Text version

IGCE

Independent Government Cost Estimate (IGCE)
1.0 DIRECT LABOR (DL)NAME, TITLE AND LABOR CATEGORYDAILY (8HR) RATEEFFORT NO. DAYSITEM TOTAL $
Energy Storage Technical Expert0
SUBTOTAL DIRECT LABOR0
2.0 OVERHEAD (OH) + GENERAL ADMINISTRATIVE (G&A)
3.0 OTHER DIRECT COSTS (ODC)
SUBTOTAL OTHER DIRECT COSTS (ODC)$0
SUBTOTAL DL + OH + G&A + ODC$0
4.0 PROFIT$0
5.0 TOTAL FIXED PRICE$ - 0

&CCompany's Name:___________________ &LU. S. Trade and Development Agency (Rev7/03)

Budget Narrative Labor Rates, Level of Effort, and Other Direct Costs:

The labor rates for this DS (RFQ-CO2016XXXXX) were derived from historical proposed rates under PO201491166 (Worldwide: Power Transmission, Distribution and Smart Grid Application DS) and Romania: Smart Grid Projects DS, PO201421191. Both historial examples required a similar level of expertise, particularly energy and power sector expertise, as required for this DS. The labor rates and level of effort for each proposal submitted pursuant to the historical requirements are shown below (please note: the labor rates are assumed to be fully loaded, which means that all benefits, overhead and general administrative costs and profit are included). For both historical contracts, a fourth column was added to determine the average daily rate for the DS using a 5% escalation, which is reflected from year to year.

Historical Contract: PO201491166 (Worldwide-Power Transmission, Distribution and Smart Grid Applications DS)
Please note that this contract was for the development of 7 projects. The LOE was divided accordingly to be per project.
OfferorDaily (8hr) RateLOE for 7 Projects (Total Days)LOE per project
C. Kazunga$960223
The Constant Group$1,21843.56
DKMT$68013019
EnerconAmerica$1,2008112
ETP$1,44032.55
GreenMax$1,0806810
Hemsley Hamilton$50020229
The Logan Group$36021330
Q consultants$848669
Skipping Stone$2,20031.55
Average$1,0498913
20142015 (with 5% escalation)2016 (with 5% escalation)2017 (with 5% escalation)
Daily (8hr) Rate$1,049$1,101.01$1,156.06$1,213.86
LOE899398
LOE per project131314
Note: This contract required 1 proposal review for a project that was less developed than the two proposals that will be assessed under this DS.
Historical Contract: Romania- Smart Grid Projects, PO201421191
Please note that this contract was for the development of 2 projects. The LOE was divided accordingly to be per project.
OfferorDaily (8hr) RateLOE (Total Days)LOE per project
Actionable Perspectives$400157.5
BlueStreams Group$70419.89.9
Auriga$1,6005929.5
The Constant Group$56019.49.7
GPT$1,08011.485.74
Greenmax$1,25610.745.37
NorthEast Group$1,40014.27.1
Skipping Stone$2,2008.184.09
Average$1,150209.86
$2,0142015 (with 5% escalation)2016 (with 5% escalation)2017 (with 5% escalation)
Daily (8hr) Rate$1,150$1,207.50$1,267.88$1,331.27
LOE202122
LOE per project101011
Note: This contract was for Technical Workshop, but required a pre-trip analysis, similar to a desk study, in preparation for the Workshop. The Total Days are not noted due to the different scope of the project.
Combined Averages of the Historical Contracts
Daily (8hr) Rate$1,272.57
Additional Notes:
1) No other direct costs are included in the independent government estimate because all benefits, overhead and general administrative costs and profit are included in the fully loaded labor rates and no travel will be required under this DS.