11-Exhibit C - Pine Crest Manor Blvd.pdf
PDF 7 MB Posted
- Solicitation number
- ITB-26-00257
- Issued by
- Hillsborough County, Florida
About this file
Pine Crest Manor Boulevard Replanting - Landscape Plans and Specifications
This document is a landscape design and specification set prepared by Hillsborough County Public Works Department for the Pine Crest Manor Boulevard replanting project, located in the Tampa, Florida area. The project involves the installation of landscape materials including trees, palms, and shrubs along Pine Crest Manor Boulevard. The master plant list specifies 14 Yellow Trumpet Trees (Tabebuia umbellata) at 45-gallon size, 1 Cabbage Palm (Sabal palmetto) measuring 12'-14' in height with 2"-2.25" caliper, and 7 Green Buttonwood trees (Conocarpus erectus) at 14'-16' height with 3" caliper. The landscape architect of record is Allen L. Howell (License No. LA-0001505), and the project plans were dated June 2025. The work scope includes site preparation, soil amendment with specified blended soil mixtures, mulch application at minimum 3-inch depth, installation of trees and palms with appropriate staking and guying, fertilization schedules, and comprehensive watering protocols for plant establishment.
The contractor is responsible for furnishing all labor, equipment, materials, and services necessary to complete the landscape installation and maintain all plantings for six months during the establishment period, with an additional one-year warranty period following final acceptance. All plant material must be Florida Grade #1 minimum and comply with American Standard of Nursery Stock (ANSI Z60.1) standards. The contractor must obtain all necessary permits and licenses, conduct field utility locates through Sunshine State One-Call, submit detailed submittals including plant photographs, soil samples, fertilizer analysis, and maintenance schedules for approval. Watering requirements vary by plant type and must continue for a minimum of 120 days from installation of the last plant material. The contractor shall remove and replace dead or unhealthy plants immediately during the warranty period at no cost to the county, with replacement plants warranted for an additional three months. Work hours are restricted to Monday through Thursday for on-site deliveries, and the job site must be maintained in orderly condition with daily debris removal and no overnight equipment storage.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PINE CREST MANOR BLVD
REPLANTING
KEN HAGAN
CHRISTINE MILLER
GWEN MYERS
HARRY COHEN
DONNA CAMERON CEPEDA
CHRIS BOLES
JOSHUA WOSTAL
AutoCAD SHX Text R17E
AutoCAD SHX Text T27S
AutoCAD SHX Text T28S
AutoCAD SHX Text R21E
AutoCAD SHX Text R22E
AutoCAD SHX Text T29S
AutoCAD SHX Text T30S
AutoCAD SHX Text R20E
AutoCAD SHX Text R19E
AutoCAD SHX Text R18E
AutoCAD SHX Text T32S
AutoCAD SHX Text T31S
AutoCAD SHX Text
INTERSTATE
AutoCAD SHX Text
AutoCAD SHX Text
INTERSTATE
AutoCAD SHX Text
AutoCAD SHX Text
TAMPA
AutoCAD SHX Text
PLANT
AutoCAD SHX Text
CITY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TEMPLE
AutoCAD SHX Text
TERRACE
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INTERSTATE
AutoCAD SHX Text
AutoCAD SHX Text
INTERSTATE
AutoCAD SHX Text
INTERSTATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INTERSTATE
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text N
AutoCAD SHX Text
TOWNSHIP 28S., RANGE 18E.
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
PROJECT COORDINATOR/MANAGER
AutoCAD SHX Text
DEVELOPMENT AND INFRASTRUCTURE SERVICES, PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
HILLSBOROUGH COUNTY
AutoCAD SHX Text
PLANS OF PROPOSED
AutoCAD SHX Text
THIS CONTRACT PLAN SET INCLUDES:
AutoCAD SHX Text
INDEX OF PLANS
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET DESCRIPTION
AutoCAD SHX Text
THE BOARD OF COUNTY COMMISSIONERS
AutoCAD SHX Text
LANDSCAPE ARCHITECT OF RECORD:
AutoCAD SHX Text
ATTENTION IS DIRECTED TO THE FACT THAT THESE PLANS
AutoCAD SHX Text
MAY HAVE BEEN REDUCED IN SIZE BY REPRODUCTION.
AutoCAD SHX Text
THIS MUST BE CONSIDERED WHEN OBTAINING SCALED DATA.
AutoCAD SHX Text
DATE: _____________________
AutoCAD SHX Text
"INVESTIGATE BEFORE YOU EXCAVATE"
AutoCAD SHX Text
MIN. OF 2 DAYS AND MAX. OF 5
AutoCAD SHX Text
DAYS NOTICE BEFORE YOU EXCAVATE.
AutoCAD SHX Text
FL. STATUTE 553.851 (1979) REQUIRES A
AutoCAD SHX Text
CALL SUNSHINE @ 1-800-432-4770
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text HILLSBOROUGH COUNTY PUBLIC WORKS DEPARTMENT, ENGINEERING & OPERATIONS DIVISION 601 E. KENNEDY BLVD. TAMPA, FL 33601.
AutoCAD SHX Text
ALLEN L. HOWELL
AutoCAD SHX Text
ALLEN L. HOWELL
AutoCAD SHX Text
COVERSHEET
AutoCAD SHX Text 1-4
AutoCAD SHX Text
LANDSCAPE PLANS
AutoCAD SHX Text
AutoCAD SHX Text
LANDSCAPE NOTES
AutoCAD SHX Text
AutoCAD SHX Text
LANDSCAPE LIST AND DETAILS
AutoCAD SHX Text
BEGIN PROJECT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
N MANHATTAN AVE
AutoCAD SHX Text
END PROJECT
AutoCAD SHX Text
DALE MABRY HIGHWAY
AutoCAD SHX Text CHAIRMAN VICE-CHAIRMAN CHAPLAIN COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER
B
E
G
I
N
P
R
O
J
E
C
T
S H
E E
T
M A
T C
H
L
I N
E
CE
80 40 0 80
SP
TC
TC YELLOW TABEBUIA
SP CABBAGE PALM
TREE LEGEND
CE GREEN BUTTONWOOD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
NO.
AutoCAD SHX Text 11x17 SCALE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SUPERVISED BY:
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text
(813) 272-5912
AutoCAD SHX Text
P.O. BOX 1110, TAMPA FLORIDA 33601
AutoCAD SHX Text
601 E. KENNEDY BLVD., TAMPA, FLORIDA 33602
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text 1"=80' H
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
HILLSBOROUGH COUNTY
AutoCAD SHX Text Pine Crest Manor Bl Replant
AutoCAD SHX Text Landscape Plan
AutoCAD SHX Text
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
JL
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text Allen L. Howell
LA-0001505
S H
E E
T
M A
T C
H L
I N
E
S H
E E
T
M A
T C
H L
I N
E
80 40 0 80
CE
TC YELLOW TABEBUIA
SP CABBAGE PALM
TREE LEGEND
CE GREEN BUTTONWOOD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
NO.
AutoCAD SHX Text 11x17 SCALE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SUPERVISED BY:
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text
(813) 272-5912
AutoCAD SHX Text
P.O. BOX 1110, TAMPA FLORIDA 33601
AutoCAD SHX Text
601 E. KENNEDY BLVD., TAMPA, FLORIDA 33602
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text 1"=80' H
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
HILLSBOROUGH COUNTY
AutoCAD SHX Text Pine Crest Manor Bl Replant
AutoCAD SHX Text Landscape Plan
AutoCAD SHX Text
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
JL
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text Allen L. Howell
E E
T
M A
T C
H L
I N
E
S H
E E
T
M A
T C
H L
I N
E
80 40 0 80
TC
TC YELLOW TABEBUIA
SP CABBAGE PALM
TREE LEGEND
CE GREEN BUTTONWOOD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
NO.
AutoCAD SHX Text 11x17 SCALE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SUPERVISED BY:
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text
(813) 272-5912
AutoCAD SHX Text
P.O. BOX 1110, TAMPA FLORIDA 33601
AutoCAD SHX Text
601 E. KENNEDY BLVD., TAMPA, FLORIDA 33602
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text 1"=80' H
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
HILLSBOROUGH COUNTY
AutoCAD SHX Text Pine Crest Manor Bl Replant
AutoCAD SHX Text Landscape Plan
AutoCAD SHX Text
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
JL
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text Allen L. Howell
O
L
A
N
D
S
C
A
E
T
I
E
E
T
E
D
O
J
E
C
T
S H
E E
T
M A
T C
H L
I N
E
80 40 0 80
E
D
O
J
E
C
T
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
NO.
AutoCAD SHX Text 11x17 SCALE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SUPERVISED BY:
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text
(813) 272-5912
AutoCAD SHX Text
P.O. BOX 1110, TAMPA FLORIDA 33601
AutoCAD SHX Text
601 E. KENNEDY BLVD., TAMPA, FLORIDA 33602
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text 1"=80' H
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
HILLSBOROUGH COUNTY
AutoCAD SHX Text Pine Crest Manor Bl Replant
AutoCAD SHX Text Landscape Plan
AutoCAD SHX Text
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
JL
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text Allen L. Howell
1. DEFINITIONS
THE FOLLOWING WORDS AND TERMS USED SHALL, WHEREVER THEY APPEAR IN THESE SPECIFICATIONS, BE DESCRIBED AS FOLLOWS, UNLESS A DIFFERENT MEANING IS CLEAR
FROM THE CONTEXT:
A. PROJECT MANAGER SHALL MEAN HILLSBOROUGH COUNTY'S PROJECT MANAGER OR THEIR DESIGNEE.
B. FINAL ACCEPTANCE SHALL MEAN THAT POINT IN TIME WHEN ALL REQUIREMENTS OF THE WORK ARE COMPLETED, INCLUDING ANY PUNCH LIST ITEMS, TO THE SATISFACTION OF THE PROJECT MANAGER, FOR THE ENTIRE PROJECT. THE CONTRACTOR SHALL BE NOTIFIED IN WRITING OF FINAL ACCEPTANCE BY THE PROJECT MANAGER.
C. ESTABLISHMENT PERIOD SHALL BEGIN WHEN PLANT MATERIAL IS INSTALLED AND CONTINUE FOR SIX (6) MONTHS AFTER NOTIFICATION OF FINAL ACCEPTANCE.
D. WARRANTY PERIOD SHALL BE A TWELVE (12) MONTH PERIOD BEGINNING AT FINAL ACCEPTANCE.
E. FINAL ESTABLISHMENT INSPECTION SHALL OCCUR AT THE END OF THE ESTABLISHMENT PERIOD.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING FULLY BOTH THE SITE AND THE BID DOCUMENTS. DISCREPANCIES IN THE DOCUMENTS OR THE ACTUAL SITE CONDITIONS SHALL BE REPORTED TO THE COUNTY IN WRITING AT THE TIME OF BIDDING OR DISCOVERY. NO ACCOUNT SHALL BE MADE AFTER CONTRACT COMPLETION FOR FAILURE TO REPORT SUCH CONDITION, OR FOR ERRORS ON THE PART OF THE LANDSCAPE CONTRACTOR AT THE TIME OF BIDDING.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY APPLICABLE PERMITS AND LICENSES TO PERFORM THE WORK SET FORTH IN THIS PLAN SET AND THE SPECIFICATIONS. ALL PERMITS NECESSARY ARE TO BE PROVIDED BY THE INSTALLING CONTRACTOR UNLESS OTHERWISE SPECIFICALLY STATED IN THE SPECIFICATIONS.
4. QUALITY ASSURANCE:
A. PLANT NAMES SPECIFIED SHALL COMPLY WITH “STANDARDIZED PLANT NAMES” AS ADOPTED BY THE LATEST EDITION OF THE AMERICAN JOINT COMMITTEE OF
HORTICULTURAL NOMENCLATURE. PROVIDE LEGIBLY TAGGED STOCK TRUE TO BOTANICAL NAME.
B. PLANT MATERIAL, INCLUDING ROOT BALLS, SHALL BE FLORIDA GRADE #1 MINIMUM, AT THE TIME OF DELIVERY AND SHALL MAINTAIN FLORIDA GRADE #1 CHARACTERISTICS
THROUGHOUT THE INSTALLATION, ESTABLISHMENT, AND WARRANTY PERIODS. PLANT MATERIAL SHALL COMPLY WITH SIZING AND GRADING STANDARDS OF THE LATEST EDITION OF AMERICAN STANDARD OF NURSERY STOCK (ANSI Z60 1) AND SIZING AND GRADING STANDARDS OF THE LATEST EDITION OF “GRADES AND STANDARDS FOR NURSERY PLANTS: PART I AND II” BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES.
C. PLANTING SHALL BE DONE IN ACCORDANCE WITH THE FLORIDA NURSERYMEN AND GROWERS ASSOCIATION'S APPROVED PRACTICES.
D. TREE CALIPER MEASUREMENT SHALL BE TAKEN 6” ABOVE GROUND LEVEL IF 4” OR LESS. IF GREATER THAN 4”, CALIPER MEASUREMENT SHALL BE TAKEN AT 12” ABOVE GROUND
LEVEL.
E. IF SPECIFIED PLANT MATERIAL IS NOT OBTAINABLE, CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER OF INTENDED SUBSTITUTIONS BY TELEPHONE AND IN WRITING, AND
SHALL BE MADE ONLY AFTER AUTHORIZED BY THE PROJECT MANAGER IN WRITING OF APPROVED INTENDED CHANGES.
F. PLANTS SHALL BE NURSERY GROWN OR REGENERATED AND 100% ACCLIMATIZED TO LOCAL PLANTING CONDITIONS.
G. TAGGED TREES WILL BE INSPECTED AND APPROVED BY THE PROJECT MANAGER AT THE PLACE OF GROWTH FOR COMPLIANCE WITH SPECIFICATION REQUIREMENTS FOR
QUALITY, SIZE AND VARIETY. FIVE (5) BUSINESS DAYS SHALL BE PROVIDED TO THE PROJECT MANAGER PRIOR TO THE INSPECTION. WHEN TREES CANNOT BE OBTAINED LOCALLY, PROVIDE SUFFICIENT PHOTOGRAPHS OF THE PROPOSED PLANTS FOR APPROVAL. SUCH APPROVAL SHALL NOT RELINQUISH THE RIGHT OF INSPECTION AND REJECTION UPON
DELIVERY AT THE SITE. REFER TO NOTE 19 (SUBMITTALS).
5. UTILITIES
THE EXACT LOCATION OF ALL EXISTING STRUCTURES, UNDERGROUND UTILITIES, DRAINAGE STRUCTURES, AND PIPE MAY NOT BE AS INDICATED ON DRAWINGS. CONTACT SUNSHINE STATE ONE-CALL AS REQUIRED BY CHAPTER 556 OF THE FLORIDA STATUTES PRIOR TO ANY EXCAVATION OR PLANTING ACTIVITIES. FIELD LOCATE ALL UTILITIES, DRAINAGE STRUCTURES, LIGHT POLES, SIGNS AND OTHER VISIBLE STRUCTURES PRIOR TO INSTALLATION OF PLANT MATERIALS. NOTIFY THE COUNTY IMMEDIATELY OF ANY
POSSIBLE CONFLICTS.
6. THE CONTRACTOR SHALL NOT CUT OR DAMAGE EXISTING TREES, PALMS, AND SHRUB/GROUNDCOVER PLANTINGS WITHIN OR OUTSIDE THE LIMITS OF WORK AS IDENTIFIED ON THE DRAWINGS, UNLESS AUTHORIZED BY THE PROJECT MANAGER. THIS INCLUDES, BUT IS NOT LIMITED TO, DAMAGE CAUSED BY OPERATION OF EQUIPMENT, STOCKPILING OF MATERIALS, CARELESS LABOR, OR OTHER CONTRACTOR ACTIVITIES (INCLUDING COMPACTION BY DRIVING OR PARKING INSIDE DRIP-LINE OF TREES OR THE SPILLING OF OIL, GASOLINE, OR OTHER DELETERIOUS MATERIALS WITHIN THE DRIP-LINE OF TREES). ALL DAMAGE SHALL BE REPAIRED TO THE SATISFACTION OF THE COUNTY, AT NO COST
TO THE COUNTY.
7. THE CONTRACTOR SHALL CONDUCT WORK IN A MANNER TO PREVENT INTERRUPTION OR DAMAGE TO EXISTING SYSTEMS. PROTECT UTILITY SERVICES WHICH MUST REMAIN
OPERATIONAL AND REPAIR OR REPLACE IMMEDIATELY IF DAMAGED.
8. THE WORK CONSISTS OF THE COMPLETE INSTALLATION OF PLANT MATERIALS, MULCH, SOIL, WATER AND INCIDENTAL ITEMS AS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. THE WORK SHALL INCLUDE THE FURNISHING OF ALL LABOR, EQUIPMENT, MATERIALS AND APPURTENANCES REQUIRED FOR THE LANDSCAPE INSTALLATION AS SHOWN ON THE PLANS. THE WORK SHALL ALSO INCLUDE THE MAINTENANCE OF ALL PLANTS AND AREAS SURROUNDING PLANTINGS (INCLUDING MOWING) UNTIL FINAL ESTABLISHMENT INSPECTION BY THE COUNTY. THE WORK SHALL BE DONE BY A SINGLE FIRM SPECIALIZING IN LANDSCAPE WORK. REMOVE ALL EXISTING TREE STAKES.
9. PLANT MATERIAL LOCATIONS SHALL BE STAKED IN THE FIELD FOR APPROVAL A MINIMUM OF ONE (1) WEEK PRIOR TO INSTALLATION OR AS APPROVED BY THE PROJECT
MANAGER.
10. WHEN APPROVED BY THE PROJECT MANAGER, THE LOCATIONS OF PLANTS MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN FIELD CONDITIONS, TO COMPLY WITH SAFETY
AND MAINTENANCE SETBACKS, OR AS OTHERWISE DIRECTED OR APPROVED BY THE COUNTY.
11. PLANT MATERIAL LOCATIONS SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE LOCAL UTILITY PROVISIONS. ALTERNATE LOCATIONS FOR PLANT MATERIALS ARE SUBJECT TO THE APPROVAL BY THE COUNTY. SUCH CHANGES IN LOCATION SHALL BE MADE WITHOUT ADDITIONAL COMPENSATION.
12. PLANTS SHALL NOT DEMONSTRATE EVIDENCE OF PREVIOUS CONTAINER CONSTRAINT. ANY INDICATION OF ROOT DEVELOPMENT RESTRICTION, GIRDLING/CIRCLING ROOTS, OR
EXCESSIVE ROOTS EXPOSED ABOVE THE SOIL SURFACE WILL BE GROUNDS FOR REJECTION.
13. THE CONTRACTOR SHALL FURNISH PLANT MATERIALS FREE FROM INSECTS, DISEASES, PARASITES, OR HARMFUL TOXIC CHEMICAL SUBSTANCES. PLANT MATERIAL SHALL HAVE NO LICHENS, ALGAE OR FUNGI ATTACHED ON MORE THAN 10% OF PLANT. PLANT MATERIAL SHALL HAVE NO SPANISH MOSS (TILLANDSIA USNEOIDES) ON OR WITHIN PLANT
CANOPY.
14. ON-SITE PLANT MATERIAL DELIVERIES SHALL OCCUR ON MONDAY THROUGH THURSDAY ONLY UNLESS OTHERWISE DIRECTED BY THE PROJECT MANAGER. THE CONTRACTOR SHALL ENSURE THAT ALL PLANT MATERIAL ARE DELIVERED ON SITE UNDAMAGED FROM TRANSPORT OR DIGGING OPERATIONS. THE PROJECT MANAGER WILL REJECT ANY MATERIAL THAT HAS BEEN DAMAGED OR RENDERED UNACCEPTABLE DUE TO RELOCATION OR TRANSPORT FROM POINT OF ORIGIN. PLANT MATERIAL SHALL BE PROTECTED FROM SUN, WIND, AND OTHER DAMAGE, DURING DELIVERY. PLANT MATERIAL SHALL BE AVAILABLE TO BE INSPECTED BY THE COUNTY PRIOR TO PLANTING. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS IN PREPARING PLANTS FOR TRANSPORT. PLANT MATERIAL THAT IS STORED IMPROPERLY SHALL RECEIVE A SPECIAL REVIEW BY THE PROJECT
MANAGER FOR ACCEPTANCE OR REJECTION.
15. THE PROPOSED PLANTINGS ARE LOCATED TO ALLOW MAINTENANCE ACCESS AND SHALL NOT OBSTRUCT ACCESS TO STORMWATER FACILITIES.
16. SWALES, DITCHES AND OTHER DRAINAGE CONVEYANCE SYSTEMS SHALL BE KEPT CLEAR OF OBSTRUCTIONS.
17. ANY VEGETATIVE COVER THAT IS DISTURBED, SUCH AS BY RUTTING OR TRENCHING, SHALL BE RE-GRADED AND REPLACED. RESTORATION OF DISTURBED AREAS SHALL BE
REPLACED WITH SOD TO MATCH EXISTING UNLESS OTHERWISE DIRECTED BY THE PROJECT MANAGER AT NO ADDITIONAL COST TO THE COUNTY.
18. THE JOB SITE SHALL BE KEPT ORDERLY AND REASONABLY CLEAN ON A DAILY BASIS DURING CONSTRUCTION OPERATIONS. UPON DAILY COMPLETION OF WORK, REMOVE ALL
DEBRIS AND WASTE GENERATED BY CONSTRUCTION OPERATIONS, INCLUDING THE DAILY CLEANING OF WALLS, PAVING, CURBS, SIDEWALKS, AND TURF AREAS. NO
VEHICLES/EQUIPMENT SHALL BE LEFT ON-SITE OVERNIGHT.
19. SUBMITTALS:
A. SUPPLY THE FOLLOWING ITEMS AND SUBMIT TO THE COUNTY FOR APPROVAL:
a. SAMPLE OF ORGANIC MULCH MATERIAL
b. SAMPLE OF FINAL BACKFILL SOIL
c. FERTILIZER ANALYSIS, MANUFACTURER'S LABEL, AND APPLICATION RATES
d. MANUFACTURER'S LABEL AND APPLICATION RATES FOR ALL PESTICIDES
e. A SCHEDULE OF VALUES FOR ALL LANDSCAPE MATERIALS AND INCIDENTALS SPECIFIED IN THE PLANS SHALL BE SUBMITTED PRIOR TO COMMENCEMENT OF THE WORK
f. PRIOR TO PLANTING, A COLOR PHOTOGRAPH SUBMISSION FOR EACH PLANT SPECIES SPECIFIED SHALL BE SUBMITTED TO THE PROJECT MANAGER FOR APPROVAL. EACH
APPROVED PLANT PHOTOGRAPH SHALL BE THE MINIMUM STANDARD ACCEPTED FOR EACH PLANT SPECIES. PLANT MATERIAL NOT MEETING THIS STANDARD WILL BE REJECTED. THE PLANT PHOTOGRAPH SHALL SHOW THE ENTIRE PLANT AND HAVE A LEGIBLE SCALE TO SHOW THE OVERALL HEIGHT AND SPREAD OF THE PLANT.
PHOTOGRAPHS SHALL INDICATE THE GENUS, SPECIES, AND SIZE OF THE PLANT IN THE PHOTO
g. PROVIDE A PLANTING SCHEDULE, SHOWING SCHEDULED DATES FOR EACH TYPE OF PLANTING IN EACH AREA OF SITE, TWO WEEKS PRIOR TO BEGINNING WORK FOR
APPROVAL BY THE PROJECT MANAGER
h. CERTIFICATES OF INSPECTION, AS REQUIRED BY GOVERNMENTAL AUTHORITIES AND MANUFACTURERS' OR VENDORS' CERTIFIED ANALYSIS FOR SOIL AMENDMENTS, HERBICIDES, INSECTICIDES AND FERTILIZER MATERIALS
i. GROWERS' AND/OR STATE INSPECTION CERTIFICATE FOR PLANT MATERIAL TWO (2) WEEKS BEFORE COMMENCING WORK
j. MAINTENANCE OF TRAFFIC PLAN, IN ACCORDANCE WITH FDOT AND HILLSBOROUGH COUNTY REQUIREMENTS FOR REVIEW AND APPROVAL
k. UPON FINAL ACCEPTANCE OF PLANT MATERIAL, SUBMIT TWO COPIES OF WRITTEN MAINTENANCE INSTRUCTION MANUALS RECOMMENDING PROCEDURES FOR
MAINTENANCE OF PLANT MATERIALS
20. PLANT SUPPLEMENTS:
A. PLANT MATERIAL SHALL BE FERTILIZED WITH A 3-MONTH SLOW RELEASE 8-2-12 +4 MG. ONE HUNDRED PERCENT (100%) OF N, K, AND MG SHALL BE IN CONTROLLED RELEASE
FORM AND MICRONUTRIENTS SHALL BE IN SULFATE OR CHELATE (FE ONLY). FERTILIZER SHALL CONTAIN 1.5%-2% MN AND FE PLUS TRACE AMOUNTS OF B (0.15%), ZN (0.15%), AND CU (0.05%). SUBMIT SAMPLES OF FERTILIZER TO THE PROJECT MANAGER FOR APPROVAL.
B. PLANT MATERIAL SHALL BE FERTILIZED AT THE TIME OF PLANTING, AT 3-MONTH INTERVALS, AND 30 DAYS PRIOR TO COMPLETION OF THE ESTABLISHMENT PERIOD. NOTIFY THE COUNTY IN WRITING 48 HOURS IN ADVANCE OF FERTILIZER APPLICATIONS. FOLLOW ALL MANUFACTURERS RECOMMENDATIONS.
C. FERTILIZER MATERIALS SHALL BE DELIVERED TO THE WORK SITE IN ORIGINAL, UNOPENED AND UNDAMAGED CONTAINERS SHOWING WEIGHT, ANALYSIS AND NAME OF
MANUFACTURE
22. HERBICIDE AND INSECTICIDE:
ALL PRE AND POST HERBICIDAL TREATMENTS SHALL INCLUDE A TEMPORARY TRACER DYE IDENTIFIABLE FOR A MINIMUM OF TWO (2) DAYS AFTER APPLICATION. USE CARE
AROUND TREE ROOTS. SUBMIT SAMPLES TO THE PROJECT MANAGER FOR APPROVAL.
23. STAKING AND GUYING:
A. TREES HALL BE INSTALLED AS SHOWN ON THE DETAILS SHEET.
B. SHRUBS AND GROUNDCOVER SHALL BE INSTALLED AS INDICATED IN THE PLANS.
C. THE CONTRACTOR SHALL MAINTAIN STAKING AND GUYING IN GOOD CONDITION AT ALL TIMES. REMOVE STAKING 1 YEAR AFTER INSTALLATION OR AS DIRECTED BY THE
COUNTY.
24. MULCH:
ORGANIC MULCH MATERIAL SHALL BE SHREDDED MELALEUCA OR APPROVED EQUAL AND SHALL BE APPLIED TO ALL PLANTING AREAS, TREESAT A MINIMUM WETTED DEPTH OF THREE INCHES UNLESS DIRECTED OTHERWISE ON PLANS. MINIMUM 3" DEPTH SHALL BE MAINTAINED THROUGHOUT THE WARRANTY PERIOD. CYPRESS MULCH IS NOT
ALLOWED.
25. WEED AND LITTER CONTROL:
DURING THE PROJECT INSTALLATION AND ESTABLISHMENT, AND WARRANTY PERIOD, THE CONTRACTOR SHALL KEEP THE INDIVIDUAL PLANTING LOCATIONS AND PLANTING
BEDS FREE OF LITTER AND UNDESIRABLE VEGETATION.
26. AMENDED SOIL BACKFILL SHALL BE AS FOLLOWS:
A. MIXTURE FOR TREES SHALL BE THOROUGHLY MIXED AND CONSIST OF THE FOLLOWING:
a. 2/3 BLENDED SOIL (SEE REQUIREMENTS BELOW)
b. 1/3 COARSE SAND
B. BLENDED SOIL SHALL CONSIST OF THE FOLLOWING:
a. 1/3 MUSHROOM COMPOST OR PEAT
b. 1/3 COMPOSTED COW MANURE
c. 1/3 COMPOSTED BARK
C. CONTRACTOR SHALL TAKE RESPONSIBILITY FOR PERFORMING PERCOLATION TESTS PRIOR TO BACKFILLING WITH APPROVED PLANTING SOIL. NOTIFY THE COUNTY IMMEDIATELY
IF PERCOLATION DOES NOT SUPPORT HEALTHY GROWTH OF PLANTINGS.
D. REFER TO DETAILS FOR MINIMUM PLANTING PIT DIMENSIONS.
27. NO CONTRACTOR IDENTIFICATION SIGNS SHALL BE PERMITTED ON THE PROJECT.
28. SANDING OF PALM TRUNKS WILL NOT BE ACCEPTED. PALM FRONDS SHALL BE TIED UP TO PROTECT THE BUD FROM DAMAGE. FRONDS SHALL BE TIED WITH A MATERIAL THAT
WILL DECOMPOSE NATURALLY. DO NOT HURRICANE CUT PALMS. TRIM FRONDS ONLY.
29. WATER:
A. WATER SHALL BE FREE OF SUBSTANCES HARMFUL TO PLANT GROWTH AND CONTAIN LESS THAN 300 PPM SOLUBLE SALTS AND 10 PPM CHLORINE. CONTRACTOR SHALL FURNISH WATER SUPPLY FROM AN ACCEPTABLE SOURCE SUCH AS DEEP WELLS, MUNICIPAL WATER SUPPLY OR TREATED WASTEWATER.
B. THIS RECOMMENDATION FOR WATER FOR PLANT ESTABLISHMENT IS PROVIDED AS A REFERENCE ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE SUFFICIENT
WATER TO ENSURE PROPER ESTABLISHMENT AND VIGOR OF PLANTS.
a. TREES: AT EACH WATERING APPLY 10 GALLONS PER INCH OF TRUNK CALIPER TO THE ROOTBALL. APPLY IN A MANNER THAT WILL ALLOW ALL WATER TO SOAK INTO THE
ROOTBALL. DO NOT WATER IF ROOTBALL IS WET OR SATURATED ON THE IRRIGATION DAY.
b. PALMS: APPLY 30 GALLONS PER PALM PER APPLICATION TO THE ROOTBALL. APPLY IN A MANNER THAT WILL ALLOW ALL WATER TO SOAK INTO THE ROOTBALL. DO NOT
WATER IF ROOTBALL IS WET OR SATURATED ON THE IRRIGATION DAY.
c. SHRUBS AND GROUNDCOVERS: AT EACH IRRIGATION APPLY WATER TO WET THE ENTIRE DEPTH OF ROOTBALL. DO NOT WATER IF ROOTBALL IS WET OR SATURATED ON THE
IRRIGATION DAY.
d. WATERING SHALL CONTINUE FOR A PERIOD OF 120 DAYS (MINIMUM) FROM THE TIME OF INSTALLATION OF THE LAST PLANT MATERIAL.
30. ACCEPTANCE:
A. INSPECTION TO DETERMINE ACCEPTANCE OF PLANTED AREAS WILL BE MADE BY THE PROJECT MANAGER UPON CONTRACTOR'S REQUEST. THE CONTRACTOR SHALL PROVIDE
NOTIFICATION AT LEAST FIVE (5) WORKING DAYS BEFORE REQUESTED INSPECTION DATE. PLANTED AREAS WILL BE ACCEPTED PROVIDED ALL REQUIREMENTS, INCLUDING MAINTENANCE, HAVE BEEN COMPLIED WITH AND PLANT MATERIALS ARE ALIVE AND IN HEALTHY, VIGOROUS CONDITION.
B. THE PROJECT MANAGER WILL CREATE A PUNCH LIST FOR THOSE ITEMS REQUIRING CORRECTION PRIOR TO FINAL ACCEPTANCE RE-INSPECTION. AN APPROPRIATE CORRECTION TIME WILL BE DETERMINED BY THE PROJECT MANAGER AT THE TIME CORRECTIONS ARE DETERMINED NECESSARY. THE CONTRACTOR SHALL PROVIDE AT LEAST THREE (3)
BUSINESS DAY'S NOTIFICATION FOR A REQUESTED RE-INSPECTION.
C. NO PLANT MATERIAL WILL BE ACCEPTED SHOWING EVIDENCE OF CABLE, CHAIN MARKS, EQUIPMENT SCARS OR OTHER MECHANICAL DAMAGE.
31. WARRANTY:
A. CONTRACTOR SHALL WARRANT PLANT MATERIAL TO REMAIN ALIVE AND SUSTAIN A HEALTHY GROWING CONDITION FOR A ONE (1) YEAR PERIOD AFTER FINAL ACCEPTANCE.
B. WARRANTY SHALL NOT INCLUDE DAMAGE OR LOSS OF PLANTS CAUSED BY FIRES, FLOODS, RAINS, LIGHTING STORMS, VEHICLES, ACTS OF VANDALISM, WINDS OVER 75 MILES
PER HOUR, WINTER KILL CAUSED BY EXTREME COLD OR WINTER CONDITIONS NOT TYPICAL OF THE PLANTING AREA.
C. THE CONTRACTOR SHALL REMOVE AND REPLACE IMMEDIATELY ALL PLANTS FOUND TO BE DEAD OR IN UNHEALTHY OR UNSIGHTLY CONDITION AS DETERMINED BY THE
PROJECT MANAGER AT ANY TIME DURING THE WARRANTY PERIOD. ALL REPLACEMENTS FOR REMOVED PLANTS ARE TO OCCUR WITHIN THREE (3) WEEKS OF NOTIFICATION BY THE COUNTY REPRESENTATIVE. THE COST OF SUCH REPLACEMENT IS AT CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL WARRANT ALL REPLACEMENT PLANTS FOR THREE
(3) MONTHS AFTER THE COUNTY'S ACCEPTANCE OF THE REPLACEMENT PLANT MATERIALS.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
NO.
AutoCAD SHX Text 11x17 SCALE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SUPERVISED BY:
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text
(813) 272-5912
AutoCAD SHX Text
P.O. BOX 1110, TAMPA FLORIDA 33601
AutoCAD SHX Text
601 E. KENNEDY BLVD., TAMPA, FLORIDA 33602
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text 1"=80' H
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
HILLSBOROUGH COUNTY
AutoCAD SHX Text Pine Crest Manor Bl Replant
AutoCAD SHX Text Landscape Notes
AutoCAD SHX Text
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
JL
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text Allen L. Howell
STAKE/ANCHOR
120°
WEBBING
TREE TRUNK
PLAN
VIEW
AutoCAD SHX Text Tabebuia umbellata
AutoCAD SHX Text
SCIENTIFIC NAME
AutoCAD SHX Text
TREES
AutoCAD SHX Text
TC
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
COMMENTS
AutoCAD SHX Text As shown
AutoCAD SHX Text
45 GAL
AutoCAD SHX Text
SPACING
AutoCAD SHX Text
SIZE
AutoCAD SHX Text Yellow Trumpet Tree
AutoCAD SHX Text
COMMON NAME
AutoCAD SHX Text
EST. QTY.
AutoCAD SHX Text
MASTER PLANT LIST
AutoCAD SHX Text
AutoCAD SHX Text Sabal palmetto
AutoCAD SHX Text
SP
AutoCAD SHX Text Regenerated, matched, 14'-16' ht, fully booted
AutoCAD SHX Text As shown
AutoCAD SHX Text B&B
AutoCAD SHX Text Cabbage Palm
AutoCAD SHX Text
AutoCAD SHX Text 12'-14' ht., 2"-2.25" cal., full, dense canopy
AutoCAD SHX Text
PALM PLANTING
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
CENTRAL LEADER (DO NOT REMOVE.)
AutoCAD SHX Text ROOT BALL SHALL BE 1"-2" ABOVE FINISH GRADE. DO NOT PLANT ROOT BALL BELOW FINISHED GRADE.
AutoCAD SHX Text FILL WITH AMENDED SOIL IN 6" LAYERS, WATERING WHEN VOID IS HALFWAY FULL AND AGAIN WHEN FULL.
AutoCAD SHX Text 3" THICK, 4' DIA. MULCH RING AROUND TREE. ENSURE MULCH IS 12" MIN. AWAY FROM TRUNK.
AutoCAD SHX Text ROUND-TOPPED SOIL MOUND, 4" HIGH x 8" WIDE ABOVE ROOT BALL SURFACE SHALL BE CONSTRUCTED AROUND THE ROOT BALL, BEGINNING AT OUTER EDGE OF ROOT BALL.
AutoCAD SHX Text
TREE PLANTING
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
WIDE NYLON WEBBING
AutoCAD SHX Text 2"x2"x12" WOOD STAKE OR ANCHOR AT OR BELOW GRADE.
AutoCAD SHX Text
REGENERATED SABAL PALM. #1 - MIN. 3 DEVELOPED FRONDS.
AutoCAD SHX Text
TIE FRONDS FOR TRANSPORTATION ONLY.
AutoCAD SHX Text
3 LAYERS OF BURLAP TO PAD BATTENS FOR BRACES
AutoCAD SHX Text 2x4x12" BATTENS (3 MIN.) SPACED EQUALLY AROUND TRUNK, OF CLEAR 13 OF CLEAR TRUNK HEIGHT
AutoCAD SHX Text
TWO " STEEL BANDS TO SECURE 34" STEEL BANDS TO SECURE BATTENS
AutoCAD SHX Text 2x4 BRACES, NAILED TO BATTENS & STAKES. ENSURE NAILS DO NOT PENETRATE PALM TRUNK.
AutoCAD SHX Text
ROOTBALL 2"-3" ABOVE GRADE
AutoCAD SHX Text
AMENDED SOIL BACKFILL
AutoCAD SHX Text 2x4x3' STAKES
AutoCAD SHX Text
EXISTING SOIL
AutoCAD SHX Text Conocarpus erectus
AutoCAD SHX Text
CE
AutoCAD SHX Text 14'-16' HT., 3" CAL., Standard, 4' CT, Full dense canopy
AutoCAD SHX Text As shown
AutoCAD SHX Text
RPG
AutoCAD SHX Text Green Buttonwood
AutoCAD SHX Text
AutoCAD SHX Text
36" MIN.
AutoCAD SHX Text
36" MIN.
AutoCAD SHX Text
36" MIN.
AutoCAD SHX Text
36" MIN.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
NO.
AutoCAD SHX Text 11x17 SCALE:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SUPERVISED BY:
AutoCAD SHX Text Lic. No.
AutoCAD SHX Text
(813) 272-5912
AutoCAD SHX Text
P.O. BOX 1110, TAMPA FLORIDA 33601
AutoCAD SHX Text
601 E. KENNEDY BLVD., TAMPA, FLORIDA 33602
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
TRANSPORTATION MAINTENANCE
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text 1"=80' H
AutoCAD SHX Text
DIVISION
AutoCAD SHX Text
HILLSBOROUGH COUNTY
AutoCAD SHX Text Pine Crest Manor Bl Replant
AutoCAD SHX Text Landscape List & Details
AutoCAD SHX Text
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text 06/25
AutoCAD SHX Text
JL
AutoCAD SHX Text 06/25
AutoCAD SHX Text
ALH
AutoCAD SHX Text Allen L. Howell
| Sheets and Views |
| Pine_Crest_Manor_Blvd Replant-1-Coversheet |
| Pine_Crest_Manor_Blvd Replant-1-Plan 1 |
| Pine_Crest_Manor_Blvd Replant-1-Plan 2 |
| Pine_Crest_Manor_Blvd Replant-1-Plan 3 |
| Pine_Crest_Manor_Blvd Replant-1-Plan 4 |
| Pine_Crest_Manor_Blvd Replant-1-Notes 5 |
| Pine_Crest_Manor_Blvd Replant-1-Details 6 |
| Pine_Crest_Manor_Blvd Replant-1.pdf |
| Sheets and Views |
| Pine_Crest_Manor_Blvd Replant-1-Details 6 |
File details come from the government source that posted it. Updated .