Statement of Work (SOW)
Oregon National Guard Delta TRP 1-82 CAV Caging requirements
1 Mission The Oregon Army National Guard mission is allocating section cage storage to meet the standards for storage of unit equipment.
1.1 Background
Each unit section has equipment assigned for the performance of their specific mission. To have accountability for unit equipment storage caging provides each unit the standard storage, provides proper ventilation, and visibility to account for assigned equipment.
2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.
2.1 Provisions and Conditions
2.1.1 The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personnel services necessary to perform the requirements as defined in the Performance Work Statement except for those items specified as government furnished property and services.
2.1.2 Inspect areas to receive caging, to verify that spaces are properly prepared to receive units.
2.1.3 Install in accordance with manufacturer's instructions, plumb, square and level.
2.1.4 Repair or replace items damaged during erection.
2.2 Hours of Work
Normal workdays Monday through Friday except US Federal Holidays. Workers typically work eight (8) hours per day, 40 hours per week. Core hours of work are from 0800 to 1600 daily.
2.3 Location
Accomplishment of the results contained in this PWS requires work at the following location: 402 East Scenic Dr. The Dalles, OR 97058.
3 Performance Requirements
The following section specifies the Performance Objectives and Performance Elements for the contract.
3.1 Scope of Work
3.2 Caging Installation
3.2.1 Install caging at The Dalles Armory. See PARA 3.3 and attached layout diagram for measurements and layout.
3.3 Materials & Requirements
· Wire Mesh: Galvanized welded chain link with 1.5" x 1.5"-3" diamond or rectangular openings.
· Panels: 9 gauge chain link welded or attached to frame.
· Doors: 9 gauge galvanized chain link, Doors are gate style, swing open doors.
· Door Hardware: Full-height hinged anti-pry locking bar and padlock hasp.
· Back: Constructed of 9 gauge chain link.
· Hardware: Minimum 5/16" bolts and nuts for panel-to-panel I panel-to-door connection
· Bracing: Field bracing, floor and wall anchors provided by installer
· Finish: Galvanized chain link with no additional finish.
· Install caging at The Dalles Armory:
· 3 each chain link cage-style fence consisting 9 gauge metal to separate the existing 3 cages. This will turn the 3 existing cages into 6: 3 new chain link cage-style fences (represented by the line with dots) will be the below dimensions
26' L X 12' H
· Because this will now create 6 cages, 6 EA chain link cage-style gates consisting of 9 gauge metal are required at the below dimensions
5' W X 12' H
· The height for all caging is 22' off the ground.
· Doors will open a minimum of 120 degrees, up to 180 degrees to the inside of the cage with anti-pry locking bar and padlock hasp.
· It will require at least a middle support at 6' and a top support at 12'. The doors should be 5'x8' which will leave 4' of caging above the door which should be cross tied to the existing caging posts.
Existing:
image3.jpeg image4.jpeg image5.jpeg image1.png image2.jpeg