1182947_2021-11-29 Lakeland HS Turf Field - Civil Plans.pdf
PDF 39 MB Posted
- Attached to
- Chemical Storage Site
- Solicitation number
- 2850
- Issued by
- Isle of Wight County, Virginia
About this file
This document appears to be a set of civil engineering plans for the installation of a new turf field at Lakeland High School. The project is being managed by the local school district and includes the construction of a synthetic turf athletic field, grading, drainage, and related site work. The plans provide detailed specifications and layouts for the field, subsurface infrastructure, and surrounding landscape features. No specific bid due date or award timeline is provided, however the plans indicate this project is an upcoming contracting opportunity for qualified civil/site contractors to perform the described scope of work.
The plans do not contain pricing information, set-asides, or details on incumbent contractors. The document also does not specify funding sources or requirements for this project. The scope is limited to the civil/site work associated with the new turf field installation, without mention of any other related construction or renovation work at the high school facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AS SHOWN
VICINITY MAP IMAGE © ESRI
0 8000'
SCALE 1"=4000'
4000'
MISS UTILITY OF VIRGINIA
THE CONTRACTOR SHALL CALL "MISS UTILITY" 48 HOURS PRIOR TO THE START OF
EXCAVATION. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL
UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO
STARTING WORK. CONTACT THE ENGINEER IMMEDIATELY IF THE LOCATION OR ELEVATION
IS DIFFERENT FROM THAT SHOWN ON THE PLAN, IF THERE APPEARS TO BE A CONFLICT,
AND/OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON PLAN. THE DEVELOPER SHALL
BE RESPONSIBLE FOR THE RELOCATION OF ANY UTILITY WITHIN THE EXISTING AND/OR
RIGHT-OF-WAY REQUIRED BY THE DEVELOPMENT. CONTACT MISS UTILITY OF VIRGINIA:
1-800-552-7001 (TOLL FREE) OR DIAL 811.
VICINITY MAP IMAGE © ESRI
SITE STATISTICAL DATA
1. PROPERTY ADDRESS 214 KENYON ROAD, SUFFOLK, VA 23434
2. TAX MAP NO. 33*11*H
3. ACCOUNT NO. 153808600
4. SOURCE PLAT P.B. 12, P. 113
5. SOURCE DEED D.B. 233, P. 195
6. ZONING RLM (RESIDENTIAL LOW-MEDIUM DISTRICT)
7. STORMWATER DESIGN CRITERIA IIB
8. JPA/WETLANDS PERMIT REQUIRED NO
9. ONSITE RESOURCE PROTECTION AREA NO
10. EXISTING USE INSTITUTIONAL - PUBLIC HIGH SCHOOL
11. PROPOSED USE INSTITUTIONAL - PUBLIC HIGH SCHOOL
12. WATERSHED NANSEMOND RIVER >> CHESAPEAKE BAY
13. FLOOD PLAIN INFORMATION ZONE 'X' OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN
14. FEMA FIRM INFORMATION NUMBER: 510156 | PANEL: 0210D | EFFECTIVE 11/16/2011
15. TOPOGRAPHIC SURVEY SOURCE TIMMONS GROUP
16. HORIZONTAL DATUM NAD83 & 93HARN (US SURVEY FEET)
17. VERTICAL DATUM NAVD 1988
18. PROPERTY AREA 69.49 ACRES - PER CITY GIS
19. DISTURBED AREA ON-SITE DISTURBED AREA: 175,450 SF (4.03 AC)
DISTURBED AREA IN RIGHTS-OF-WAY: 0 SF (0.00 AC)
TOTAL DISTURBED AREA: 175,450 SF (4.03 AC)
20. BUILDING DATA NO EXISTING BUILDINGS AFFECTED NOR NEW BUILDINGS PROPOSED
21. PARKING DATA NO EXISTING SPACES AFFECTED NOR NEW SPACES PROPOSED
22. DOMESTIC WATER SERVICE CITY WATER AVAILABLE. EXISTING SERVICES NOT AFFECTED
23. WASTEWATER FLOW DATA CITY SANITARY SEWER AVAILABLE. EXISTING SERVICES NOT AFFECTED
24. FIRE PROTECTION DATA NOT AFFECTED
25. GROUND COVER DATA DISTURBED AREA 175,450 SF, 4.03 AC
PRE-DEVELOPMENT IMPERVIOUS AREA 8,394 SF, 0.19 AC (4.8%)
PRE-DEVELOPMENT MANAGED TURF 167,056 SF, 3.84 AC (95.2%)
POST-DEVELOPMENT IMPERVIOUS AREA 104,189 SF, 2.40 AC (59.4%)
POST-DEVELOPMENT MANAGED TURF 71,261 SF, 1.63 AC (40.6%)
26. SOIL TYPES PER USDA NRCS WEB SOIL SURVEY AND ONSITE SOILS EVALUATION
8A | EUNOLA LOAMY FINE SAND | HSG C | 0 - 2% SLOPES
8B | EUNOLA LOAMY FINE SAND | HSG C | 2 - 6% SLOPES
14 | LYNCHBURG FINE SANDY LOAM | HSG B |
22B | SUFFOLK LOAMY SAND | HSG B | 2 - 6% SLOPES
SITE
C-0.0
C O
V E R
S H
E E T
C. HERON
C. HERON
D. RUBY
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A T E
DRAWN BY
DATE
R E V I S I O
N
D
E S C R I P T I O
N
Y O
U R
V I S I O
N
A C H
I E V E D
T H
R O
U G
H
O
U R S
S L a k e l a n d
H i g h
S c h o o l D
W G
S h e e t C
D
C
C
O V
R d w g
P l o t t e d o n
P
M b y
C a s e y
H e r o n
S
L y n n h a v e n
R o a d
S u i t e
V i r g i n i a
B e a c h
V A
T E L
F A X w w t i m m o n s c o m
T H
I S
D
R A W
I N
G
P R E P A R
T H
E
V I R
G I N
I
B
A
C
O
F I C
E
LA
KE
LA
ND
H
IG
H
SC
HO
OL
TU
RF
F
IE
LD
C
ON
VE
RS
IO
N
CI
TY
O
F
SU
FF
OL
K, V
IR
GI
NI
OL
Y
NE
CK
B
OR
OU
GH
11/29/2021
49297
T h e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f
T
I M
M O
N S
G
R O
U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r i n c l u s i v e b u t n o t l i m i t e d t o c o n s t r u c t i o n b i d d i n g a n d o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f
T
I M
M O
O
U P
11/29/2021
CIVIL SITE PLANS
CITY OF SUFFOLK, VIRGINIA
FILE #: SPL2021-00043
RESPONSIBLE LAND DISTURBER NOTE
THE PROFESSIONAL WHOSE SEAL IS AFFIXED HEREON SHALL ACT AS THE "RESPONSIBLE
LAND DISTURBER" FOR THE PURPOSES OF PLAN APPROVAL ONLY. PRIOR TO THE ISSUANCE
OF THE LAND DISTURBING PERMIT, THE OWNER OR DEVELOPER SHALL PROVIDE THE NAME
OF A "RESPONSIBLE LAND DISTURBER" WHO SHALL ASSUME RESPONSIBILITY AS THE
"RESPONSIBLE LAND DISTURBER" FOR THE CONSTRUCTION PHASE OF THE PROJECT. THE
OWNER OR DEVELOPER SHALL PROVIDE WRITTEN NOTIFICATION SHOULD THE "RESPONSIBLE
LAND DISTURBER" CHANGE DURING CONSTRUCTION.NOVEMBER 29, 2021
RESPONSIBLE LAND DISTURBER DESIGNATION
THE PERSON IDENTIFIED BELOW IS DESIGNATED AS THE RESPONSIBLE LAND DISTURBER WHO WILL BE IN CHARGE OF AND RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY ASSOCIATED WITH THIS PROJECT. THE PERSON MEETS THE APPLICABLE REQUIREMENTS OF VIRGINIA CODE SECTION 10.1-563 AND 10.1-566 BY VIRTUE OF THE FOLLOWING:
____ RESPONSIBLE LAND DISTURBER CERTIFICATE
____ DCR CERTIFICATION FOR COMBINED ADMINISTRATOR, ADMINISTRATOR, PLAN REVIEWER,
INSPECTOR, OR CONTRACTOR.
____ VIRGINIA PROFESSIONAL ENGINEER, LAND SURVEYOR, LANDSCAPE ARCHITECT, OR ARCHITECT
RESPONSIBLE LAND DISTURBER CONTACT INFORMATION:
NAME (SIGNATURE)
NAME (PRINT) DAN RUBY
CERTIFICATION/REGISTRATION NUMBER: 043841
COMPANY: TIMMONS GROUP
MAILING ADDRESS: 2901 S. LYNNHAVEN RD, SUITE 200
VIRGINIA BEACH, VA 23452
TELEPHONE: 757-213-6661
EMAIL: DAN.RUBY@TIMMONS.COM
X
THIS DESIGNATION MAY ONLY BE
CHANGED BY A PLAN COVER
SHEET REVISION THAT MUST BE
SUBMITTED TO THE CITY FOR
VERIFICATION AND APPROVAL.
LAKELAND HIGH SCHOOL
TURF FIELD CONVERSION
ADVISORY NOTES
1. THE CONTRACTOR MUST CONTACT DEAN ADAMS, PUBLIC
UTILITIES CONSTRUCTION MANAGER, AT (757) 514-7029 AT
LEAST FIVE (5) BUSINESS DAYS PRIOR TO COMMENCEMENT OF
CONSTRUCTION TO SET UP A PRECONSTRUCTION MEETING.
2. THE CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO
ALL OWNERS AND RESIDENTS OF THE PROPERTIES ADJACENT
TO THE PROJECT SITE 30 DAYS PRIOR TO THE
COMMENCEMENT OF WORK UNLESS OTHERWISE DIRECTED BY
THE CITY.
3. PUBLIC REFUSE COLLECTION WILL NOT BE PROVIDED TO THIS
SITE. THE OWNER/DEVELOPER SHALL COORDINATE REFUSE
COLLECTION WITH A PRIVATE HAULER.
4. ALL EXCAVATED MATERIAL SHALL BE DISPOSED OF IN A
LAWFUL MANNER. THE CONTRACTOR SHALL COORDINATE
HAUL ROUTES, MATERIAL QUANTITIES, TRUCK CAPACITIES AND
NUMBER OF TRIPS WITH THE CITY CIVIL INSPECTOR.
5. ANY AND ALL MATERIALS OR DEBRIS TRACKED ONTO A PUBLIC
OR PRIVATE ROAD SURFACE SHALL BE REMOVED AT THE END
OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE
ROADS BY SHOVELING OR SWEEPING AND WILL BE
TRANSPORTED TO A SEDIMENT- CONTROLLED DISPOSAL AREA.
STREET WASHING IS NOT PERMITTED UNTIL SEDIMENT HAS
BEEN REMOVED BY SWEEPING AND SHOVELING.
6. THIS PROPERTY IS LOCATED WITHIN THE CHESAPEAKE BAY
PRESERVATION OVERLAY DISTRICT AND IS DESIGNATED AS A
RESOURCE MANAGEMENT AREA (RMA). ALL LAND
DISTURBANCE, USES, DEVELOPMENT AND REDEVELOPMENT IN
THE CHESAPEAKE BAY PRESERVATION AREA OVERLAY
DISTRICT ARE REQUIRED TO RETAIN AN UNDISTURBED
VEGETATED 100-FOOT BUFFER AREA AROUND RPA FEATURES,
SUCH AS WETLANDS, SHORELINES, AND ALONG WATERBODIES
WITHIN PERENNIAL FLOW.
7. NO DELIVERY, LOADING, TRASH REMOVAL OR COMPACTION,
OR OTHER SUCH OPERATIONS SHALL BE PERMITTED BETWEEN
THE HOURS OF 10 P.M. AND 7 A.M.
8. THE CONTRACTOR SHALL FIELD-VERIFY THE LOCATION,
DEPTH, AND SIZE OF EXISTING UNDERGROUND UTILITIES. THE
LOCATIONS SHOWN ARE APPROXIMATE AND NOT
GUARANTEED BY TIMMONS GROUP. THE CONTRACTOR SHALL
ALERT THE CIVIL ENGINEER OF ANY DISCREPANCIES
IMMEDIATELY.
9. THE CONTRACTOR SHALL INSTALL SIGNAGE IN AREAS THAT
ARE RESTRICTED TO THE PUBLIC DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL PROVIDE LIGHTING THROUGHOUT
THE CONSTRUCTION AREA IF WORK IS TO BE PERFORMED
AFTER DARK. THE EXISTING STADIUM LIGHTS ARE
ACCEPTABLE FOR ILLUMINATING THE FOOTBALL FIELD. THE
CONTRACTOR SHALL COORDINATE WORK HOURS AND
LIGHTING USAGE WITH THE OWNER.
PERMITTING NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR SECURING ALL NECESSARY
PERMITS FOR THIS PROJECT PRIOR TO COMMENCING CONSTRUCTION.
2. A LAND DISTURBANCE PERMIT IS REQUIRED FOR THIS PROJECT. THE
CONTRACTOR SHALL CONTACT THE CITY OF SUFFOLK (BETH GILL) AT
BGILL@SUFFOLKVA.US OR (757) 514-7611 A MINIMUM OF 48 HOURS IN
ADVANCE OF APPLYING FOR A LAND DISTURBANCE PERMIT.
3. IN ORDER TO ISSUE A LAND DISTURBANCE PERMIT FOR THIS PROJECT
THE FOLLOWING ITEMS ARE REQUIRED:
· A GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER
FROM CONSTRUCTION ACTIVITIES (CONSTRUCTION GENERAL
PERMIT) MUST BE OBTAINED FROM DEQ FOR LAND-DISTURBING
ACTIVITIES OF ONE ACRE OR GREATER. APPLICANT MUST PROVIDE
EITHER EVIDENCE OF A VALID CONSTRUCTION GENERAL PERMIT FOR
THE LAND-DISTURBING ACTIVITY OR MUST PROVIDE A COMPLETE
AND ACCURATE REGISTRATION STATEMENT TO THIS OFFICE FOR
REVIEW AND SUBMISSION TO DEQ IN ORDER TO OBTAIN A
CONSTRUCTION GENERAL PERMIT. UPON RECEIPT OF VERIFICATION
FROM DEQ THAT THE REGISTRATION STATEMENT HAS BEEN
ACCEPTED AND THAT A CONSTRUCTION GENERAL PERMIT WILL BE
ISSUED BY DEQ, A LAND DISTURBANCE PERMIT WILL BE ISSUED BY
THE CITY OF SUFFOLK. BE ADVISED THAT LAND-DISTURBING
ACTIVITIES MAY NOT COMMENCE UNTIL THE DEQ CONSTRUCTION
GENERAL PERMIT IS RECEIVED BY THE PERMITTEE.
· AN INVOICE FOR INSPECTION FEES FOR PUBLIC UTILITIES, PUBLIC
WORKS ENGINEERING (INSPECTION FEES) AND TRAFFIC
ENGINEERING MUST BE OBTAINED FROM THIS OFFICE. THIS INVOICE
MUST BE PAID AT THE TREASURER'S OFFICE.
· THE EROSION AND SEDIMENT CONTROL SURETY IN THE AMOUNT
REVIEWED AND APPROVED BY PUBLIC WORKS ENGINEERING DURING
SITE PLAN APPROVAL MUST BE PROVIDED.
· A COMPLETE AND SIGNED LAND DISTURBANCE PERMIT APPLICATION
WITH ORIGINAL SIGNATURES.
· A COMPLETED RESPONSIBLE LAND DISTURBER DESIGNATION SHEET.
· A COPY OF THE PLANNING APPROVAL LETTER.
LAND RECORDS
SOURCE OF TITLE
THIS PROPERTY WAS CONVEYED TO THE SCHOOL BOARD OF
THE CITY OF SUFFOLK FROM LOUISE LUTER PARKER AND
JAMES HODGES PARKER BY DEED DATED AUGUST 25, 1988,
RECORDED IN DEED BOOK 233, PAGE 195 IN THE CLERK'S
OFFICE OF THE CIRCUIT COURT OF THE CITY OF SUFFOLK,
VIRGINIA.
SIGNATURE BLOCK FOR CITY USE
DIRECTOR OF PLANNING DATE
CONSTRUCTION RECORD DRAWING NOTES
1. CONSTRUCTION RECORD DRAWINGS WILL BE REQUIRED FOR ALL STORMWATER MANAGEMENT FACILITIES
AND ANY WORK IN THE RIGHT-OF-WAY. REFER TO CHAPTER 6 OF THE SUFFOLK PUBLIC FACILITIES MANUAL
(PFM) FOR SUBMISSION INSTRUCTIONS.
2. UPON CONSTRUCTION COMPLETION, ALL STORMWATER PIPE INSTALLED IN THE RIGHT-OF-WAY SHALL BE DOCUMENTED BY MEANS OF CLOSED-CIRCUIT VIDEO RECORDING. THE DEPARTMENT OF PUBLIC WORKS SHALL BE GIVEN AT LEAST A 72 HOUR NOTICE (CONTACT JASON TRIMYER AT 757-514-7704) PRIOR TO THE CLOSED-CIRCUIT VIDEO DOCUMENTATION OCCURRING. REFER TO CHAPTER 6 OF THE SUFFOLK PUBLIC
FACILITIES MANUAL (PFM) FOR DETAILS AND FURTHER REQUIREMENTS.
3. THE CONTRACTOR SHALL PROVIDE THE CITY OF SUFFOLK DEPARTMENT OF PUBLIC UTILITIES A COMPLETE SET OF AS BUILT DRAWINGS IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE SUFFOLK PUBLIC
FACILITIES MANUAL, VOLUME II.
SUFFOLK PUBLIC SCHOOLS
SUFFOLK PUBLIC SCHOOLS
N: 3427871.99' E: 12021351.54'
BMP INFORMATION TABLE
0.25 LB/YR
SYNTHETIC TURF FIELD (FUNCTIONS AS PERMEABLE PAVEMENT LEVEL 1)
GEOGRAPHIC COORDINATES
POLLUTANT REMOVAL PROVIDED BY BMP
MAINTENANCE RESPONSIBILITY
EXCESS POLLUTANT REMOVAL PROVIDED
BMP OWNER
DRAINAGE AREA OF BMP
TYPE OF BMP
TOTAL POLLUTANT REMOVAL REQUIRED 4.12 LB/YR
3.77 AC | 3.44 AC IMPERVIOUS
4.37 LB/YR
WATER/SEWER SERVICE
CITY OF SUFFOLK PUBLIC UTILITIES
442 W. WASHINGTON ST.
SUFFOLK, VA 23434
CONTACT: DEAN ADAMS
PHONE: (757) 514-7029
EMAIL: DMADAMS@SUFFOLKVA.US
NATURAL GAS SERVICE
COLUMBIA GAS OF VIRGINIA
7001 HARBOUR VIEW BLVD.
SUFFOLK, VA 23435
PHONE: (800) 543-8911
ELECTRIC SERVICE
DOMINION ENERGY
2700 CROMWELL DRIVE
NORFOLK, VA 23509
CONTACT: BELINDA WINSTEAD
PHONE: (757) 857-2870
EMAIL: BELINDA.WINSTEAD@DOMINIONENERGY.COM
TELEPHONE/INTERNET SERVICE
VERIZON
2920 ELMHURST LANE, 2ND FLOOR
PORTSMOUTH, VA 23701
CONTACT: JIM FULTON
PHONE: (757) 663-6721
DEVELOPER/OWNER
SUFFOLK PUBLIC SCHOOLS
100 N. MAIN STREET
SUFFOLK, VA 23434
CONTACT: ANTHONY HINDS
PHONE: (757) 925-6750 x668230
EMAIL: ANTHONYHINDS@SPSK12.NET
TURF FIELD SPECIALIST
LDDSPORTS, LLC.
13384 BERLIN TURNPIKE
LOVETTSVILLE, VA 20180
CONTACT: MATT VETTER, PE
PHONE: (703) 999-9748
EMAIL: MATT.VETTER@LDDSPORTS.COM
STORMWATER MANAGEMENT
PUBLIC WORKS DEPT. OF ENGINEERING
442 W. WASHINGTON ST., 2ND FLOOR
SUFFOLK, VA 23434
CONTACT: ERIN ROUNTREE
PHONE: (757) 514-7678
EMAIL: EROUNTREE@SUFFOLKVA.US
SURVEYOR
TIMMONS GROUP
2901 S. LYNNHAVEN ROAD, SUITE 200
VIRGINIA BEACH, VA 23452
CONTACT: TODD FRENCH, LS
PHONE: (757) 217-4871
EMAIL: TODD.FRENCH@TIMMONS.COM
TRAFFIC ENGINEERING
DEPT. OF PUBLIC WORKS TRAFFIC ENGINEERING
866 CAROLINA ROAD
SUFFOLK, VA 23434
CONTACT: JASON SOUDERS
PHONE: (757) 514-7649
EMAIL: JSOUDERS@SUFFOLKVA.US
FIRE MARSHAL
CITY OF SUFFOLK FIRE PREVENTION BUREAU
300 KINGS FORK ROAD
SUFFOLK, VA 23434
CONTACT: CHARLES "CHUCK" CHAPIN
PHONE: (757) 514-4539
EMAIL: CCHAPIN@SUFFOLKVA.US
PLANNING
DEPT. OF PLANNING & COMMUNITY DEVELOPMENT
442 W. WASHINGTON ST.
SUFFOLK, VA 23434
CONTACT: KEVIN WYNE, CURRENT PLANNING MGR.
PHONE: (757) 514-4065
EMAIL: KWYNE@SUFFOLKVA.US
CIVIL ENGINEER
TIMMONS GROUP
2901 S. LYNNHAVEN ROAD, SUITE 200
VIRGINIA BEACH, VA 23452
CONTACT: DAN RUBY, PE
PHONE: (757) 213-6661
EMAIL: DAN.RUBY@TIMMONS.COM
SHEET INDEX
SHEET NO. SHEET TITLE
C-0.0 COVER SHEET
C-0.1 CIVIL PROJECT NOTES
C-0.2 PRE-DEVELOPMENT DRAINAGE AREA MAP
C-0.3 POST-DEVELOPMENT DRAINAGE AREA MAP
C-1.0 EXISTING CONDITIONS SURVEY
C-2.0 EROSION & SEDIMENT CONTROL NARRATIVE
C-2.1 PHASE 1 EROSION & SEDIMENT CONTROL PLAN
C-2.2 PHASE 2 EROSION & SEDIMENT CONTROL PLAN
C-2.3 EROSION & SEDIMENT CONTROL DETAILS
C-3.0 DEMOLITION PLAN
C-4.0 SITE LAYOUT PLAN
C-4.1 FIELD DIMENSION PLAN
C-5.0 GRADING PLAN
C-5.1 DRAINAGE PLAN
C-6.0 CONSTRUCTION DETAILS
C-6.1 DRAINAGE DETAILS
C-6.2 DRAINAGE DETAILS
C-6.3 DRAINAGE DETAILS
C-6.4 DRAINAGE DETAILS
C-7.0 ATHLETIC DETAILS
C-7.1 ATHLETIC DETAILS
C-7.2 ATHLETIC DETAILS
C-7.3 ATHLETIC DETAILS
APPROVALS
TIMMONS GROUP IS NOT RESPONSIBLE OR LIABLE FOR ANY
CONSTRUCTION OR DAMAGES TO THIS PROJECT PRIOR TO
ALL FINAL PLAN APPROVALS.
NO SCALE
C-0.1
C I V I L
P R O
J E C T
N
O T E S
C. HERON
C. HERON
D. RUBY
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A T E
DRAWN BY
DATE
R E V I S I O
N
D
E S C R I P T I O
N
Y O
U R
V I S I O
N
A C H
I E V
R O
U G
H
O
U R S
S L a k e l a n d
H i g h
S c h o o l D
W G
S h e e t C
D
C
N
O T
E S d w g
P l o t t e d o n
A
M b y
C a s e y
H e r o n
S
L y n n h a v e n
R o a d
S u i t e
V i r g i n i a
B e a c h
V A
T E L
X w t i m m o n s c o m
T H
I S
D
R A W
I N
G
P R E P A R
T H
E
V I R
G I N
A
F I C
E
LA
KE
LA
ND
H
IG
H
SC
HO
OL
TU
RF
F
IE
LD
C
ON
VE
RS
IO
N
CI
TY
O
F
SU
FF
OL
K, V
IR
GI
Y
NE
CK
B
OR
OU
GH
11/29/2021
49297
T h e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f
T
I M
M O
O d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r i n c l u s i v e b u t n o t l i m i t e d t o c o n s t r u c t i o n b i d d i n g a n d o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f
T
I M
M O
O
U P
11/29/2021
DEMOLITION AND ABANDONMENT NOTES
1. THE CONTRACTOR SHALL STRICTLY ADHERE TO THE LIMITS OF DISTURBANCE, SAWCUT LIMITS, AND PERIMETER
SILT FENCE AS SHOWN ON THE APPROVED PLANS. IF IT IS NECESSARY TO PERFORM WORK BEYOND THE LIMITS OF DISTURBANCE, THE CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER AND COORDINATE THE WORK
PRIOR TO COMMENCING CONSTRUCTION.
2. SAWCUTTING SHALL BE PERFORMED ON EDGES OF PAVEMENT AND CONCRETE DEMOLITION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING (WITH MATCHING MATERIALS) PAVEMENT, DRIVEWAYS, SIDEWALKS, SIGNS, PAVEMENT MARKINGS, LIGHT POLES, CURBS, CONCRETE, FENCES, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION. CONCRETE SIDEWALKS, CURBS, OR
ENTRANCES THAT ARE DAMAGED SHALL BE REPLACED TO THE NEAREST UNDISTURBED JOINT.
4. THE CONTRACTOR SHALL COORDINATE WITH PRIVATE UTILITY COMPANIES INCLUDING BUT NOT LIMITED TO VERIZON, CHARTER COMMUNICATIONS, COLUMBIA GAS OF VIRGINIA, AND DOMINION ENERGY TO RELOCATE AND/OR REMOVE EXISTING UTILITIES THAT ARE IN CONFLICT WITH PROPOSED IMPROVEMENTS.
5. PIPE DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE DEMOLITION PLAN. WHEN PIPES ARE REMOVED FROM DRAINAGE STRUCTURES, THE FORMER PENETRATIONS MUST BE PATCHED AND SEALED TO BE
WATERTIGHT.
6. PIPES THAT ARE FILLED WITH FLOWABLE FILL SHALL BE MONITORED BY THE SITE GEOTECHNICAL ENGINEER TO
ENSURE THAT THE PIPES ARE SEALED AT BOTH THE UPSTREAM AND DOWNSTREAM STRUCTURES.
CIVIL PROJECT GENERAL NOTES
1. SUBMITTALS ON MATERIALS FOR THIS PROJECT SHALL BE PROVIDED TO THE ENGINEER FOR APPROVAL PRIOR TO
ORDERING MATERIALS AND BEGINNING CONSTRUCTION.
2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM WITH THESE CIVIL SITE PLANS, PROJECT SPECIFICATIONS, AND WITH ALL CURRENT APPLICABLE CODES AND THE LATEST REVISIONS OF THE FOLLOWING
REFERENCE DOCUMENTS:
A. HAMPTON ROADS PLANNING DISTRICT COMMISSION (HRPDC) REGIONAL CONSTRUCTION STANDARDS
B. VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS
C. VDOT ROAD AND BRIDGE STANDARDS
D. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
E. VIRGINIA WORK AREA PROTECTION MANUAL
F. VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH)
G. CITY OF SUFFOLK PUBLIC FACILITIES MANUAL - VOLUME I (PFM-VI)
H. CITY OF SUFFOLK PUBLIC FACILITIES MANUAL - VOLUME II (PFM-VII)
3. THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS AND REQUIREMENTS OF THE OVERHEAD HIGH VOLTAGE LINES SAFETY ACT (SECTION 59.1-406, ET. SEQ. OF THE CODE OF VIRGINIA) IN PERFORMING WORK ON THIS PROJECT. AS
A MINIMUM:
3.1. CONTACT THE ELECTRICAL UTILITY 48 HOURS PRIOR TO COMMENCING WORK IF THE CONTRACTOR'S TOOLS OR
MATERIALS WILL INTRUDE TO WITHIN TEN (10) FEET OF AN OVERHEAD POWER LINE.
3.2. CONTACT THE ELECTRICAL UTILITY 48 HOURS PRIOR TO COMMENCING WORK IF COVERED EQUIPMENT SUCH AS CRANES OR DERRICKS WILL BE OPERATED WITHIN TEN (10) FEET OF AN OVERHEAD POWER LINE.
3.3. POST AND MAINTAIN WARNING SIGNS WITHIN AND ON THE OUTSIDE OF EQUIPMENT OPERATING NEAR AN
OVERHEAD HIGH VOLTAGE LINE.
3.4. COORDINATE WITH THE UTILITY OWNER SHOULD THE CONTRACTOR'S EXCAVATION ACTIVITIES REQUIRE SHORING AND BRACING OF EXISTING UTILITY POLES. DOMINION ENERGY SHALL BE NOTIFIED TEN (10) WORKING DAYS BEFORE ANTICIPATED SHORING AND BRACING ACTIVITIES COMMENCE. ALL SHORING AND BRACING ACTIVITIES SHALL BE ACCOMPLISHED BY DOMINION ENERGY PERSONNEL AT THE CONTRACTOR'S EXPENSE.
4. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO CONSTRUCTION, INCLUDING BUT NOT LIMITED TO UNDERGROUND UTILITY CONNECTION POINTS, RECEIVING PIPE SIZES, INVERTS, AND PIPE MATERIALS. ALL ERRORS AND DISCREPANCIES WITH THE PLANS OR EXISTING CONDITIONS SHALL BE REPORTED TO THE ENGINEER OR SURVEYOR OF
RECORD BEFORE PROCEEDING WITH THE WORK.
5. THE EXISTING UTILITIES SHOWN ON THESE DRAWINGS ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. OTHER EXISTING UTILITIES MAY BE PRESENT. INFORMATION HAS BEEN OBTAINED FROM THE BEST AVAILABLE SOURCES AT THE TIME OF SURVEY BUT IS NOT REPRESENTED AS BEING COMPLETE AND ACCURATE. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE LOCATIONS SHOWN.
6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND PROTECT EXISTING UTILITIES AND UNDERGROUND STRUCTURES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING MISS UTILITY (811) FOR EXISTING UTILITY LOCATIONS AT LEAST 48 HOURS PRIOR TO COMMENCING CONSTRUCTION. DAMAGE TO EXISTING UTILITIES AND UNDERGROUND STRUCTURES SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE DEVELOPER.
7. EXISTING UTILITY LOCATIONS ARE APPROXIMATE AND SHALL BE FIELD-VERIFIED BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES. IF EXISTING UTILITIES ARE FOUND TO BE IN CONFLICT WITH PROPOSED SITE IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER, OWNER, AND THE UTILITY COMPANY TO EITHER REDESIGN THE PROPOSED IMPROVEMENTS OR RELOCATE THE EXISTING UTILITIES. ANY UTILITIES TO BE RELOCATED SHALL BE RELOCATED AT THE OWNER/DEVELOPER'S EXPENSE, INCLUDING UTILITIES WITHIN THE
RIGHT-OF-WAY.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION EFFORTS WITH DOMINION ENERGY, COLUMBIA GAS OF VIRGINIA, VERIZON, CHARTER COMMUNICATIONS, SUFFOLK PUBLIC WORKS, SUFFOLK PUBLIC SCHOOLS, AND
OTHER ENTITIES AS REQUIRED.
9. THE CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF THE APPROVED PLANS AT THE PROJECT SITE AT ALL TIMES
DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS AND LICENSES AND KEEP COPIES OF THE SAME ON SITE
DURING CONSTRUCTION.
11. THE CONTRACTOR SHALL SATISFY HIMSELF AS TO ALL SITE CONDITIONS PRIOR TO CONSTRUCTION.
12. DURING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A CLEAN WORK SITE AND REMOVAL OF
CONSTRUCTION DEBRIS AND MATERIALS.
13. THE CONTRACTOR SHALL USE ONLY NEW MATERIALS, PARTS, AND PRODUCTS ON THIS PROJECT. ALL MATERIALS SHALL BE STORED SO AS TO ENSURE THE PRESERVATION OF THEIR QUALITY AND FITNESS FOR THE WORK.
14. ALL STAGING OF CONSTRUCTION VEHICLES AND EQUIPMENT SHALL BE ONSITE. NO VEHICLES WILL BE ALLOWED TO
PARK WITHIN THE TRAVEL LANES OR SHOULDERS OF ANY PUBLIC STREET.
15. THE CONTRACTOR'S LAYDOWN & STORAGE AREA IS LIMITED TO THE AREA WITHIN THE SITE CONSTRUCTION LIMITS.
COORDINATE EXACT LOCATIONS WITH THE OWNER.
16. ALL SALVAGEABLE ITEMS REMOVED AND NOT USED REMAIN THE PROPERTY OF THE OWNER.
17. MATERIALS, EQUIPMENT, PRODUCTS, AND METHODS OTHER THAN THOSE INDICATED IN THE DRAWINGS SHALL NOT BE CONSIDERED UNLESS PRIOR APPROVAL IS OBTAINED FROM THE OWNER'S REPRESENTATIVE, DESIGN ENGINEER, AND
THE APPLICABLE GOVERNING CODE AUTHORITY IF NECESSARY.
18. THE CONTRACTOR SHALL COMPLY WITH ALL OSHA AND STATE SAFETY ORDERS AT ALL TIMES.
19. ALL DISTURBED AREAS, INCLUDING BUT NOT LIMITED TO PAVEMENT, SHOULDERS, DITCHES, HEADWALLS, ENDWALLS, CULVERT PIPES, FENCES, CURB AND GUTTER, UTILITIES, DRIVEWAYS, LIGHT POLES, SIGNS, MAILBOXES, ETC. SHALL BE REPAIRED TO A CONDITION EQUAL TO OR BETTER THAN THOSE EXISTING PRIOR TO CONSTRUCTION, OR AS SHOWN ON THE DRAWINGS. SIGNS AND MAILBOXES THAT ARE DISTURBED SHALL BE RETURNED TO THEIR ORIGINAL LOCATIONS
DAILY, AND MAINTAINED THROUGHOUT THE PROJECT.
20. THE CONTRACTOR SHALL REESTABLISH ALL PROPERTY PINS AND MONUMENTS DISTURBED DURING CONSTRUCTION AT
NO ADDITIONAL COST TO THE DEVELOPER.
21. ONSITE EXTERIOR CONCRETE IS TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI (28-DAYS) WITH 5% TO 7%
AIR ENTRAINMENT, UNLESS OTHERWISE NOTED.
22. ALL PROPOSED PAVING SURFACES SHALL MEET ADJACENT PAVING SURFACES IN A SMOOTH CONTINUOUS MANNER, FLUSH ALONG ENTIRE COMMON EDGE.
23. THE CONTRACTOR SHALL MAKE ANY NECESSARY ADJUSTMENTS TO ALL UTILITY SPLICE BOXES, JUNCTION BOXES, METER BOXES, VALVE BOXES, ELECTRICAL SPLICE BOXES, MANHOLES, CLEANOUTS, AND OTHER ITEMS TO MATCH
FINISHED GRADE.
24. ALL RADII INDICATED SHALL HAVE CONTINUOUS/SMOOTH TRANSITIONS WITHOUT ABRUPT CHANGES, BENDS, OR FACETED EDGES. ALL RADIAL DIMENSIONS ARE TO THE EDGE OF CONCRETE UNLESS OTHERWISE NOTED.
25. THE CONTRACTOR SHALL CHECK ALL DIMENSIONS. ANY DISCREPANCIES FOUND SHALL BE CALLED TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE AND BE RESOLVED BEFORE PROCEEDING WITH ANY WORK. DIMENSIONS TAKE
PRECEDENCE OVER SCALE.
26. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES.
27. CITY OF SUFFOLK FLOOD CERTIFICATION: THE PROPERTY SHOWN HEREON APPEARS TO FALL WITHIN FLOOD ZONE "X" (UNSHADED) ACCORDING TO THE F.E.M.A. FLOOD INSURANCE RATE MAP (F.I.R.M.) FOR THE CITY OF SUFFOLK, VIRGINIA.
MAP NUMBER: 5101560210D, MAP REVISED: NOVEMBER 16, 2011.
28. ALL CLEARING, GRUBBING AND GRADING SHALL BE PERFORMED IN ACCORDANCE WITH VDOT SPECIFICATIONS AND
STANDARDS.
29. ALL UNPAVED SURFACES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE GRADED TO DRAIN, TOPSOILED, SEEDED, MULCHED, AND FERTILIZED.
30. THE CONTRACTOR SHALL PROVIDE AND PAY FOR ALL CONSTRUCTION SURVEYING REQUIRED.
31. SAW CUTTING OF EXISTING CONCRETE AND ASPHALT PAVING SHALL COMPLY WITH OSHA. THE CONTRACTOR SHALL KEEP DUST TO A MINIMUM AND SHALL BE RESPONSIBLE FOR THE DAMAGE TO AND REPLACEMENT OF ADJACENT
MATERIALS AND FINISHES.
32. THE CONTRACTOR SHALL INSTALL SIGNAGE IN AREAS THAT ARE RESTRICTED TO THE PUBLIC DURING CONSTRUCTION.
33. THE CONTRACTOR SHALL PROVIDE LIGHTING THROUGHOUT THE CONSTRUCTION AREA IF WORK IS TO BE PERFORMED AFTER DARK. THE EXISTING STADIUM LIGHTS ARE ACCEPTABLE FOR ILLUMINATING THE FOOTBALL FIELD. THE
CONTRACTOR SHALL COORDINATE WORK HOURS AND LIGHTING USAGE WITH THE OWNER.
GRADING AND DRAINAGE NOTES
1. THE OWNER/DEVELOPER SHALL CONTRACT WITH A REPUTABLE AND QUALIFIED GEOTECHNICAL ENGINEERING
FIRM TO PROVIDE SOILS INSPECTIONS, TESTING, AND RECOMMENDATIONS DURING CONSTRUCTION.
2. THE SITE CONTRACTOR SHALL FOLLOW THE EARTHWORK STANDARDS PROVIDED IN THE PROJECT SPECIFICATIONS, THE RECOMMENDATIONS OF THE SITE GEOTECHNICAL ENGINEER, AND THE PROJECT
GEOTECHNICAL REPORT AT ALL TIMES DURING CONSTRUCTION.
3. ALL AREAS, ESPECIALLY THE SUBGRADE BELOW THE FIELD, SHALL BE GRADED FOR POSITIVE DRAINAGE AS
SHOWN ON THE PLANS. POSITIVE DRAINAGE IS CRITICAL TO THE PROJECT.
4. TEMPORARY DRAINAGE DURING CONSTRUCTION SHALL BE PROVIDED BY THE CONTRACTOR TO RELIEVE AREAS
THAT EXPERIENCE PONDING OR COULD CAUSE DAMAGE TO LIFE, SAFETY, AND PROPERTY.
5. ALL FILL MATERIAL SHALL BE VOID OF DEBRIS AND PLACED IN UNIFORM LIFTS (6" MAXIMUM) OR AS SPECIFIED BY
THE SITE GEOTECHNICAL ENGINEER AND/OR SITE-SPECIFIC GEOTECHNICAL REPORT.
6. COMPACT SUBGRADE TO 95% OF STANDARD PROCTOR THEORETICAL MAXIMUM DRY DENSITY (ASTM D-698).
7. COMPACTION SHALL BE PERFORMED BY HEAVY COMPACTION EQUIPMENT AS SPECIFIED BY THE SITE
GEOTECHNICAL ENGINEER AND/OR SITE-SPECIFIC GEOTECHNICAL REPORT.
8. SITE PREPARATION, INCLUDING FILL PLACEMENT AND COMPACTION, SHOULD BE OBSERVED BY A QUALIFIED SOILS TECHNICIAN WORKING UNDER THE DIRECTION OF THE SITE GEOTECHNICAL ENGINEER. DURING FILL PLACEMENT, A SUFFICIENT AMOUNT OF IN-PLACE DENSITY TESTS SHOULD BE CONDUCTED TO CONFIRM THAT COMPACTION AND FILL MOISTURE IS IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE SITE
GEOTECHNICAL ENGINEER AND/OR SITE-SPECIFIC GEOTECHNICAL REPORT.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING COMPACTION TEST RESULTS BY A GEOTECHNICAL
ENGINEER TO THE OWNER FOR VERIFICATION OF PROPER COMPACTION.
10. WHEN MATERIAL UNSUITABLE FOR FOUNDATION, SUBGRADES, OR OTHER PURPOSES OCCURS WITHIN THE LIMITS OF CONSTRUCTION, THE CONTRACTOR SHALL EXCAVATE SUCH MATERIAL AND BACKFILL WITH APPROVED SUITABLE MATERIAL. THE EXTENT OF UNDERCUTTING AND BACKFILLING IS TO BE DETERMINED BY THE OWNER'S SOILS ENGINEERING CONSULTANT. THE USE OF OPEN-GRADED STONE AND/OR GEOGRID REINFORCEMENT MATERIALS IS OFTEN RECOMMENDED BASED ON OBSERVATIONS OF THE GEOTECHNICAL ENGINEER AT THE TIME
OF CONSTRUCTION.
11. ALL OBJECTIONABLE, HAZARDOUS, AND/OR DELETERIOUS MATERIAL ENCOUNTERED SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A STATE-APPROVED FACILITY MEETING THE REQUIREMENTS OF ALL APPLICABLE
LOCAL, STATE, AND FEDERAL REGULATIONS.
12. EXCAVATED SOIL CAN BE STOCKPILED ONSITE PROVIDED IT IS CLEAN AND FREE FROM DEBRIS, ORGANIC MATTER, HAZARDOUS MATERIAL, AND CONTAMINATION. THE LOCATION OF THE PERMANENT STOCKPILE IS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLANS AND SHALL BE CONFIRMED WITH THE OWNER PRIOR TO EXCAVATION.
13. TOPSOIL THAT IS REMOVED FROM THE PROJECT CAN BE RE-USED TO RESTORE GRASS AREAS THAT ARE DISTURBED DURING CONSTRUCTION AND/OR TO ESTABLISH GROUND COVER ON THE PERMANENT STOCKPILE.
14. ALL STORM DRAINAGE IMPROVEMENTS AND FACILITIES SHALL BE INSTALLED AS SOON AS FEASIBLE IN THE
CONSTRUCTION SCHEDULE.
15. UNDERGROUND STORM SEWER PIPING SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) STANDARDS AND SPECIFICATIONS, AND THE LATEST
EDITION OF THE CITY OF SUFFOLK PUBLIC FACILITIES MANUAL - VOLUME I.
16. STORM SEWER PIPING SHALL CONSIST OF:
■ N-12 HIGH-DENSITY POLYETHYLENE (HDPE) PIPE WITH SMOOTH WALL INTERIOR
■ SCHEDULE 40/80 POLYVINYL CHLORIDE (PVC) PIPE, AS SHOWN ON THE PLANS.
17. THE CONTRACTOR SHALL INSTALL PIPES, FITTINGS, AND OTHER STORM DRAINAGE COMPONENTS IN DRY TRENCH
CONDITIONS AND IN ACCORDANCE WITH THE MANUFACTURER'S AND GEOTECHNICAL ENGINEER'S
RECOMMENDATIONS. THE CONTRACTOR SHALL PROVIDE ALL DE-WATERING, WELL POINTING, SHEETING, TRENCH BOXES, AND TRENCH STABILIZATION AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER/DEVELOPER.
18. STORM STRUCTURES SHALL CONFORM TO THE CURRENT VDOT ROAD AND BRIDGE STANDARDS AND VDOT SPECIFICATIONS. ALL STRUCTURES SHALL INCLUDE INLET SHAPING (IS-1) AND STRUCTURES DEEPER THAN 4-FEET SHALL HAVE STEPS (ST-1). STORM SEWER PIPE BEDDING SHALL BE IN ACCORDANCE WITH VDOT STANDARD "PB-1", THE MANUFACTURER'S GUIDELINES, AND THE THE DETAILS SHOWN ON THESE PLANS.
19. ALL THERMOPLASTIC, HDPE, PE, AND NON-CONCRETE PIPE JOINTS AND CONNECTIONS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE DETAILS SUPPLIED BY THE MANUFACTURER AND SHOWN ON THE PLAN.
WHEN CONNECTING TO DRAINAGE STRUCTURES (PRE-CAST, CAST-IN-PLACE, CONCRETE BLOCK, BRICK, ETC.), ALL PIPES MUST BE INSTALLED IN ACCORDANCE WITH ASTM AND VDOT REQUIREMENTS TO ELIMINATE THE POTENTIAL FOR SHEAR FAILURE, TO BE SOIL TIGHT, AND LEAK RESISTANT (FLEXIBLE CONNECTORS).
20. CONSTRUCTION STAKEOUT FOR STORM SEWER INFRASTRUCTURE SHALL BE PERFORMED BY A VIRGINIA
LICENSED SURVEYOR.
21. ALL ON-SITE STORM DRAINS AND PIPES WITHIN THE PROJECT LIMITS SHALL BE VACUUMED CLEAN AFTER THE SITE HAS BEEN PERMANENTLY STABILIZED. THE CONTRACTOR SHALL DISPOSE OF SEDIMENT, TRASH, AND DEBRIS
IN A LAWFUL MANNER.
22. THE STONE SECTION BELOW THE TURF FIELD SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND IN A MANNER THAT PERMITS THE REQUIRED INFILTRATION RATE. INFILTRATION TESTS SHALL BE PERFORMED ON THE STONE USING BSI-7044 METHOD #4 - "DUAL RING INFILTROMETER TEST" TO ENSURE A MINIMUM PERMEABILITY OF 20 INCHES PER HOUR IS PROVIDED ACROSS THE FIELD. THIS TEST SHALL
BE PERFORMED BY OWNER'S REPRESENTATIVE.
23. THE TURF FIELD SHALL BE GRADED TO ELIMINATE LOCALIZED LOW SPOTS AND DEPRESSIONS.
FP
GATE
G A
T E
GATE
G
A
T
E
LP
LP
LP
LP
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXX
ASPHALT PATH
ASPHALT PATHASPHALT PATH
ASPHALT TRACK
(SURFACE MILLED)
ASPHALT TRACK
(SURFACE MILLED)
ASPHALT TRACK
(SURFACE MILLED)
BLEACHERS
BLEACHERS
ASPHALT
PAD
SCOREBOARD
BLEACHERS BLEACHERS
ASPHALT
ASPHALT
ASPHALT TRACK
(SURFACE MILLED)
PAINT BY OTHERS
(ELECTRIC)
TBM
TOP OF IRON ROD
ELEVATION=67.63
HOME BLEACHERS
VISITOR BLEACHERS
YD
RIM=66.73
INV(NE)=64.56
INV(SE)=64.56
P
YD
RIM=66.72
INV(SW)=64.02
INV(NW)=64.27
15" RCP
YD
RIM=65.82
UNABLE
TO OPEN
YD
RIM=66.83
INV(E)=62.41
INV(SW)=63.79
INV(W)=NOT
ACCESSIBLE
APPROXIMATE
INV=61.91
(FULL OF DEBRIS)
INV=61.91
R
C P
R
C P
YD
RIM=65.97
UNABLE
TO OPEN
YD
RIM=66.78
INV(N)=62.31
INV(SE)=62.34
INV(W)=62.21
C
P P
INV=61.70
VISITOR BLEACHERS
ANALYSIS POINT #1
Tc = 21 MINUTES
2.50 AC CN = 76
ANALYSIS POINT #2
Tc = 22 MINUTES
1.27 AC CN = 76
12" CPP
12" CPP
12" CPP
YD
RIM=66.66
INV(NE)=64.80
INV(SW)=64.74
INV(W)=64.80
12" CPP
YD
RIM=66.61
INV(SW)=65.07
YD
RIM=66.66
INV(NE)=63.08
INV(S)=63.08
P
YD
RIM=66.83
INV(SW)=63.25
YD
RIM=66.66
INV(N)=62.79
INV(E)=62.82
INV(S)=62.78
P
YD
RIM=66.66
INV(NW)=62.94
C
P P
TY
PE
'C ' S
OI
LS
TYPE 'C' SOILS
TY
PE
'C ' S
OI
LS
TY
PE
'C ' S
OI
LS
TYPE 'C' SOILS
TYPE 'C' SOILS
TYPE 'C' SOILS
TYPE 'C' SOILS
TYPE 'B' SOILS
TYPE 'B' SOILS
TYPE 'B' SOILS
TYPE 'B' SOILS
TY
PE
'B ' S
OI
LS
TY
PE
'B ' S
OI
LS
ANALYSIS POINT #2
(STORM DRAIN ST2.0)
INV. (NE) 64.56'
ANALYSIS POINT #1
(STORM DRAIN ST1.0)
INV. (N) 62.31'
TYPE 'B' SOILS
TY
PE
'B ' S
OI
LS
G 68.4'
G 67.4'
RIM 66.66'
INV. (S) 63.08'
INV. (N) 62.79'
INV. (S) 62.78'
OV
ER
LA
ND
F
LO
W L
', S
1.
1%
PIPE FLOW: D = 12", L = 151', S = 0.0019%PIPE FLOW: D = 12", L = 149', S = 0.0032%
OVERLAND FLOW
L = 101', S = 1.0%
OVERLAND FLOW
L = 56', S = 1.4%
RIM 66.61'
INV. (SW) 65.07'
PIPE FLOW: D = 12", L = 150', S = 0.0018%
INV. (NE) 64.80'
INV. (SW) 64.74'
PIPE FLOW: D = 12", L = 150', S = 0.0012%
G 67.4'
OVERFLOW FLOW
L = 65', S = 1.1%
ASPHALT TRACK
(SURFACE MILLED)
NF
THE SCHOOL BOARD OF THE CITY OF SUFFOLK
LAKELAND HIGH SCHOOL
TAX MAP NO. 33*11*H
ACCOUNT NO. 153808600
P.B. 12, P. 113 (PLAT)
D.B. 233, P. 195 (DEED)
ZONING: RLM
C-0.2
P R E D
E V E L O
P M
E N
T
D
R A I N
A G
E
A R E A
M
A P
C. HERON
C. HERON
D. RUBY
1" = 25'
SCALE 1"=25'
50'25'
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A T E
DRAWN BY
DATE
R E V I S I O
N
D
E S C R I P T I O
N
Y O
U R
V I S I O
N
A C H
I E V
R O
U G
H
O
U R S
S L a k e l a n d
H i g h
S c h o o l D
W G
S h e e t C
D
C
P
R E d w g
P l o t t e d o n
P
M b y
C a s e y
H e r o n
S
L y n n h a v e n
R o a d
S u i t e
V i r g i n i a
B e a c h
V A
T E L
X w t i m m o n s c o m
T H
I S
D
R A W
I N
G
P R E P A R
T H
E
V I R
G I N
A
F I C
E
LA
KE
LA
ND
H
IG
H
SC
HO
OL
TU
RF
F
IE
LD
C
ON
VE
RS
IO
N
CI
TY
O
F
SU
FF
OL
K, V
IR
GI
Y
NE
CK
B
OR
OU
GH
11/29/2021
49297
T h e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f
T
I M
M O
O d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r i n c l u s i v e b u t n o t l i m i t e d t o c o n s t r u c t i o n b i d d i n g a n d o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f
T
I M
M O
O
U P
11/29/2021
DRAINAGE AREA MAP LEGEND
DRAINAGE AREA DIVIDE
SOIL BOUNDARY
Tc FLOW PATH - OVERLAND
Tc FLOW PATH - THROUGH PIPES
ANALYSIS POINT
DRAINAGE
AREA
ANALYSIS
POINT
2.50 AC 76#1 (ST1.0)
IMPERVIOUS
AREA
0.89 AC
CURVE
NUMBER, CN
TIME OF
CONCENTRATION, Tc
21 MINUTES
1.27 AC 760.34 AC 22 MINUTES
DRAINAGE SYSTEM LEGEND
EXISTING STORM PIPE
EXISTING STORM MANHOLE
EXISTING YARD DRAIN
D
#2 (ST2.0)
9,252 CF
1-YEAR
VOLUME
4,700 CF
2.55 CFS
1-YEAR
PEAK FLOW
1.29 CFS
3.81 CFS
2-YEAR
PEAK FLOW
1.94 CFS
8.07 CFS
10-YEAR
PEAK FLOW
4.10 CFS
NOTE: VOLUMES AND PEAK FLOWS OBTAINED DIRECTLY FROM
HYDRAFLOW HYDROGRAPHS EXTENSION FOR AUTOCAD CIVIL 3D 2019
G A
T E
GATE
G
A
T
E
LP
LP
LP
LP
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXX
ASPHALT PATH
ASPHALT PATHASPHALT PATH
ASPHALT TRACK
(SURFACE MILLED)
ASPHALT TRACK
(SURFACE MILLED)
ASPHALT TRACK
(SURFACE MILLED)
BLEACHERS
BLEACHERS
ASPHALT
PAD
SCOREBOARD
BLEACHERS BLEACHERS
ASPHALT
ASPHALT
ASPHALT TRACK
(SURFACE MILLED)
PAINT BY OTHERS
(ELECTRIC)
TBM
TOP OF IRON ROD
ELEVATION=67.63
HOME BLEACHERS
VISITOR BLEACHERS
YD
RIM=66.73
INV(NE)=64.56
INV(SE)=64.56
P
YD
RIM=66.72
INV(SW)=64.02
INV(NW)=64.27
15" RCP
YD
RIM=65.82
UNABLE
TO OPEN
YD
RIM=66.83
INV(E)=62.41
INV(SW)=63.79
INV(W)=NOT
ACCESSIBLE
APPROXIMATE
INV=61.91
(FULL OF DEBRIS)
INV=61.91
R
C P
R
C P
YD
RIM=65.97
UNABLE
TO OPEN
YD
RIM=66.78
INV(N)=62.31
INV(SE)=62.34
INV(W)=62.21
C
P P
INV=61.70
TY
PE
'C ' S
OI
LS
TYPE 'C' SOILS
TY
PE
'C ' S
OI
LS
TY
PE
'C ' S
OI
LS
TYPE 'C' SOILS
TYPE 'C' SOILS
TYPE 'C' SOILS
TYPE 'C' SOILS
TYPE 'B' SOILS
TYPE 'B' SOILS
TYPE 'B' SOILS
TYPE 'B' SOILS
VISITOR BLEACHERS
TY
PE
'B ' S
OI
LS
TY
PE
'B ' S
OI
LS
TYPE 'B' SOILS
TY
PE
'B ' S
OI
LS
ANALYSIS POINT #1
Tc = 5 MINUTES
3.77 AC CN = 95
ASPHALT TRACK
(SURFACE MILLED)
NF
THE SCHOOL BOARD OF THE CITY OF SUFFOLK
LAKELAND HIGH SCHOOL
TAX MAP NO. 33*11*H
ACCOUNT NO. 153808600
P.B. 12, P. 113 (PLAT)
D.B. 233, P. 195 (DEED)
ZONING: RLM
ANALYSIS POINT #2
(STORM DRAIN ST2.0)
ANALYSIS POINT #1
(STORM DRAIN ST1.0)
STONE STORAGE PIT
VOLUME CONTROL FACILITY
STONE STORAGE PIT
VOLUME CONTROL FACILITY
GROUND COVER LEGEND
SYNTHETIC TURF FIELD
(IMPERVIOUS SURFACE)
SANDPIT FOR LONG/TRIPLE JUMP
(IMPERVIOUS SURFACE)
CONCRETE RUNWAY LONG/TRIPLE JUMP
(IMPERVIOUS SURFACE)
C-0.3
P O
S T D
E V E L O
P M
E N
T
D
R A I N
A G
E
A R E A
M
A P
C. HERON
C. HERON
D. RUBY
1" = 25'
SCALE 1"=25'
50'25'
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A T E
DRAWN BY
DATE
R E V I S I O
N
D
E S C R I P T I O
N
Y O
U R
V I S I O
N
A C H
I E V
R O
U G
H
O
U R S
S L a k e l a n d
H i g h
S c h o o l D
W G
S h e e t C
D
C
P
O S
T d w g
P l o t t e d o n
P
M b y
C a s e y
H e r o n
S
L y n n h a v e n
R o a d
S u i t e
V i r g i n i a
B e a c h
V A
T E L
X w t i m m o n s c o m
T H
I S
D
R A W
I N
G
P R E P A R
T H
E
V I R
G I N
A
F I C
E
LA
KE
LA
ND
H
IG
H
SC
HO
OL
TU
RF
F
IE
LD
C
ON
VE
RS
IO
N
CI
TY
O
F
SU
FF
OL
K, V
IR
GI
Y
NE
CK
B
OR
OU
GH
11/29/2021
49297
T h e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f
T
I M
M O
O d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r i n c l u s i v e b u t n o t l i m i t e d t o c o n s t r u c t i o n b i d d i n g a n d o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f
T
I M
M O
O
U P
11/29/2021
DRAINAGE AREA MAP LEGEND
DRAINAGE AREA DIVIDE
SOIL BOUNDARY
ANALYSIS POINT
DRAINAGE
AREA
ANALYSIS
POINT
3.77 AC 95#1 (ST1.0)
IMPERVIOUS
AREA
3.44 AC
[1] ANALYSIS POINT #1 (STORM DRAIN ST1.0) SERVES AS THE PRIMARY
OUTFALL FOR THIS PROJECT, AND WILL EXPERIENCE FLOW DURING ALL
STORM EVENTS. CHANNEL PROTECTION IS SATISFIED BY MEETING THE
ENERGY BALANCE EQUATION DURING THE 1-YEAR, 24-HOUR STORM, WITH
A 20% IMPROVEMENT FACTOR. FLOOD PROTECTION CRITERIA ARE
SATISFIED BY REDUCING THE 10-YEAR, 24-HOUR PEAK FLOW BELOW THE
PRE-DEVELOPMENT RATE. NO FURTHER DOWNSTREAM ANALYSES ARE
REQUIRED.
CURVE
NUMBER, CN
TIME OF
CONCENTRATION, Tc
5 MINUTES*
0.00 AC N/A0.00 AC N/A
DRAINAGE SYSTEM LEGEND
EXISTING STORM PIPE
EXISTING STORM MANHOLE
EXISTING YARD DRAIN
HDPE N-12 STORM SEWER PIPE
HDPE N-12 UNDERDRAIN
PVC STORM SEWER PIPE
ELBOWS, TEES, CROSSES, REDUCERS
OBSERVATION WELL W/ TURF BOX
CLEANOUT ON COLLECTOR PIPE
STONE STORAGE PIT VOLUME
CONTROL FACILITY (UNDERGROUND)
D
* 5-MINUTE TIME OF CONCENTRATION ASSUMED AS A WORST CASE
SCENARIO, AND TO REFLECT HIGH IMPERVIOUS PERCENTAGE.
#2 (ST2.0)
[2] ANALYSIS POINT #2 (STORM DRAIN ST2.0) SERVES AS A SECONDARY
OUTFALL FOR LARGER STORM EVENTS ONLY. IT DOES NOT EXPERIENCE
FLOW DURING THE 1-YEAR, 24-HOUR STORM BECAUSE THE WATER LEVEL
IN THE STONE STORAGE PIT DOES NOT RISE TO THE LEVEL OF THE
OVERFLOW DRAIN SHOWN ON SHEET C-6.1. DURING LARGER STORMS
(2-YEAR, 24-HOUR AND GREATER), WATER LEAVES THE STONE STORAGE
PIT THROUGH THE OVERFLOW DRAIN, WHICH IS CONNECTED TO BOTH
ST1.0 AND ST2.0. THE REPORTED PEAK DISCHARGE LEAVING THE FACILITY
IS SHARED EQUALLY BETWEEN THE TWO STORM DRAINS. CHANNEL
PROTECTION IS SATISFIED BECAUSE NO FLOW IS EXPERIENCED DURING
THE 1-YEAR, 24-HOUR STORM, THEREBY MEETING THE ENERGY BALANCE
EQUATION. FLOOD PROTECTION CRITERIA ARE SATISFIED BY REDUCING
THE 10-YEAR, 24-HOUR PEAK FLOW BELOW THE PRE-DEVELOPMENT RATE.
NO FURTHER DOWNSTREAM ANALYSES ARE REQUIRED.
31,137 CF
1-YEAR
VOLUME
0 CF
0.57 CFS
1-YEAR
PEAK FLOW
0 CFS
0.81 CFS
2-YEAR
PEAK FLOW
0.81 CFS
2.56 CFS
10-YEAR
PEAK FLOW
2.56 CFS
NOTE: VOLUMES AND PEAK FLOWS OBTAINED DIRECTLY FROM
HYDRAFLOW HYDROGRAPHS EXTENSION FOR AUTOCAD CIVIL 3D 2019
G A
T E
GATE
G
A
T
E
INV=61.91
LP
LP
LP
LP
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXX
INV=61.70
YD
RIM=66.78
INV(N)=62.31
INV(SE)=62.34
INV(W)=62.21
YD
RIM=66.73
INV(NE)=64.56
INV(SE)=64.56
YD
RIM=66.66
INV(NW)=62.94
YD
RIM=65.97
UNABLE
TO OPEN
YD
RIM=65.82
UN ABLE
TO OPEN
YD
RIM=66.83
INV(E)=62.41
INV(SW)=63.79
INV(W)=NOT
ACCESSIBLE
YD
RIM=66.83
INV(SW)=63.25
YD
RIM=66.61
INV(SW)=65.07
YD
RIM=66.72
INV(SW)=64.02
INV(NW)=64.27
YD
RIM=66.66
INV(NE)=64.80
INV(SW)=64.74
INV(W)=64.80
YD
RIM=66.66
INV(NE)=63.08
INV(S)=63.08
C
P P
P
12" CPP
12" CPP
P
YD
RIM=66.66
INV(N)=62.79
INV(E)=62.82
INV(S)=62.78
C
P P
12" CPP
12" CPP
P
15" RCP
R
C P
R
C P
APPROXIMATE
INV=61.91
(FULL OF DEBRIS)
ASPHALT PATH
ASPHALT PATHASPHALT PATH
S A
T
R U
B B
R
F A
C E
R U
B B
R
F A
C E
S A
T
ASPHALT TRACK
(SURFACE MILLED)
ASPHALT TRACK
(SURFACE MILLED)
ASPHALT TRACK
(SURFACE MILLED)
BLEACHERS
BLEACHERS
CONCRETE
PAD
ASPHALT
PAD
SCOREBOARD
BLEACHERS BLEACHERS
ASPHALT
ASPHALT
GOAL POST
GOAL POST
ASPHALT TRACK
(SURFACE MILLED)
PAINT BY OTHERS
(ELECTRIC)
TBM
TOP OF IRON ROD
ELEVATION=67.63
HOME BLEACHERS
VISITOR BLEACHERS
YD
RIM=66.81
INV(NE)=64.36
SURVEY NOTES
1. THE MERIDIAN SOURCE OF THIS SURVEY IS BASED ON THE CITY OF SUFFOLK, VIRGINIA 1997
GEODETIC GROUND CONTROL NETWORK, VIRGINIA STATE PLANE COORDINATE SYSTEM,
SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (NAD 83) / HIGH ACCURACY REFERENCE
NETWORK OF 1994 (94 HARN). COORDINATE VALUES SHOWN ARE EXPRESSED IN U.S. SURVEY
FEET. CITY OF SUFFOLK STATIONS USED: 140, 145, 147 AND 323.
2. ELEVATIONS SHOWN HEREON ARE IN FEET AND ARE REFERENCED TO THE CITY OF SUFFOLK, VIRGINIA 1997 GEODETIC GROUND CONTROL NETWORK, NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD88). CITY OF SUFFOLK STATIONS USED: 140, 145, 147 AND 323.
3. TBM 'A' IS AN IRON ROD DRIVEN FLUSH
ELEVATION = 67.63
4. THE PROPERTY SHOWN HEREON APPEARS TO FALL INSIDE ZONE X (AREAS DETERMINED TO
BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) AS SHOWN ON THE FEDERAL
EMERGENCY MANAGEMENT AGENCY (F.E.M.A.) FLOOD INSURANCE RATE MAPS (F.I.R.M.) FOR
THE CITY OF SUFFOLK, VIRGINIA, COMMUNITY PANEL NO 510156 0210 D, MAP REVISED:
NOVEMBER 16, 2011. FLOOD ZONE DETERMINATION IS BASED ON F.I.R.M. AND DOES NOT
IMPLY THAT THIS PROPERTY WILL OR WILL NOT BE FREE FROM FLOODING OR DAMAGE.
CONTACT THE LOCAL COMMUNITY FLOOD OFFICIAL TO CONFIRM THE ABOVE INFORMATION.
FLOOD ZONE INFORMATION WAS SCALED FROM F.E.M.A. F.I.R.M. TIMMONS GROUP IS NOT A
PARTY IN DETERMINING THE REQUIREMENTS FOR FLOOD INSURANCE ON THE PROPERTY
SHOWN HEREON.
5. THIS SURVEY DOES NOT GUARANTEE THE EXISTENCE, SIZE OR HORIZONTAL LOCATION OF
ANY UNDERGROUND UTILITIES. THE UNDERGROUND UTILITIES SHOWN ON THIS SURVEY, IF
ANY, WERE ESTABLISHED USING ABOVE GROUND STRUCTURES (VALVES, MANHOLES, ETC.).
NO GUARANTEE IS MADE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH
UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. ACCURACY OF THE UTILITY
INFORMATION SHOWN CANNOT BE GUARANTEED, AND ALL UNDERGROUND UTILITY
LOCATIONS SHOWN HEREON SHOULD BE CONSIDERED APPROXIMATE. CONTRACTOR MUST
VERIFY ALL UTILITIES PRIOR TO CONSTRUCTION.
S
CHAIN LINK FENCE
CENTERLINE SWALE
CORRUGATED METAL PIPE
CORRUGATED PLASTIC PIPE
CONCRETE
DUCTILE IRON PIPE
ELEVATION
EDGE OF PAVEMENT ELEVATION
FINISHED FLOOR ELEVATION
FLAG POLE
INVERT
IRRIGATION VALVE
OVERHEAD UTILITY LINE
POWER POLE
REINFORCED CONCRETE PIPE
SANITARY CLEAN OUT
TOP OF BANK
TOE OF SLOPE
UNDERGROUND POWER LINE
UTILITY VAULT
YARD DRAIN
CLF
CLS
CMP
CPP
CONC
DIP
ELEV
EP
FFE
FP
INV
IV
OHU
PP
RCP
SCO
TOB
TOS
UGP
UV
YD
ABBREVIATIONS
UTILITY VALVE
UTILITY POLE
CLEANOUT
BUMPER POST / BOLLARD
LIGHT POLE
EDGE OF PAVEMENT
SWALE CENTERLINE
FENCE LINEX
ELECTRICAL BOX
EDGE OF GRAVEL
BUILDING
OVERHEAD UTILITY LINE
OHU
UNDERGROUND POWER
UGP
STORM PIPE
UNDERGROUND WATER
W
SURVEY LEGEND
UGP
OHU
W
X
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
D A T E
DRAWN BY
DATE
R E V I S I O
N
D
E S C R I P T I O
N
Y O
U R
V I S I O
N
A C H
I E V
R O
U G
H
O
U R S
T h e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f
T
I M
M O
O d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t a n d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r i n c l u s i v e b u t n o t l i m i t e d t o c o n s t r u c t i o n b i d d i n g a n d o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f
T
I M
M O
O
U P
S L a k e l a n d
H i g h
S c h o o l D
W G
X
P T
O P
O d w g
P l o t t e d o n
P
M b y
C a s e y
H e r o n
1 " = 25'
SCALE 1"=25'
50'25'
C-1.0
E X I S T I N
G
C O
N D
I T I O
N S
S U
R V E Y
W. LEWIS
T. FRENCH
TU
RF
F
IE
LD
C
ON
VE
RS
IO
N
LA
KE
LA
ND
H
IG
H
SC
HO
OL
CI
TY
O
F
SU
FF
OL
K, V
IR
GI
Y
NE
CK
B
OR
OU
GH
08/26/2021
49297
S
L y n n h a v e n
R o a d
S u i t e
V i r g i n i a
B e a c h
V A
T E L
X w t i m m o n s c o m
T H
I S
D
R A W
I N
G
P R E P A R
T H
E
V I R
G I N
A
F I C
E
NOTE: AT THE TIME OF SURVEY, THE
RUNNING TRACK AND HIGH JUMP PAD
WERE BEING RESURFACED. THE SPOT
ELEVATIONS ON THE RUNNING TRACK REFER TO
THE TOP OF THE MILLED SURFACE. THE TRACK
AND HIGH JUMP ARE EXPECTED TO RECEIVE A
2" ASPHALT TOP COURSE AND 1/2" RUBBER
SURFACE PRIOR TO NOVEMBER 1, 2021.
NF
THE SCHOOL BOARD OF THE CITY OF SUFFOLK
LAKELAND HIGH SCHOOL
TAX MAP NO. 33*11*H
ACCOUNT NO. 153808600
P.B. 12, P. 113 (PLAT)
D.B. 233, P. 195 (DEED)
ZONING: RLM
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DESCRIPTION
THIS PROJECT PROPOSES IMPROVEMENTS TO THE EXISTING ATHLETIC FACILITIES AT LAKELAND HIGH SCHOOL, LOCATED AT 214 KENYON ROAD IN SUFFOLK, VIRGINIA. SPECIFICALLY, THE PROJECT WILL CONVERT THE EXISTING GRASS FOOTBALL FIELD TO A SYNTHETIC TURF FIELD; REPLACE THE LONG AND TRIPLE JUMP EVENTS; AND REPLACE THE FOOTBALL GOAL POSTS. THE EXISTING RUNNING TRACK AND HIGH JUMP PAD WERE RECENTLY MILLED AND OVERLAID AND RECEIVED NEW RUBBER SURFACING. IT IS CRITICAL THAT THE TURF FIELD CONTRACTOR PROTECTS THE NEW RUBBER SURFACE DURING CONSTRUCTION.
THE SYNTHETIC TURF FIELD WILL INCLUDE A STONE STORAGE LAYER UNDER THE ENTIRE FOOTPRINT OF THE FIELD, AS WELL AS A DEEPER STONE STORAGE PIT FOR MANAGING STORMWATER QUANTITY. THE TURF FIELD, WHILE CONSIDERED AN IMPERVIOUS SURFACE, WILL ALSO FUNCTION AS A PERMEABLE PAVEMENT
SYSTEM (DESIGN LEVEL 1) FOR ADDRESSING STORMWATER QUALITY CRITERIA.
THE SUBJECT PROPERTY IS ZONED RLM (RESIDENTIAL LOW-MEDIUM DISTRICT) WHICH PERMITS PUBLIC SCHOOL USAGES BY-RIGHT. THE PROPERTY IS APPROXIMATELY 69.49 ACRES, OF WHICH 4.03 ACRES WILL BE DISTURBED. CONSTRUCTION ACTIVITIES ARE NOT ANTICIPATED NOR PROPOSED IN THE PUBLIC RIGHT-OF-WAY OR ADJACENT PRIVATE PROPERTIES. CONSTRUCTION IS EXPECTED TO BEGIN IN NOVEMBER
2021 AND LAST APPROXIMATELY FIVE MONTHS.
ADJACENT AREAS
THE PROPERTY IS BOUNDED BY UNDEVELOPED LAND TO THE NORTH AND WEST, AND SINGLE-FAMILY RESIDENTIAL HOMES TO THE EAST AND SOUTH. KENYON ROAD IS LOCATED TO THE EAST OF THE SCHOOL
ON THE OTHER SIDE OF THE SINGLE-FAMILY HOMES.
EXISTING CONDITIONS
THE SUBJECT PROPERTY CURRENTLY CONSISTS OF THE HIGH SCHOOL BUILDING, ASPHALT PARKING LOTS, TENNIS COURTS, AND GRASS FIELDS FOR FOOTBALL, BASEBALL, SOFTBALL, AND FIELD HOCKEY. THE SCHOOL BUILDING, TENNIS COURTS, AND PARKING LOTS ARE SITUATED ON THE EASTERN SIDE OF THE PROPERTY WHEREAS THE SPORTS FIELDS AND TRACK ARE LOCATED ON THE WEST SIDE BEHIND THE SCHOOL. THE FOOTBALL FIELD IS LOCATED IN THE NORTHWEST CORNER OF THE SITE ADJACENT TO THE UNDEVELOPED (WOODED) PROPERTY. ELEVATIONS WITHIN THE PROJECT AREA RANGE FROM 66 TO 69 (NAVD88) WITH SLOPES GENERALLY RANGING BETWEEN 1% AND 3%. THE SITE IS LOCATED WITHIN FEMA FLOOD ZONE 'X' (UNSHADED) OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN PER FLOOD INSURANCE
RATE MAP (FIRM) 5101560210D, EFFECTIVE 11/16/2011.
THE EXISTING FOOTBALL FIELD IS SURROUNDED BY A DEEP NATURAL DITCH THAT ABUTS THE WESTERN AND NORTHERN PROPERTY LINES. DRAINAGE FROM THE FIELD IS CURRENTLY HANDLED BY TWO SEPARATE STORM SEWER SYSTEMS, BOTH OF WHICH OUTFALL TO THE DITCH. THE SYSTEM TO THE WEST CONSISTS OF FIVE YARD DRAINS, INCLUDING ST1.0 IN THE SOUTHWEST CORNER, AND RECEIVES APPROXIMATELY 2.50 ACRES OF DRAINAGE. THE SYSTEM TO THE EAST CONSISTS OF THREE YARD DRAINS, INCLUDING ST2.0 IN THE SOUTHEAST CORNER, AND RECEIVES APPROXIMATELY 1.27 ACRES OF DRAINAGE. THE WESTERN SYSTEM IS APPROXIMATELY 2-FEET DEEPER THAN THE EASTERN SYSTEM. DRAINAGE FROM THE PROJECT SITE IS CONVEYED THROUGH THE DITCH TO THE SPEIGHTS RUN RESERVOIR, WHICH CONNECTS TO LAKE
KILBY AND THE NANSEMOND RIVER, AND ULTIMATELY TO THE CHESAPEAKE BAY.
OFFSITE AREAS
CONSTRUCTION ACTIVITIES WILL BE LIMITED TO THE SUBJECT PROPERTY. CONSTRUCTION ACTIVITIES ARE NOT ANTICIPATED NOR PROPOSED IN THE PUBLIC RIGHT-OF-WAY OR ADJACENT PRIVATE PROPERTIES. ANY MATERIALS THAT ARE DISPOSED OFFSITE SHALL BE TRANSPORTED IN A LAWFUL AND SAFE MANNER, AND DELIVERED TO A CONTROLLED FACILITY IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL
REGULATIONS.
SOIL PROPERTIES
TIMMONS GROUP ENVIRONMENTAL SCIENTISTS PERFORMED A SOILS AND GROUNDWATER INVESTIGATION TO BENEFIT THIS PROJECT. FOUR SHALLOW BORINGS WERE DRILLED WITHIN THE EXISTING FOOTBALL FIELD TO EVALUATE THE PRESENCE OF A SEASONAL-HIGH GROUNDWATER TABLE OR RESTRICTIVE SOIL LAYERS.
THE INVESTIGATION SHOWED EVIDENCE OF THE SEASONAL-HIGH GROUNDWATER TABLE AT
APPROXIMATELY 2-FEET BELOW EXISTING GRADE, CORRESPONDING TO AN AVERAGE ELEVATION OF 65.4. IN ADDITION, THE STUDY SHOWED THAT THE SOILS ARE MODERATELY WELL-DRAINED WITH HYDROLOGIC SOIL
GROUPS (HSG) RANGING FROM “B” TO “C”.
ACCORDING TO THE “WEB SOIL SURVEY” PROVIDED BY THE NATURAL RESOURCE CONSERVATION SERVICE
(NRCS), THE EXISTING SITE HAS THE FOLLOWING SOIL CHARACTERISTICS:
MAP UNIT: 8A | EUNOLA LOAMY FINE SAND | 0 TO 2 PERCENT SLOPES | HSG C
MAP UNIT: 8B | EUNOLA LOAMY FINE SAND | 2 TO 6 PERCENT SLOPES | HSG C
MAP UNIT: 14 | LYNCHBURG FINE SANDY LOAM | | HSG B
MAP UNIT: 22B | SUFFOLK LOAMY SAND | 2 TO 6 PERCENT SLOPES | HSG B
CRITICAL AREAS
THIS PROJECT DOES NOT IMPACT ANY KNOWN CRITICAL AREAS.
STORMWATER CONSIDERATIONS
THIS PROJECT WILL REPLACE THE EXISTING GRASS FOOTBALL FIELD WITH A SYNTHETIC TURF FIELD. THE TURF FIELD IS CONSIDERED IMPERVIOUS FOR BOTH STORMWATER QUANTITY AND QUALITY PURPOSES.
THE TURF FIELD FUNCTIONS AS A STORMWATER MANAGEMENT FACILITY AND WILL CONTAIN A 6-INCH THICK STONE STORAGE LAYER ACROSS THE ENTIRE FOOTPRINT. IN ADDITION, A DEEP STONE STORAGE PIT WILL BE INSTALLED UNDER THE MIDDLE OF THE FIELD TO PROVIDE NEARLY 30,000 CF OF EXTRA STORAGE. THE STONE UNDER THE FIELD WILL BE INTERCONNECTED WITH THE STORAGE PIT TO FUNCTION TOGETHER AS ONE LARGE UNDERGROUND DETENTION SYSTEM. A NETWORK OF PERIMETER COLLECTOR DRAINS AND FLAT PANEL DRAINS WILL BE USED TO DIRECT THE WATER UNDER THE FIELD TO THE STONE STORAGE PIT.
THE STONE STORAGE PIT WILL CONTAIN A 10” UNDERDRAIN AT THE BASE OF THE FACILITY, WHICH REDUCES TO A 4” SCHEDULE 80 PVC PIPE (INTERNAL DIAMETER = 3.83”) TO SERVE AS THE LOW-FLOW ORIFICE. IT WILL ALSO CONTAIN A 10” OVERFLOW DRAIN APPROXIMATELY 2.6-FEET ABOVE THE BOTTOM. THE UNDERDRAIN CONNECTS TO STORM STRUCTURE ST1.0 IN THE SOUTHWEST CORNER OF THE FIELD SINCE THAT
STRUCTURE IS DEEPEST. THE OVERFLOW DRAIN CONNECTS TO BOTH ST1.0 AND ST2.0.
CHANNEL PROTECTION CRITERIA
ANALYSIS POINT #1 (STORM DRAIN ST1.0): CHANNEL PROTECTION CRITERIA ARE SATISFIED BY MEANS OF THE ENERGY BALANCE EQUATION USING A 1-YEAR, 24-HOUR STORM FOR COMPARISON PURPOSES AND A 20% IMPROVEMENT FACTOR. THE STONE STORAGE PIT AND 4” LOW FLOW ORIFICE FUNCTION TOGETHER TO
MINIMIZE THE FLOW RATE DURING THIS STORM EVENT AND SATISFY THE EQUATION.
ANALYSIS POINT #2 (STORM DRAIN ST2.0): THIS STRUCTURE DOES NOT EXPERIENCE FLOWS DURING THE 1-YEAR, 24-HOUR STORM BECAUSE THE WATER LEVEL IN THE STONE STORAGE PIT DOES NOT RISE TO THE LEVEL OF THE OVERFLOW DRAIN (WATER LEVEL = 64.85, OVERFLOW DRAIN INVERT = 64.90). CHANNEL PROTECTION CRITERIA ARE SATISFIED BECAUSE NO FLOW IS EXPERIENCED, THEREBY MEETING THE
ENERGY BALANCE EQUATION.
FLOOD PROTECTION CRITERIA
FLOOD PROTECTION CRITERIA ARE SATISFIED BY REDUCING THE PEAK FLOW DURING THE 10-YEAR, 24-HOUR STORM TO LESS THAN THE PRE-DEVELOPMENT RATE. DURING THIS STORM, FLOWS ARE CONVEYED TO BOTH STRUCTURES ST1.0 AND ST2.0 THROUGH THE 10” OVERFLOW DRAIN. IT IS ASSUMED THAT THE TOTAL REPORTED OUTFLOW IS SHARED EQUALLY BETWEEN THE TWO STORM DRAINS. EACH STRUCTURE RECEIVES HALF OF THE TOTAL PEAK FLOW, WHICH IS SIGNIFICANTLY LESS THAN THEIR
RESPECTIVE PRE-DEVELOPMENT FLOW RATES.
STORMWATER QUALITY
THE PROPOSED TURF FIELD IS CONSIDERED IMPERVIOUS FOR STORMWATER QUALITY PURPOSES, BUT THE FIELD IS ALSO CONSIDERED A “PERMEABLE PAVEMENT” SYSTEM (DESIGN LEVEL 1) AND EARNS POLLUTANT REMOVAL CREDIT.