11706PR240000070 SOW MUNRO Oily Waste Offload.pdf
PDF 298 KB Posted
- Attached to
- USCGC MUNRO (WMSL-755) Oily Waste Offload
- Solicitation number
- 11706PR240000070
About this file
This document is a Statement of Work (SOW) for the USCGC MUNRO (WMSL-755) at Coast Guard Island Pier in Alameda, CA requesting quotes for approximately 3,500 gallons of oily (hazardous) waste offload.
The contractor shall have an over-the-water permit to transfer the oily waste from the cutter to the pier, provide deployment and recovery of containment boom, and supply the containment boom during the transfer. The contractor shall provide all hoses to accommodate a 150-foot span from the cutter to the contractor's truck on the pier. The contractor is responsible for disposing of the hazardous waste in accordance with state and federal regulations. The preferred offload period is between August 26-30, 2024, with a preferred service time of 0800-1200. This opportunity will be set aside for small businesses and awarded on the lowest price technically acceptable basis. The Service Contract Act will apply.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11706PR240000070 W_D MUNRO Oily Waste Offload.pdf | ||
| 11706PR240000070 RFQ SF_18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
USCGC MUNRO (WMSL-755) at Coast Guard Island Pier, Alameda CA 94501, is requesting quotes for approximately 3,500 gallons of oily (hazardous) waste offload.
The contractor shall have an over the water permit to transfer oily waste from the cutter to the pier.
The contractor shall provide deployment of containment boom prior commencement of work, and recovery of containment boom upon completion of work (see cutter specs below).
The contractor shall supply containment boom during the over the water transfer.
The contractor shall provide all hoses to accommodate a 150-foot span from the discharge point on the cutter to the contractor provided truck on the pier. Cutter connection is 2” camlock.
The contractor is responsible for disposing hazardous waste IAW state and federal regulations.
Preferred offload period is expected between August 26th and August 30th, 2024.
Time for Service: 0800 -1200 preferred.
This will be set aside for small business companies and will be awarded on the lowest price technically acceptable. The service wage contract act will apply to this award.
SHIP'S CHARACTERISTICS:
LENGTH OVERALL: 418FT/127.4M
LENGTH AT WATERLINE: 390FT/118.9M
BEAM: 54FT/16.5M
DRAFT: 24FT/7.3M
OILY WASTE DECK CONNECTION HEIGHT:
25FT/7.6M ABOVE WATERLINE
Technical POC:
MKCS Jebediah Fleener Main Propulsion Division
(510) 437-5757
Contract POC:
SKC London Venzon CGC Munro - Contracting Officer Coast Guard Island Bldg 42 Alameda CA, 94501 ☎ (510) 437-5757