11670 Single Source Justification.pdf
PDF 82 KB Posted
- Attached to
- IR RS185ie Airend Replacement
- Solicitation number
- FA822724Q5001
About this file
This document is a Single Source Justification (Simplified Acquisition) for the procurement and replacement of a two-stage airend kit for an Ingersoll-Rand RS185IE-W-125 Air Compressor at Hill AFB, Utah. The total estimated cost is $80,311.60, which includes the airend kit, additional parts, labor, and shipping/delivery. Ingersoll-Rand, the original equipment manufacturer (OEM), is the only source that can provide the required airend kit, and Cate Industrial Solutions, LLC, the authorized Ingersoll-Rand distributor, is the only vendor able to perform the installation. The contracting activity is AFMC OL:H/PZIMB. The government intends to evaluate future opportunities to increase competition for this requirement.
The related federal contract opportunity is Solicitation Number FA822724Q5001 for the IR RS185ie Airend Replacement. The government is seeking quotes for this requirement, and the solicitation package includes a combined synopsis and solicitation, product description, and the single source justification document. Questions must be submitted to the contract specialist Lt. Quinn Walsh by July 22, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11670 Product Description.pdf | ||
| Combined Synopsis and Solicitation_11670 09Jul24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Source Justification (Simplified Acquisition)
CONTROLLED UNCLASSIFIED INFORMATION
April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 2
Section A: General Contract Information
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: AFMC OL:H/PZIMB
Project/Program Name: IR RS185ie Airend Replacement
Purchase Request / Local ID Number: 11670
Estimated Contract Cost (including Options): $80,311.60
Section B: Description of the Supplies/Services Required
309th Maintenance Support Group (309 MXSG) requires the procurement and replacement of a two (2) Stage Airend Kit, for an Ingersoll-Rand RS185IE-W-125 Air Compressor in building 238 at Hill AFB, Utah. All parts, labor and travel will be included to bring the compressor back to full operational status.
P/N: N/A Desc: 2 Stage Airend KIT, AIREND FIELD RETROFIT MODULATION (RS185IE) Qty: 1 EA Estimated Cost: $69,487.00
P/N: N/A Desc: Additional Parts Qty: 1 EA Estimated Cost: $2,372.60
P/N: N/A Desc: Labor Qty: 1 EA Estimated Cost: $7,912.00
P/N: N/A Desc: Shipping/Delivery Qty: 1 EA Estimated Cost: $540.00
Total Estimated Cost: $80,311.60
Section C: Justification for Soliciting from a Single Source or Brand Name
Ingersoll-Rand, the Original Equipment Manufacturer (OEM), is the only brand of the two (2) Stage Airend Kit required by 309 MXSG to bring the Ingersoll-Rand RS185IE-W-125 Air Compressor back to full operational status. Cate Industrial Solutions, LLC. (Cate Industrial) is the Authorized Ingersoll-Rand Distributor that can provide the unique two (2) Stage Airend Kit, along with the required installation. Therefore, this acquisition requires the Brand Name procurement and replacement of the two (2) Stage Airend Kit through Cate Industrial.
Section D: Efforts to Obtain Competition
The Government SME contacted Ingersoll-Rand, the OEM, to locate other vendors capable of providing and replacing the two (2) Stage Airend Kit. Ingersoll-Rand stated that Cate Industrial is the only Authorized Ingersoll-Rand Distributor
CONTROLLED UNCLASSIFIED INFORMATION
April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 2 that can provide the two (2) Stage Airend Kit. Additionally, a search of GSA Advantage showed none of the required parts were available through GSA.
Section E: Steps to Preclude Future Single Source or Brand Name Awards
The Government intends to evaluate any opportunities to remove barriers on future requirements. The Government will continue to perform market research to see if any new opportunities allow for competition. Currently, the only option for the two (2) Stage Airend Kit is to use Cate Industrial. The Government will need to reengage with Ingersoll- Rand for future requirements, to determine if new vendors have been granted access to their distribution rights.
Section F: Contracting Officer's Determination
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date
16-Apr-2024
Typed Name and Rank/Grade of Contracting Officer
Hideo Mera/ GS-13
Signature of Contracting Officer
April 2021 Page of Section A: General Contract Information Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source or Brand Name Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source or Brand Name Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
9.0.0.2.20120627.2.874785
| security_markings: CONTROLLED UNCLASSIFIED INFORMATION |
| CurrentPage: |
| PageCount: |
| Yes: |
| No: |
| Contract_Activity: AFMC OL:H/PZIMB |
| Project_Name: IR RS185ie Airend Replacement |
| PR-ID_Number: 11670 |
| Estimated_Cost: $80,311.60 |
| Text: |
| Date: 16-Apr-2024 |
| Name: Hideo Mera/ GS-13 |
| Signature: |
File details come from the government source that posted it. Updated .