
D77A Grate Details No. 1
D77B Grate Details No. 2
D78A Gutter Depressions
D78B Inlet Depressions - Concrete Shoulders
D78C Inlet Depressions - Hot Mix Asphalt Shoulders
D80 Cast-In-Place Reinforced Concrete Single Box Culvert
D81 Cast-In-Place Reinforced Concrete Double Box Culvert
D82 Cast-In-Place Reinforced Concrete Box Culvert - Miscellaneous Details
D91A Cast-In-Place Reinforced Concrete Junction Structure
D91B Cast-In-Place Reinforced Concrete Junction Structure
D93C Pipe Riser with Debris Rack Cage
H1 Landscape and Erosion Control Symbols
H2 Landscape Details
H3 Landscape Details
H6 Landscape Details
RSP H8 Landscape Details
H9 Landscape Details
T3C Temporary Barrier System (Cross Bolt)
T3D Temporary Barrier System (Cross Bolt)
T3E Temporary Barrier System (Cross Bolt)
T3F Temporary Barrier System (Cal F-23)
T3F2 Temporary Barrier System (Cal F-23)
T3G Temporary Barrier System (Staking or Anchoring)
T3G2 Temporary Barrier System (Staking or Anchoring)
T9 Traffic Control System Tables for Lane and Ramp Closures v
RSP T13 Traffic Control System with Reversible Control on Two Lane Conventional Highways
T19 Traffic Control System - Construction Work Zone Speed Limit Reduction on Conventional Highways
T21 Traffic Control System - Construction Work Zone Speed Limit Reduction Twenty- Four Hours a Day 7 Days a Week (24/7)
T22 Traffic Control System for Construction Work Zone Speed Limit Reduction on Two Lane Conventional Highways
T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and Pedestrian Detour
T31 Temporary Pedestrian Access Routes - Typical Sidewalk Diversion Within Roadbed
T32 Temporary Pedestrian Access Routes - Typical Sidewalk/Crosswalk Closure and Pedestrian Detour
T51 Temporary Water Pollution Control Details (Temporary Silt Fence)
T53 Temporary Water Pollution Control Details (Temporary Cover)
T58 Temporary Water Pollution Control Details (Temporary Construction Entrance)
T59 Temporary Water Pollution Control Details (Temporary Concrete Washout Facility)
T61 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T62 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T63 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T64 Temporary Water Pollution Control Details (Temporary Drainage Inlet Protection)
T65 Temporary Water Pollution Control Details (Temporary High-Visibility Fence)
B0-3 Bridge Details
B3-5 Retaining Wall Details No. 1
B3-6 Retaining Wall Details No. 2
B7-11 Utility Details
B11-47 Cable Railing
B15-3 Sound Wall Masonry Block on Pile Cap Details (1)
B15-4 Sound Wall Masonry Block on Pile Cap Details (2)
B15-5 Sound Wall Masonry Block on Pile Cap Details (3)
RS1 Roadside Signs - Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post - Typical Installation Details No. 2
RS4 Roadside Signs - Typical Installation Details No. 4
ES-1A Electrical Systems (Legend)
ES-1B Electrical Systems (Legend)
ES-1C Electrical Systems (Legend)
ES-2A Electrical Systems (Service Equipment)
ES-2E Electrical Systems (Service Equipment Enclosure and Typical Wiring Diagram, Type III - B Series)
ES-3C2 Electrical Systems (Controller Cabinet Foundation Details) vi
ES-3K Electrical Systems (Electronics Assembly Connection Diagram) (Battery Backup System)
ES-4A Electrical Systems (Signal Head Mounting)
ES-4B Electrical Systems (Pedestrian Signal Heads)
ES-4C Electrical Systems (Signal Heads and Mountings)
ES-4D Electrical Systems (Signal Head Mounting)
ES-4E Electrical Systems (Signal Heads)
ES-5A Electrical Systems (Loop Detectors)
ES-5B Electrical Systems (Detectors)
ES-5C Electrical Systems (Accessible Pedestrian Signal and Push Button Assemblies)
ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details)
ES-5E Electrical Systems (Trench in Pavement and Piezoelectric Axle Sensor Details)
ES-6A Electrical Systems (Lighting Standard, Types 15 and 21)
ES-6B Electrical Systems (Electrolier Anchorage and Grouting for Type 15 and Type 21, Barrier Rail Mounted)
ES-7A Electrical Systems (Signal and Lighting Standard, Type TS, and Type 2 Post)
ES-7B Electrical Systems (Signal and Lighting Standard, Type 1 and Equipment Identification Characters)
ES-7C Electrical Systems (Signal and Lighting Standard, Case 1 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 15' to 30')
ES-7F Electrical Systems (Signal and Lighting Standard, Case 4 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 25' to 45')
ES-7G Electrical Systems (Signal and Lighting Standard, Case 5 Signal Mast Arm Loading, Wind Velocity = 100 mph and Signal Mast Arm Lengths 50' to 55')
ES-7M Electrical Systems (Signal and Lighting Standard, Details No. 1)
ES-7N Electrical Systems (Signal and Lighting Standard, Details No. 2)
RSP ES-7O Electrical Systems (Signal and Lighting Standard, Details No. 3)
ES-7Q Electrical Systems (Pedestrian Barricades)
ES-7R Electrical Systems (Signal and Lighting Attachments)
ES-8A Electrical Systems (Non-Traffic Pull Box)
ES-8B Electrical Systems (Traffic Pull Box)
ES-11 Electrical Systems (Foundation Installations)
ES-13A Electrical Systems (Splice Insulation Methods Details)
ES-13B Electrical Systems (Kinking and Banding Detail)
ES-18A Temporary Wood Poles - General Notes
ES-18B Temporary Wood Poles - Non-Guyed - No Signals on Spans
ES-19A Temporary Wood Poles - Details No. 1
ES-19C Temporary Wood Poles - Details No. 3
ES-19D Temporary Wood Poles - Details No. 4 vii
CANCELED STANDARD PLANS LIST
The 2025 standard plan sheets listed below are canceled and not applicable to this contract.
Plan No. Date Canceled Plan No. Date
Canceled Plan No. Date Canceled
P8 04-20-26
NOTICE TO BIDDERS
Bids open Tuesday, November 10, 2026
Dated September 21, 2026
General work description: Construct RW, SW, HMA Pvmt, drainage, and Elect systems.
The Department will receive electronically sealed bids for the following work: CONSTRUCTION ON
STATE HIGHWAY IN ORANGE COUNTY IN AND NEAR SAN JUAN CAPISTRANO FROM 0.1 MILE
WEST OF CALLE ENTRADERO TO REATA ROAD.
District-County-Route-Post Mile: 12-Ora-74-1.0/R2.2
Contract No. 12-086924
The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-12, C-8.
Federal-aid project no.:
ST-S074(078)
For the Federal training program, the number of trainees or apprentices is 28.
Bids must be on a unit price basis.
Complete the work, excluding plant establishment and permanent erosion control establishment work, within 600 working days.
Complete the work, including plant establishment and permanent erosion control establishment work, within 750 working days.
Complete the plant establishment work within 250 working days.
Complete the permanent erosion control establishment work within 250 working days.
The estimated cost of the project is $47,000,000.
The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website.
The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time.
For bid results go to:
https://ppmoe.dot.ca.gov/cc
Select Electronic Bidding under the Bidding tab.
District office addresses are provided in the Standard Specifications.
Present bidders' inquiries to the Department and view the Department's responses at:
https://ppmoe.dot.ca.gov/cc?id=cc_bidinquiries
Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests.
Submit your bid with bidder's security equal to at least 10 percent of the bid.
Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, http://www.dir.ca.gov, or from the Department's Labor Compliance Office of the district in which the work is located.
The federal minimum wage rates for this Contract as determined by the United States Secretary of Labor are available at https://sam.gov/content/home.
If the minimum wage rates as determined by the United States Secretary of Labor differs from the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors must not pay less than the higher wage rate. The Department does not accept lower State wage rates not specifically included in the federal minimum wage determinations. This includes helper, or other classifications based on hours of experience, or any other classification not appearing in the federal wage determinations. Where federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors must not pay less than the federal minimum wage rate that most closely approximates the duties of the employees in question.
The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to https://www.dir.ca.gov/dlse/debar.html.
Additional information is provided in the Excluded Parties List System at https://sam.gov/content/home.
Caltrans and the Construction Industry are committed to making partnering the way we do business. For more information, go to https://dot.ca.gov/programs/construction/partnering.
Department of Transportation
BID ITEM LIST
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM
0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM
0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 600
0004 090205 DISPUTE RESOLUTION BOARD ON-SITE
MEETING
EA 13
0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-
BOARD-RELATED TASKS
HR 40
0006 100100 DEVELOP WATER SUPPLY LS LUMP SUM
0007 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM
0008 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM
0009 120149 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 1,210
0010 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 39,800
0011 120165 CHANNELIZER (SURFACE MOUNTED) EA 410
0012 120207 PORTABLE RADAR SPEED FEEDBACK SIGN
SYSTEM
DAY 600
0013 120300 TEMPORARY PAVEMENT MARKER EA 960
0014 120320 TEMPORARY BARRIER SYSTEM LF 8,760
0015 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 6
0016 129105 TEMPORARY CRASH CUSHION TL-2 EA 40
0017 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN
SYSTEM
EA 4
0018 130100 JOB SITE MANAGEMENT LS LUMP SUM
0019 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM
0020 130312 PRE-STORM EVENT INSPECTION REPORT EA 23
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0021 130323 DURING-AND POST-STORM EVENT INSPECTION
REPORT
DAY 9
0022 130331 STORMWATER ANNUAL REPORT EA 3
0023 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 30
0024 130680 TEMPORARY SILT FENCE LF 1,060
0025 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 30
0026 130730 STREET SWEEPING LS LUMP SUM
0027 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM
0028 141120 TREATED WOOD WASTE LB 2,620
0029 153247 REMOVE CONCRETE (MISCELLANEOUS) (CY) CY 160
0030 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 4,320
0031 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM
0032 190101 ROADWAY EXCAVATION CY 40,500
0033 192037 (F) - STRUCTURE EXCAVATION (RETAINING
WALL)
CY 10,577
0034 193006 (F) - STRUCTURE BACKFILL (SLURRY CEMENT) CY 32
0035 193013 (F) - STRUCTURE BACKFILL (RETAINING WALL) CY 8,084
0036 193031 (F) - PERVIOUS BACKFILL MATERIAL
(RETAINING WALL)
CY 764
0037 194001 DITCH EXCAVATION CY 220
0038 198010 IMPORTED BORROW (CY) CY 3,730
0039 200002 ROADSIDE CLEARING LS LUMP SUM
0040 202006 SOIL AMENDMENT CY 16
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0041 202038 PACKET FERTILIZER EA 150
0042 204006 PLANT (GROUP F) EA 3,200
0043 204038 PLANT (GROUP U) EA 49
0044 204045 SOD SQYD 3,320
0045 204096 MAINTAIN EXISTING PLANTED AREAS LS LUMP SUM
0046 204099 PLANT ESTABLISHMENT WORK LS LUMP SUM
0047 205035 WOOD MULCH CY 67
0048 206300 TEMPORARY IRRIGATION SYSTEM LS LUMP SUM
0049 206559 CONTROL AND NEUTRAL CONDUCTORS
(ARMOR-CLAD)
LS LUMP SUM
0050 206562 1" REMOTE CONTROL VALVE EA 2
0051 206564 1 1/2" REMOTE CONTROL VALVE EA 2
0052 208220 (F) - 1/2" DRIP IRRIGATION TUBING LF 2,280
0053 208449 POP-UP SPRINKLER ASSEMBLY EA 30
0054 208595 (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY
LINE)
LF 495
0055 208596 (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40)
(SUPPLY LINE)
LF 180
0056 208601 (F) - 4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY
LINE)
LF 120
0057 208607 (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY
LINE)
LF 40
0058 208685 1 1/2" BALL VALVE EA 2
0059 208690 (F) - PVC PIPE CONDUIT (SLEEVE) LF 36
0060 210300 HYDROMULCH SQFT 41,600
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0061 210430 HYDROSEED SQFT 41,600
0062 210610 COMPOST (CY) CY 480
0063 211111 PERMANENT EROSION CONTROL
ESTABLISHMENT WORK
LS LUMP SUM
0064 260203 CLASS 2 AGGREGATE BASE (CY) CY 9,020
0065 390132 HOT MIX ASPHALT (TYPE A) TON 18,700
0066 013430 RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
WITH 10% RAP
TON 4,690
0067 394073 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 22
0068 397005 TACK COAT TON 27
0069 398000 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 5,430
0070 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 20,900
0071 460200 GROUND ANCHOR (VERTICAL) EA 266
0072 498016 16" CAST-IN-DRILLED-HOLE CONCRETE PILING
(SOUND WALL)
LF 2,435
0073 510060 (F) - STRUCTURAL CONCRETE, RETAINING
WALL
CY 4,461
0074 046510 (F) - STRUCTURAL CONCRETE, SOUND WALL
PILE CAP
CY 187
0075 048997 (F) - STRUCTURAL CONCRETE, SOUND WALL
PILASTER
CY 64
0076 510090 (F) - STRUCTURAL CONCRETE, BOX CULVERT CY 13.5
0077 510094 (F) - STRUCTURAL CONCRETE, DRAINAGE
INLET
CY 142
0078 510502 (F) - MINOR CONCRETE (MINOR STRUCTURE) CY 51.5
0079 048994 CONCRETE SURFACE TEXTURE (FORMED
RELIEF, DRY STACK ROCK, SPLITFACE BLOCK)
SQFT 29,053
0080 048995 CONCRETE SURFACE TEXTURE (DRY STACK
ROCK)
SQFT 1,058
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0081 520103 (F) - BAR REINFORCING STEEL (RETAINING
WALL)
LB 460,451
0082 048998 (F) - BAR REINFORCING STEEL (SOUND WALL
PILASTER)
LB 15,684
0083 568040 REMOVE PEDESTRIAN BARRICADE EA 3
0084 582001 (F) - SOUND WALL (MASONRY BLOCK) SQFT 19,166
0085 048996 TRANSPARENT PANEL (SOUND WALL,
ACRYLITE SOUNDSTOP XT BIRD GUARD)
SQFT 9,312
0086 600017 REMOVE RETAINING WALL (LF) LF 150
0087 600051 REMOVE SOUND WALL (LF) LF 1,840
0088 641101 12" PLASTIC PIPE LF 380
0089 650014 18" REINFORCED CONCRETE PIPE LF 300
0090 650018 24" REINFORCED CONCRETE PIPE LF 2,600
0091 650026 36" REINFORCED CONCRETE PIPE LF 240
0092 700617 DRAINAGE INLET MARKER EA 35
0093 707117 36" PRECAST CONCRETE PIPE INLET LF 26
0094 707217 36" PRECAST CONCRETE PIPE MANHOLE LF 5
0095 710132 REMOVE CULVERT (LF) LF 670
0096 710150 REMOVE INLET EA 6
0097 710152 REMOVE HEADWALL EA 3
0098 710162 REMOVE DRAINAGE JUNCTION STRUCTURE EA 1
0099 710260 REMOVE CONCRETE (CHANNEL) CY 52
0100 721430 CONCRETE (CHANNEL LINING) CY 1
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0101 730040 MINOR CONCRETE (GUTTER) (LF) LF 2,182
0102 730070 DETECTABLE WARNING SURFACE SQFT 180
0103 731502 MINOR CONCRETE (MISCELLANEOUS
CONSTRUCTION)
CY 690
0104 731780 REMOVE CONCRETE SIDEWALK (SQYD) SQYD 2,910
0105 731840 REMOVE CONCRETE (CURB AND GUTTER) LF 1,850
0106 733000 PRE/POST CONSTRUCTION SURVEYS EA 12
0107 750001 (F) - MISCELLANEOUS IRON AND STEEL LB 14,314
0108 750500 (F) - MISCELLANEOUS METAL LB 452
0109 017074 TEMPORARY LIGHTING SYSTEMS (CITY) LS LUMP SUM
0110 015585 MODIFYING LIGHTING SYSTEMS (CITY) LS LUMP SUM
0111 018121 ADJUST SANTA MARGARITA WATER DISTRICT
FACILITIES
EA 60
0112 780440 PREPARE AND STAIN CONCRETE SQFT 26,251
0113 011216 TEMPORARY CHAIN LINK FENCE WITH PRIVACY
SCREEN (TYPE CL-6)
LF 2,200
0114 803015 REMOVE WOOD FENCE LF 530
0115 803050 REMOVE CHAIN LINK FENCE LF 290
0116 810120 REMOVE PAVEMENT MARKER EA 1,510
0117 810230 PAVEMENT MARKER (RETROREFLECTIVE) EA 870
0118 820113 TREATMENT BEST MANAGEMENT PRACTICE
MARKER
EA 10
0119 820250 REMOVE ROADSIDE SIGN EA 24
0120 820300 REMOVE ROADSIDE SIGN (STRAP AND SADDLE
BRACKET METHOD)
EA 14
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0121 820590 RELOCATE ROADSIDE SIGN-ONE POST EA 1
0122 820750 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.063"-UNFRAMED)
SQFT 240
0123 820760 FURNISH SINGLE SHEET ALUMINUM SIGN
(0.080"-UNFRAMED)
SQFT 24
0124 820840 ROADSIDE SIGN - ONE POST EA 20
0125 820850 ROADSIDE SIGN - TWO POST EA 1
0126 820860 INSTALL SIGN (STRAP AND SADDLE BRACKET
METHOD)
EA 11
0127 839521 (F) - CABLE RAILING LF 2,182
0128 839752 REMOVE GUARDRAIL LF 45
0129 840516 THERMOPLASTIC PAVEMENT MARKING
(ENHANCED WET NIGHT VISIBILITY)
SQFT 3,700
0130 840517 PREFORMED THERMOPLASTIC PAVEMENT
MARKING
SQFT 12,400
0131 840617 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-
1)
LF 490
0132 846007 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
LF 34,200
0133 846008 6" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-
4)
LF 3,380
0134 846009 8" THERMOPLASTIC TRAFFIC STRIPE
(ENHANCED WET NIGHT VISIBILITY)
LF 1,410
0135 846020 REMOVE PAINTED TRAFFIC STRIPE LF 39,800
0136 846025 REMOVE PAINTED PAVEMENT MARKING SQFT 660
0137 846030 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 29,400
0138 846035 REMOVE THERMOPLASTIC PAVEMENT
MARKING
SQFT 1,660
0139 847213 6" TRAFFIC STRIPE TAPE (WARRANTY)
(BROKEN 17-7)
LF 9,500
0140 870400 SIGNAL AND LIGHTING SYSTEM LS LUMP SUM
Item No.
Item Code Item Description Unit of Measure Estimated Quantity
0141 871400 RADAR SPEED FEEDBACK SIGN SYSTEMS LS LUMP SUM
0142 872135 MODIFYING TRAFFIC MONITORING STATIONS LS LUMP SUM
0143 999990 MOBILIZATION LS LUMP SUM
SPECIAL PROVISIONS
ORGANIZATION
Special provisions are under headings that correspond with the main-section headings of the Standard Specifications. A main-section heading is a heading shown in the table of contents of the Standard Specifications.
Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications.
Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications.
DIVISION I GENERAL PROVISIONS
1 GENERAL
Add to section 1-1.01:
Bid Items and Applicable Sections Item code
Item description Applicable section
090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING 5
090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED
TASKS
013430 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) WITH 10% RAP 39
046510 STRUCTURAL CONCRETE, SOUND WALL PILE CAP 51
048997 STRUCTURAL CONCRETE, SOUND WALL PILASTER 51
048994
CONCRETE SURFACE TEXTURE (FORMED RELIEF, DRY STACK
ROCK, SPLITFACE BLOCK) 51
048995 CONCRETE SURFACE TEXTURE (DRY STACK ROCK) 51
048998 BAR REINFORCING STEEL (SOUND WALL PILASTER) 52
048996
TRANSPARENT PANEL (SOUND WALL, ACRYLITE SOUNDSTOP XT
BIRD GUARD) 58
017074 TEMPORARY LIGHTING SYSTEMS (CITY) 77
015585 MODIFYING LIGHTING SYSTEMS (CITY) 77
018121 ADJUST SANTA MARGARITA WATER DISTRICT FACILITIES 77
011216 TEMPORARY CHAIN LINK FENCE WITH PRIVACY SCREEN (TYPE
CL-6)
2 BIDDING
Add between the 1st and 2nd paragraphs of section 2-1.06B:
The Department makes the following supplemental project information available:
Supplemental Project Information Means Description
Included in the Information Handout 1.SMWD-Caltrans Cover Agreement, dated October 31, 2.Kinder Morgan-Caltrans Encroachment Agreement, dated June 19, 2026
3. Revised Foundation Report State Route 74 (SR-74) Gap Closure Project, dated March 10, 2026
4. Revised Addendum to Revised Foundation Report State Route 74 (SR-74) Gap Closure Project, dated June 19, 2026
5. Geotechnical Design Report for Signal and Light Poles, Dated April 19, 2024
6. ADL Report, Dated September 4, 2018
7. Warranty Bond Form (TOTE-1)
8. Department Furnished Materials and Expenses (DFME) Items Subject to BABA Requirements
Available as specified in the Standard Specifications
Bridge as-built drawings Cross sections (DGN and PDF) Existing Surface (DGN, XML, and DWG) Design Surface (DGN, XML, and DWG) Alignment (DGN, XML, and DWG) Pavement Profile Smoothness Data Files
Included with the project plans Logs of test borings
Delete section 2-1.20.
Delete section 2-1.33B(2)(b).
5 CONTROL OF WORK
Delete section 5-1.13B.
Replace section 5-1.13E with:
5-1.13E Prompt Payment Section 5-1.13E applies to all contracts.
Pay your subcontractors within 7 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. Pay duly authorized motor carriers of property in dump trucks for transportation charges under Bus & Prof Code § 7108.6. Pay other entities, such as material suppliers, within 30 days of receipt of each progress payment.
Each month, after the 15th and prior to 20th, submit the following payment information through the Department’s prompt payment monitoring system at https://caltrans.dbesystem.com:
1. Subcontractor’s or entity’s business name
2. Description of work performed
2.1. Bid item numbers or change order numbers
2.2. Written narrative of work performed
3. Value of work performed
4. Amount paid to subcontractor or entity
5. Withhold amount, if applicable
6. Explanation of withhold reasoning, if applicable
Your subcontractors and other entities may validate payments received using the prompt payment monitoring system.
If a subcontractor’s or other entity’s work is in dispute, provide a written withhold notification to the subcontractor or entity and the Engineer no later than 7 days after receipt of the corresponding progress payment that includes the following:
1. Value of the disputed work
2. Amount of the withhold being taken
3. Bid item numbers or change order numbers associated with the disputed work
4. Explanation of the deficiencies of the disputed work and how the corresponding value was calculated
5. Corrective actions to be taken for release of withheld amount
The Department may request additional documentation from you to evaluate whether you applied the withhold in good faith. Submit requested documents within 10 days of receipt of request.
The Department may withhold the same amount of your withhold from a future progress pay estimate if the Department determines any of the following has occurred:
1. Withhold was not applied in good faith
2. Requested additional withhold documentation records were not provided
3. Payment information was not submitted through the prompt payment monitoring system
4. Required withhold notification was not provided
The Department may also apply a 2 percent penalty on the withhold amount for every month payment is not made.
Replace section 5-1.15 with:
5-1.15 SAFETY REPRESENTATIVE
5-1.15A General Designate an on-site safety representative to superintend project safety for the duration of this Contract.
The safety representative may perform other non-safety related work if safety responsibilities are fulfilled.
The safety representative must be available after work hours as needed. The safety representative is not required to be on-site during plant establishment period, erosion control establishment period, or temporary suspensions when no other Contract work is being performed.
Develop a written site-specific safety program (SSSP) that incorporates known hazards associated with the project.
5-1.15B Submittals Submit a resume of the safety representative before starting work on the project, including education, completed safety training, and safety experience in heavy construction, heavy industrial, or oil and energy industry.
Submit a copy of the safety representative's certificate for the Cal/OSHA 30-hour – Cal/OSHA Standards for the Construction Industry or OSHA 510 - OSHA Standards for the Construction Industry training course as an informational submittal. The certificate must include:
1. Name of the entity providing certification
2. Name of the individual receiving certification
3. Date when the certification was provided
4. Expiration date, if applicable
Submit a copy of the SSSP as an informational submittal:
1. At least 15 days before starting work
2. At least 48 hours before starting work whenever a revision is made to the SSSP
5-1.15C Certifications The safety representative must have completed training and received a certificate of completion for the Cal/OSHA 30-hour - Cal/OSHA Standards for the Construction Industry or OSHA 510 – OSHA Standards for the Construction Industry training course.
The safety representative must have one of the following certifications:
1. Certified Safety Professional from the Board of Certified Safety Professionals
2. Construction Health and Safety Technician from the Board of Certified Safety Professionals
3. Occupational Hygiene and Safety Technician from the Board of Certified Safety Professionals
4. Safety Trained Supervisor from the Board of Certified Safety Professionals
5. Safety Trained Supervisor Construction from the Board of Certified Safety Professionals
6. Associate Safety Professional from the Board of Certified Safety Professionals
7. Master Safety Professional from the National Association of Safety Professionals
8. Certified Safety Director from the National Association of Safety Professionals
5-1.15D Qualifications The safety representative must be a competent and qualified person, as defined by Cal/OSHA, and must provide safety oversight on the project. The safety representative must have:
1. At least 3 years of safety experience in heavy construction, heavy industrial, or oil and energy industry
2. Knowledge in the area of safety procedure for all types of work being performed on this project
3. Knowledge of Department specifications and plans, Cal/OSHA policy and procedures, and 8 CA
Code of Regs safety requirements
The safety representative must have completed safety training and maintain valid certifications for:
1. First aid
2. Cardiopulmonary resuscitation
5-1.15E Duties and Responsibilities The safety representative must be available by:
1. Cellular telephone
2. Two-way radio
3. Mobile internet access
The safety representative must:
1. Develop the SSSP
2. Conduct the on-site new project orientation for each worker assigned to the project
3. Review the construction work plans for each subcontractor before starting work
4. Conduct or attend pre-planning sessions for high hazard work such as excavations, demolition, confined space entry, falsework, crane hoisting, high-risk utilities such as high-pressure pipelines with fuel or natural gas, and tunneling or boring
5. Conduct weekly job site safety meetings
6. Review work schedules, including subcontractors' work schedules, to ensure adequacy of job hazard analyses and address all safety concerns and issues
7. Ensure safety data sheets are available on-site for all materials and have a hazard communication program for informing workers of material hazards
8. Verify compliance with hazardous waste requirements under section 14-11, including spill prevention and control measures
9. Conduct daily safety inspections of the job site for hazards and compliance with safety requirements in the specifications and 8 CA Code of Regs
10. Report all incidents to the Engineer immediately, including the investigation of any close calls
When monitoring the job site, including work zones with certified flaggers or traffic control technicians, take immediate corrective action and notify the Engineer if an imminent danger is identified.
If the Engineer determines the safety representative is not meeting the intended duties and responsibilities, you must replace the safety representative within 30 days of written notice from the Engineer. If you need to replace the safety representative, notify the Engineer and provide replacement safety representative resume and required certifications at least 15 days before the replacement.
You may submit a secondary safety representative to act on behalf of the designated safety representative during extended shifts, continuous operations, or short-term absences that will not exceed 14 days in duration. The secondary safety representative must meet the same required qualifications and certifications as the designated safety representative.
Add to the end of section 5-1.20A:
During the progress of the work under this Contract, work under the following contracts may be in progress at or near the job site of this Contract:
Coincident or Adjacent Contracts
Contract no. County–Route–Post Mile Location Type of work 12-0R9904 Ora-74-0.0/11.4 San Juan Capistrano Multi Asset, Overlay, remove and replace with scattered dig-outs (Class II)
Coordinate lane closures and traffic handling with the Engineer and with contractors of coincident or adjacent projects. Potential conflicts may not be limited to the contracts listed above.
Replace section 5-1.20I with:
5-1.20I Private Property Coordination Before you begin any roadway improvement work along Ortega Highway submit a temporary access plan to the Engineer. The plan must address necessary measures you will take to maintain access to private property during construction.
Work on private property is accessed by temporary construction easement (TCE). Notify the Engineer and obtain authorization before entering private property and beginning work.
You will have access to all TCEs starting on April 21, 2026. The expiration for each specific parcel is on the date shown in Section 5-1.20I(1).
Once you enter and begin work within private property, you must diligently prosecute the work within that property until completion. Maintain access to private property during business hours.
5-1.20I(1) Temporary Construction Easement Provide advance notification and complete work within the TCE before the expiration date according to the following table:
Parcel No. APN #/Address Expiration Date
Appraisal Map Advance Notice
104294-1 664-012-24
31062 Via Madera, San Juan Capistrano, CA 92675
03/06/2030 E120171-02 2 days
104295-1 664-012-23 03/06/2030 E120171-02 2 weeks
31051 Via Madera, San Juan Capistrano, CA 92675
104296-2 664-012-30
No Situs – 28080-28098, San Juan Capistrano, CA 92675
03/06/2030 E120171-02 72 hours
104297-2
664-012-90
No Situs – Via Cordova, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 72 hours
104298-2 664-012-89
28101 Paseo Azteca, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104299-2 664-012-88
28111 Paseo Azteca, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104300-2 664-012-87
28121 Paseo Azteca, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104301-1 664-031-11
31031 Via Solana, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104302-1 664-031-12
31023 Via Solana, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104303-1 664-031-13
31021 Via Solana, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104304-2 664-031-24,-25
31022 Via Solana, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 weeks
104306-1 664-031-26
30981 Via Cristal, San Juan Capistrano, CA 9267
03/06/2030 E120171-03,-08 30 days
104308-1 644-034-10
30991 Paseo Valencia, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104309-1 644-034-11
30981 Paseo Valencia, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104310-1 644-034-12 03/06/2030 E120171-03,-04 7 days
30982 Via Cristal, San Juan Capistrano, Ca 92675
104312-1 644-051-04
28331 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104313-1 664-051-05
PTR-No Situs; LV 28351 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104314-1 664-051-06
28361 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104315-1 664-051-07
28371 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104316-1 664-051-08
28381 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104317-1 664-051-09
28391 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104318-1 664-051-10
PTR-No Situs;LV 28411 Via Anzar, San Juan Capistrano, CA 92675
104319-1 664-051-11
PTR-No Situs;LV-28421 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104320-1 664-051-12
28431 Via Anzar, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104321-2,-3,-
125-201-38
PTR-No Situs;LV Vacant Land
03/06/2030 E120171-05 2 days
104324-5 650-171-20
Vacant Land – Palm Hill Dr., San Juan Capistrano, CA
92675
03/06/2030 E120171-03 2 days
104325-4 650-171-17 03/06/2030 E120171-03 2 days
28181 Ortega Highway, San Juan Capistrano, CA 92675
104326-5 650-171-14
28241 Ortega Highway, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104327-1 650-171-12
28281 Ortega Highway, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104328-1 650-171-11
28271 Ortega Highway, San Juan Capistrano, CA 92675
03/06/2030 E120171-03,-04 2 days
104329-2 650-181-12
PTR-No Situs;LV- 30741 Hilltop Way, San Juan Capistrano, CA 92675
104330-2 650-181-10
30742 Hilltop Way, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104331-5 650-181-04
28451 Ortega Highway, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104332-1 650-181-25
30621 Shadetree Lane, San Juan Capistrano, CA 92675
104333-4 650-181-02
28511 Ortega Hwy., San Juan Capistrano, CA 92675
03/06/2030 E120171-04, -05 2 days
104336-2,-3 650-331-03
30981 Hunt Club Dr., San Juan Capistrano, CA 92675
03/06/2030 E120171-02 2 days
104338-2 650-331-17
28101 Ascot Lane, San Juan Capistrano, CA 92675
03/06/2030 E120171-03 2 days
104339-1 650-331-02
30971 Hunt Club Dr., San Juan Capistrano, CA 92675
03/06/2030 E120171-02 2 days
104340-1 650-331-01
30961 Hunt Club Dr., San
104341-1 650-311-10
30981 Steeplechase Dr., San Juan Capistrano, CA 92675
03/06/2030 E120171-02 2 days
104342-1 650-311-11
30977 Steeplechase Dr., San Juan Capistrano, Ca 92675
104343-1 650-311-12
30971 Steeplechase Dr., San Juan Capistrano, CA 92675
03/06/2030 E120171-02 2 days
104344-1 650-311-13
30967 Steeplechase Dr., San Juan Capistrano, CA 92675
03/06/2030 E120171-02 2 days
104346-1 650-171-28
28333 Ortega Highway, San Juan Capistrano, CA 92675
03/06/2030 E120171-04 2 days
104348-1 125-172-27
28632 Ortega Highway, San Juan Capistrano, CA 92675
03/06/2030 E120171-05 2 days
104350-1 650-311-14
30961 Steeplechase Dr., San
To request extension of the expiration date for the temporary construction easement, submit an RFI at least 8 months before the date the temporary construction easement expires. You will be charged for costs incurred by the State for extending the expiration date of the temporary construction easement.
Coordinate the use of the TCE during stage construction.
You must not stockpile, store equipment, or park vehicles within the TCE except as necessary for immediate incorporation into the work.
You must not block or impede access to property except as reasonably necessary to conduct the work.
You must not block or impede more than one point of access to properties at any given time.
You must always provide access for deliveries.
You must secure properties to not allow pets from exiting properties.
You must protect in place masonry wall, wooden fence and metal fence for Parcel No. 104295-1.
You must protect in place concrete brick wall and irrigation backflow valve. Cut and cap only affected irrigation system removed in acquisition area for Parcel No. 104296-2, 104297-2 and 104308-1.
You must coordinate construction activities for Parcel No. 104336-A. Homeowners Association to relocate guardhouse, however should not affect your construction activities.
The areas listed below and shown on the plans are designated as "Work Around Areas".
You are not permitted to perform any work within these areas before the date listed below.
Appraisal Map Parcel No.
Estimated Date Available to Contractor
E120171-03 104307-1 11/13/2026
E120171-03,04 104311-1 11/13/2026
E120171-05 104334-1, -2 11/13/2026
E120171-05 104335-1, -2 11/13/2026
E120171-02,03 104337-1, -2, -3 11/13/2026
Replace section 5-1.24 with:
5-1.24 CONSTRUCTION SURVEYS
5-1.24A General The Department places stakes and marks under the chapter, "Construction Surveys," of the Department's Surveys Manual.
Submit construction staking request for Department-furnished stakes and ensure:
1. Area is cleared and prepared for stakes
2. Request For Construction Staking form is complete with project and contact information, reference alignment, offset and priorities listed, and completion dates
After submittal, the Department starts staking within 2 business days.
The Department will complete the requested staking. The Contractor must plan for the time required by Department surveyors to complete the staking.
Preserve stakes and marks placed by the Department. If the stakes or marks are destroyed the Department replaces them at their earliest convenience and deducts the cost.
5-1.24B Department Construction Surveys for Automated Machine Guidance The Department will provide a project control referenced to the State Plane Coordinate System compatible with the project datum. These physical points must be used by all positioning system users on the site.
The Department may provide grid coordinates for control points, at acceptable locations provided by the Contractor, where the Contractor can install the Contractor’s global navigation satellite system reference station receiver.
For slope stakes and rough grade stakes, the Department sets 6 survey control points or 2 per mile, whichever is greater.
The Department sets slope stakes and rough grade stakes at:
1. Conform stations
2. Beginning and end of each alignment
3. Midpoint or every 200 feet, whichever results in a greater number of stakes, on a curve of less than
1,500 feet
4. Every 500 feet on tangents and curves of 1,500 feet or more
For final grade, the Department sets stakes under the section, "Final Grade Stakes," of the Department's Surveys Manual, or at your request the Department sets survey control points under the sections, "Automated Machine Guidance (AMG)" and "Supplemental Project Control," of the chapter, "Construction Surveys," of the Department's Surveys Manual at:
1. Conform stations
2. Beginning and end of each alignment
3. Midpoint or every 100 feet, whichever results in the greater number of stakes, on a curve with a radius of 1,200 feet or less
4. Midpoint or every 200 feet, whichever results in the greater number of stakes, on a curve with a radius of more than 1,200 feet
5. Every 200 feet on a tangent
At your request and under the chapter, "Construction Surveys," of the Department's Surveys Manual, the Department provides (1) staking for intersections, clearing, fencing, drainage, curbs, structures, abutment fill, walls, and miscellaneous areas and (2) additional survey control or staking for earthwork in areas where global navigation satellite system coverage is inadequate for AMG.
Replace section 5-1.25 with:
5-1.25 AUTOMATED MACHINE GUIDANCE
5-1.25A General Automated machine guidance (AMG) must be used by and for the Department to perform earthwork. Any positioning equipment used for AMG must meet accuracy requirements to comply with staking tolerances specified in section titled "Typical Department-Furnished Construction Stakes" in the Department's Surveys Manual.
5-1.25B Definitions automated machine guidance: Technology that uses one or more positioning devices, such as GNSS, robotic total stations, or rotating laser levels, to determine line and grade, or control the real-time position of construction equipment using onboard computer equipment.
California Coordinate System of 1983 (CCS83): California Coordinate System as defined in Public Resource Code §8801.
Caltrans Spatial Reference Network: The Department owned and operated GNSS real-time positioning network. This network is used to collect data to be used for the design and construction of transportation improvement projects.
digital construction model: Electronic three-dimensional model of the project’s proposed design infrastructure used by the Contractor's AMG equipment.
digital design model: Electronic three-dimensional model consisting of roadway design elements including alignments, profiles, and cross sections representing the finished grade.
digital terrain model: Electronic three-dimensional model that represents the original ground before job site activities begin.
global navigation satellite system: Constellation of orbiting satellites used to determine the geographic location of a user's receiver on the surface of the earth.
GNSS base station: Single ground-based instrument consisting of a GNSS receiver, antenna, and telemetry equipment that provides GNSS corrections to other GNSS receivers. Base stations can be set up temporarily or permanently constructed. Multiple base stations can be combined into a GNSS real-time network.
GNSS correction service subscription: Subscription service to receive GNSS corrections for GNSS positioning through a private GNSS real-time network. Corrections are typically received via cellular wireless data services.
GNSS real-time network: Satellite-based correction service using a collection of ground-based receivers and a central processing center that provides highly accurate location services to users instantaneously over a broad geographic region.
GNSS rover: Portable GNSS antenna, receiver, rod, and data collector with telemetry equipment for real-time point measurements.
GNSS site calibration: Process that establishes the relationship between the observed control point coordinates and the established control point coordinates that define the project survey datum.
grid: General term for describing cartesian coordinates. For the purposes of this specification, grid references Northing (y) and Easting (x) coordinates based on CCS83.
National Spatial Reference System (NSRS): Nationwide network of vertical and horizontal control monuments in the United States. CCS83 is aligned to the NSRS.
project survey datum: Time-stamped reference to the NSRS, represented by CCS83 defined by geodetic survey control points on the surface of the earth.
robotic total station: Survey instrument capable of tracking an optical target and providing real-time coordinates of the target to the equipment operator and AMG equipment. A robotic total station unit can provide positioning for AMG if site conditions do not allow GNSS receivers to be used and must also be used where a higher accuracy is required than the GNSS provides, such as structural section elements.
5-1.25C Electronic Files Electronic design files include:
1. Digital terrain model as a TIN surface in DWG format
2. Digital design model representing the finished grade surface as a TIN surface in DWG format
3. Digital datum model representing any roadway prism structural section datum surfaces as a TIN surface in DWG format
4. Design features including the design alignments, profiles, superelevations, catch lines, hinge lines, grade changes, edge of pavement, edge of traveled way, and other elements used to facilitate project design, provided in DWG format
The Department makes electronic design files available as supplemental project information. This information is part of the bid package provided to the Bidders.
You must create the digital construction models (DCM) for use with your AMG system.
Convert the electronic design files to a format compatible with your AMG system.
Digital design model information may not exist for certain project features. The Department places stakes under these circumstances.
The Department provides you with updated electronic data whenever the Engineer determines a plan change materially affects the finished grade. For minor grade changes, the Department may place stakes and marks at the discretion of the Engineer.
5-1.25D Quality Control Plan Submit an AMG QC plan at least 15 days before starting work requiring AMG. The plan must include the following information:
1. Contract number.
2. Names, professional license numbers, and contact information of a person licensed to practice land surveying in the State in responsible charge of AMG and GNSS site calibration.
3. Limits of the area for which the AMG will be used.
4. Scope of work when AMG is to be used for any of the following work categories:
4.1. Earthwork
4.2. Rough grading
4.3. Subgrade
4.4. Subbase
4.5. Base
4.6. Trench excavation
4.7. Clearing and grubbing
4.8. Curb and gutter
4.9. Cold planing or milling existing pavement
4.10. Paving
4.11. Intelligent compaction
4.12. Concrete barrier
4.13. Finishing roadway
5. Project control plan sheet detailing control points covering the job site, including control points used in the GNSS site calibration.
6. List of GNSS equipment, including:
6.1. Type
6.2. Manufacturer
6.3. Model
6.4. Software version
7. Description of GNSS site calibration or robotic total station quality control validation methods, including:
7.1. List of equipment used for any GNSS site calibration
7.2. GNSS site calibration procedures
7.3. Estimated dates of any GNSS site calibration
7.4. Format of the report of the results of any GNSS site calibration and QC validation measurements, including:
7.4.1. Dates performed
7.4.2. Names of survey control points used in the GNSS site calibration
7.4.3. Difference between the survey control point coordinates and the GNSS site calibration results
7.4.4. GNSS equipment manufacturer and model
7.4.5. Accuracy statement of the GNSS site calibration or QC validation measurements
7.4.6. Name, stamp, and signature of the person licensed to practice land surveying in the
Statein responsible charge of performing the calibration or localization.
7.5. Estimated timeframe to submit the…
This is the start of the file's text. The full file is on GovTribe.