This is a Bid Form and Price Schedule (Attachment A) for Murray City, Utah's Invitation for Bid (IFB) 26-22 for Park Center Roof Replacement. The project requires complete removal and disposal of existing roofing materials, deck and substrate repairs, insulation installation, and placement of a new 60 mil TPO roofing system with drainage improvements, flashings, coping, parapet work, and related accessories. The scope is divided into nine distinct roof areas (Areas 1-9) as identified on Attachment D – Map of the Park Center Roof. Bidders must provide comprehensive pricing that includes all labor, materials, equipment, demolition, disposal, permits and fees, cranes, temporary facilities, site protection, cleanup, warranties, insurance, bonding, overhead, and profit necessary for complete performance of the work.
The Total Base Bid serves as the sole price for bid comparison and must account for all work specified in the IFB, plans, specifications, attachments, and addenda. Bidders are required to break down costs by roof area across six cost categories: Labor, Materials, Equipment, Disposal, Permits & Fees, and Other/Overhead & Profit. The bid form also requests separate unit pricing for optional items including insulation replacement, steel deck replacement, coping, wood nailer, and walk pads, measured per square foot or linear foot as applicable. Additionally, bidders may submit pricing for two Additive Alternates—ladder access between roof sections and a release-sheet TPO system installation—which are optional and will not affect award determination. Bidders must complete a Construction Preference Certification addressing qualified health insurance coverage, drug and alcohol testing policies, veteran employment programs, job training programs, safety programs, and formal nondiscrimination policies, with award remaining subject to responsiveness, responsibility, and the construction preference system outlined in the IFB and Murray City Code 3.10.370.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| MURRAY CITY, UTAH |
| IFB 26-22 – PARK CENTER ROOF REPLACEMENT |
| ATTACHMENT A – BID FORM AND PRICE SCHEDULE |
| Bidder Legal Name | Contact Name |
| Address | Phone |
| City / State / ZIP |
The Total Base Bid is the sole price used for bid comparison. It shall include all work required by the IFB, plans, specifications, attachments, and addenda. Unit prices and Additive Alternate prices are separate and will not be used to determine the low bid. Award remains subject to responsiveness, responsibility, and the construction preference system stated in the IFB.
| A. TOTAL BASE BID – COST BY ROOF AREA | |||||||
| Roof Area | Labor ($) | Materials ($) | Equipment ($) | Disposal ($) | Permits & Fees ($) | Other / O&P ($) | Area Total ($) |
| Roof Area 1 | - | ||||||
| Roof Area 2 | - | ||||||
| Roof Area 3 | - | ||||||
| Roof Area 4 | - | ||||||
| Roof Area 6 | - | ||||||
| Roof Area 7 | - | ||||||
| Roof Area 8 | - | ||||||
| Roof Area 9 | - | ||||||
| TOTAL BASE BID | - | ||||||
| Base Bid shall include all labor, materials, equipment, demolition, disposal, permits and fees, cranes, temporary facilities, site protection, cleanup, warranties, insurance, bonding, overhead, profit, and all other costs necessary for complete performance of the Work. Roof Areas 1–9 correspond to Attachment D – Map of the Park Center Roof. |
| B. UNIT PRICE SCHEDULE | |||
| Item | Unit | Unit Price ($) | Basis / Notes |
| Insulation replacement | SF | Per square foot. | |
| Steel deck replacement | SF | Per square foot. See IFB scope for required Base Bid work. | |
| Coping | LF | Per linear foot. | |
| Wood nailer | LF | Per linear foot. | |
| Walk pads | LF | Per linear foot. See IFB §3.10 for walk-pad location and approximate quantity. |
Unit prices shall be fully burdened and include all labor, materials, equipment, overhead, profit, and incidentals required for the applicable unit of work. Unit prices do not alter the Total Base Bid used for bid comparison.
| C. ADDITIVE ALTERNATES | ||
| Additive Alternate prices are requested for optional work and are not included in the Total Base Bid. They will not be used to determine the lowest responsive responsible Bidder or to apply the construction preference evaluation. After the Bidder is determined for award, the City may elect to include one or more Additive Alternates, subject to available funding. | ||
| Alternate | Description | Lump Sum Price ($) |
| Additive Alternate No. 1 | Provide and install ladder access between roof sections, complete and operational. | |
| Additive Alternate No. 2 | Provide and install release-sheet TPO system as specified. | |
| Additive Alternate prices shall be fully burdened and include all labor, materials, equipment, overhead, profit, and incidentals required for the alternate work. Acceptance of an Additive Alternate does not change the Total Base Bid used for award determination. |
D. CONSTRUCTION PREFERENCE CERTIFICATION – REQUIRED
OpenAI: Preference categories are based on Murray City Code §3.10.370(E), excluding apprentice utilization because this project is below the qualifying-project threshold stated in the IFB/project direction.
| Each Bidder shall complete this section by selecting Yes or No for every preference listed below. A Bidder is not required to qualify for any preference in order to submit a responsive Bid. For each Yes response, the Bidder and every subcontractor, if any, shall provide sufficient supporting documentation with the Bid to demonstrate the claimed preference in accordance with IFB Section 9 and Murray City Code §3.10.370. | ||
| Preference | Yes / No | Supporting Documentation / Reference |
| Qualified health insurance coverage (see IFB Section 9) | ||
| Drug and alcohol testing policy, including random testing | ||
| Veteran recruitment and/or employment program | ||
| Job training program | ||
| Safety program | ||
| Formal nondiscrimination policy | ||
| The City will verify each claimed preference after Bid opening and apply all verified preferences during evaluation in accordance with IFB Sections 9 and 10 and Murray City Code §3.10.370. A Bidder that does not qualify for any preference may still submit a responsive Bid. Construction preferences do not change the Bidder’s actual Total Base Bid. |
| E. BID SUMMARY AND CERTIFICATION | |
| TOTAL BASE BID | - |
By submitting this Bid Form, the Bidder certifies that the Total Base Bid is complete and includes all costs necessary to perform the Work required by IFB 26-22 and its attachments and addenda. The Bidder acknowledges that unit prices and Additive Alternate prices are separate from the Total Base Bid and will not be used to determine the low bid. The Bidder further certifies that it has completed the Construction Preference Certification by selecting Yes or No for each preference and that each Yes response is supported by information submitted with the Bid and is subject to the City’s determination under Murray City Code §3.10.370.
Addenda Acknowledged (list numbers)
| Authorized Rep. | Signature |
| Title | Date |
Source basis: IFB 26-22 Park Center Roof Replacement, including Construction Preferences §9 and Evaluation Process §10; Murray City Code §3.10.370: https://codelibrary.amlegal.com/codes/murrayut/latest/murray_ut/0-0-0-2966 OpenAI: Murray City Procurement Code source: https://codelibrary.amlegal.com/codes/murrayut/latest/murray_ut