About this file

This Bidders Information Sheet is a solicitation from Genesee School District, located at 7347 N Genesee Rd, Genesee, Michigan, for Mechanical HVAC improvements to Genesee High School/Middle School and Haas Elementary School as part of a facility-wide upgrades project. The scope includes design assist services, removal of existing classroom unit ventilators and rooftop air-handling units, installation of new rooftop condensing units and air-handling equipment with new line sets, provision of building controls, new ductwork installation, cutting and coring, and all associated testing, start-up, and commissioning. The project is funded through the Michigan Department of Education's 12e Grant Program and managed by Lurvey Construction as Construction Manager. A mandatory site walk-through is scheduled for Wednesday, December 2, 2026, at 3:30 PM, with proposals due Wednesday, December 9, 2026, at 2:00 PM at the Genesee Schools address. The anticipated target award date is December 18, 2026, with field investigation during the school holiday shutdown from December 21-23, 2026, and equipment design and ordering to support installation during the summer shutdown from June 1 through August 15, 2027.

The proposal must include separate lump-sum pricing for each school facility, the total Mechanical Base Bid, an HVAC Building Controls Allowance, and any alternates or allowances with supporting cost breakdowns. All labor, materials, equipment, engineering, supervision, demolition, installation, connections, testing, start-up, coordination, permits, inspections, and related costs are the responsibility of the Mechanical Contractor, except for electrical power disconnects/reconnects, roof patching, and architectural finishes, which are identified as work by others. Bidders must clearly identify assumptions, exclusions, clarifications, proposed schedules, anticipated lead times, and any costs not included in proposals. Contact for the bid is Kyle Hulett at (810) 922-2753 or khulett@dwlurvey.com. No specific set-asides, incumbents, or pricing terms are identified in this document.

View the file

Other files

File Type Posted
Mechanical Bid Advertisement - Genesee Schools (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11/23/2026

GENESEE SCHOOL DISTRICT

7347 N GENESEE RD, GENESEE, MI 48437

WORK SCOPE / BID FORM = MECHANICAL HVAC BIDDERS

INFORMATION SHEET

To all prospective Mechanical HVAC Contractors:

Please consider this as an invitation to provide a proposal for the Mechanical HVAC improvements required for the Genesee School District Facility-Wide Upgrades Project. Lurvey Construction is serving as

Construction Manager (CM) for the proposed facility improvements at Genesee High School / Middle

School and Haas Elementary School.

General Description:

Lurvey Construction is assisting Genesee School District with the planning, coordination, and implementation of improvements funded through the Michigan Department of Education’s 12e Grant

Program. The mechanical improvements are intended to provide air conditioning in areas of the buildings that are not currently air-conditioned and replace older rooftop units that are no longer operational or are beyond their expected service life.

The Mechanical Contractor shall provide all labor, materials, equipment, supervision, layout, demolition, installation, connections, testing, start-up, and coordination necessary to provide complete and operational mechanical systems in accordance with the Mechanical Narrative (THA# 26-280, dated

November 17, 2026), associated mechanical drawings and schedules, applicable codes, and the requirements of the Owner and Construction Manager. Contractors shall review the complete bid documents and field-verify existing conditions.

Project Schedule:

Immediate engagement with the selected subcontractor is anticipated. The selected subcontractor shall coordinate with Lurvey Construction to establish the project schedule, submittal requirements, fabrication and delivery lead times, and anticipated installation dates. All proposed lead times and schedule requirements shall be clearly identified in the bid proposal.

Proposed Timing:

• Target Award of Work Scope by December 18, 2026.

• Field investigation during School Holiday Shutdown: December 21–23, 2026.

• Design and order equipment to support installation during the summer shutdown: June 1–August 15, 2027.

Bid Schedule:

Mandatory Site Walk Through: Wednesday, December 2nd at 3:30 PM.

Proposals Due: Wednesday, December 9, 2026, at 2:00 PM.

Proposal Delivery / Submission Location: Genesee Schools, 7347 N. Genesee Rd, Genesee, MI 48437.

Bidders shall follow the submission instructions outlined in the Instructions to Bidders.

Bid Contact: Kyle Hulett

Phone: (810) 922-2753

Email: khulett@dwlurvey.com

7347 N GENESEE RD, GENESEE, MI 48437

Documents Provided for Bidders Use:

• Mechanical Narrative (THA# 26-280), dated November 23, 2026

• Mechanical HVAC Work Scope / Bid Form

• Associated mechanical drawings and schedules

• Familial Relationship Disclosure

• Iran Economic Sanctions Certification

• Instructions to Bidders

Process Notes:

• Review the Mechanical HVAC Work Scope / Bid Form, Mechanical Narrative, drawings, schedules, keyed notes, and all applicable bid documents prior to submitting a proposal.

• Perform site visits and field verification of existing equipment, ductwork, piping, roof curbs, louvers, openings, utilities, access, and installation conditions before submitting the proposal. A planned site investigation after award is anticipated during the School Holiday Shutdown, December 21–23, 2026.

• Submit a complete proposal identifying separate lump-sum pricing for Genesee High School / Middle

School and Haas Elementary School, the total Mechanical Base Bid, the HVAC Building Controls

Allowance, and any alternates / allowances with a supporting breakdown.

• Clearly identify assumptions, exclusions, clarifications, proposed schedule, anticipated lead times, and any costs not included in the proposal.

• Include all labor, materials, equipment, engineering, supervision, demolition, installation, connections, testing, start-up, coordination, permits, inspections, fees, hoisting, rigging, lifting, and access equipment necessary for a complete installation, except where specifically identified as by others or excluded.

• Coordinate all work with the Owner, Lurvey Construction, design professionals, and affected trades.

Coordinate shutdowns, tie-ins, and interruptions in advance to maintain required building operations.

• Coordinate electrical power and control connections with the Electrical Contractor. Identify voltage, phase, MCA/MOCP, disconnect, and other electrical requirements for each item of equipment.

Mechanical Work Included:

The Mechanical Contractor’s proposal shall include, as applicable, the following work identified in the

Mechanical Narrative and Work Scope / Bid Form:

• Design assist with THA to facilitate completed engineering documents for submission to the State.

• Removal of existing classroom unit ventilators and installation of new units, including required disconnection, reconnection, and disposal.

• Removal of existing rooftop AHUs, including required hoisting, lifting, and disposal.

7347 N GENESEE RD, GENESEE, MI 48437

• Installation of new rooftop condensing units and new air-handling equipment, including required hoisting, lifting, blocking, and protection of existing roofing. Provide roof curb adapters to support new AHUs on existing curbs.

• Provide new line sets routed as cleanly and efficiently as possible, including manufacturer covers over exposed line sets. Confirm routing with the Owner / Contractor Team prior to installation.

• Provide building controls complete. Include the HVAC Building Controls Allowance identified in the bid form.

• Provide new ductwork as required to support the installation and complete all required testing and balancing.

• Provide cutting and coring required for the Mechanical Contractor’s work. Roof patching is by others.

• Provide equipment submittals, product data, installation information, coordination drawings, testing, start-up, adjustment, warranties, operation and maintenance information, and closeout documentation.

Related Work by Others / Exclusions:

• Electrical power disconnects / reconnects by others.

• Roof patching by others.

• Painting, flooring, and architectural finishes by others.

The Mechanical Contractor shall protect existing building finishes, equipment, occupied spaces, and adjacent construction, and shall coordinate patching, sealing, and restoration associated with mechanical work.

Comply with applicable codes, regulations, manufacturer requirements, and Authority Having Jurisdiction requirements. Clearly identify scope limits and trade responsibilities in the proposal to minimize gaps, overlaps, and change orders.