13-1-6-1-1.pdf
PDF 6 MB Posted
- Solicitation number
- 10952581
About this file
NAVAIR regulation 13-1-6.1-1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-authorization,TM1-1500-204-23-1_20160901162453.704_X.pdf | ||
| AWR980R14_UH_HH-60_Rescue_Hoist_(002).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 SEPTEMBER 2007
CHANGE 1 - 1 April 2008
0813LP1075743
NAVAIR 13-1-6.1-1
T.O. 14S3-8-2-1
TECHNICAL MANUAL
AVIATION-CREW SYSTEMS
INFLATABLE SURVIVAL
EQUIPMENT
(LIFERAFTS)
This change incorporates IRAC 26.
This manual update includes Basic, dated 1 September 2007 through Change 1, dated 1 April 2008.
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies only and their contractors to protect publications required for official use or for administrative or operational purposes only, determinedon1September 2007.
Other requests for this document shall be referred to Department of the Navy, Commander, Attn: PMA-202, Bldg. 2272, Suite 347, COMNAVAIRSYSCOMHQ, RADM William A. Moffett Building, 47123 Buse Road, Patuxent River, MD 20670-1547.
DESTRUCTION NOTICE – For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Published by Direction of the Commander, Naval Air Systems Command and by Order of the Secretary of the Air Force
NAVAIR 13-1-6.1-1
LIST OF EFFECTIVE PAGES
Insert latest changed pages; dispose of superseded pages in accordance with applicable regulations.
# Zero in this column indicates an original page.
A Change 1
NOTE: On a changed page, the portion of the text affected by the latest change is indicated by a vertical line, or other change symbol, in the outer margin of the page. Changes to illustrations are indicated by miniature pointing hands.
Changes to wiring diagrams are indicated by shaded areas.
Dates of issue for original and changed pages are:
Original 1 Sep 2007 (Incorp IRACs 1 thru 25)
Change 1 1 Apr 2008 (Incorp IRAC 26)
Total number of pages in this manual is 490 consisting of the following:
Page #Change No. No.
Page #Change No. No.
Page #Change No. No.
Title 1 A — B 1 C Blank 1 i — v 0 vi 1 vii — xi 0 xii Blank 0 1-1 1 1-2 — 1-3 0 1-4 Blank 0 2-1 1 2-2 — 2-5 0 2-6 Blank 0 3-1 — 3-5 0 3-6 Blank 0 4-1 1 4-2 — 4-37 0 4-38 Blank 0 5-1 — 5--29 0 5-30 Blank 0 6-1 — 6-8 0 6-9 1 6-10 — 6-14 0 6-15 — 6-17 1 6-18 — 6-28 0 6-29 1 6-30 0 7-1 — 7-8 0 8-1 — 8-11 0
8-12 — 8-13 1 8-13A 1 8-13B Blank 1 8-14 — 8-48 0 9-1 1 9-2 — 9-5 0 9-6 1 9-7 —9-11 0 9-12 — 9-13 1 9-13A 1 9-13B Blank 1 9-14 — 9-26 0 9-27 1 9-28 — 9-50 0 10-1 — 10-6 0 10-7 1 10-8 — 10-16 0 10-17 — 10-18 1 10-18A 1 10-18B Blank 1 10-19 — 10-22 0 10-23 1 10-24 — 10-51 0 10-52 Blank 0 11-1 — 11-20 0 11-21 — 11-22 1 11-22A 1 11-22B Blank 1 11-23 — 11-76 0
12-1 — 12-6 0 12--7 — 12-8 1 12-8A 1 12-8B Blank 1 12-9 — 12-15 0 12-16 1 13-1 — 13-3 0 13-4 1 13-5 — 13-6 0 13-7 — 13-8 1 13-8A 1 13-8B Blank 1 13-9 1 13-10 — 13-15 0 13-16 1 14-1 — 14-4 0 14-5 — 14-6 1 14-6A 1 14-6B Blank 1 14-7 — 14-14 0 14-15 — 14-16 1 A-1 0 A-2 Blank 0 A-3 — A-11 0 A-12 Blank 0 A-13 — A-15 0 A-16 Blank 0 A-17 — A-19 0 A-20 Blank 0
Major changes resulting from this change are as follows:
1. Miscellaneous changes.
LIST OF EFFECTIVE PAGES (Cont)
Page #Change No. No.
Page #Change No. No.
Page #Change No. No.
# Zero in this column indicates an original page.
Change 1 B/(C Blank)
A-21 — A-25 0 A-26 Blank 0 A-27 — A-29 0 A-30 Blank 0 B-1 — B-19 0
B-20 Blank 0 C-1 — C--3 0 C-4 Blank 0 Glossary-1 — Glossary-7 0 Glossary-8 Blank 0
Index-1 1 Index-2 Blank 1 Index-3 — Index-16 Deleted 1. .
THIS PAGE INTENTIONALLY LEFT BLANK.
TABLE OF CONTENTS
Chapter Page i
1 INTRODUCTION
1-1. General 1-1 1-6. Description of NAVAIR 13-1-6.1-1 1-2 1-17. Supplementary Publications 1-3 1-19. Definitions 1-3
2 MAINTENANCE CONCEPTS, SCHEDULING AND DOCUMENTATION
(Section 2-1. Maintenance Concepts)
2-1. General 2-1
(Section 2-2. Maintenance Scheduling)
2-5. General 2-1
(Section 2-3. Accident Evaluation)
2-7. Aircraft Accident Report Inspection 2-1
(Section 2-4. Maintenance Documents)
2-10. General 2-2
(Section 2-5. Illustrated Parts Breakdown Information)
2-13. General 2-2 2-16. Group Assembly Parts List 2-2 2-25. Numerical Index 2-3
3 LIFERAFT SPECIAL TOOLS AND SUPPORT EQUIPMENT
(Section 3-1. Description)
3-1. General 3-1
(Section 3-2. Liferaft Support Equipment)
3-3. Leak Test Fixture 3-1 3-5. Temperature and Barometric Pressure Gages 3-2 3-7. Pneumatic Inflator Valve (Check Valve) Core Tool 3-2
(Section 3-3. Illustrated Parts Breakdown (IPB))
3-9. General 3-2
4 LR-1 LIFERAFT ASSEMBLY
(Section 4-1. Description)
4-1. General 4-1 4-3. Configuration 4-1 4-5. Application 4-2 4-7. Function 4-2
TABLE OF CONTENTS (Cont)
Chapter Page ii
(Section 4-2. Modifications)
4-9. General 4-7
(Section 4-3. Maintenance)
4-11. General 4-8 4-13. Inspection 4-8 4-39. Cleaning and Servicing 4-15 4-45. Repair/Replacement 4-19 4-65. Packing LR-1 Liferaft 4-30
(Section 4-4. Illustrated Parts Breakdown (IPB))
4-68. General 4-33
5 LRU-23/P LIFERAFT ASSEMBLY
(Section 5-1. Description)
5-1. General 5-1 5-3. Configuration 5-1 5-9. Application 5-4 5-11. Function 5-5
(Section 5-2. Modifications)
5-15. General 5-5
(Section 5-3. Maintenance)
5-17. General 5-6 5-20. Inspection 5-6 5-43. Cleaning and Servicing 5-14 5-49. Repair/Replacement 5-18 5-63. Packing LRU-23/P Liferaft Assembly 5-25
(Section 5-4. Illustrated Parts Breakdown (IPB))
5-65. General 5-26
6 LRU-18/U LIFERAFT ASSEMBLY
(Section 6-1. Description)
6-1. General 6-1 6-3. Configuration 6-1 6-5. Application 6-1 6-7. Function 6-1
Chapter Page iii
(Section 6-2. Modifications)
6-9. General 6-4
(Section 6-3. Maintenance)
6-11. General 6-5 6-14. Inspection 6-5 6-38. Cleaning and Servicing 6-11 6-46. Repair/Replacement 6-14 6-61. Packing LRU-18/U Liferaft 6-20
(Section 6-4. Illustrated Parts Breakdown (IPB))
6-64. General 6-27
7 LRU-29/P22P-20 SEALED LIFERAFT ASSEMBLY
(Section 7-1. Description)
7-1. General 7-1 7-3. Configuration 7-1 7-5. Major Components 7-2 7-9. Application 7-2 7-11. Function 7-3
(Section 7-2. Modifications)
7-13. General 7-3
(Section 7-3. Maintenance)
7-15. General 7-3 7-18. Inspection 7-3 7-33. Cleaning and Servicing 7-5 7-35. Repack/Overhaul Facility Information 7-5
(Section 7-4. Illustrated Parts Breakdown (IPB))
7-36. General 7-6
8 LRU-12/A (MK-4) LIFERAFT ASSEMBLY
(Section 8-1. Description)
8-1. General 8-1 8-3. Configuration 8-1 8-5. Application 8-1 8-7. Function 8-1
(Section 8-2. Modifications)
8-9. General 8-5
(Section 8-3. Maintenance)
8-11. General 8-6
Chapter Page iv
8-13. Inspection 8-6 8-38. Cleaning and Servicing 8-16 8-47. Repair/Replacement 8-23 8-73. Packing LRU-12/A Liferaft 8-41
(Section 8-4. Illustrated Parts Breakdown (IPB))
8-76. General 8-46
9 LRU-13/A (MK-7) LIFERAFT ASSEMBLY
(Section 9-1. Description)
9-1. General 9-1 9-3. Configuration 9-1 9-5. Application 9-1 9-7. Function 9-1
(Section 9-2. Modifications)
9-9. General 9-5
(Section 9-3. Maintenance)
9-11. General 9-6 9-13. Inspection 9-6 9-38. Cleaning and Servicing 9-16 9-47. Repair/Replacement 9-24 9-73. Packing LRU-13/A Liferaft 9-42
(Section 9-4. Illustrated Parts Breakdown (IPB))
9-76. General 9-47
10 LRU-14 SERIES (MK-12A-1) LIFERAFT ASSEMBLY
(Section 10-1. Description)
10-1. General 10-1 10-3. Configuration 10-1 10-5. Application 10-1 10-7. Function 10-1
(Section 10-2. Modifications)
10-9. General 10-5
(Section 10-3. Maintenance)
10-11. General 10-6 10-13. Inspection 10-6 10-38. Cleaning and Servicing 10-22 10-47. Repair/Replacement 10-29 10-72. Packing LRU-14 Series Liferaft 10-44
Chapter Page v
(Section 10-4. Illustrated Parts Breakdown (IPB))
10-75. General 10-49
11 LRU-15/A (MK-20) LIFERAFT ASSEMBLY
(Section 11-1. Description)
11-1. General 11-1 11-3. Configuration 11-1 11-5. Application 11-1 11-7. Function 11-1
(Section 11-2. Modifications)
11-9. General 11-5
(Section 11-3. Maintenance)
11-11. General 11-6 11-13. Inspection 11-6 11-41. Cleaning and Servicing 11-25 11-50. Repairs/Replacement 11-32 11-76. Packing LRU-15/A Liferaft 11-55
(Section 11-4. Illustrated Parts Breakdown (IPB))
11-80. General 11-71
12 MULTI-PLACE LIFERAFTS (MPLR A/A), LRU-30A/A (8-MAN), LRU-31A/A (12-MAN),
AND LRU-32A/A (20-MAN)
(Section 12-1. Description)
12-1. General 12-1 12-3. Configuration 12-1 12-5. Application 12-1 12-7. Function 12-1
(Section 12-2. Modifications)
12-9. General 12-1
(Section 12-3. Maintenance)
12-11. General 12-3 12-13. Inspection 12-3 12-28. Packing 12-9 12-34. Cleaning and Servicing 12-12 12-36. Repair/Replacement 12-12
(Section 12-4. Illustrated Parts Breakdown)
12-38. General 12-13
13 MULTI-PLACE LIFERAFT (MPLR), LRU-33/A (20-MAN)
(Section 13-1. Description)
13-1. General 13-1
TABLE OF CONTENTS
Chapter Page vi Change 1
13-3. Configuration 13-1 13-7. Application 13-1 13-9. Function 13-1
(Section 13-2. Modifications)
13-11. General 13-4
(Section 13-3. Maintenance)
13-13. General 13-4 13-15. Inspection 13-4 13-30. Packing 13-9 13-33. Cleaning and Servicing 13-10 13-35. Repair/Replacement 13-13
(Section 13-4. Illustrated Parts Breakdown)
13-37. General 13-13
14 MULTI-PLACE LIFERAFT (MPLR), LRU-34/A (20-MAN) (V-22 Liferaft System)
(Section 14-1. Description)
14-1. General 14-1 14-3. Configuration 14-1 14-7. Application 14-1 14-9. Function 14-1
(Section 14-2. Modifications)
14-11. General 14-3
(Section 14-3. Maintenance)
14-13. General 14-3 14-15. Inspection 14-3 14-30. Packing 14-9 14-36. Cleaning and Servicing 14-12 14-38. Repair/Replacement 14-12
(Section 14-4. Illustrated Parts Breakdown)
14-41. General 14-13
Appendix A Quality Assurance Inspection Sheets A-1
Appendix B The Metric System and Metric Unit Conversion Charts B-1
Appendix C Equipment, Materials and Supplies C-1
Glossary Glossary-1
Alphabetical Index Deleted
LIST OF ILLUSTRATIONS
Figure Title Page
NAVAIR 13-1-6.1-1
vii
3-1. Leak Test Fixture Schematic 3-1 3-2. Core Tool 3-2 3-3. Leak Test Fixture for Liferafts 3-3
4-1. LR-1 Liferaft Assembly 4-1 4-2. LR-1 Liferaft Assembly, Parts Nomenclature 4-2 4-3. Typical Rigid Seat Survival Kit 4-2 4-4. Alternate Inflation Valve Assemblies 4-3 4-5. Equipment Container and Combination Carrying Case and Equipment Container 4-3 4-6. Packaged LR-1 Liferaft Assemblies 4-4 4-7. Disassembly of Inflation Valve Safety Disc Assembly 4-16 4-8. Recharging Schematic 4-17 4-9. Webbing Retaining Line, Details 4-24 4-10. Stowing Sea Anchor and Line 4-32 4-11. Folding LR-1 for Helicopter Back Pack 4-34 4-12. LR-1 Liferaft Illustrated Parts Breakdown 4-35
5-1. LRU-23/P Liferaft Assembly 5-2 5-2. LRU-23/P Liferaft Assembly Components and Parts 5-3 5-3. Test Fixture Schematic 5-12 5-4. Disassembly of Inflation Valve Safety Disc Assembly 5-15 5-5. Recharging Schematic 5-16 5-6. Patch Specifications 5-21 5-7. LRU-23/P Liferaft Assembly 5-27
6-1. LRU-18/U Liferaft Assembly 6-2 6-2. LRU-18/U Liferaft, Parts Nomenclature 6-2 6-3. Carbon Dioxide Inflation Assembly 6-3 6-4. Packaged LRU-18/U Liferaft Assemblies 6-3 6-5. Test Fixture Schematic 6-10 6-6. Cylinder Thread Count 6-13 6-7. Tether Line Assembly 6-20 6-8. LRU-18/U Liferaft Assembly 6-28
7-1. LRU-29/P22P-20 Liferaft (Inflated) 7-1 7-2. LRU-29/P22P-20 Liferaft (Vacuum Packaged) 7-2 7-3. LRU-29/P22P-20 Liferaft Illustrated Parts Breakdown 7-6
8-1. LRU-12/A Liferaft Assembly 8-2 8-2. LRU-12/A Liferaft Assembly, Parts Nomenclature 8-3 8-3. LRU-12/A Liferaft Assembly Carrying Case 8-4 8-4. LRU-12/A Liferaft Assembly Accessory Container 8-4 8-5. Test Fixture Schematic 8-14 8-6. Valve Poppet Disassembly 8-18 8-7. Disassembly of Inflation Valve Safety Disc Assembly 8-19 8-8. Recharging Schematic 8-19 8-9. Routing of Multi-Place Liferaft Pull Cable 8-22 8-10. International Morse Code Patch 8-27 8-11. Painter Line Pouch 8-28 8-12. Stowed Painter Line 8-28
LIST OF ILLUSTRATIONS (Cont)
Figure Title Page viii
8-13. Drilling IV0303 Inflation Valve 8-29 8-14. Drilling A128 Inflation Valve 8-30 8-15. Drilling 871444 Inflation Valve 8-31 8-16. 10-Foot Retaining Line 8-33 8-17. Fabrication of Boarding Stirrup Assembly 8-36 8-18. Stowed Painter Line 8-43 8-19. LRU-12/A Folding Procedure - (Droppable) 8-44 8-20. LRU-12/A Liferaft Illustrated Parts Breakdown 8-47
9-1. LRU-13/A Liferaft Assembly 9-2 9-2. LRU-13/A Liferaft Assembly, Parts Nomenclature 9-3 9-3. LRU-13/A Liferaft Assembly Carrying Case 9-4 9-4. LRU-13/A Liferaft Assembly Accessory Container 9-4 9-5. Test Fixture Schematic 9-14 9-6. Valve Poppet Disassembly 9-18 9-7. Disassembly of Inflation Valve Safety Disc Assembly 9-19 9-8. Recharging Schematic 9-20 9-9. Routing of Multi-Place Liferaft Pull Cable 9-22 9-10. International Morse Code Patch 9-27 9-11. Painter Line Pouch 9-29 9-12. Stowed Painter Line 9-29 9-13. Drilling IV0303 Inflation Valve 9-30 9-14. Drilling A128 Inflation Valve 9-31 9-15. Drilling 871444 Inflation Valve 9-32 9-16. 10-Foot Retaining Line 9-33 9-17. Fabrication of Boarding Stirrup Assembly 9-36 9-18. Stowed Painter Line 9-44 9-19. LRU-13/A Folding Procedure - (Droppable) 9-45 9-20. LRU-13/A Liferaft Illustrated Parts Breakdown 9-48
10-1. LRU-14 Liferaft Assembly 10-2 10-2. LRU-14A/A Liferaft Assembly (Canopy Erected) 10-3 10-3. LRU-14A/A Liferaft Assembly (Canopy Stowed) 10-3 10-4. LRU-14 Series Liferaft Assembly, Parts Nomenclature (With or Without Canopy) 10-4 10-5. LRU-14 Liferaft Assembly Carrying Case and Accessory Container 10-5 10-6. Test Fixture Schematic 10-19 10-7. Valve Poppet Disassembly 10-23 10-8. Disassembly of Inflation Valve Safety Disc Assembly 10-24 10-9. Recharging Schematic 10-25 10-10. Routing of Multi-Place Liferaft Pull Cable 10-27 10-11. International Morse Code Patch 10-33 10-12. Painter Line Pouch 10-36 10-13. Stowed Painter Line 10-36 10-14. Drilling IV0303 Inflation Valve 10-37 10-15. Drilling A128 Inflation Valve 10-38 10-16. Drilling 871444 Inflation Valve 10-39 10-17. 10-Foot Retaining Line 10-40 10-18. Stowed Painter Line 10-46 10-19. LRU-14 Series Folding Procedure - (Droppable) 10-47 10-20. LRU-14 Series Liferaft Illustrated Parts Breakdown 10-49
LIST OF ILLUSTRATIONS (Cont)
Figure Title Page ix
11-1. LRU-15/A Liferaft Assembly 11-2 11-2. LRU-15/A Liferaft Assembly, Parts Nomenclature 11-3 11-3. LRU-15/A Carrying Cases and Accessory Container 11-4 11-4. Test Fixture Schematic 11-23 11-5. Valve Poppet Disassembly 11-27 11-6. Disassembly of Inflation Valve Safety Disc Assembly 11-28 11-7. Recharging Schematic 11-29 11-8. Routing of Multi-Place Liferaft Pull Cable 11-31 11-9. Painter Line Pouch 11-39 11-10. Stowed Painter Line 11-39 11-11. Drilling IV0303 Inflation Valve 11-40 11-12. Drilling A128 Inflation Valve 11-41 11-13. Drilling 871444 Inflation Valve 11-42 11-14. Panel Body Dimensions 11-46 11-15. Webbing Locations 11-47 11-16. Side Panel 11-48 11-17. Assembled Container 11-49 11-18. Fastener Locations 11-51 11-19. Packing Frame Assembly 11-52 11-20. Identification Patch for C-130 Type Aircraft Wing Installed Liferaft 11-54 11-21. Survivor Attachment Strap 11-55 11-22. CO2 Cylinder Down-Pull Routing 11-57 11-23. Stowed Painter Line 11-58 11-24. LRU-15/A Folding Procedure (Droppable) 11-59 11-25. Streamers 11-61 11-26. Stowed Painter Line 11-61 11-27. LRU-15/A Folding Procedure (C-130 Left Wing Installation) 11-62 11-28. LRU-15/A Folding Procedure (C-130 Right Wing Installation) 11-63 11-29. C-130 Wing Well Mock-up with Carrying Case Installed 11-64 11-30. Front and Back Carrying Case Flaps Secured 11-66 11-31. Lacing Side Flaps and Tie Down Tabs 11-68 11-32. LRU-15/A Liferaft (Droppable) Illustrated Parts Breakdown 11-72 11-33. LRU-15/A Liferaft (C-130 Wing Installation) Illustrated Parts Breakdown 11-74
12-1. Multi-Place Liferaft (MPLR) 12-2 12-2. Multi-Place Liferaft (MPLR), LRU-30A/A, LRU-31A/A, and LRU-32A/A 12-14
13-1. LRU-33/A Liferaft 13-2 13-2. LRU-33/A Packed in Liferaft Carrying Case 13-3 13-3. Liferaft Retaining Straps 13-6 13-4. Packing Liferaft Assembly in Carrying Case 13-11 13-5. Closing the Liferaft Carrying Case 13-12 13-6. LRU-33/A 20-Man Liferaft System 13-14
14-1. LRU-34/A Liferaft 14-2 14-2. Multi-Place Liferaft LRU-34/A 14-14
B-1. Reference Conversion Charts B-2
LIST OF TABLES
Table Title Page x
2-1. Source, Maintenance, and Recoverability (SM&R) Code Definitions 2-5
4-1. LR-1 Survival Items 4-5 4-2. LR-1 Aircraft Applications 4-6 4-3. LR-1 Common Repairs and Fabrications 4-7 4-4. LR-1 Liferaft Markings 4-11 4-5. LR-1 Case and Container Markings 4-12 4-6. Temperature Conversion Chart 4-14 4-7. Barometric Pressure Conversion Chart 4-15 4-8. LR-1 Liferaft Assemblies 4-31
5-1. LRU-23/P Common Repairs and Fabrications 5-5 5-2. LRU-23/P Liferaft Markings 5-10 5-3. Temperature Conversion Chart 5-13 5-4. Barometric Pressure Conversion Chart 5-14
6-1. LRU-18/U Aircraft Applications 6-1 6-2. LRU-18/U Series Directives 6-4 6-3. LRU-18/U Common Repairs and Fabrications 6-4 6-4. LRU-18/U Liferaft Markings 6-8 6-5. LRU-18/U Container Markings 6-8 6-6. LRU-18/U Test Pressures 6-10 6-7. Temperature Conversion Chart 6-11 6-8. Barometric Pressure Conversion Chart 6-12
8-1. LRU-12/A Liferaft Common Repairs and Fabrications 8-5 8-2. LRU-12/A Liferaft Markings 8-10 8-3. LRU-12/A Case and Container Markings 8-11 8-4. LRU-12/A Survival Items 8-12 8-5. LRU-12/A Test Pressures 8-15 8-6. Temperature Conversion Chart 8-15 8-7. Barometric Pressure Conversion Chart 8-16
9-1. LRU-13/A Liferaft Common Repairs and Fabrications 9-5 9-2. LRU-13/A Liferaft Markings 9-10 9-3. LRU-13/A Case and Container Markings 9-11 9-4. LRU-13/A Survival Items 9-12 9-5. Flotation Compartment Pressures 9-15 9-6. Temperature Conversion Chart 9-15 9-7. Barometric Pressure Conversion Chart 9-16
10-1. LRU-14 Common Repairs and Fabrications 10-5 10-2. LRU-14 Series Liferaft Markings 10-11 10-3. LRU-14/A Case and Container Markings 10-13 10-4. MK-12A-1 Liferaft Markings 10-14 10-5. MK-12A-1 Case and Container Markings 10-16 10-6. LRU-14 Series Survival Items 10-17 10-7. Flotation Compartment Pressures 10-20 10-8. Temperature Conversion Chart 10-21 10-9. Barometric Pressure Conversion Chart 10-21
LIST OF TABLES (Cont)
Table Title Page xi/(xii blank)
11-1. LRU-15/A Common Repairs and Fabrications 11-5 11-2. LRU-15/A Liferaft Markings 11-13 11-3. LRU-15/A Case and Container Markings 11-16 11-4. MK-20 Liferaft Markings 11-17 11-5. MK-20 Case and Container Markings 11-20 11-6. LRU-15/A Survival Items 11-21 11-7. LRU-15/A Liferaft Test Pressures 11-24 11-8. Temperature Conversion Chart 11-24 11-9. Barometric Pressure Conversion Chart 11-25 11-10. Liferaft Packing Components (Droppable) 11-56 11-11. Liferaft Packing Components (C-130 Wing) 11-60
12-1. MPLR Survival Items 12-7
13-1. LRU-33/A Survival Items 13-7
14-1. MPLR Survival Items 14-5
A-1. LR-1 Quality Assurance Representative Inspection Sheet A-3 A-2. LRU-23/P Quality Assurance Representative Inspection Sheet A-5 A-3. LRU-18/U Quality Assurance Representative Inspection Sheet A-7 A-4. LRU-12/A Quality Assurance Representative Inspection Sheet A-9 A-5. LRU-13/A Quality Assurance Representative Inspection Sheet A-13 A-6. LRU-14 Series Quality Assurance Representative Inspection Sheet A-17 A-7. LRU-15 Quality Assurance Representative Inspection Sheet A-21 A-8. MPLR (LRU-30A/A, 31A/A, 32A/A) Quality Assurance Representative
Inspection Sheet A-25 A-9. MPLR, LRU-33A (C-130 Wing Installed) Quality Assurance Representative
Inspection Sheet A-27 A-10. MPLR, LRU-34A (V-22 Liferaft System) Quality Assurance Representative
Inspection Sheet A-29
B-1. Symbols and Relationships of Metric Units B-4 B-2. Inches to Millimeters Conversion Chart B-5 B-3. International System of Units (SI) B-6 B-4. Fraction/Decimal/Millimeter Conversion Chart B-7 B-5. Metric Unit Conversions B-8 B-6. Alphabetical Index of Metric Unit Conversions B-9
Change 1 1-1
CHAPTER 1
INTRODUCTION
1-1. GENERAL.
WARNING
Unauthorized modification to, and devi-ations from prescribed life support and sur-vival equipment by individual aircrew-member could create unknown safety haz-ards. The OPNAVINST 3710.7 Series specifies minimum requirements for such equipment and is supplemented by the in-dividual model NATOPS.
1-2. COMNAVAIRFORINST 4790.2 identifies NAV- AIRSYSCOM as the only authority for modifications to life support and survival equipment, which is usual-ly accomplished by the Fleet Support Team (FST) (formerly Cognizant Field Activity (CFA)) via Aircrew Systems Changes or a change to the equipment pro-curement package. This manual also permits an oper-ating activity with approval of the controlling custo-dian, to conditionally modify ONE UNIT of equipment in-service to correct or overcome unsatisfactory condi-tions in that equipment item. Any other type of devi-ation/peculiar configuration or modification to life support and survival equipment is disallowed, and the Aircrew Survival Equipmentman has no authority or responsibility to perform them.
1-3. If an omission or conflict should occur between FST documents and NATOPS requirements, or if there is a need for clarification of equipment configuration or if equipment deficiencies are discovered, the appli-cable FST should be notified. If maintenance deficien-cies are discovered, they shall be reported to area type commander in accordance with COMNAVAIRFORINST
4790.2. The FST for most of the life support and
survival equipment is Commander, Naval Air Warfare Center Aircraft Division (NAWCAD), Attn: Code 4 . 6 . 7 . 4 , B l d g 2 1 8 7 , P a t u x e n t R i v e r , M D 20670-1906. For parachutes and related hardware, in-cluding torso harnesses, the FST is the Naval Air Warfare Center Weapons Division, Code 463000D, China Lake, CA 93555. NAWCAD DET Indianapolis, IN 46219 has cognizance over all survival radios and emergency beacons. NSWC, Indian Head, MD is FST for the FLU-8B/P Automatic Inflation Device.
1-4. The Aviation-Crew Systems manual is released under the authority of the Naval Air Systems Com-mand in compliance with the request of the Chief of Naval Operations. The instructions contained herein are mandatory. This manual consists of separately bound volumes, as listed below:
PUBLICATION
TITLE NUMBER
Inflatable Survival Equipment NAVAIR 13-1-6.1-1 (Liferafts)
Inflatable Survival Equipment NAVAIR 13-1-6.1-2 (Life Preservers)
Parachutes NAVAIR 13-1-6.2
Seat Survival Kits NAVAIR 13-1-6.3-1 (Oxygen Hoses and Non-SKU Seat Kits)
Seat Survival Kits NAVAIR 13-1-6.3-2 (SKU Series Seat Kits)
Oxygen Equipment (Aircraft NAVAIR 13-1-6.4-1 Equipment, Masks, and Other Systems)
Oxygen Equipment NAVAIR 13-1-6.4-2 (Regulators)
Oxygen Equipment NAVAIR 13-1-6.4-3 (Concentrators)
Oxygen Equipment NAVAIR 13-1-6.4-4 (Converters)
Rescue and Survival NAVAIR 13-1-6.5 Equipment
Aircrew Personal Protective NAVAIR 13-1-6.7-1 Equipment (Aircrew/Passenger Equipment)
Aircrew Personal Protective NAVAIR 13-1-6.7-2 Equipment (Clothing)
Aircrew Personal Protective NAVAIR 13-1-6.7-3 Equipment (Helmets and Masks)
Aircrew Personal Protective NAVAIR 13-1-6.7-4 Equipment (Protective Assembly, Aircrew Survival - Armor)
Special Missions Aircrew NAVAIR 13-1-6.10 Equipment
1-2
1-5. The purpose of each volume is to provide techni-cal information related to the function, inspection and repair of a particular category of aircrew safety and survival equipment. The information contained in each volume is intended for organizational, intermediate and depot levels of maintenance as established within the Naval Aviation Maintenance Program (COMNAV-
AIRFORINST 4790.2).
1-6. DESCRIPTIONOFNAVAIR13-1-6.1-1.
1-7. CONTENTS. This volume contains information on configuration, functions, application, inspection, repair and packing of liferaft inflatable survival equ ipmen t . Pack ing and fo ld ing of LR-1 and LRU-23/P liferafts used in Seat Survival Kits are cov-ered in NAVAIR 13-1-6.3-1 and NAVAIR 13-1-6.3-2.
1-8. CONFLICTS AND SUPERSEDURES. This volume shall take precedence over all other docu-ments except for effective related Aircrew System Changes, Interim Aircrew System Changes and Air-crew System Bulletins. This document is effective until officially rescinded, canceled or superseded.
1-9. The modifications section of each chapter lists all effective changes and bulletins which affect inflatable survival equipment and have been issued on or before the date of latest change or revision. When applicable, the subject matter of these documents has been incor-porated within the text of the appropriate chapters.
1-10. Effective changes which affect inflatable equip-ment and are issued between changes and revisions to this volume should be recorded in the modification section of the manual for the affected equipment by annotating the outer margin of the page with a vertical line and the number of the change. A copy of the change should be filed in a separate binder in the ALSS work center. When this volume is updated these documents will be listed in the modification sections of the applicable chapters and the text of the chapters will be updated to reflect the changes.
1-11. Appendix A is reserved. Appendix B lists metric system and metric unit conversion charts. Appendix C lists supplies, materials or equipment used in the volume which is not listed in the IPBs.
1-12. UPDATING. This volume will be updated pe-riodically by the issuance of a Revision, which is a 100-percent replacement of pages. Between revisions, changes and rapid action changes will be released, which are partial replacements of pages. All added and changed pages shall be incorporated according to page number. Superseded and deleted pages shall be discarded in accordance with local security proce-dures for data containing distribution statements. A L i s t o f E ffec t i ve Pages i s p rov ided wi th each change. The List of Effective Pages will show the most current change or rapid action change. A sum-mary of the major changed areas for a particular change is located directly beneath the List of Effec-tive Pages.
1-13. TECHNICAL PUBLICATION DEFICIENCY
REPORT. Technical publication deficiencies shall be submitted in accordance with COMNAVAIRFORINST 4790.2.
1-14. ENGINEERING DRAWINGS. Government engineering drawings are available to the fleet by submitting a letter of request to Commanding Officer, Naval Air Technical Data and Engineering Service Command, Naval Air Station North Island, P.O. Box 357031, Building 90 Distribution, San Diego, CA 92135-7031. Each request should include the equip-men t n omenc l a t u r e , p a r t n umbe r, a n d CAGE code. The drawings will be provided in the form of aperture cards (Automatic Data Processing Punch Cards). Technical data may also be obtained online at the NATEC website located at http://www.natec.na-vy.mil. Authorized users must first establish an ac-count prior to obtaining data. Access/account infor-mation can be obtained at the NATEC website.
1-15. T E C H N I C A L D I R E C T I V E S A N D FORMS. NATEC is the central management activity for aeronautical technical publications, engineering drawings and associated technical services. Upon re-lease, NATEC will forward to all designated activi-ties, copies of Technical Directives and Forms. Addi-tional copies are available utilizing the procedures sh own i n p a r a g r a ph 1-14 a s we l l a s f r om t h e PMA-202 website at https://pma202.navair.navy.mil.
1-16. QUALITY ASSURANCE. Quality assurance steps are provided for critical operations. When a step is underlined, the Aircrew Survival Equipmentman shall perform the operation, then have performance verified by a Collateral Duty Inspection (CDI-CDQAR-QAR) as established within the Naval Aviation Maintenance Pro-gram (COMNAVAIRFORINST 4790.2) prior to proceed-ing to the next operation. In no case shall an Aircrew Survival Equipmentman perform his/her own quality as-surance inspection.
1-3/(1-4 Blank)
1-17. SUPPLEMENTARY PUBLICATIONS.
1-18. The following publications supplement this vol-ume:
1. NAVAIR 00-35QH-2 Allowance List. Aviation Life Support System and Airborne Operation Equip-ment for Aircraft Squadrons Navy and Marine Corps.
2. COMNAVAIRFORINST 4790.2. The Naval Avi-ation Maintenance Program.
3. List of Naval Aviation Life Preserver and Life-raft Equipment E0088.
4. OPNAVINST 4410.2A.
5. OPNAV INSTRUCTION 3710.7 provides gener-al instructions on required minimums for aircrew per-sonal protective equipment.
6. NATOPS MANUALS provide instructions on re-quired inflatable survival equipment.
7. Naval Logistics Library (NAVSUP 600).
8. Code of Federal Regulations 49 CFR 71 90 pro-vides information on hydrostatic testing of multi-place liferaft CO2 cylinders.
9. NAVAIR 13-1-6-8 Aviation Crew Systems Work Unit Code Manual.
10. NAVAIR 01-1A-509 Cleaning and Corrosion Organizational and Intermediate Maintenance.
11. NAVAIR 11-100-1.1 General Use Cartridges and Cartridge Actuated Devices for Aircraft and Unique Aircraft Systems (CADS).
12. NAVSUPINST 4440.128B.
13. NAVSUPINST 4423.29 (Series). Naval Materi-al Command (NMC) Uniform Source, Maintenance and Recoverability (SM&R) Codes.
14. NAVSUP P-719 is a Guide for the Assignment and Use of Source, Maintenance and Recoverability (SM&R) Codes.
1-19. DEFINITIONS.
1-20. The following is a list of definitions used in this volume:
WARNING
Indicates danger to personnel. The warning precedes the item to which it refers.
CAUTION
Indicates danger to the equipment. The caution precedes the item to which it re-fers.
NOTE
An information item. The note may pre-cede or follow the item to which it refers.
Change 1 2-1
CHAPTER 2
MAINTENANCE CONCEPTS,
SCHEDULING AND DOCUMENTATION
Section 2-1. Maintenance Concepts
2-1. GENERAL.
2-2. NAVAL AVIATION MAINTENANCE PRO-
GRAM. All maintenance and inspection actions upon Aviation Life Support Systems (ALSS) equipment shall be made as part of the Naval Aviation Mainte-nance Program in accordance with COMNAVAIRFO-
RINST 4790.2
2-3. LEVELS OF MAINTENANCE. Maintenance of ALSS equipment shall be performed at the established level of maintenance in accordance with COMNAV-
AIRFORINST 4790.2.
2-4. QUALIFIED PERSONNEL. Refer to COM- NAVAIRFORINST 4790.2 for qualifications of per-sonnel authorized to perform maintenance actions on ALSS equipment.
Section 2-2. Maintenance Scheduling
2-5. GENERAL.
2-6. INSPECTION CYCLES. Scheduled mainte-nance requirements for aircraft and man-mounted equipment are published in the applicable aircraft maintenance requirement cards and this manual.
NOTE
To meet unusual situations and facilitate workload scheduling, refer to COMNAVAIR- FORINST 4790.2 for authorized deviations to scheduled phase inspection intervals.
Section 2-3. Accident Evaluation
2-7. AIRCRAFT ACCIDENT REPORT IN-
SPECTION.
2-8. Any Aviation Life Support System Equipment along with related subassemblies or equipment which have been recovered following use in an emergency ditching/bailout or ejection (refer to NAVAIR 13-1-6.2 for personnel and drogue parachutes) will be returned to the nearest Naval Supply Activity for shipment via traceable means to: Code 4.6.7.4, Naval Air Warfare Center Aircraft Division, Bldg 2187, 48110 Shaw Rd., Unit 5, Patuxent River, MD 20670-1906.
NOTE
Under no circumstances will any piece of Aviation Life Support System equipment which has been subjected to ditching/bail-out or ejection be returned to service.
2-9. Stencil outside of container in 1-in. letters as follows:
THIS EQUIPMENT HAS BEEN USED IN AN EMER-
GENCY. These items of equipment are required for evalua-tion and determination of design deficiency and to establish requirements for product improvement.
2-2
Section 2-4. Maintenance Documents
2-10. GENERAL.
2-11. DOCUMENTING MAINTENANCE AC-
TIONS. Upon completion of any maintenance action (e.g., inspections, repairs, modifications), appropriate entries shall be made on applicable maintenance re-cords, in accordance with COMNAVAIRFORINST
4790.2. The entries by the Aircrew Survival Equipment-
man shall provide a systematic record of equipment history and the documentation of all maintenance ac-tions performed on the equipment.
2-12. MAINTENANCE DOCUMENTS. Refer to COM- NAVAIRFORINST 4790.2 for documents used to record history or to document maintenance actions or for addi-tional information for completion of maintenance re-cords. These records are designed to provide continuous configuration and inspection records throughout the ser-vice life of ALSS assemblies and their components.
Section 2-5. Illustrated Parts Breakdown Information
2-13. GENERAL.
2-14. This section explains the Illustrated Parts Break-down (IPB) for ALSS equipment. The IPB can be found at the end of each chapter where applica-ble. The IPB should be used during maintenance when requisitioning and identifying parts.
2-15. SYMBOLS AND ABBREVIATIONS. Sym-bols and abbreviations used in the Illustrated Parts Breakdown are as follows:
Symbol Definition
---*--- Closure (end) of attaching parts # Selected part, only one used x By (used in dimensions 12“ x 6”) & And
Abbreviation Definition
AR or A/R As Required CAGE Commercial and Government Entity COML Commercially available FIG, Fig Figure GAPL Group Assembly Parts List GFE Government Furnished Equipment IPB Illustrated Parts Breakdown L.H. Left Hand MAINT Maintenance NHA Next Higher Assembly No. Number RECOVER, RECY Recoverability REF Reference R.H. Right Hand SM&R Source, Maintenance and Recoverability Spec. Cont. Specification Control Drawing Dwg. or SCD
2-16. GROUP ASSEMBLY PARTS LIST.
2-17. The Group Assembly Parts List (GAPL) contains illustrations and parts lists for each major assemb-
ly. These illustrations and accompanying lists show how the major assemblies are disassembled into subas-semblies and detail parts. Each item illustrated is indexed for identification purposes. Each illustration is accompanied by a parts list providing a part number, description, and quantity for each item. The list is arranged in disassembly order. Through the use of a system of indentation, the relationship of the detail parts to the subassemblies and the relationship of the subassemblies to the main assembly, is shown.
2-18. F IGURE AND INDEX NUMBER COL-
UMN. The figure and index number of each item shown on the corresponding illustration appears in the Figure and Index Number Column, with the exception of assemblies and subassemblies which are not illus-trated in assembled form. In these cases, the assem-blies or subassemblies are listed but not indexed. The component parts thereof are both listed and indexed.
2-19. PART NUMBER COLUMN. This column contains the contractor’s drawing number, government standard number, vendor drawing number or identifies the part as being commercial hardware (COML). Gov-ernment standard parts are listed using the applicable MS, AN, AF, NAS, MIL, or JAN part number. Where the part number is controlled by a military specifica-tion, this specification number is listed in the De-scription Column.
2-20. DESCRIPTION COLUMN. This column lists the item name plus those modifiers necessary to iden-tify the item. The description of a vendor-supplied
2-3 item includes a five-digit number which identifies the manufacturer. This is the Commercial and Govern-ment Entity (CAGE) code. To correlate this CAGE code to the manufacturer’s name, refer to the catalog-ing handbook H4/H8. CAGE codes may be omitted for prime manufacturer’s parts and for government standard parts. When applicable, contractor’s control drawing numbers and reference designations of elec-tronic parts are also listed for general reference.
When a separate exploded view is used to show the detail parts of an assembly or subassembly the De-scription Column contains an appropriate figure cross-reference in parenthesis fol lowing the descrip-tion. This cross-reference appears both in the listing where the assembly is first described, and in the list-ing which the assembly is broken down. In the latter case, the abbreviation REF will appear in the Units Per Assembly column. Commercial hardware items (COML) are fully described so that they may be pro-cured from normal commercial sources. Parts stocked in kits are identified with kit component code in this column, i.e., KD.
2-21. Indentation. The indentations headed “1” through “7” in the Description Column are provided to show the relationship of assemblies and their detail parts. The detail parts are indented one space to the right and listed below the assembly to which they belong. Determine the next higher assembly (NHA) of any detail part by locating, in the next space to the left (excluding attaching parts) the first item above the detailed part.
1 2 3 4 5 6 7
ARTICLE (or MAIN ASSEMBLY) . Detailed parts for ARTICLE (or MAIN ASSEMBLY)
. ASSEMBLY
(ATTACHING PARTS)
. ATTACHING PARTS FOR ASSEMBLY
. . Detailed parts for ASSEMBLY
. . SUBASSEMBLY
(ATTACHING PARTS)
. . ATTACHING PARTS FOR SUBASSEMBLY
. . . Detailed parts for SUBASSEMBLY
. . . SUB-SUBASSEMBLY
(ATTACHING PARTS)
. . . ATTACHING PARTS FOR SUB-SUBASSEMBLY
. . . . Detailed parts for SUB-SUBASSEMBLY
2-22. Attaching Parts. Attaching parts are items used to attach parts or assemblies to each other and follow immediately after the part to be attached. The attaching parts have the same indentation as the part attached. The caption “(ATTACHING PARTS)” is placed on the line immediately above the listing of attaching parts. The separation symbol ---*--- appears on the line immediately under the last attaching part. Quantities of attaching parts are listed per unit. For example, if two fittings are required for each assembly and one bolt is required to attach each fitting, the correct listing would be:
. FITTING ASSEMBLY, Hinge 2
(ATTACHING PARTS)
. BOLT 1
2-23. UNITS PER ASSEMBLY COLUMN. This column shows the quantity of an item required in the next higher assembly. The abbreviation AR indicates when the quantity is “As Required”.
2-24. USABLE ON CODE COLUMN. Usable on codes are used to indicate part usage where various models and serial numbers of the equipment or simi-lar parts within the equipment use different parts. A code is assigned to each variation of the equipment and entered into the GAPL when a part is used only in a specified variation. Where no code is entered, the part is used on all units covered by the GAPL or when no variations from the original equipment exist.
2-25. NUMERICAL INDEX.
2-26. The numerical index which follows each GAPL contains all the part numbers listed in that GAPL, arranged in alphabetical-numerical sequence.
2-27. PART NUMBER COLUMN. This column contains the part numbers of the parts and assem-blies. Part number arrangement starts at the extreme left-hand position and continues left to right, one position at a time, according to the following order or precedence:
Space (blank column) Diagonal (Slant) Point (period) Dash (hyphen) Letters A through Z Numerals 0 through 9
2-4
NOTE
Spaces, diagonals, points, and dashes do not appear in the extreme left-hand posi-tion of the part numbers. However, they may be used in the second and succeeding positions and take precedence over letters and numbers as indicated above.
2-28. F IGURE AND INDEX NUMBER COL-
UMN. In this column, the digits preceding the dash refer to the figure in which the parts are i l lus-trated. The digits following the dash are the index numbers.
2-29. SOURCE , MA INTENANCE AND RE-
COVERABILITY (SM&R) CODE COLUMN. The five digit SM&R codes, assigned by Naval Air Sys-tems Command Representatives are reflected in the SM&R code column. The code format is composed of three parts consisting of a two-position Source Code, a two-position Maintenance Code and a one-position Recoverability Code. See Table 2-1 for basic information.
NOTE
For more complete information on Uniform SM&R Codes, refer to NAVSUPINST 4423.29, OPNAVINST 4410.2A, and NAV-
SUP P-719.
2-5/(2--6 Blank)
Table 2-1. Source, Maintenance, and Recoverability (SM&R) Code Definitions
SOURCE MAINTENANCE
1ST
POS 2ND POSITION 3RD POSITION 4TH POSITION
MEANS OF ACQUIRING SUPPORT
USE: LOWEST LEVEL AUTHORIZED
TO REMOVE/REPLACE THE ITEM
REPAIR: LOWEST LEVEL WITH
CAPABILITY AND RESOURCES TO
PERFORM COMPLETE REPAIR ACTION
A ITEM: STOCKED O ORG/UNIT O ORG/UNIT
B ITEM: STOCKED, INSURANCE 2 MINESWEEPER 2 MINESWEEPER
C ITEM: STOCKED, DETERIORATIVE 3 SUBMARINES 3 SUBMARINES
D
ITEM: SUPPORT, INITIAL ISSUE OF OUTFITTING & STOCKED ONLY FOR
ADDITIONAL INITIAL ISSUE
AUX/AMPHIB
DESTROYER, FFG
AUX/AMPHIB
DESTROYER, FFG
P E
EQUIPMENT: SUPPORT, STOCKED FOR INITIAL ISSUE OR OUTFITTING OF
SPECIFIED MAINTENANCE ACTIVITIES
6 CRUISER/CARRIER 6 CRUISER/CARRIER
P
F
EQUIPMENT: SUPPORT, NON-STOCKED, CENTRALLY PROCURED ON
DEMAND
G
ITEM: STOCKED FOR SUSTAINED SUPPORT, UNECONOMICAL TO
PRODUCE AT A LATER TIME F I/AFLOAT
F I/AFLOAT
H ITEM: STOCKED, CONTAINS HAZMAT, HMIS/MSDS REPORTING REQUIRED
R TERMINAL OR OBSOLETE, REPLACED
I/ASHOREZ TERMINAL OR OBSOLETE, NOT REPLACED G
I/ASHORE
AND AFLOAT
D ITEM: DEPOT O/H & MAINTENANCE KITS
G I/ASHORE
G AND AFLOAT
K F ITEM: MAINTENANCE KIT, PLACE AT O, F, H, L
G I/ASHORE
AND AFLOATK
B ITEM: IN BOTH DEPOT REPAIR & MAINT. KITS H I/ASHORE
O MFR OR FAB AT UNIT LEVEL
H I/ASHORE
F MFR OR FAB AT INTERMEDIATE/DS LEVEL
H I/ASHORE CONTRACTOR
M
H MFR OR FAB AT INTERMEDIATE/GS LEVEL
H I/ASHORE
K
CONTRACTOR
FACILITYM
L MFR OR FAB AT SPECIALIZED REPAIR ACTIVITY (SRA)
K FACILITY
G MFR OR FAB AT INTERMEDIATE BOTH AFLOAT AND ASHORE
D MFR OR FAB AT DEPOT MAINTENANCE LEVEL
K CONTRACTOR L INTERMEDIATE SRA
O ITEM: ASSEMBLED AT ORG/UNIT
K CONTRACTOR
FACILITY
L INTERMEDIATE SRA
F ITEM: ASSEMBLED AT INTERMEDIATE LEVEL - AFLOAT
A
H ITEM: ASSEMBLED AT INTERMEDIATE LEVEL - ASHORE D DEPOT
A
L ITEM: ASSEMBLED AT SRA
L INTERMEDIATE SRA
D DEPOT
G ITEM: ASSEMBLED AT INTERMEDIATE BOTH AFLOAT AND ASHORE
L INTERMEDIATE SRA
D ITEM: ASSEMBLED AT DEPOT MAINTENANCE LEVEL Z NON-REPAIRABLE
A ITEM: REQUISITION NEXT HIGHER ASSEMBLY
Z NON REPAIRABLE
X
B
ITEM: NOT PROCURED OR STOCKED, AVAILABLE THRU SALVAGE, REQ. BY
CAGE/PART NUMBER
D DEPOT
X C
INSTALLATION DRAWING, DIAGRAM, INSTRUCTION SHEET, IDENTIFY BY
CAGE/PART NUMBER Z REF ONLY
B RECONDITION
D NON-STOCKED. OBTAIN VIA LOCAL PURCHASE
Z REF ONLY
RECOVERABILITY SERVICE OPTION
5TH POSITION 6TH POSITION
DISPOSITION: WHEN UNSERVICEABLE OR UNECONOMICALLY REPAIRABLE,
CONDEMN OR DISPOSE.
ASSIGNED TO SUPPORT ITEMS TO CONVEY SPECIFIC INFORMATION TO THE
SERVICE’S LOGISTICS COMMUNITY/OPERATING FORCES.
O ORG/UNIT
I-LEVEL
1ST DEGREE1 1ST DEGREE
F I/AFLOAT
2 I-LEVEL
G I/ASHORE AND AFLOAT
2 I-LEVEL
2ND DEGREE
G I/ASHORE AND AFLOAT
3 I-LEVEL
H I/ASHORE
3 I-LEVEL
3RD DEGREE
H I/ASHORE
6 COMMERCIAL ITEM, ORGANICALLY MFR’D
K DLR; CONTRACTOR FACILITY 8 NON-CONSUMABLE; 2ND DEGREE ENGINE
I LEVEL
8 ;
I-LEVEL
L INTERMEDIATE SRA LEVEL 9 NON-CONSUMABLE; 3RD DEGREE ENGINE
I-LEVEL
D DLR; CONDEMN OR DISPOSE AT DEPOT
E END TO END TEST
D DLR; CONDEMN OR DISPOSE AT DEPOT
J INTER-SERVICE DLR REPAIRABLE BELOW D-LEVEL
Z NON REPAIRABLE
P PROGRESSIVE MAINTENANCE
Z NON-REPAIRABLE
R GOLD DISC REPAIR
A NON-REPAIRABLE BUT REQUIRES SPECIAL HANDLING T TRAINING DEVICES
3-1
CHAPTER 3
LIFERAFT SPECIAL TOOLS AND
SUPPORT EQUIPMENT
Section 3-1. Description
3-1. GENERAL.
3-2. This chapter lists special support equipment re-quired for the testing and inspection of liferafts. An assembly and parts breakdown is included with each item of support equipment. See Section 3-3.
Section 3-2. Liferaft Support Equipment
3-3. LEAK TEST FIXTURE.
3-4. A leak test fixture may be fabricated to meet the requirements of the schematic shown in Figure 3-1. A suggested leak test fixture, consisting of three-way valve, pressure gage, and adapters for connection to a source of low-pressure air and to the liferaft, is shown in Figure 3-3.
NOTE
If a suitable air source is not available, water-pumped nitrogen (BB-N-411) may be substituted.
CAUTION
If three-way valve is not used, measuring device valve must be closed when air feed valve is open.
Damage may occur to oral inflation valve if air supply pressure entering the liferaft exceeds ten (10) psi during leak tests.
10030001
Figure 3-1. Leak Test Fixture Schematic
3-2
3-5. TEMPERATURE AND BAROMETRIC
PRESSURE GAGES.
3-6. The temperature and barometric pressure must be recorded when performing leakage tests on life pre-servers. Part number 930 for the Thermo--Hygrometer is replacing part number 5033 through attrition.
Should existing gages need to be replaced; any suit-able, commercially available instruments may be used.
Items can be ordered open purchase from:
American Weather Enterprises P. O. Box 14381 San Francisco, CA 94114 Phone: (800) 293--2555 www.Americanweather.com
NOTE
Calibration of this equipment is not re-quired.
3-7. PNEUMATIC INFLATOR VALVE (CHECK
VALVE) CORE TOOL.
3-8. A pneumatic inflator valve (check valve) core tool, part number 8769A or equivalent (CAGE 27783), c an a l so be fabr i c a t ed a s de sc r i bed he re . See Figure 3-2.
1. Use 3/16 inch solid brass or aluminum rod, approximately 5 inches long.
2. Fabricate as shown in Figure 3-2.
3. There is no IPB or Numerical Index for this tool.
10030002
Figure 3-2. Core Tool
Section 3-3. Illustrated Parts Breakdown (IPB)
3-9. GENERAL.
3-10. This section lists and illustrates the assemblies and detail parts of the Special Tools and Support Equipment for Liferafts.
3-11. The Illustrated Parts Breakdown should be used during maintenance when requisitioning and identify-ing parts.
3-12. Figure 3-3 illustrates the leak test fixture as used on all liferafts except LRU-18/U. Items with Usable on Code A are not required on text fixture when used for LRU-18/U.
3-3
10030003
Figure 3-3. Leak Test Fixture for Liferafts
Figure and Index Number
Part Number
Description
1 2 3 4 5 6 7 Units Per Assembly
Usable On Code
3-3 LEAK TEST FIXTURE, LIFERAFT . . . . . . . . . . . . . REF
-1 B-43XF4 . VALVE, 3-way with vent (12623)
(NOTE 1)
-2 MIL-C-4109 . COUPLING, air hose (male)
(NOTE 2)
-3 MIL-C-4109 . COUPLING, air hose (female)
(NOTE 2)
-4 P-734 . GAGE, Pressure, 0 to 5 psig
(NOTE 3)
40R31-2 . GAGE, Pressure, 0 to 15 psig
(NOTE 4)
CC-TM-12 . MANOMETER, Mercury, calibrated 0 to 6 psig (75331)
-5 AN816-4-8D . REDUCER, 3/4-inch tubing to 1/2-inch pipe
-6 MS27404-8D . FITTING, Hose -7 No Number . HOSE, Rubber, 1/2-inch
ID, 3/4-inch OD A/R
3-4
Figure and Index Number
Usable On Code
Units Per Assembly
Description
1 2 3 4 5 6 7 Part
Number
3-3-8 AN840-8 . ADAPTER, Hose to pipe thread . . . . . . . . . . . . . . . 1 A -9 AN910-3D . COUPLING, Pipe thread . . . . . . . . . . . . . . . . . . . . . 1 A -10 AN840-10 . ADAPTER, Hose to pipe thread
(NOTE 5)
1 A
-11 MIL-P-8258 . HOSE, Liferaft hand pump
(NOTE 5)
1 A
-12 MS21962 . ADAPTER, Hose to liferaft
(NOTE 6)
1 A
NOTE: 1. NSN: 6685-00-953-9090
2. Select quick-disconnect coupling compatible with local low pressure air installation.
3. NSN: 6685-00-953-9090
4. NSN: 9G-6685-00-942-8127
5. Cut hose from salvaged liferaft hand pump.
6. Adapter can be obtained from salvaged liferaft hand pump.
3-5/(3-6 Blank)
NUMERICAL INDEX
Figure and SM&R Figure and SM&R Part Number Index No. Code Part Number Index No. Code
AN816-4-8D 3-3-5
AN840-8 3-3-8
AN840-10 3-3-10
AN910-3D 3-3-9
B-43XF4 3-3-1
CC-TM-12 3-3-4
MIL-C-4109 3-3-2
MIL-C-4109 3-3-3
MIL-P-8258 3-3-11
MS21962 3-3-12
MS27404-8D 3-3-6
Change 1 4-1
CHAPTER 4
LR-1 LIFERAFT ASSEMBLY
Section 4-1. Description
4-1. GENERAL.
4-2. The LR-1 is a one-man liferaft utilized with various soft and hard type survival kits. It is intended for use by an aircrewmember forced down at sea. It can also be used when forced down over land for fording rivers and streams or as shelter. See Figure 4-1 through Figure 4-6.
4-3. CONFIGURATION.
4-4. The LR-1 liferaft assembly consists of a inflation assembly (CO2 cylinder and inflation valve) and a one-man liferaft constructed of polychloroprene-coated cloth. Three types of CO2 cylinders and one type of inflation valve, FLU-6/P or modified FLU-6/P is avai-lable. The liferaft consists of a single compartment flotation tube with a non-inflatable floor. It is blue in color and features a weathershield, sea anchor, sea anchor pocket, retaining line pocket, and ballast bags. The weathershield is nonspecular sea blue in color on the outside and bright red on the inside. The survival items which may be required in LR-1 liferaft assemblies are listed for reference only in Table 4-1, and most must be individually requisitioned.
10040001
Figure 4-1. LR-1 Liferaft Assembly
4-2
10040002
Figure 4-2. LR-1 Liferaft Assembly, Parts Nomenclature
10040003
Figure 4-3. Typical Rigid Seat Survival Kit
4-5. APPLICATION.
4-6. The type of packaged LR-1 liferaft assembly used aboard various types of aircraft is shown in Table 4-2.
4-7. FUNCTION.
4-8. The LR-1 liferaft assembly is inflated either manually by pulling the inflation assembly actuating lanyard or automatically on LR-1 (RSSK) by gravity drop on kit actuation. The inflation assembly inflates the flotation tube. After boarding, the LR-1 may be topped off by using the oral inflation valve.
4-3
10040004
Figure 4-4. Alternate Inflation Valve Assemblies
10040005
Figure 4-5. Equipment Container and Combination Carrying Case and Equipment Container
4-4
10040006
Figure 4-6. Packaged LR-1 Liferaft Assemblies
4-5
Table 4-1. LR-1 Survival Items
Description Quantity Required
Reference Number NIIN
SM&R
Code
Dye Marker 2 MIL-S-17980 00-270-9986 PAOZZ
Distress Signal, MK-124 MOD 0 2 — 01-030-8330
Emergency Radio Beacon
AN/URT-33A
1 MIL-B-38401A 00-160-2136 PAOGG
Battery Power Supply (Note 2) 1 P/N A3-03-0052
(CAGE 18560)
00-168-8628 PAOZZ
Water, Drinking, Bagged, 3 01-124-4543 PAOZZ Emergency
Cord, Nylon, Utility, 50 feet 1 MIL-C-5040 00-262-2148 PAOZZ
SRU-31/P Individual Survival Kit (Part 1 - Medical, Part 2 - General)
1 MIL-S-81941 00-478-6504 PCOZZ
Ground Air Emergency Code Manual 1 NAVAIR 00-25-213 0800-LP-000-1500 —
Combat Casualty Blanket Type II, 3 oz. 1 MIL-B-36964 00-935-6666 PAOZZ
Bailing Sponge 1 P/N L-S-626
(CAGE 81348)
00-240-2555 PAOZZ
Personnel Lowering Device (Note 1) 1 CL213D2-1 00-451-3324
Notes: 1. Optional item.
2. Refer to NAVAIR 16-30URT33-1 for battery service life.
4-6
Table 4-2. LR-1 Aircraft Applications
Packaged LR-1 Liferaft Assembly Aircraft
Standard Soft Pack Assembly (Note 1) C-2A E-2A E-2B
E-2C T-34B
KC-130F
KC-130R
High Speed Soft Pack Assembly A-4B A-4C A-4E
KC-130F
KC-130R
High Speed Soft Pack (Modified) Assembly T-39E CT-39G
Rigid Seat Survival Kit 1/1A F-4B F-4J
F-4K F-4M
F-4N
RF-4B
Rigid Seat Survival Kit 3 T-2
Rigid Seat Survival Kit 8/8A A-4F A-4M A-7C
TA-4J
A-7A
TA-4F
A-7E S-3A A-7B
Helicopter Back Pack Assembly All Helicopters (except AH-1 series)
SKU-2/A F-14 A-6E EA-6B
KA-6D EA-6A
SKU-3/A F-18
SKU-4/A A-7
SKU-6/A AV-8B TAV-8B
SKU-12/A (Note 2) A-6E EA-6A F-14
KA-6D EA-6B
NOTE: 1. E-2 Aircraft equipped with the A/P22P-11 Crew Backpack utilize the LRU-18/U One Man Vee Bottom Liferaft.
2. The LRU-23/P Liferaft Assembly is installed in seat survival kits used in F-14 and F/A-18 aircraft equipped with SJU-17(V)1A through SJU-17(V)4A ejection seats.
4-7
Section 4-2. Modifications
4-9. GENERAL.
4-10. There are no authorized modifications to the LR-1 liferaft assembly at this time. Common repairs and fabrications are listed in Table 4-3.
Table…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .