This is a comprehensive set of engineering plans and specifications prepared by the Ohio Department of Transportation (ODOT) for Project PER-345-06.48, a bridge replacement and roadway improvement project in Perry County, Ohio on State Route 345. The project involves the superstructure replacement of an existing prestressed concrete box beam bridge over Buckeye Fork, including deck replacement and guardrail installation, along with roadway resurfacing and shoulder reconstruction across approximately 1,051.74 linear feet from station 376+00.00 to station 380+50.00. Key construction items include clearing and grubbing, pavement removal (22,900 square yards), excavation and embankment work, full-depth asphalt pavement replacement, installation of new prestressed concrete composite box beams (8 beams, each 53 feet-3 inches long), reinforced concrete approach slabs (12-inch thickness), installation of MGS-type guardrail with anchor assemblies and bridge terminal assemblies, and comprehensive erosion control and traffic control measures. The design includes maintenance of traffic with state and local detour routes, portable changeable message signs, and road closure procedures with incentive/disincentive provisions for the contractor to minimize project duration between 30 to 45 days maximum. The earthwork calculations indicate a total of 579 square yards of seeding and mulching, 229 cubic yards of cut, 202 cubic yards of fill, and 113 cubic yards of pavement removal across the project limits.
The project is located in Clayton Township, Perry County, with design parameters including a 2046 design year ADT of 2,900 vehicles (2026 current ADT of 2,300), a design speed of 55 miles per hour, and classification as a Major Collector road. The bridge design conforms to AASHTO LRFD Bridge Design Specifications with HL-93 vehicular live loading and accommodates 60 pounds per square foot of future wearing surface. The plans indicate the structure will be constructed on capped pile (drilled shaft) abutments with composite prestressed concrete box beams featuring a monolithic concrete deck with 1-inch wearing surface at ends and 4-inch surface at mid-span. Utilities located within the project area include water lines, electric and telephone services operated by Northern Perry Water, Crooksville Water, American Electric Power, Columbia Gas of Ohio, and AT&T Ohio. The project requires coordination with a concurrent pavementaintenance project on SR 669 and anticipates concurrent bridge rehabilitation work on a separate ODOT project; the contractor must maintain at least one lane of traffic in each direction on SR 345 during construction except during specified closure periods. Design and construction specifications follow the 2023 ODOT Construction and Material Specifications (Specification 800, Version 800-2023) and applicable supplemental specifications, with referenced standard bridge drawings for components such as prestressed box beams, approach slabs, diaphragms, and bridge railings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 456-26.pdf | ||
| 456pricing.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T u rk e y
R u n
Butch erkni fe
Cre ek
Bu cke ye
For k
BurleyRun
McLun ey
C e n te r
B r
R u s h
C r
CLAYTON
HARRISON
Cannon
Rehoboth
Clover
Hill
Wesley io So ut he rn
STAGE 2 COMPLETE
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w
.b e n tl e y .c o m
:o h io d o t-p w
-0 \D o c u m e n ts
\0 A c ti v e P ro je c ts
\D is tr ic t \P e rr y \1
\4
-E n g in e e ri n g \R o a d w a y \S h e e ts
\1 G
T .d g n
M O
D E
L
S h e e t_
S u rv F t P
A P
E R
S
IZ
E x in
D
A T
E
/2
/2
IM
E
:0
:2
P M
L T
D R
V
O H
D O
T
P D
F .p lt c fg
E N
T B
L
O H
D O
T
U T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g o v
W O
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
R
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.1
T
IT
IL
E
S H
E E
T
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
Jason L. Sturgeon, P.E.
Pamela Boratyn
S.L.M. 6.51
STA. 379+00.00
END PROJECT
A-1-20 1/21/22
AS-1-15 1/20/23
AS-2-15 7/21/23
BD-1-11 7/20/18
DS-1-92 7/15/22
MT-101.60 1/17/25
MT-101.90 7/17/20
PSBD-1-25 1/16/26
TST-2-21 1/17/25
800-2023 7/18/25 ASBESTOS
SURVEY
REPORT
DATED:10/30/2025
NLATITUDE: 39°47'20.1" LONGITUDE: -82°09'33.6"
PORTION TO BE IMPROVED
INTERSTATE HIGHWAY
COUNTY & TOWNSHIP ROADS
OTHER ROADS
CURRENT ADT (2026)
DESIGN YEAR ADT (2046)
DESIGN HOURLY VOLUME (2046)
DIRECTIONAL DISTRIBUTION
TRUCKS (24 HOUR B&C)
DESIGN SPEED
LEGAL SPEED
DESIGN FUNCTIONAL CLASSIFICATION:
MAJOR COLLECTOR
NHS PROJECT
2,300
2,900
55%
8%
55 MPH
55 MPH
NO
FEDERAL ROUTES
STATE ROUTES
LOCATION MAP
DESIGN DESIGNATION
DESIGN EXCEPTIONS
INDEX OF SHEETS:
TITLE SHEET 1
SCHEMATIC PLAN 2
TYPICAL SECTIONS 3-4
GENERAL NOTES 5-6
MAINTENANCE OF TRAFFIC 7-9
GENERAL SUMMARY 10
CALCULATIONS 11
PLAN AND PROFILE 12-14
CROSS SECTIONS 15-22
EARTHWORK CALCULATIONS 23
STRUCTURES OVER 20 FT.
SFN 6402666
SITE PLAN 24
GENERAL PLAN 25
BRIDGE NOTES 26
BRIDGE SUMMARY 27
ABUTMENT REMOVAL DETAILS 28
PROPOSED ABUTMENT DETAILS 29-30
PROPOSED DIAPHRAGM DETAILS 31-32
TRANSVERSE SECTIONS 33
FRAMING PLAN DETAILS 34-35
BEAM DETAILS 36-37
DECK PLAN 38
APPROACH SLAB DETAILS 39
REINFORCING SCHEDULE 40
PER SR 345 6.48
PERRY COUNTY
CLAYTON TOWNSHIP
N/A
ADA DESIGN WAIVERS
STANDARD CONSTRUCTION DRAWINGS
SUPPLEMENTAL
SPECIFICATIONS
SPECIAL
PROVISIONS
PLAN PREPARED BY:
Before You Dig
Contact Two Working Days
OHIO811, 8-1-1, or 1-800-362-2764
UNDERGROUND UTILITIES
PROJECT EARTH DISTURBED AREA: 0.11 ACRES
0.52 ACRES
N/A (NOI NOT REQUIRED)
SUPERSTRUCTURE REPLACEMENT OF PRESTRESSED CONCRETE BOX BEAMS,
DECK, AND GUARDRAIL WITH SUBSTRUCTURE REPLACEMENT DOWN
TO ABUTMENT BEAM SEATS
PROJECT DESCRIPTION
LIMITED ACCESS
ESTIMATED CONTRACTOR EARTH DISTURBED AREA:
THIS IMPROVEMENT IS ESPECIALLY DESIGNED FOR THROUGH TRAFFIC AND
HAS BEEN DECLARED A LIMITED ACCESS HIGHWAY OR FREEWAY BY ACTION
OF THE DIRECTOR IN ACCORDANCE WITH THE PROVISIONS OF SECTION
5511.02 OF THE OHIO REVISED CODE.
THE STANDARD SPECIFICATIONS OF THE STATE OF OHIO, DEPARTMENT OF
TRANSPORTATION, INCLUDING SUPPLEMENTAL SPECIFICATIONS LISTED IN
2023 SPECIFICATIONS
SPECIFICATION 800 VERSION INDICATED ON THE PROPOSAL SHALL GOVERN
THE PLANS, CHANGES LISTED IN THE PROPOSAL, AND THE SUPPLEMENTAL
THIS IMPROVEMENT.
EARTH DISTURBED AREAS
NOTICE OF INTENT EARTH DISTURBED AREA:
FEDERAL PROJECT NUMBER
E(251)076
RAILROAD INVOLVEMENT
NONEDEPARTMENT OF TRANSPORTATION
STATE OF OHIO
District Deputy Director
MT-105.10 1/17/20
TC-42.20 10/18/13
TC-52.10 10/18/13
TC-52.20 1/15/21
WATERWAY
PERMITS
CONDITIONS
DATED:01/23/2026
S.L.M. 6.48
STA. 377+50.00
BEGIN PROJECT
http://www.dot.state.oh.us/Divisions/Engineering/Structures/standard/Bridges/Pages/StandardBridgeDrawings.aspx http://www.dot.state.oh.us/Divisions/Engineering/Structures/standard/Bridges/Pages/StandardBridgeDrawings.aspx http://www.dot.state.oh.us/Divisions/Engineering/Structures/standard/Bridges/Pages/StandardBridgeDrawings.aspx http://www.dot.state.oh.us/Divisions/Engineering/Structures/standard/Bridges/Pages/StandardBridgeDrawings.aspx http://www.dot.state.oh.us/Divisions/Engineering/Structures/standard/Bridges/Pages/StandardBridgeDrawings.aspx http://www.dot.state.oh.us/Divisions/Engineering/Roadway/DesignStandards/traffic/SCD/Pages/CurrentMaintainingTraffic(MT)SCDs.aspx http://www.dot.state.oh.us/Divisions/Engineering/Roadway/DesignStandards/traffic/SCD/Pages/CurrentMaintainingTraffic(MT)SCDs.aspx http://www.dot.state.oh.us/Divisions/Engineering/Structures/standard/Bridges/Pages/StandardBridgeDrawings.aspx http://www.dot.state.oh.us/Divisions/Engineering/Structures/standard/Bridges/Pages/StandardBridgeDrawings.aspx https://www.dot.state.oh.us/Divisions/ConstructionMgt/Pages/ProposalNotesSupplementalSpecificationsandSupplements.aspx http://www.dot.state.oh.us/Divisions/Engineering/Roadway/DesignStandards/traffic/SCD/Pages/CurrentMaintainingTraffic(MT)SCDs.aspx http://www.dot.state.oh.us/Divisions/Engineering/Roadway/DesignStandards/traffic/SCD/Pages/CurrentTrafficControl(TC)SCDs.aspx http://www.dot.state.oh.us/Divisions/Engineering/Roadway/DesignStandards/traffic/SCD/Pages/CurrentTrafficControl(TC)SCDs.aspx http://www.dot.state.oh.us/Divisions/Engineering/Roadway/DesignStandards/traffic/SCD/Pages/CurrentTrafficControl(TC)SCDs.aspx tgreenwa Text Box
N17°37'40"E
.3
S
T A
P T
4.83'E =
332.5'L =
166.44'T =
2,864.79'R =
02°00'00"Dc =
06°39'00" RTΔ =
373+29.30P.I. = STA.
CURVE DATA
374 375 376 377 378 379 380 381 3821,051.74'
M O
D E
L
C L
X
S R
P la n
S h e e t]
P
E R
S
IZ
E x2
T E
/2 /2
E
:0
:3
T D
R V
O
H D
O T
P
D F
.p ltc
N T
B L
O
H D
O T
U
T P e n
.t b l U
S E
R
E ri c.
Jo h n so n d o t.
o h io
.g o v W
O R
K S
P A
C E
O
H D
O T
C E v0
R
K S
E T
O D
U C
T
O p e n
R o a d sD e si g n e r
.0
.0
.2
N
S C
A L E
I N
F E
E T
H O
R
IZ
O N
T A
L
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.2
S C
H E
M A
T
IC
P L
A N
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
DO NOT DISTURB
WETLANDS
STA. 375+75.00
BEGIN WORK
S.L.M. 6.51
STA. 379+00.00
END PROJECT
STA. 380+75.00
END WORK
S.L.M. 6.48
STA. 377+50.00
BEGIN PROJECT
PER-345-06.489
BRIDGE NO.
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w
.b e n tl e y .c o m
:o h io d o t-p w
-0 \D o c u m e n ts
\0 A c ti v e P ro je c ts
\D is tr ic t \P e rr y \1
\4
-E n g in e e ri n g \R o a d w a y \S h e e ts
\1 G
Y .d g n
M O
D E
L
E x is ti n g T y p ic a l
S e c ti o n s
P
A P
E R
S
IZ
E x
T
E
/2
/2
T
IM
E
:0
:4
P
M
P
L T
D R
V
O H
D O
T P
D F
.p lt
N
T B
L
O H
D O
T U
T P e n .t b l
U S
E R
E ri c .J o h n s o n d o t.
o h io
.g o v
W
O R
K S
P A
C E
O
H D
O T
C E v
W
O R
K S
E T
P
R O
D U
C T
O p e n R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.3
E X
IS
T
IN
G
T Y
P
IC
A L
S E
C T
IO
N
S
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
ROUNDING
4'±
3'-6"±3'-0"±9'-0"±9'-0"±3'-0"±3'-6"±ROUNDING
4'±
2'-6"±9'-6"±9'-6"±2'-6"±
ROUNDING
4'±
7'-0"±9'-0"±9'-0"±7'-0"±ROUNDING
4'±
EXISTING TYPICAL SECTION
EXISTING APPROACH SLAB SECTION
STA. 378+69.95 TO STA. 380+50.00
STA. 376+00.00 TO STA. 377+73.64
STA. 378+49.95 TO STA. 378+69.95
STA. 377+73.64 TO STA. 377+93.64
A
B
C
D
EXISTING BITUMINOUS ASPHALT MATERIAL (6"±)
EXISTING BITUMINOUS SHOULDER MATERIAL (8"±)
EXISTING SUBBASE (6"±)
EXISTING APPROACH SLAB (13"±)
LEGEND
B A C
AD
2:1 (M
AX)2:1
(M
AX)
2:1 (M
AX)2:1
(M
AX)
0.0160.016
0.016 0.016
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w
.b e n tl e y .c o m
:o h io d o t-p w
-0 \D o c u m e n ts
\0 A c ti v e P ro je c ts
\D is tr ic t \P e rr y \1
\4
-E n g in e e ri n g \R o a d w a y \S h e e ts
\1 G
Y .d g n
M O
D E
L
P ro p o s e d T y p ic a l
S e c ti o n s
P
A P
E R
S
IZ
E x
T
E
/2
/2
T
IM
E
:0
:4
P
M
P
L T
D R
V
O H
D O
T P
D F
.p lt
N
T B
L
O H
D O
T U
T P e n .t b l
U S
E R
E ri c .J o h n s o n d o t.
o h io
.g o v
W
O R
K S
P A
C E
O
H D
O T
C E v
W
O R
K S
E T
P
R O
D U
C T
O p e n R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.4
P R
O P
O S
E D
T Y
P
IC
A L
S E
C T
IO
N
S
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
6'-0"5'-0"11'-0"11'-0"5'-0"6'-0"
2:1 (M
AX)
M
AT
CH
EXIS
TIN
G 2:1 (M
AX) M
ATCH EXISTING
PROPOSED TYPICAL SECTION (FULL DEPTH)
STA. 378+64.95 TO STA. 379+00.00
STA. 377+50.00 TO STA. 377+78.64
" ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG70-224
ITEM 441 - 1
" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448)4
ITEM 441 - 1
PROPOSED APPROACH SLAB (12" THICKNESS)
ITEM 304 - 6" AGGREGATE BASE
LEGEND
ITEM 204 - SUBGRADE COMPACTION
ITEM 407 - NON-TRACKING TACK COAT
ITEM 606 - GUARDRAIL, TYPE MGS
ITEM 203 - EMBANKMENT
ITEM 659 - SEEDING AND MULCHING
2 3 4 6 6 598 8 97 7
0.0160.016 0.040.04
0.08 0.08
PROPOSED TYPICAL SECTION (SHOULDER RECONSTRUCTION)
STA. 379+00.00 TO STA. 380+25.00
STA. 376+25.00 TO STA. 377+50.00
PROPOSED TYPICAL SECTION (RESURFACING)
STA. 380+25.00 TO STA. 380+50.00
STA. 376+00.00 TO STA. 376+25.00
1 2 67
0.08
0.04
0.016 0.016
0.04
0.08
8 97
2:1 (M
AX) M
ATCH EXISTING
2:1 (M
AX)
M
AT
CH
EXIS
TIN
G
1 2 67
0.08
0.04
0.016 0.016
0.04
0.08
8 97
2:1 (M
AX) M
ATCH EXISTING
2:1 (M
AX)
M
AT
CH
EXIS
TIN
G
6'-0"5'-0"11'-0"11'-0"5'-0"6'-0"
6'-0"5'-0"11'-0"11'-0"5'-0"6'-0"
3 4
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w .b e n tl e y
.c o m :o h io d o t-p w -0
\D o c u m e n ts \0
A c ti v e P ro je c ts
\D is tr ic t
\P e rr y \1
\4
-E n g in e e ri n g
\R o a d w a y
\S h e e ts
\1
G
N
.d g n
M O
D E
L
S h e e t_
S u rv F t P
A P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:4
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
U T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.5
G E
N E
R A
L N
O T
E S
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
CONSTRUCTION NOTIFICATION
MENTIONED ITEMS, VIA MEDIA SOURCES.
AND BUSINESSES, AND ANY OTHER IMPACTED LOCAL PUBLIC AGENCY OF ANY OF THE ABOVE
THE PIO WILL, IN TURN, NOTIFY THE PUBLIC, THE LOCAL EMERGENCY SERVICES, AFFECTED SCHOOLS
OR EMAIL AT:
CENTRAL OFFICE SPECIAL HAUL PERMITS SECTION BY FAX AT (614) 728-4099
OR EMAIL AT:
DISTRICT PERMIT SECTION BY FAX AT (614) 887-4525
OR EMAIL AT:
DISTRICT PUBLIC INFORMATION OFFICER (PIO) BY FAX AT (614) 887-4510
TO THE FOLLOWING:
CLOSURES, AND/OR ROAD CLOSURES. THE PROJECT ENGINEER WILL FORWARD THIS INFORMATION
PRIOR TO THE FOLLOWING: THE START OF CONSTRUCTION ACTIVITIES, LANE RESTRICTIONS, LANE
THE CONTRACTOR WILL ADVISE THE PROJECT ENGINEER A MINUMUM OF TWENTY-ONE (21) DAYS hauling.permits@dot.state.oh.us brian.bosch@dot.state.oh.us
D05.PIO@dot.state.oh.us
UTILITY OWNERSHIP
REQUIRED BY SECTION 153.64 O.R.C.
THE LOCATION OF THE UTILITIES SHOWN ON THE PLANS ARE AS OBTAINED FROM THE OWNERS AS npcw@perrycountyohio.net
740-342-1065
NEW LEXINGTON, OHIO 43764
130 S MAIN STREET
NORTHERN PERRY WATER
waterservice@crooksville.com administrator@crooksville.com
740-982-2656
ATTN: TOM COLLINS
CROOKSVILLE, OHIO 43731
22 CHINA STREET
CROOKSVILLE WATER
cmsaunders@aep.com
740-985-3054
ATTN: CLARKE SAUNDERS
REEDSVILLE, OHIO 45772
38831 STATE ROUTE 7
AMERICAN ELECTRIC POWER CO. (DISTRIBUTION)
WITH THEIR RESPECTIVE OWNERS:
LISTED BELOW ARE ALL UTILITIES LOCATED WITHIN THE PROJECT CONSTRUCTION LIMITS TOGETHER
INCORPORATED INTO THE FINAL CHANGE ORDER GOVERNING COMPLETION OF THIS PROJECT.
ENGINEER. THE ACTUAL WORK LOCATIONS AND QUANTITIES USED FOR SUCH ITEMS SHALL BE
BY PLAN NOTE TO BE USED "AS DIRECTED BY THE ENGINEER" UNLESS AUTHORIZED BY THE
THE CONTRACTOR SHALL NOT ORDER MATERIALS OR PERFORM WORK FOR ITEMS DESIGNATED
CONTINGENCY QUANTITIES
MOBILIZATION
PRICE FOR ITEM 624, MOBILIZATION.
2023 CONSTRUCTION AND MATERIAL SPECIFICATIONS. PAYMENT SHALL BE THE LUMP SUM BID
AN AMOUNT TO COVER ANY APPLICABLE EXPENDITURES REFERRED TO UNDER ITEM 624 OF THE
THE CONTRACTOR SHALL ON ANY CONTRACT FOR WHICH HIS BID EXCEEEDS $50,000.00 INCLUDE
MPaulus@nisource.com
740-466-5131
ATTN: Michael Paulus
ZANESVILLE, OHIO 43701
2429 LINDEN AVENUE
COLUMBIA GAS OF OHIO
FOR ITEM 201, CLEARING AND GRUBBING.
UNDER THIS ITEM ARE INCLUDED IN THE LUMP SUM PRICE BID
ITEM 201 - CLEARING AND GRUBBING. ALL PROVISIONS AS SET FORTH IN THE SPECIFICATIONS
LIMITS OF THE PROJECT, A LUMP SUM QUANTITY IS INCLUDED IN THE GENERAL SUMMARY FOR
ALTHOUGH THERE ARE NO TREES OR STUMPS SPECIFICALLY MARKED FOR REMOVAL WITHIN THE
CLEARING AND GRUBBING
WORK LIMITS
CONTROL DEVICES REQUIRED BY THESE PLANS WHETHER INSIDE OR OUTSIDE THESE WORK LIMITS.
INSTALLATION AND OPERATION OF ALL WORK ZONE TRAFFIC CONTROL AND WORK ZONE TRAFFIC
THE WORK LIMITS ON THESE PLANS ARE FOR PHYSICAL CONSTRUCTION ONLY. PROVIDE THE
REMOVED MATERIALS
PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED BY THE CONTRACTOR FROM THE JOB SITE.
ALL REMOVED MATERIALS EXCEPT AS NOTED ELSEWHERE IN THE PLANS SHALL BECOME THE
GENERAL PROVISIONS
MATERIAL SPECIFICATIONS OF THE OHIO DEPARTMENT OF TRANSPORTATION.
THE CONTRACTOR'S ATTENTION IS CALLED TO ALL OF SECTION 100 OF THE CONSTRUCTION AND
ATTN: BRYAN BUNTING
ZANESVILLE, OHIO 43701
737 HOWARD ST.
SPECTRUM CABLE TV
ITEM 202 STRUCTURE REMOVAL ITEM(S) IN THE PLAN.
SUBMIT THE OEPA NOTIFICATION FORM. PAYMENTS FOR THIS WORK SHALL BE INCIDENTAL TO THE
THE CONTRACTOR SHALL FURNISH ALL FEES, LABOR, AND MATERIAL NECESSARY TO COMPLETE AND
BASIS FOR PAYMENT:
MADE EITHER BY HARD COPY OR ELECTRONICALLY. ADDITIONAL INFORMATION CAN BE FOUND HERE:
AT LEAST 10 WORKING DAYS PRIOR TO THE START OF ANY DEMOLITION WORK. NOTIFICATION CAN BE
COLUMBUS OH 43216-1049
PO BOX 1049
OHIO EPA, DAPC
ASBESTOS PROGRAM
SURVEY REPORT TO:
COMPLETE THE NECESSARY SECTIONS OF THE FORM AND SUBMIT IT WITH A COPY OF THE ASBESTOS
HAS BEEN INCLUDED AT THE END OF THE ASBESTOS SURVEY REPORT. THE CONTRACTOR SHALL
AND RENOVATION FORM, PARTIALLY COMPLETED BY THE ASBESTOS HAZARD EVALUATION SPECIALIST, A COPY OF THE OHIO ENVIRONMENTAL PROTECTION AGENCY (OEPA) NOTIFICATION OF DEMOLITION
MATERIALS.
THE ASBESTOS SURVEY REPORT DID NOT IDENTIFY THE PRESENCE OF ANY ASBESTOS CONTAINING
SURVEY REPORT FOR THE BRIDGE HAS BEEN INCLUDED IN THE PLAN PACKAGE FOR THIS PROJECT.
CONDUCTED BY A CERTIFIED ASBESTOS HAZARD EVALUATION SPECIALIST. A COPY OF THE ASBESTOS
AN ASBESTOS SURVEY FOR THE PER-SR 345-6.48 BRIDGE SCHEDULED FOR DEMOLITION WORK WAS
OEPA NOTIFICATION OF DEMOLITION AND RENOVATION
740-454-3552
ATTN: BARRETT TAMASOVICH
ZANESVILLE, OHIO 43701
160 NORTH SIXTH STREET
AT&T OHIO
CONTRACTOR COORDINATION AND DELAYED START
THAT PROJECT MAY BE CONSTRUCTED CONCURRENTLY WITH THIS PROJECT.
ALONG THE STATE DESIGNATED DETOUR ROUTE DURING THE 2026 CONSTRUCTION SEASON,
CONCRETE PATCHING AND DECK SEALING ON MULTIPLE STRUCTURESANTICIPATED TO BE
. THAT PROJECT ISREHABILITATION PROJECT D05-FY2027-BRIDGE REHAB WEST (PID 124808)
BRIDGE THE CONTRACTOR FOR THIS PROJECT SHALL COORDINATE WITH THE CONTRACTOR FOR
.PER 669 IS REOPENED TO NORMAL TRAFFIC FLOWBEGIN UNTIL
THEREFORE THIS PROJECT MAY NOTDETOUR ROUTE DURING THE 2026 CONSTRUCTION SEASON,
COMPLETING CHIP AND SEAL MAINTENANCE ON THE STATE DESIGNATEDIS ANTICIPATED TO BE
. THAT PROJECTMAINTENANCE PROJECT PER-669-0.00 (PID 109748, PROJECT NUMBER E(191)753)
PAVEMENTTHE CONTRACTOR FOR THIS PROJECT SHALL COORDINATE WITH THE CONTRACTOR FOR
WITHIN THE CONSTRUCTION AREA PRIOR TO EXCAVATING.
RESPONSIBLE FOR VERIFYING THE EXACT SIZE, DEPTH, AND LOCATION OF ALL BURIED UTILITIES
OF THE BURIED UTILITIES SHOWN OR NOT, ARE NOT WARRANTED. THE CONTRACTOR IS
NOT ALL UTILITIES ARE SHOWN ON THE CONSTRUCTION PLANS. THE SIZE, DEPTH, AND LOCATION
LOCATION OF UTILITIES
THE OWNERS AS REQUIRED BY SECTION 153.64 O.R.C.
THE LOCATION OF THE UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE AS OBTAINED FROM
UNDERGROUND UTILITIES
COORDINATE SYSTEM - PERRY COUNTY, UNSCALED GRID VALUES, AND THE GR580 ELLIPSOID.
1988 (NAVD 88), GEOID 18. THE HORIZONTAL POSITION ARE BASED ON THE OHIO COUNTY
ALL ELEVATIONS ARE ORTHOMETRIC HEIGHTS USING THE NORTH AMERICAN VERTICAL DATUM OF
ELEVATION DATUM
REMOVE ONLY THE TREES NECESSARY TO CONSTRUCT THE PROJECT.
THE GROUND SURFACE, AND WITH A MINIMUM HEIGHT OF 13 FEET. THE CONTRACTOR SHALL
PLANT, WITH A TRUNK THREE INCHES OR GREATER IN DIAMETER AT A HEIGHT OF 4.5 FEET ABOVE
ACT. FOR THE PURPOSES OF THIS NOTE, A TREE IS DEFINED AS A LIVE, DYING, OR DEAD WOODY
AVOID AND MINIMIZE IMPACTS TO THESE SPECIES AS REQUIRED BY THE ENDANGERED SPECIES
SHALL OCCUR FROM OCTOBER 1 THROUGH MARCH 31. THIS REQUIREMENT IS NECESSARY TO
UNDER THIS PROJECT FROM APRIL 1 THROUGH SEPTEMBER 30. ALL NECESSARY TREE REMOVAL
PROTECTED INDIANA BAT AND NORTHERN LONG-EARED BAT. NO TREES SHALL BE REMOVED
THE PROJECT IS LOCATED WITHIN THE KNOWN HABITAT RANGES OF THE FEDERALLY LISTED AND
ENDANGERED BAT HABITAT REMOVAL
OTHER APPROPRIATE PAY ITEM
OR
ASBESTOS CONTAINING MATERIALS LUMP SUM
MOP 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS: WORK INVOLVING
OR
MATERIALS - LUMP SUM
690E98400 ITEM SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAINING
ESTIMATED QUANTITY HAS BEEN INCLUDED IN THE GENERAL SUMMARY FOR THE WORK NOTED ABOVE:
STAFF. PAYMENT FOR THIS WORK SHALL BE MADE AT THE BID PRICE OF LUMP SUM. THE FOLLOWING
THE ENGINEER WILL PROVIDE A COPY OF THE DOCUMENTATION TO THE DISTRICT ENVIRONMENTAL
OF ASBESTOS CONTAINING MATERIALS TO THE ENGINEER WITHIN TWO WEEKS OF COMPLETION.
SUBMIT ALL DOCUMENTATION RELATED TO THE SURVEY, ABATEMENT, TRANSPORT, AND DISPOSAL
BASIS OF PAYMENT
AND SUBMIT ONE COPY TO THE ENGINEER AND ONE COPY TO DISTRICT ENVIRONMENTAL STAFF.
TO DEMOLITION ACTIVITY, RENOVATION ACTIVITY, OR BOTH. RETAIN TWO HARD COPIES OF THE NDRF
REQUIRE A HARD COPY SUBMITTAL. SUBMIT THE COMPLETED NDRF TO OEPA AT LEAST 10 DAYS PRIOR
TO DETERMINE IF THEYPERRY COUNTY HEALTH DEPARTMENT AT (740)-342-5179CHECK WITH
WITH THE ASBESTOS INSPECTION REPORT. FOLLOW THE MAILING INSTRUCTIONS ON THE NDRF.
THE CONTRACTOR MAY SUBMIT A HARD COPY OF THE COMPLETED NDRF AND PAYMENT ALONG
HARD COPY SUBMISSION:
PROVIDE ONE COPY TO THE DISTRICT ENVIRONMENTAL STAFF.
ELECTRONIC PDF COPY AND ONE HARD COPY OF THE NDRF TO THE ENGINEER. THE ENGINEER WILL
ALONG WITH THE ASBESTOS INSPECTION REPORT USING THE OEPA EBUSINESS CENTER. SUBMIT ONE
ANY DEMOLITION ACTIVITY, RENOVATION ACTIVITY, OR BOTH. SUBMIT THE NDRF AND PAYMENT
APPLICABLE FEES, AND THE ASBESTOS INSPECTION REPORT TO THE OEPA AT LEAST 10 DAYS PRIOR TO
SUBMIT A COMPLETED ELECTRONIC NOTIFICATION OF DEMOLITION AND RENOVATION FORM (NDRF), ELECTRONIC SUBMISSION:
HAZARDOUS AIR POLLUTANTS (NESHAP) STANDARD FOR ASBESTOS.
ADMINISTRATIVE CODE (OAC) REGULATIONS AND THE NATIONAL EMISSION STANDARD FOR
DISPOSAL OF ALL ASBESTOS CONTAINING MATERIAL MUST COMPLY WITH THE OHIO
AIR POLLUTION CONTROL TO ACCEPT ASBESTOS CONTAINING MATERIAL. THE REMOVAL AND
OF HEALTH AND PERMITTED BY THE OHIO ENVIRONMENTAL PROTECTION AGENCY - DIVISION OF
DISPOSE ASBESTOS CONTAINING MATERIALS IN A LANDFILL LICENSED BY THE OHIO DEPARTMENT
CONTAINING MATERIALS ABOVE REGULATORY LIMITS.
THE ASBESTOS INSPECTION REPORT DID NOT IDENTIFY THE PRESENCE OF ANY ASBESTOS
INSPECTION REPORT FOR THE STRUCTURE IS INCLUDED IN THE PLAN PACKAGE FOR THIS PROJECT.
CONDUCTED BY A LICENSED ASBESTOS HAZARD EVALUATION SPECIALIST. A COPY OF THE ASBESTOS
AN ASBESTOS SURVEY FOR PER-345-06.45; SFN: 6402666 SCHEDULED FOR DEMOLITION WORK WAS
NO ASBESTOS OR ASBESTOS BELOW REGULATORY LIMITS
ITEM 606 - ANCHOR ASSEMBLY, MGS TYPE E
SPECIFIED, AS REQUIRED BY THE MANUFACTURER.
SHEETING, HARDWARE, GRADING, EMBANKMENT, AND EXCAVATION NOT SEPARATELY
ANCHOR ASSEMBLY SYSTEM, INCLUDING ALL RELATED TRANSITIONS, REFLECTIVE
EQUIPMENT, AND MATERIALS NECESSARY TO CONSTRUCT A COMPLETE AND FUNCTIONAL
ANCHOR ASSEMBLY, MGS TYPE E, EACH, AND SHALL INCLUDE ALL LABOR, TOOLS,
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 606,
DRAWINGS, PRODUCT INSTALLATION MANUAL/GUIDANCE, AND AS DIRECTED BY THE ENGINEER
(RESULTING IN A 2' OFFSET). THE INSTALLATION SHALL BE IN ACCORDANCE WITH THE SHOP
THE FULL LENGTH OF THE SYSTEM. THE FLARE RATE SHALL BE A MAXIMUM OF 25:1
TYPE E ANCHOR ASSEMBLY SHALL BE INSTALLED AT A CONSISTENT FLARE RATE THROUGH
THE PROPOSED EDGE LINE, AND PERMITTING SITE CONDITIONS EXIST: THE PROPOSED
WHEN THE FACE OF THE ADJACENT (ATTACHED) GUARDRAIL IS LESS THAN 4' OFFSET FROM
YELLOW REBOUNDABLE RETROREFLECTIVE SHEETING, PER CMS. 730.191
THE FACE OF THE TYPE E IMPACT HEAD SHALL BE COVERED WITH SOLID FLOURESCENT
GUARDRAIL HEIGHT OF 31 INCHES FROM THE EDGE OF THE SHOULDER.
BE AN APPROPRIATE DEPTH BELOW THE LEVEL LINE IN ORDER TO MAINTAIN THE FINISHED
THAN 4 INCHES ABOVE THE GROUND LINE. THE PLACEMENT OF THE FOUNDATION TUBES SHOULD
THE TOP OF THE FOUNDATION TUBES OR TOP OF THE GROUND STRUT DOES PROJECT MORE
TUBE SHOULD BE LESS THAN 4 INCHES ABOVE THE GROUND. ON-SITE GRADING IS REQUIRED IF
GRADING AROUND THE FOUNDATION TUBES AND GROUND STRUT. THE TOP OF ANY FOUNDATION
REFER TO THE MANUFACTURER'S INSTRUCTIONS REGARDING THE INSTALLATION OF, AND THE
POSTED SHOP DRAWINGS FOR THE MOST CURRENT APPROVED PRODUCT MODELS.
IN THE PLANS, IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. REFER TO THE
ROADWAY ENGINEERING'S WEB PAGE. INSTALLATION SHALL BE AT THE LOCATION SPECIFIED
ACCEPTED FOR NEW INSTALLATIONS" ON ROADWAY APPROVED PRODUCTS LIST POSTED ON
TANGENTIAL END TREATMENTS FOR TYPE MGS GUARDRAIL AS LISTED UNDER "PRODUCTS
THIS ITEM SHALL CONSIST OF FURNISHING AND INSTALLING ANY OF THE MASH 2016 TYPE E
ITEM 209 - RESHAPING UNDER GUARDRAIL
ITEM 209 - RESHAPING UNDER GUARDRAIL...................................................................... 5 STA.
SUMMARY IN ADDITION TO ITEM 209 RESHAPING UNDER GUARDRAIL:
IRREGULARITIES. THE FOLLOWING QUANTITIES HAVE BEEN CARRIED TO THE GENERAL
AND AS DIRECTED BY THE ENGINEER TO ENSURE A SMOOTH SURFACE FREE FROM ALL
IS REMOVED OR WHERE NEW GUARDRAIL IS TO BE ERECTED AS DESCRIBED IN CMS 209.05
RESHAPE BERMS AT LOCATIONS SHOWN ON SHEETS 17-20 WHERE EXISTING GUARDRAIL
ANCHOR ASSEMBLY, MGS TYPE E, AS DETAILED IN THIS PLAN.
THE GRADING LAYOUT SHOWN HERE SHALL BE USED WITH ITEM 606 -
GRADING FOR ANCHOR ASSEMBLY, MGS TYPE E
EDGE OF TRAVELED WAY
EDGE OF SHOULDER
END TERMINAL GUARDRAIL
GRADING LIMITS
1V:10H
1'
6.25'
2'-0" MIN.
10'-0"
TRAFFIC
LOCATION OF GUARDRAIL
ALL INSTALLATION WILL AFFORD MAXIMUM PROTECTION FOR TRAFFIC.
ADJUSTMENTS PRIOR TO FINAL ACCEPTANCE. THE ENGINEER SHALL BE SATISFIED THAT
THE LOCATIONS OF THE GUARDRAIL RUNS, AS SHOWN IN THESE PLANS ARE SUBJECT TO
ITEM 621 - RAISED PAVEMENT MARKER REMOVED
ROADWAY. ALL RPM'S REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR.
RPM REMOVAL SHALL NOT OCCUR SOONER THAN 10 DAYS PRIOR TO RESURFACING OF THE
PER
06.489
6402666
PER
06.489
6402666
PER
06.489
6402666
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w .b e n tl e y
.c o m :o h io d o t-p w -0
\D o c u m e n ts \0
A c ti v e P ro je c ts
\D is tr ic t
\P e rr y \1
\4
-E n g in e e ri n g
\R o a d w a y
\S h e e ts
\1
G
N
.d g n
M O
D E
L
G E
N N
O T
E S
P
A P
E R
S
IZ
E x
T
E
/2
/2
T
IM
E
:0
:4
P
M
P
L T
D R
V
O H
D O
T P
D F
.p lt
N
T B
L
O H
D O
T U
T P e n .t b l
U S
E R
E ri c .J o h n s o n d o t.
o h io
.g o v
W
O R
K S
P A
C E
O
H D
O T
C E v
W
O R
K S
E T
P
R O
D U
C T
O p e n R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.6
G E
N E
R A
L N
O T
E S
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
ITEM 623 - CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER PLAN....................LUMP SUM
THE WORK AS DESCRIBED ABOVE.
THE FOLLOWING QUANTITY HAS BEEN INCLUDED IN THE GENERAL SUMMARY TO PERFORM
BID FOR ITEM 623 - CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER PLAN.
PERFORM THE WORK AS DESCRIBED ABOVE AND WILL BE INCLUDED IN THE UNIT PRICE
PAYMENT FOR STAKING WILL INCLUDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO
CONTRACTOR APPROVAL FOR EACH LOCATION.
TRAVELING PUBLIC. NO GUARDRAIL WILL BE INSTALLED UNTIL THE PROJECT ENGINEER GIVES THE
ENGINEER MAY ADJUST THE LOCATION AS STAKED TO PROVIDE THE MAXIMUM PROTECTION FOR THE
BEFORE GIVING THE CONTRACTOR FINAL APPROVAL TO INSTALL THE RUN OF GUARDRAIL, THE PROJECT
(2) DAYS PRIOR TO INSTALLATION.
TO BE INSTALLED AT EACH LOCATION. THE CONTRACTOR SHALL STAKE EACH LOCATION AT LEAST TWO
THE PROPOSED GUARDRAIL RUN. THIS WILL ALSO INCLUDE INDICATING THE TYPE OF END TREATMENT
THE CONTRACTOR IS REQUIRED TO STAKE EACH LOCATION TO INDICATE THE BEGINNING AND END OF
INSTALLATIONS SHALL BE STAKED BY THE CONTRACTOR PRIOR TO INSTALLATION ON THIS PROJECT.
IN ADDITION TO THE ABOVE REQUIREMENTS, THE LOCATIONS OF ALL PROPOSED GUARDRAIL
THE LUMP SUM BID FOR ITEM 623 - CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER PLAN.
ALL COST ASSOCIATED WITH OBTAINING THE INFORMATION LISTED ABOVE SHALL BE INCLUDED IN
MAPPING SPECIFICATION MANUAL.
REQUIREMENTS OF SECTION 400 IN THE OHIO DEPARTMENT OF TRANSPORTATION SUREY &
THE ABOVE ITEMS SHALL BE COLLECTED USING SURVEY GRADE EQUIPMENT MEETING THE
- SIGNS (WITH DESCRIPTION)
- GUARDRAIL AND CABLE BARRIER
BELOW IS A LIST OF THE ITEMS THE CONTRACTOR IS REQUIRED TO PROVIDE:
POINT NUMBER, NORTHING, EASTING, ELEVATION, FEATURE CODE, DESCRIPTION
COLLECTION (I.E. OHIO VRS, GPS RTK, TOTAL STATION, ETC.) AND BE IN A TABLE FORM AS FOLLOWS:
SYSTEM NORTH OR SOUTH), VERTICAL DATUM (I.E. NAVD 88, GEOIDI2A) AND METHOD OF
DATE(S) OF COLLECTION, HORIZONTAL DATUM (I.E. NAD8 (2011), OHIO STATE PLANE COORDINATE
BEEN COLLECTED. THE ASCII FILE SHALL INCLUDE A HEADER CONTAINING THE NAME OF SURVEYOR(S), AND THE PROJECT ENGINEER AFTER ALL THE INFORMATION HAS
ASCII FILE AND A SURVEYOR'S CERTIFICATION SHALL BE DELIVERED TO ,
OFFICE OF CADD & MAPPING SERVICES WEBSITE. AN EMAIL CONTAINING A COMMA DELIMITED
AS PER THE SURVEY FEATURE CODE LIST FOUND ON THE OHIO DEPARTMENT OF TRANSPORTATION
ITEMS IN OHIO STATE PLANE COORDINATES (GRID). THE CONSTRUCTION ITEMS SHALL BE LOCATED
THE CONTRACTOR SHALL PROVIDE AS-BUILT DATA FOR THE SPECIFIED COMPLETED CONSTRUCTION
DEPARTMENT:
SURVEYING, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION TO THE
IN ADDITION TO THE REQUIREMENTS OF ITEM 623 CONSTRUCTION LAYOUT STAKES AND
ITEM 623 - CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER PLAN
cody.gierhart@dot.ohio.gov
QUANTITY CALCULATIONS ARE BASED ON THESE LIMITS.
THE RIGHT-OF-WAY LINES COVERED BY WORK AGREEMENT OR SLOPE EASEMENT.
THE RIGHT-OF-WAY LINES, AND WITHIN THE CONSTRUCTION LIMITS FOR AREAS OUTSIDE
SEEDING AND MULCHING SHALL BE APPLIED TO ALL AREAS OF EXPOSED SOIL BETWEEN
(1,600 x 0.0027 = 4.32)
5 MGALITEM 659 - WATER
(1,600 / 4,840 = 0.33)
0.33 ACRESITEM 659 - LIME
(1,600 / 7,410 = 0.22)
0.22 TONITEM 659 - COMMERCIAL FERTILIZER
1,600 SQ, YDSITEM 659 - SEEDING AND MULCHING, CLASS 2
PERMANENT SEEDED AREAS:
THE FOLLOWING QUANTITIES ARE PROVIDED TO PROMOTE GROWTH AND CARE OF
ITEM 659 - SEEDING AND MULCHING, CLASS 2
CONSTRUCTION DRAWING TC-41.20.
POST ANCHOR BASES AS DETAILED IN STANDARD
THE CONTRACTOR SHALL PROVIDE TYPE S POSTS INCLUDING
OF THE GROUND MOUNTED SIGN SHALL BE 5'-0" ABOVE PAVEMENT.
SIGNS SHALL BE INSTALLED 1'-0" BEHIND THE GUARDRAIL POST AND BRIDGE RAILING. THE BOTTOM
ATOP THE OM-3R-12 SIGNS SHALL BE I-H25a BRIDGE IDENTIFICATION SIGNS, AS SHOWN BELOW. THE
THE CONTRACTOR SHALL INSTALL OM-3L & OM-3R (36"X12") SIGNS AT THE APPROACH WINGWALLS.
ITEM 630- SIGN, FLAT SHEET
ITEM 630 - GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN /
OM-3L-12
OM-3L-12
I-H25b
OM-3R-12
I-H25b
OM-3R-12
BRIDGE NO. PER-345-06.489
I-H25b (TYP.)
T-2
T -8
2 T-71BT-71A
N
O
HOLLOW
RD
HOLLOW
R
D
C-48
C -48
C-6
W
ESL
EY
C -4
BUTCH
ER KNIFE RD
C -95
OLD
C-3
POLE
CA
T
RDC-84
P A
L M
E R
R D
C -1
T -1
T -2
T-71A
T -57
T -5
T -114
T -1
T-208
T -1
T -1
T-51
T-1
T-
A
T -1
A
T-173
T-
T -4
T -1
T-163
T -1
T-71A
T-4
T-58
T -9
T-150
N
O
NO.
HOLLOW
R
D
C-48
C -48
C -4
TUNNEL
HIL
L
RD
C-6
C -4
O
LD
S O
M E R
SE
T
R D
C
-60
C -5
W
IL
S O
N C
-3
POLE
CA
T
RDC-84
P A
L M
E R
R D
C -1
B U C
K E
Y E
V A
LL
E
Y R
D
C-
MEL
ON
H
IL
L R
D
C -1
G R
E E
N
B R
A N
C H
R D
C -8
C-42
B L
A C
K
G O
L D
R D
C
C
-1
C-111
GRE
E N
RD
C-
E
C -7
C-113
C -9
A
C -4
2N
C-6
T -2
T-11
T -114
T -1
T-208
T -1
T -2
T -1
T-124
T -2
T -122
T-149
T-51
T-210
T -1
T-153
T-
A
T -1
T -1
A
T-173
T-121
T -497
T-21
T -3
T -1
T-1
T-127
T-
T -1
T-146
T-175
T-4
T -9
T -4
T-121
T-150
T -29
T -4
NEW
CLAYTON
HARRISON
CLAYTON
Cannon
Rehoboth
Clover
Hill
Wesley
Wilbren
Rehoboth
Mainsville
Clover
Hill
Wesley hio So ut he rn
R ai lro ad
NorfolkSouthern
Ohio So uth ern
Rai lroa d
MUSKI
LOCAL DETOUR FOR BR. NO. PER-345-06.489 STATE DETOUR FOR BR. NO. PER-345-06.489
DESIGNATED LOCAL DETOUR ROUTE
ITEM 614 DETOUR SIGNING
OF CRITICAL WORK
CONTRACT SEGMENT - LOCATION
INCENTIVE $
MAXIMUM
$3,000 $45,000
FOR ITEM 614, MAINTAINING TRAFFIC, UNLESS SEPARATELY ITEMIZED IN THE PLAN.
EQUIPMENT AND MATERIALS SHALL BE INCLUDED IN THE LUMP SUM CONTRACT PRICE
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. PAYMENT FOR ALL LABOR,
AND OTHER APPLICABLE PORTIONS OF THE SPECIFICATIONS, AS WELL AS THE OHIO
ALL WORK AND TRAFFIC CONTROL DEVICES SHALL BE IN ACCORDANCE WITH CMS 614
OFFICE WITHIN THE DISTRICT RATHER THAN THE GENERAL SWITCHBOARD NUMBER.
WHICH A MOTORIST MAY CALL FOR ADDITIONAL INFORMATION. THIS IS TO BE A SPECIFIC
OF DAYS OF THE CLOSURE. THE LAST LINE OF THE W20-H13 SIGN LISTS A PHONE NUMBER
THE SIGN SHALL DISPLAY THE DATE OF THE CLOSURE IN MMM-DD FORMAT AND THE NUMBER
MOTORISTS.
SHALL BE ERECTED WELL IN ADVANCE OF THE MERGE AREA TO AVOID DISTRACTING
THEY ARE VISIBLE TO THE MOTORISTS USING THE RAMP. ON ENTRANCE RAMPS, THE SIGN
THE POINT OF CLOSURE. THE SIGNS MAY BE ERECTED ANYWHERE ON RAMPS AS LONG AS
OTHER TRAFFIC CONTROL SIGNS. ON ROADWAYS, THEY SHOULD BE ERECTED AT OR NEAR
TRAFFIC. THEY SHALL BE PLACED SO AS NOT TO INTERFERE WITH THE VISIBILITY OF ANY
THE SIGNS SHALL BE ERECTED ON THE RIGHT-HAND SIDE OF THE ROAD/RAMP FACING
DURATIONS OF LESS THAN 1 WEEK.]
MESSAGE SIGNS MAY BE USED IN LIEU OF THE STANDARD FLATSHEET SIGN FOR CLOSURE
TIME TABLE BELOW. [AT THE APPROVAL OF THE ENGINEER, PORTABLE CHANGEABLE
THE SCHEDULED ROAD OR RAMP CLOSURE IN ACCORDANCE WITH THE NOTICE OF CLOSURE
NOTICE OF CLOSURE SIGNS (W20-H13) SHALL BE ERECTED BY THE CONTRACTOR PRIOR TO
W20-H13
60"
BE INCLUDED IN THE LUMP SUM BID FOR ITEM 614 DETOUR SIGNING, AS PER PLAN.
PAYMENT FOR ALL MATERIAL, LABOR, AND EQUIPMENT TO PERFORM THIS WORK SHALL
THE CONTRACTOR SHALL SUPPLY, ERECT, MAINTAIN, AND REMOVE THE DETOUR SIGNING.
ITEM 616 - WATER................................................................................................3 MGAL
ITEM 614 - ASPHALT CONCRETE FOR MAINTAINING TRAFFIC ......................10 C.Y.
ITEM 410 - TRAFFIC COMPACTED SURFACE, TYPE C......................................10 C.Y.
ROUTE.
ENGINEER TO MAINTAIN AND SUBSEQUENTLY RESTORE THE DESIGNATED LOCAL DETOUR
THE FOLLOWING ESTIMATED QUANTITIES ARE PROVIDED FOR USE AS DIRECTED BY THE
BY THE ENGINEER.
TO ITS' USE FOR THIS PURPOSE. ALL SUCH WORK SHALL BE PERFORMED WHEN AND AS DIRECTED
ROUTE SHALL BE RESTORED TO A CONDITION THAT IS EQUIVALENT TO THAT WHICH EXISTED PRIOR
REMOVED AND TRAFFIC RETURNED TO ITS NORMAL PATTERN, THE DESIGNATED LOCAL DETOUR
FREE FROM HOLES, RUTS, RIDGES, BUMPS, DUST AND STANDING WATER. ONCE THE DETOUR IS
CONTRACTOR SHALL MAINTAIN THIS ROUTE IN A CONDITION WHICH IS REASONABLY SMOOTH AND
THIS ROUTE IS SHOWN ON THIS SHEET. DURING THE TIME THAT TRAFFIC IS DETOURED, THE
TO BE THE SECONDARY, UNSIGNED, DETOUR ROUTE OR "DESIGNATED LOCAL DETOUR ROUTE."
IN ADDITION TO THE OFFICIALLY SIGNED DETOUR ROUTE, A LOCAL ROUTE HAS BEEN DETERMINED
NOTICE OF CLOSURE SIGNS
A+B BIDDING CONTRACT TABLE
RE-OPEN THE ROADWAY ACCORDING TO THE TABLE AT RIGHT.
IMPACTS TO NEW LEXINGTON SCHOOL DISTRICT.
DISTRICT. THIS PROJECT SHALL DETOUR TRAFFIC ON S.R. 345 WHILE MINIMIZING
AS LISTED IN THE PROPOSAL. THIS PROJECT FALLS WITHIN THE NEW LEXINGTON SCHOOL
USE THE FOLLOWING INFORMATION IN COMBINATION WITH PROPOSAL NOTE A+B BIDDING
CLOSED WITHIN SHOWN WORK LIMITS
NO. PER-345-06.489 - 2 LANES OF S.R. 345
BRIDGE REPLACEMENT @ BRIDGE
DAYS
MINIMUM
DAYS
MAXIMUM
$ PER DAY
INCENTIVE
DAYS
INCENTIVE
MAXIMUM
WILL BE
CLOSED FOR
INFO:
DAYS
PER-345-06.489
BRIDGE NO.
PER-345-06.489
BRIDGE NO.
2 BUSINESS DAYS PRIOR TO CLOSURE 12 HOURS<
7 CALENDAR DAYS PRIOR TO CLOSURE> 12 HOURS & < 2 WEEKS
14 CALENDAR DAYS PRIOR TO CLOSURE 2 WEEKS>
CLOSURES
ROAD
RAMP &
SIGN DISPLAYED TO PUBLICDURATION OF CLOSUREITEM
NOTICE OF CLOSURE SIGN TIME TABLE
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w
.b e n tl e y .c o m
:o h io d o t-p w
-0 \D o c u m e n ts
\0 A c ti v e P ro je c ts
\D is tr ic t \P e rr y \1
\4
-E n g in e e ri n g \M
O T
\S h e e ts
\1 M
D .d g n
M O
D E
L
S h e e t_
S u rv F t P
A P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:5
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
U T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.7
M A
IN
T
E N
A N
C E
O F
T R
A F
F
IC
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
Wilbren
Rehoboth
Mainsville
Clover
Hill
Wesley
NorfolkSouthern
Ohio So uth ern
Rai lroa d
DETOUR
END
STATE DETOUR FOR BRIDGE NO. PER-345-06.467
M1-5-30-3 M1-5-30-3
R11-3A-60 R11-3A-60
M4-10L-48
W20-2-48
M4-8-24 M4-8-24 M4-8-24
M1-5-30-3 M1-5-30-3 M1-5-30-3
M6-3-21 M6-1-21 M6-1-21
M4-8-24 M4-8-24
M1-5-30-3 M1-5-30-3
M5-1-21 M5-1-21
1 2 3
5 7 96 8
M1-5-30-3
R11-3A-60
M4-10R-48
4345 345 345
345345345345345
DETOUR DETOUR DETOURDETOUR DETOUR
LOCAL TRAFFIC ONLY
ROAD CLOSED
## MILES AHEAD
LOCAL TRAFFIC ONLY
ROAD CLOSED
## MILES AHEAD
LOCAL TRAFFIC ONLY
ROAD CLOSED
## MILES AHEAD
DETOUR
1500 FT
DETOUR DETOUR
R11-2-48W20-3-48 W20-3-48
THESE SIGNS WILL BE PLACED AS PER STANDARD DRAWING MT-101.60
AT LOCATIONS WHERE MARKED ON THIS SHEET.
## - CONTRACTOR SHALL INSTALL ACCURATE MILEAGE NUMBERS ON SIGNS
NOTES:
CLOSED
ROAD
CLOSED
ROAD
AHEAD
CLOSED
ROAD
AHEAD
FEET
FEET
W16-2P-30 W16-2P-30
WORK
ROAD
AHEAD
WARNING LIGHT
TYPE A
WARNING LIGHT
TYPE A
W20-1-48
B = SIGN PLACED ON BOTH DETOURS
LEGEND
N = SIGN PLACED ON NORTHBOUND DETOUR
S = SIGN PLACED ON SOUTHBOUND DETOUR
S.R. 669 WESTBOUND TO S.R. 13 SOUTHBOUND TO S.R. 37 EASTBOUND.
SOUTHBOUND S.R. 345 STATE ROUTE DETOUR:
S.R. 37 WESTBOUND TO S.R. 13 NORTHBOUND TO S.R. 669 EASTBOUND.
NORTHBOUND S.R. 345 STATE ROUTE DETOUR:
PER-345-06.489
BRIDGE NO.
BARRICADES
TYPE III
S
S
S
S
N
N
N
N
N
S
S N
S
N
N
N
BB
B
B
M1-5-30-3
M4-8a
S
N
N
N
ONLY. EXACT LOCATIONS SHALL BE AS DIRECTED BY THE ENGINEER.
-SIGN LOCATIONS ON THIS SHEET ARE FOR REFERENCE PURPOSES
ROUTE BEING DETOURED
THE CORRESPONDING DETOUR INDICATING THE DIRECTION OF THE
CONTAIN DIRECTIONAL PLAQUES (E.G. "NORTH", "SOUTH") ALONG
-IN ADDITION TO THE SIGNS HEREIN, THE ASSUMBLIES SHALL
-NO SIGNS DETAILED ON THIS SHEET WILL BE SUPPLIED BY ODOT.
ADDITIONAL NOTES:
N
S
N
N
S
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w
.b e n tl e y .c o m
:o h io d o t-p w
-0 \D o c u m e n ts
\0 A c ti v e P ro je c ts
\D is tr ic t \P e rr y \1
\4
-E n g in e e ri n g \M
O T
\S h e e ts
\1 M
D .d g n
M O
D E
L
M O
T S ig n s
P E
R S
IZ
E x
T E
/2 /2
E
:0
:5
T D
R V
O
H D
O T
P
D F
.p lt
N
T B
L
O H
D O
T
U T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.8
M A
IN
T
E N
A N
C E
O F
T R
A F
F
IC
MM-DD-YY
40P E
R -3
-0
.4
AS PER PLAN
ITEM 614, PORTABLE CHANGEABLE MESSAGE SIGN,
DAY FOR DIFFERENT DAYS OF THE WEEK.
OR MESSAGES CHANGED AUTOMATICALLY AT DIFFERENT TIMES OF THE
LOGIC WHICH WILL ALLOW THE SIGN TO BE ACTIVATED, DEACTIVATED
THE PCMS SHALL CONTAIN AN ACCURATE CLOCK AND PROGRAMMING
THE COMPLETE MESSAGE FOR EACH PHASE TO BE READ AT LEAST TWICE.
MESSAGE PHASES SHALL BE SUPPORTED. PCMS FORMAT SHALL PERMIT
IN THE FIELD. THREE-LINE PRESENTATION FORMATS WITH UP TO SIX
COMPUTER. THE SIGN LEGEND SHALL BE CAPABLE OF BEING CHANGED
NOT BE LOST AS A RESULT OF POWER FAILURES TO THE ON-BOARD
MESSAGES. MESSAGE MEMORY OR PRE-PROGRAMMED DISPLAYS SHALL
CONFERENCE. THE SIGN SHALL HAVE THE CAPABILITY TO STORE UP TO 99
BE GIVEN TO THE CONTRACTOR AT THE PROJECT PRECONSTRUCTION
ENGINEER. A LIST OF ALL REQUIRED PRE-PROGRAMMED MESSAGES WILL
ALL MESSAGES TO BE DISPLAYED ON THE SIGN WILL BE PROVIDED BY THE
PHONE.
TELEPHONE NOTIFICATION FROM THE PROJECT ENGINEER TO A DESIGNATED
MESSAGES WILL BE IMPLEMENTED WITHIN TWO HOURS FOLLOWING
THE CONTRACTOR SHALL IMPLEMENT A SYSTEM WHEREBY CHANGEABLE
TROUBLESHOOT THE UNIT, AND TO REVISE SIGN MESSAGES, IF NECESSARY.
INSTRUCTIONS TO ENABLE ODOT PERSONNELTO OPERATE AND
SHALL BE PROVIDED WITH APPROPRIATE TRAINING AND OPERATION
THE ENGINEER SHALL BE PROVIDED ACCESS TO EACH SIGN UNIT AND
PERIODS OF TIME, THE PCMS SHALL BE TURNED AWAY FROM ALL TRAFFIC.
SHALL BE TURNED OFF. ADDITIONALLY, WHEN NOT IN USE FOR EXTENDED
ACCOMMODATE CHANGED CONDITIONS. WHEN NOT IN USE, THE PCMS
OF THE ENGINEER, RELOCATE THE PCMS TO IMPROVE VISIBILITY OR
PROTECTED FROM TRAFFIC. THE CONTRACTOR SHALL, AT THE DIRECTION
THE PCMS SHALL BE LOCATED IN A HIGHLY VISIBLE POSITION YET
SIGNS BY THE CONTRACTOR SHALL BE AS DIRECTED BY THE ENGINEER.
PLACEMENT, OPERATION, MAINTENANCE AND ALL ACTIVATION OF THE
WITH CMS 614.03.
COMPANY. THE PCMS SHALL BE DELINEATED IN ACCORDANCE
POWERED BY AN ELECTRICAL SERVICE DROP FROM A LOCAL UTILITY
TROUBLESHOOT THE UNIT. THE SIGN SHALL ALSO BE CAPABLE OF BEING
INSTRUCTIONS TO ENABLE ONSITE PERSONNEL TO OPERATE AND
SHALL BE PROVIDED WITH APPROPRIATE TRAINING AND OPERATION
DARKNESS, AND A TAMPER AND VANDAL PROOF ENCLOSURE. EACH SIGN
FUNCTIONAL DIMMING MECHANISM, TO DIM THE SIGN DURING
EACH SIGN SHALL BE TRAILER-MOUNTED AND EQUIPPED WITH A
DISTANCES OF 800 FEET AND 650 FEET, RESPECTIVELY.
THE LIST CONTAINS CLASS A AND B UNITS WITH MINIMUM LEGIBILITY
AVAILABLE ON THE OFFICE OF MATERIALS MANAGEMENT WEB PAGE.
SHALL BE OF A TYPE SHOWN ON A LIST OF APPROVED PCMS UNITS
WHEN NO LONGER NEEDED, 2 CHANGEABLE MESSAGE SIGNS. THE SIGN
THE CONTRACTOR SHALL FURNISH, INSTALL, MAINTAIN AND REMOVE,
(ESTIMATED 2 SIGNS X 1 MONTHS = 2 SNMT)
PERFORM THE ABOVE DESCRIBED WORK.
FUELS, LUBRICATING OILS, SOFTWARE, HARDWARE AND INCIDENTALS TO
UNIT PRICE. PAYMENT SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT,
PAYMENT FOR THE ABOVE DESCRIBED ITEM SHALL BE AT THE CONTRACT
THE DURATION OF THE PHASES WHEN THE PLAN REQUIRES THEIR USE.
OPERATION AND MAINTENANCE OF THESE SIGNS ON THE PROJECT FOR
THE CONTRACTOR SHALL BE RESPONSIBLE FOR 24-HOUR-PER-DAY
MONEYS DUE, OR TO BECOME DUE THE CONTRACTOR ON HIS CONTRACT.
DUE TO THE CONTRACTOR'S NONCOMPLIANCE, WILL BE DEDUCTED FROM
THE ENTIRE COST TO CONTROL TRAFFIC, ACCRUED BY THE DEPARTMENT
DEPARTMENT TAKING APPROPRIATE ACTION TO SAFELY CONTROL TRAFFIC.
AN ORDER TO STOP WORK AND OPEN ALL TRAFFIC LANES AND/OR IN THE
12 HOURS, INCLUDING WEEKENDS. FAILURE TO COMPLY MAY RESULT IN
SHALL NOT RESULT IN THE SIGN BEING OUT OF SERVICE FOR MORE THAN
TO ASSURE PROMPT SERVICE IN THE EVENT OF FAILURE. ANY FAILURE
ARRANGEMENTS, WITH AN AUTHORIZED SERVICE AGENT FOR THE PCMS,
THE CONTRACTOR SHALL, PRIOR TO ACTIVATING THE UNIT, MAKE
THE CONTRACTOR IN ACCORDANCE WITH THE PROVISIONS OF CMS 614.07.
THE PCMS UNIT SHALL BE MAINTAINED IN GOOD WORKING ORDER BY
ENGINEER, OR EQUIVALENT, AND SHALL BE INSURED AGAINST THEFT.
EQUIVALENT) SHALL BE FURNISHED FOR USE BY THE DISTRICT TRAFFIC
REMOTE DATA INPUT DEVICE (LAPTOP COMPUTER PLUS MODEM OR
VERIFICATION OF CURRENT AND PROGRAMMED MESSAGES. ONE
TO TIME OF DAY PROGRAMS. THE SYSTEM SHALL ALSO PERMIT
ACTIVATION, MESSAGE CHANGES, MESSAGE ADDITIONS AND REVISIONS
WILL (IN ACTIVE CELLULAR PHONE AREAS) ALLOW REMOTE SIGN
THE PCMS SHALL CONTAIN A CELLULAR TELEPHONE DATA LINK WHICH
MESSAGE SIGN, AS PER PLAN
ITEM 614, PORTABLE CHANGEABLE
2 SNMT
ITEM 614 MAINTAINING TRAFFIC
IN THE PLAN.
FOR ITEM 614, MAINTAINING TRAFFIC, UNLESS SEPERATELY ITEMIZED
MATERIALS SHALL BE INCLUDED IN THE LUMP SUM CONTRACT PRICE
CONTROL DEVICES. PAYMENT FOR ALL LABOR, EQUIPMENT AND
SPECIFICATIONS, AS WELL AS THE OHIO MANUAL OF UNIFORM TRAFFIC
WITH C&MS 614 AND OTHER APPLICABLE PORTIONS OF THE
ALL WORK AND TRAFFIC CONTROL DEVICES SHALL BE IN ACCORDANCE
AND LOCATIONS AS SHOWN ON THE MOT SIGNAGE SHEET.
TRAFFIC CONTROL DEVICES, AND TYPE III BARRICADES OF THE TYPE
SIGN SUPPORTS, AS DETAILED IN THE OHIO MANUAL OF UNIFORM
THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN SIGNS AND
AFFECTED ROADS ARE CLOSED TO TRAFFIC.
SHOWN ON THE MOT SIGNAGE SHEET DURING PERIODS IN WHICH
LIGHTS, AS DETAILED IN TRAFFIC SCD MT-101.60 AT THE LOCATIONS
48 X 30 INCH ROAD CLOSED SIGNS, SIGN SUPPORTS, BARRICADES AND
THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN STANDARD
PROGRESS
OF TRAFFIC DEVICES SHALL BE COMMENSURATE WITH THE WORK IN
SHALL NOT BE PERMITTED. THE LEVEL OF UTILIZATION OF MAINTENANCE
WITHIN A REASONABLE TIME FRAME, AS DETERMINED BY THE ENGINEER,
OVER SEGMENTS OF THE PROJECT IN WHICH NO WORK IS ANTICIPATED
THE IMPACT TO THE TRAVELING PUBLIC. LANE CLOSURES OR RESTRICTIONS
BE AT THE APPROVAL OF THE ENGINEER. IT IS THE INTENT TO MINIMIZE
LENGTH AND DURATION OF LANE CLOSURES AND RESTRICTIONS SHALL
S.R. 345: JUST SOUTH OF BRIDGE NO. PER-345-06.489
S.R. 345: JUST NORTH OF BRIDGE NO. PER-345-06.489
CLOSED TO TRAFFIC.
LOCATIONS DURING PERIODS IN WHICH THE AFFECTED ROADS ARE
GATES AND LIGHTS, AS DETAILED IN SCD MT-101.60 AT THE FOLLOWING
48x30 INCHES ROAD CLOSED SIGNS, SIGN SUPPORTS, BARRICADES, THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN STANDARD
ROADWAY REMAINS CLOSED TO TRAFFIC BEYOND THE SPECIFIED TIME.
SHALL BE AS PER PROPOSAL NOTE 124 FOR EACH CALENDAR DAY THE
TRAFFIC MAY BE DETOURED AS PER PROPOSAL NOTE 124. DAMAGES
SHALL BE MAINTAINED AT ALL TIMES, EXCEPT FOR WHEN THROUGH
A MINIMUM OF ONE LANE OF TRAFFIC IN EACH DIRECTION ON S.R. 345
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w
.b e n tl e y .c o m
:o h io d o t-p w
-0 \D o c u m e n ts
\0 A c ti v e P ro je c ts
\D is tr ic t \P e rr y \1
\4
-E n g in e e ri n g \M
O T
\S h e e ts
\1 M
N .d g n
M O
D E
L
S h e e t_
S u rv F t P
A P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:5
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
U T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.9
M A
IN
T
E N
A N
C E
O F
T R
A F
F
IC
N O
T E
S
MM-DD-YY
40P E
R -3
-0
.4
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w .b e n tl e y
.c o m :o h io d o t-p w -0
\D o c u m e n ts \0
A c ti v e P ro je c ts
\D is tr ic t
\P e rr y \1
\4
-E n g in e e ri n g
\R o a d w a y
\S h e e ts
\1
G
G
.d g n
M O
D E
L
S h e e t_
S u rv F t P
A P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:0
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.10
G E
N E
R A
L S
U M
M A
R Y
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
SHEET NUMBER PART.
ITEM
ITEM GRAND
UNIT DESCRIPTION
NO.
SEE SHEET
01/IMS EXT TOTAL
ROADWAY
201 11000 LS CLEARING AND GRUBBING
202 22900 SY APPROACH SLAB REMOVED
202 23500 SY WEARING COURSE REMOVED
202 38000 FT GUARDRAIL REMOVED
203 10001 CY EXCAVATION, AS PER PLAN
203 20001 CY EMBANKMENT, AS PER PLAN
204 10000 SY SUBGRADE COMPACTION
209 15000 STA RESHAPING UNDER GUARDRAIL
606 15050 FT GUARDRAIL, TYPE MGS
606 26000 EACH ANCHOR ASSEMBLY, TYPE B
606 32160 EACH BRIDGE TERMINAL ASSEMBLY, TYPE TST
EROSION CONTROL
659 00510 SY SEEDING AND MULCHING, CLASS 2
659 20000 TON COMMERCIAL FERTILIZER
659 31000 ACRE LIME
659 35000 MGAL WATER
832 30000 EACH EROSION CONTROL
PAVEMENT
255 20000 FT FULL DEPTH PAVEMENT SAWING
407 20000 GAL NON-TRACKING TACK COAT
441 70100 CY ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG70-22M
441 70200 CY ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (449)
441 70300 CY ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (449)
TRAFFIC CONTROL
618 40100 FT RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE)
630 03101 FT GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN
630 80100 SF SIGN, FLAT SHEET
642 00104 MILE EDGE LINE, 6", TYPE 1
642 00204 MILE LANE LINE, 6", TYPE 1
STRUCTURE OVER 20 FOOT SPAN (6402666)
INCIDENTALS
614 11000 LS MAINTAINING TRAFFIC
623 10001 LS CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER PLAN
623 50000 LS PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND REPORT
623 51000 LS POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND REPORT
624 10000 LS MOBILIZATION
DESIGNER
DESIGN AGENCY
TOTAL
p w
\o h io d o t-p w
.b e n tl e y .c o m
:o h io d o t-p w
-0 \D o c u m e n ts
\0 A c ti v e P ro je c ts
\D is tr ic t \P e rr y \1
\4
-E n g in e e ri n g \R o a d w a y \S h e e ts
\1 G
C .d g n
M O
D E
L
S h e e t_
S u rv F t P
A P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:0
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
ELJ
XXX
117969
P.11
C A
L C
U L
A T
IO
N
S
MM-DD-YY
40P E
R -3
-0
.4
CURVE DATA
P.I. = STA. 373+29.30
Δ = 06°39'00" RT
Dc = 02°00'00" R = 2,864.79' T = 166.44' L = 332.5' E = 4.83'
P T S
TA
. 3
.3
373 374
M O
D E
L
C L
X
S R
P la n
S h e
P
E R
S
IZ
E x2
T E
/2 /2
E
:0
:1
T D
R V
O
H D
O T
P
D F
.p ltc
N T
B L
O
H D
O T
U
T P e n
.t b l U
S E
R
E ri c.
Jo h n so n d o t.
o h io
.g o v W
O R
K S
P A
C E
O
H D
O T
C E v0
R
K S
E T
O D
U C
T
O p e n
R o a d sD e si g n e r
.0
.0
.2
N
S C
A L E
I N
F E
E T
H O
R
IZ
O N
T A
L
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.12
P L
A N
A N
D P
R O
F
IL
E
S .R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
TO REMAIN
WATER LINE
EXISTING
372 373 374 375 825 825
830 830
835 835
840 840
845 845
850 850
855 855
860 860
865 865
870 870
.1
.4
.8
.1
.5
.8
.3
.9
.6
.6
.6
.8
M
A T C
H L
IN
E S
TA
N17°37'40"E
376 377 378 379 380 381 1,051.74'
M O
D E
L
C L
X S
R
P la n
S h e
P
E R
S
IZ
E x
T
E
/2
/2
T
IM
E
:0
:1
P
M
P
L T
D R
V
O H
D O
T P
D F
.p lt
N
T B
L
O H
D O
T U
T P e n .t b l
U S
E R
E ri c .J o h n s o n d o t.
o h io
.g o v
W
O R
K S
P A
C E
O
H D
O T
C E v
W
O R
K S
E T
P
R O
D U
C T
O p e n R o a d s D e s ig n e r
.0
.0
.2
N
S C
A L
E I
N F
E E
T
H O
R
IZ
O N
T A
L
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.13
P L
A N
A N
D P
R O
F
IL
E
S .R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
DO NOT DISTURB
WETLANDS
S.L.M. 6.45
STA. 375+75.00
BEGIN WORK
S.L.M. 6.48
STA. 377+50.00
BEGIN PROJECT
SFN: 6402666
BRIDGE NO. PER-345-06.489
S.L.M. 6.51
STA. 379+00.00
END PROJECT
S.L.M. 6.55
STA. 380+75.00
END WORK
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION
PROJECT LIMITS (450'-0")
RESURFACING (150'-0")" FDR8
35'-0A.S.
FWD.
15'-0"
")8
BRIDGE LIMITS (55'-7A.S.
REAR
15'-0"
29'-4" FDRRESURFACING (150'-0")
837.7'
OHWM 9/11/25
837.7'
OHWM 9/11/25
B U
C K E Y E F
O R
K
TO REMAIN
TELEPHONE
ELECTRIC &
OVERHEAD
TO REMAIN
ELECTRIC
OVERHEAD
TO REMAIN
TELEPHONE
BURIED
TO REMAIN
TELEPHONE
BURIED
TO REMAIN
TELEPHONE
OVERHEAD
TO REMAIN
TELEPHONE
ELECTRIC &
OVERHEAD
TO REMAIN
WATER LINE
EXISTING
TO REMAIN
TELEPHONE
ELECTRIC &
OVERHEAD
TO REMAIN
TELEPHONE
BURIED
TO REMAIN
WATER LINE
EXISTING
TO REMAIN
TELEPHONE
BURIED
TO REMAIN IN PLACE
EXISTING POLE
TO REMAIN IN PLACE
EXISTING POLE
CROSSING TO REMAIN
BURIED TELEPHONE
TO REMAIN
CROSSING
TELEPHONE
ELECTRIC &
OVERHEAD
TO REMAIN IN PLACE
EXISTING POLE
376 377 378 379 380 381
825 825
830 830
835 835
840 840
845 845
850 850
855 855
860 860
865 865
870 870
.8
.1
.5
.1
.6
.2
.9
.7
.6
.6
.2
.9
.7
.8
.8
.9
.0
.2
.5
.8
.2
.6
.0
-1.90% +0.15%+0.15% +1.18%
.5
.1
.6
.3
.0
.9
.8
.8
.8
.8
.9
.9
.0
.1
.2
.4
.6
.9
.2
.2
V P
I 3
.0
V P
I 3
.0
E le v . 8
.5
E le v . 8
.2
-1.90%
+0.15% +1.18%
.0
.0
.1
.9
.0
.0
.8
.9
-2.11% +1.49%
M A
T C
H L
IN
E
S T
A
M A
T C
H L
IN
E
S T
A
381 382 383 384
O
D E
L
C L
X S
R
P la n
S h e
P
E R
S
IZ
E x
T
E
/2
/2
T
IM
E
:0
:1
P
M
P
L T
D R
V
O H
D O
T P
D F
.p lt
N
T B
L
O H
D O
T U
T P e n .t b l
U S
E R
E ri c .J o h n s o n d o t.
o h io
.g o v
W
O R
K S
P A
C E
O
H D
O T
C E v
W
O R
K S
E T
P
R O
D U
C T
O p e n R o a d s D e s ig n e r
.0
.0
.2
N
S C
A L
E I
N F
E E
T
H O
R
IZ
O N
T A
L
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.14
P L
A N
A N
D P
R O
F
IL
E
S .R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
TO REMAIN
TELEPHONE
BURIED
TO REMAIN
TELEPHONE
ELECTRIC &
OVERHEAD
TO REMAIN
TELEPHONE
ELECTRIC &
OVERHEAD
TO REMAIN
WATER LINE
EXISTING
381 382 383 384
825 825
830 830
835 835
840 840
845 845
850 850
855 855
860 860
865 865
870 870
.0
.4
.9
.5
.0
.6
.2
.9
.8
.9
.0
.6
.0
.5
M A
T C
H L
IN
E
S T
A
X
S H
E X
S H
375+50.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
E X
S H
E X
S H
375+75.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
E X
S H
E X
S H
M O
D E
L
C L
X
S R
.0
S h e
P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:2
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.15
C R
O S
S S
E C
T
IO
N S
S
.R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
DO NOT DISTURB
WETLANDS
DO NOT DISTURB
WETLANDS
C/L C/L
C/L C/L
ITEM 202 - PAVEMENT REMOVED
F-0 F-0
3.50% 0.65%
846.60
376+00.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
846.60
S H
E X
S H
1.56% 1.56% 8.00%
846.12
376+25.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
846.10
E X
S H
E X
S H
2.0 :1
4.00% 1.56% 1.56% 4.00% 8.00%
845.69
376+50.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
845.66
E X
S H
E X
S H
M O
D E
L
C L
X
S R
.0
S h e
P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:2
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.16
C R
O S
S S
E C
T
IO
N S
S
.R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
DO NOT DISTURB
WETLANDS
DO NOT DISTURB
WETLANDS
DO NOT DISTURB
WETLANDS
C/L
C/L
C/L C/L
C/L
C/L
ITEM 202 - PAVEMENT REMOVED
F-5 F-5
F-7 F-5
F-2 F-5
C-4 C-10
C-10C-5
C-5 C-9
2.0 :1 8.00% 4.00% 1.56% 1.56% 4.00% 8.00%
845.34
376+75.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
845.27
S H
2.0 :1
8.00% 4.00% 1.56% 1.56% 4.00% 8.00%
845.08
377+00.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
2.0 :1
844.91
E X
S H
8.00% 4.00% 1.56% 1.56% 4.00% 8.00% 2.0:1
844.90
377+25.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
844.72
E X
S H
E X
S H
E X
S H
E X
S H
M O
D E
L
C L
X
S R
.0
S h e
P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:2
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.17
C R
O S
S S
E C
T
IO
N S
S
.R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
DO NOT DISTURB
WETLANDS
DO NOT DISTURB
WETLANDS
DO NOT DISTURB
WETLANDS
C/L C/L
C/L C/L
C/LC/L
ITEM 202 - PAVEMENT REMOVED
F-6 F-8
F-7 F-5
F-7 F-5
C-9C-7
C-6 C-10
C-10C-5
2.0 :1
8.00% 4.00% 1.56% 1.56% 4.00% 8.00%
2.0:1
844.81
377+50.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
844.61
S H
E X
S H
M O
D E
L
C L
X
S R
.0
S h e
P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:2
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
ELJ
XXX
117969
P.18
C R
O S
S S
E C
T
IO
N S
S
.R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
DO NOT DISTURB
WETLANDS
C/L C/L
ITEM 202 - PAVEMENT REMOVED
STA. 378+49.95 TO STA. 378+64.95 = FWD. APPROACH SLAB LIMITS
STA. 377+94.34 TO STA. 378+49.95 = BRIDGE LIMITS
TO STA. 377+94.34 = REAR APPROACH SLAB LIMITS377+79.34STA.
F-11 F-11
C-11 C-13
1.56% 1.56% 4.00%
2.0 :1
8.00% 4.00%
2.0:1
844.81
377+75.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
8.00%
844.66
S H
E X
S H
8.00% 4.00% 1.56% 1.56% 4.00% 8.00% 2.0:1
844.96
378+75.00
60 50 40 30 20 10 0 10 20 30 40 50 60820 820
825 825
830 830
835 835
840 840
845 845
850 850
844.84
E X
S H
E X
S H
M O
D E
L
C L
X
S R
.0
S h e
P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:3
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.19
C R
O S
S S
E C
T
IO
N S
S
.R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
C/L
C/L C/L
C/L
ITEM 202 - PAVEMENT REMOVED
STA. 378+49.95 TO STA. 378+64.95 = FWD. APPROACH SLAB LIMITS
STA. 377+94.34 TO STA. 378+49.95 = BRIDGE LIMITS
TO STA. 377+94.34 = REAR APPROACH SLAB LIMITS377+79.34STA.
F-4 F-8
F-3 F-11
C-16
C-17 C-17
C-16
8.00% 4.00% 1.56% 1.56% 4.00% 8.00% 2.0:1
845.02
379+00.00
60 50 40 30 20 10 0 10 20 30 40 50 60825 825
830 830
835 835
840 840
845 845
850 850
844.89
S H
8.00% 4.00% 1.56% 1.56% 4.00% 8.00% 2.0:1
845.12
379+25.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
844.94
E X
S H
8.00% 4.00% 1.56% 1.56% 4.00% 8.00%
2.0:1
845.26
379+50.00
60 50 40 30 20 10 0 10 20 30 40 50 60830 830
835 835
840 840
845 845
850 850
855 855
845.05
E X
S H
E X
S H
E X
S H
E X
S H
M O
D E
L
C L
X
S R
.0
S h e
P
E R
S
IZ
E x
T
E
/2
/2
E
:0
:3
T
D R
V
O H
D O
T
P D
F .p lt
N
T B
L
O H
D O
T
P e n
.t b l U
S E
R
E ri c .J o h n s o n d o t.
o h io
.g
R K
S P
A C
E
O H
D O
T C
E v
R
K S
E T
O D
U C
T
O p e n
R o a d s D e s ig n e r
.0
.0
.2
PROJECT ID
SHEET
DESIGNER
DESIGN AGENCY
TOTAL
S T
A
.0
T
O S
T A
.0
ELJ
XXX
117969
P.20
C R
O S
S S
E C
T
IO
N S
S
.R
MM-DD-YY
40P E
R -3
-0
.4
REVIEWER
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .