Amendment No. 2 Revised.docx
DOCX document 31 KB Posted
- Solicitation number
- 1082961
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment No.3--.docx | DOCX document | |
| wage determination (2).pdf | ||
| Amendment No. 1.docx | DOCX document | |
| RFP.pdf | ||
| wage determination.pdf | ||
| Capability of Offeror Questionnaire.docx | DOCX document | |
| Fire Plan 080212 RK.doc | DOC document | |
| Combined Toilet Site Work Spec Revised3.pdf | ||
| KR Toilet Sitework Dwg Set Color.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. AMENDMENT/MODIFICATION NUMBER
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQUISITION NUMBER |
| 5. PROJECT NUMBER (If applicable) |
| A00002 |
| 12/15/22 |
| 1082961 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
11. (
AMENDMENT
OF
SOLICITATION/MODIFICATION
OF
CONTRACT
1.
CONTRACT
ID
CODE
PAGE
OF
PAGES
USDA,
Forest
Service
Peacekeeper
Way
Suite
101 McClellan Park, Ca. 95652 USDA Forest Service Construction
Contracting
Peacekeeper
Way, Suite
McClellan, CA
95652 8.
NAME
AND
ADDRESS
OF
CONTRACTOR
(Number, street, county, State and
ZIP
Code)
ALL
PROSPECTIVE
OFFERORS
(X)
9A.
AMENDMENT OF
SOLICITATION
NUMBER
127EAW2
3R0001 9B.
DATED
(SEE
ITEM
11) 11/2 /2022 10A.
MODIFICATION
OF
CONTRACT/ORDER
NUMBER
10B.
DATED
(SEE
ITEM
13)
CODE
FACILITY
CODE
)THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
| CHECK ONE |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
GAOA S. Sierra Campground Day Use Site Toilet Replacement and Access, Sequoia National Forest, California See Attachment 1 to this amendment for RFI responses and information Note: Deadline for submission of RFIs has passed.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of Contracting Officer)
Previous edition unusable
STANDARD FORM 30 (REV. 11/2016)
ATTACHMENT NO. 1 RFI RESPONSES
Question No. 1: Line items 02100(02), 02100(03) and 03300(01C) are all listed as Lump Sum Pay Units yet they have a Qty in order of 4, 3 and 7. With the majority of Lump Sum line items listed with 1 qtys, I wanted to clarify what these numbers are referring to. Does the 4 mean we are bidding on a LS for 4 septic tanks, 3 means the LS for 3 septic tanks and 7 would mean the LS for 7 different sidewalks?
Response No.1: Per specification section 01010 Summary of Work, paragraph 1.2.A.3, a Lump Sum (LS) is defined as one complete unit, which may consist of one or more parts. Pricing for item 02100(02) should consist of demolition of one septic tank, paid for at each of four locations. Pricing for item 02100(03) should consist of demolition of both a septic tank and a dosing tank which make up one sewer system; paid for at each of three locations. Pricing for item 03300(01C) should consist of all work to construct sidewalks around one set of two double vault toilets; paid for at each of seven locations.
Question No. 2: Will the concrete sidewalks be considered structural concrete that will need independent testing?
Response No. 2: Per specification section 03300 Cast-In-Place Concrete, paragraph 3.14, and as stated in the schedule of items for pay items 03300(01A), 03300(01B), 03300(01C), and 03300(02), construction of sidewalks includes independent concrete testing.
Question No. 3: Existing Grades and ADA Compliance - Per Section C Description/Specification/Statement of Work paragraph C.1 Scope of Contract states "Construction of ADA accessible concrete sidewalks around new double vault toilet building". At Tillie Creek Campground site #6, the new vault toilets existing elevation is much higher than the existing asphalt elevation. What if the existing grade will not allow the new sidewalks to be ADA compliant as shown on the drawings?
Response No. 3: Construct the sidewalk as shown on drawing sheet 9, matching the asphalt elevation at one end and the toilet elevation at the other end. If ADA compliance is not fully satisfied, that is acceptable.
Question No. 4: Tillie Creek Campground Access - Contractor went to Tillie Creek Campground to see the project. The road to sites 5, 6 & 7 is blocked by pipes and debris. Will the Forest Service clear the roads prior to construction?
Response No. 4: Toilets 5, 6, and 7 are located in the back portion of the campground behind locked gates made of steel pipe. Access through the locked gates will be provided and roads will be cleared of debris.
Question No. 5: Camp 9 Backfill Septic System - Per the specification all septic tanks are to be demolished 2' below ground surface. The septic tank located at Camp 9 by the fish cleaning station is located in the existing road.
Question 5(a): Can this septic tank be pumped, cleaned, 4" hole punched in bottom and then filled with slurry? This tank would not be demolished 2' below grade.
Response No. 5 (a): Backfill with slurry as proposed is acceptable.
Question 5(b): If slurry is approved, when the existing steel lid is removed can the asphalt be patched with concrete? The patch would only be approximately 3'x'3 and can be colored black.
Response 5(b): As stated in the schedule of items description for item 02100(01), repairing the paved surface with concrete is acceptable.