10458000-RFP-Yellowstone-River-Huntley.pdf

PDF 401 KB Posted

Attached to
Yellowstone River-Huntley
Solicitation number
MDT-RFP/RFQ-2026-2161
Issued by
Ravalli County, Montana

About this file

Summary

This Request for Proposals is issued by the Montana Department of Transportation (MDT) for consulting firms to prepare construction plans and specifications for the Yellowstone River-Huntley bridge replacement project on State Primary Route 264 (Structure 04863) spanning the Yellowstone River in Yellowstone County. The project scope encompasses bridge design, roadway design, geotechnical investigation and analysis, survey, environmental evaluation and permitting, hydraulic analysis and design, public involvement, local agency coordination, right-of-way design, and potentially right-of-way acquisition. The work will be phased, with MDT retaining the option to assume responsibility for design work in-house following the AGR (Advanced Group Review) milestone. One prime consulting firm will be selected, with the requirement that the prime consultant complete at least 50% of the work. Montana professional engineering licensure must be in-hand at proposal submission. Proposals are due electronically by 3:00 PM MST on March 4, 2026, with the Consultant Selection Board meeting scheduled for April 1, 2026, and a scoping meeting with the selected consultant on April 23, 2026. The contract will be administered on a cost-plus fixed fee basis with negotiated cost ceilings.

Pricing information and specific cost details should not be included in proposals; however, prior to contract execution, firms must provide indirect cost rates, personnel rates, profit margins, and direct expenses calculated in accordance with 23 CFR 172 and 48 CFR Part 31. No Disadvantaged Business Enterprise goals are established for this work, though MDT strongly encourages utilization of Montana-certified DBE firms. The RFP contains no specific budget amount or award value. Proposals are limited to five pages plus required appendices and will be evaluated on Team Qualifications (50 points), Project Approach (100 points), and Record of Past Performance (30 points). Kelly Williams, Consultant Design Engineer, serves as the single point of contact at (406) 444-7964 or kwilliams@mt.gov. MDT reserves the right to cancel the RFP, reject proposals, terminate any resulting contract, or decline to award if adequate funds are unavailable.

View the file

Other files

File Type Posted
1370164-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consultant Design Bureau Phone: (406) 444–6209 Fax: (406) 444–6253

An Equal Opportunity Employer Engineering Division

TTY: (800) 335–7592

Web Page: www.mdt.mt.gov

2701 Prospect ▪ PO Box 201001 Helena MT 59620-1001

Christopher Dorrington, Director

Date: February 4, 2026

Subject: Request for Proposals Yellowstone River-Huntley

STPB 264-2(1)8

UPN 10458000

To Whom It May Concern:

The Montana Department of Transportation (MDT) is accepting proposals from consulting firms interested in the preparation of the construction plans and specifications for the subject project.

One firm will be selected to perform the work specified herein.

Teams may be established as necessary; however, it is expected that the prime consultant will be capable of completing the vast majority of the work, and the proposal must clearly identify the prime for this contract. As a rule, the prime consultant must complete at least 50% of the work for a specific project or assignment unless written exception is given.

Montana professional engineering licensure is required for this work and must be in-hand at the time your proposal is submitted. If this requirement is not met and clearly identified in the proposal, your proposal will be considered non-responsive.

If your firm is interested, please submit a proposal as described herein.

SCOPE OF WORK

This project was nominated to replace the existing bridge on State Primary Route 264 (structure 04863) from RP 8.6 to 8.9 spanning the Yellowstone River. The selected consultant will be required to provide all services necessary for the project including (but not limited to) bridge design; roadway design; geotechnical investigation, analysis, and design; survey; environmental evaluation and permitting; hydraulic analysis and design; public involvement; local agency and other stakeholder coordination; R/W design; and potentially R/W acquisition.

Please note that while consultants are expected to demonstrate their ability to provide services through final PS&E, the project design will be scoped in phases. MDT will reassess internal resources at the AGR milestone and may elect to complete the remaining design work in-house, which could result in early termination of the consultant’s contract. If MDT assumes responsibility for the design after AGR, the selected consultant may still be retained to provide support as needed.

By submitting a proposal, the consultant affirms its capacity to complete the required work in accordance with the negotiated project schedule. The consultant must also demonstrate a robust internal quality assurance/quality control (QA/QC) process that meets or exceeds industry standards for engineering deliverables.

LOCATION

This project is located in Yellowstone County on P-264 (MT-264) north of Huntley from reference point 8.6 to 8.9.

PROJECT SCHEDULE AND DELIVERABLES

The project schedule will be developed and negotiated prior to executing the contract agreement.

At this time, it is anticipated that deliverables will generally follow those described in MDT’s Consultant Activity Descriptions (as applicable):

http://www.mdt.mt.gov/other/webdata/external/cdb/ACTIVITY_DESCRIPTIONS/CONSULTA

NT_DESIGN_2500_MU.PDF

STANDARDS, SPECIFICATIONS, AND POLICIES

Work is expected to follow MDT’s various Manuals, Guides, and Policies. These items may be found on MDT’s Design Consulting web page at: http://www.mdt.mt.gov/business/consulting/.

PROPOSAL SUBMITTAL

Submit one (1) electronic version (Adobe© PDF format) of the proposal. Hard copy proposals will not be accepted.

Submit the electronic version by uploading to the State of Montana File Transfer Service (FTS) site, which can be accessed at this link: https://transfer.mt.gov. To upload to FTS, an account must be created unless the person who is uploading already has an account. Uploading instructions can be accessed at https://transfer.mt.gov/Home/Instructions. When your proposal has been uploaded, the FTS system will prompt you for an email address to send to. Please send this email of your uploaded proposal to the following individuals:

http://www.mdt.mt.gov/other/webdata/external/cdb/ACTIVITY_DESCRIPTIONS/CONSULTANT_DESIGN_2500_MU.PDF http://www.mdt.mt.gov/other/webdata/external/cdb/ACTIVITY_DESCRIPTIONS/CONSULTANT_DESIGN_2500_MU.PDF http://www.mdt.mt.gov/business/consulting/ https://transfer.mt.gov/ https://transfer.mt.gov/Home/Instructions

Sheryl Tangen: stangen@mt.gov Kelly Williams: kwilliams@mt.gov Ben Schendel: beschendel@mt.gov

The Department must receive the proposals for this RFP no later than 3:00 PM MST, March 4, 2026.

Regardless of cause, late proposals will not be accepted and will automatically be disqualified from further consideration. It shall be solely the vendor's responsibility to assure delivery at the specified office by the specified time. Offeror may request the State return late proposals at vendor’s expense or the State will dispose of late proposals if requested by the offeror. (See Administrative Rules of Montana (ARM) 2.5.509.). If no request is made, late proposals become the property of the Department. All proposals submitted on time become the property of the Department.

The costs for developing and delivering responses to this solicitation are entirely the responsibility of the offeror. The State is not liable for any expense incurred by the offeror in the preparation and presentation of this submittal.

TENTATIVE RFP/SELECTION SCHEDULE

The anticipated schedule for consultant solicitation and selection for this contract is as follows (subject to change):

February 4, 2026: RFP released March 4, 2026: Proposals due to be submitted to MDT Consultant Design April 1, 2026: Consultant Selection Board meeting to select consultant April 23, 2026: Scoping meeting with selected consultant

There are three (3) members on the evaluation committee for this RFP (subject to change):

1. MDT Billings District Staff

2. MDT Consultant Design Staff

3. MDT Bridge Staff

PROPOSAL CONTENTS

The proposal must contain the information listed in this section. The proposal is limited to five

(5) pages, not including the required Appendices. A single cover jacket/title page is allowed if desired and will not count in the page limit. Each page is defined as one side of a letter size sheet (no larger than 8 ½” x 11”), minimum font size of 10. Evaluation of information will begin with the first page immediately following the cover jacket/title page, and every page will be counted, in order, from that point forward, including any table of contents or divider pages the firm wishes to include. Once the page limit is reached, any information included thereafter will be removed and not considered or scored. Please organize your proposal in the same order and numbering format as shown below, which will assist MDT in reviewing your proposal:

Questions

1) Team Qualifications

Provide a discussion on how the team you propose to use for this project (including subconsultants, if used) is best qualified to respond to the requirements of this project.

mailto:stangen@mt.gov mailto:kwilliams@mt.gov mailto:beschendel@mt.gov

Discussion should focus on the requirements for this specific project, particularly your team’s expertise and experience, as it relates to the work described in the “Scope of Work” section above. Provide examples of previous related project experience as it relates to these services. Identify professional licensure of staff that satisfy the requirements for this contract. Include an organizational chart of your team for this project. Also briefly discuss your compatibility of systems, software, and equipment (i.e.

CADD software, word processing software, etc.), and experience with these systems, software, and equipment. The Department’s standard design software is Autodesk® technology included in the Architecture, Engineering & Construction (AEC) Collection.

Describe any special equipment or software you intend to use. Resumes may be considered as supplemental information for scoring this question.

2) Project Approach Transportation work has many challenging aspects, and the development and delivery of a successful project that addresses and mitigates specific project challenges is of utmost interest to MDT. Discuss the challenges you foresee as they relate to this project and its requirements, your strategy for addressing these challenges, and your specific experience in implementing the strategies identified. Describe your quality assurance/quality control process. Include a discussion on your ability to successfully deliver this project, and your overall plan for delivering this project in a timely manner.

Appendix A: Resumes Include brief resumes for the key personnel to be assigned to the contract. Resumes are limited to one (1) page per person.

Appendix B: Cover Page Form Include a completed version of MDT’s standard cover page form, available at the following location:

http://www.mdt.mt.gov/other/webdata/external/cdb/MDT-CDB-002-Proposal-SOQ-Cover-Sheet.pdf

Information presented in the cover page form will not be considered in proposal scoring.

Appendix C: References Submit references that includes a minimum of five (5) separate contracts from the past three (3) years. If applicable, you may submit multiple contracts for a single client. Each contract must pertain to work similar to the proposed scope of services. Include client name, a currently employed primary contact person, an alternative contact person, corresponding valid phone numbers and emails for both contacts, a range of contract value, and a brief description of the work performed. If MDT needs to use these references for the Past Performance Score (as described in the “Evaluation of Proposals” section below) and is unable to contact the required number of references after a reasonable effort, the firm will receive a zero for the missing reference(s).

EVALUATION OF PROPOSALS

All proposals will be evaluated in accordance with the following factors:

1) Team Qualifications (50 points possible)

2) Project Approach (100 points possible) http://www.mdt.mt.gov/other/webdata/external/cdb/MDT-CDB-002-Proposal-SOQ-Cover-Sheet.pdf

3) Record of past performance (30 points possible)

a) If two (2) or more MDT evaluations specific to the discipline for this contract are available for the consultant, the average score of these evaluations will be used.

Evaluations for Project Management & Overall Performance will also be included.

b) If fewer than two (2) MDT evaluations specific to the discipline for this contract are available for the consultant, but there are two (2) or more MDT evaluations are available for other work disciplines, the consultant’s current overall past performance score from MDT evaluations will be used.

c) If there is only one (1) MDT evaluation available for the consultant, the record of past performance score will be an average of the MDT evaluation and one (1) reference check from the references provided in the unbound attachment.

d) If no MDT evaluations are available, the average score of two (2) reference checks from the references provided in the unbound attachment will be used for this score.

Regardless of partnership/teaming relationships, the past performance of the prime consultant will be the past performance scored that will be used for this score.

All Proposals will be evaluated using the following basic scoring methodology:

o Outstanding/Exceptional response: 90-100% of the available points o Good response: 70-90% of the available points o Average response: 50-70% of the available points o Poor response: 30-50% of the available points o Qualifications not clearly met: 0-30% of the available points

Following the review, evaluation, and rating of all proposals, the final results will be presented to the Consultant Selection Board (Board) at the MDT Headquarters Building. At this time, the Board will select the most qualified firm(s) to perform the work. The Board may consider any proposal scoring within 2% of the highest-scoring proposal as equally qualified and take into account its knowledge of the firms’ workload, past performance, and familiarity with the project area and local entities in selecting the most-qualified consultant. In the event that a firm cannot be identified as the most qualified through an evaluation of these proposals, MDT reserves the right to narrow down the list of responding firms to an appropriate short list. Short-listed firms will either be asked to provide a supplemental proposal or asked to be interviewed or provide a presentation. Scores from the proposals, supplement project proposals (if used), and interviews (if used) will be carried forward to determine final consultant score. Consultant selection is finalized by MDT at the Consultant Selection Board meeting.

INDIRECT COST RATE REQUIREMENTS

Proof of the firm’s Indirect Cost Rate (overhead rate) is not required with this proposal submittal. However, an Indirect Cost Rate may be required prior to executing a contract according to MDT’s Indirect Cost Rate Requirements:

All submitted indirect cost rates must be calculated in accordance with 23 CFR 172 for the cost principles of 48 CFR part 31 and include the required items identified in the MDT Indirect Cost Rate Policy located in Appendix A of the Consultant Services Manual on the MDT Internet website.

http://www.mdt.mt.gov/other/webdata/external/cdb/consultant_manual/consultant-design-manual_combined.pdf http://www.mdt.mt.gov/other/webdata/external/cdb/consultant_manual/consultant-design-manual_combined.pdf http://www.mdt.mt.gov/other/webdata/external/cdb/consultant_manual/consultant-design-manual_combined.pdf

Do not show any actual numerical financial information such as the overhead rate or personnel rates within your proposal. Specific cost information of the firm or team should not be part of the proposal.

AGREEMENT REQUIREMENTS

Contract agreements will generally be administered on a cost-plus fixed fee basis. The contracts will have negotiated cost ceilings. If a consulting firm is selected for a specific project and a contract agreement is successfully negotiated, certain financial information will be required as part of the contract agreement. As described in the Indirect Cost Rate Requirements section above, all Consultants and subconsultants must provide the Department with an Indirect Cost Rate (as applicable) audited (when applicable) in accordance with 23 CFR 172 for the cost principles of 48 CFR Part 31 and based on the firm’s latest completed fiscal year’s costs.

Personnel rates, profit, and direct expenses must be clearly outlined and provided to the Department. The standard MDT agreement can be found at the following address:

http://www.mdt.mt.gov/other/webdata/external/cdb/forms/pdf/General-Terms-and-Conditions.pdf

Do not submit actual numerical financial information within this proposal.

STATE OPTION TO AWARD

While the State has every intention to award a contract resulting from this RFP, issuance of the RFP in no way constitutes a commitment by the State to award and execute a contract. Upon a determination such actions would be in its best interest, the State, in its sole discretion, reserves the right to:

• Cancel or terminate this RFP (18-4-307, MCA);

• Reject any or all proposals received in response to this RFP (ARM 2.5.602);

• Waive any undesirable, inconsequential, or inconsistent provisions of this RFP that would not have significant impact on any proposal (ARM 2.5.505);

• Not award a contract, if it is in the State's best interest not to proceed with contract execution (ARM 2.5.602); or

• If awarded, terminate any contract if the State determines adequate funds are not available (18-4-313, MCA).

SINGLE POINT OF CONTACT

From the date this solicitation is issued until the consultant selection is finalized by MDT at the Consultant Selection Board meeting, offerors are not allowed to communicate with any state staff or officials regarding this solicitation, except at the direction of the Consultant Design Engineer. If unauthorized contact is made and the Consultant Design Engineer determines the context of the contact gives the firm an unfair advantage, the firm will be disqualified from the solicitation. Contact information for the single point of contact is as follows:

Kelly Williams Consultant Design Engineer

Montana Department of Transportation

(406) 444-7964 (Direct Line) kwilliams@mt.gov http://www.mdt.mt.gov/other/webdata/external/cdb/forms/pdf/General-Terms-and-Conditions.pdf

DBE GOALS

There are no DBE goals for this work, but firms are strongly encouraged to utilize DBE firms if applicable. A Montana certified DBE list is available and can be found on the MDT web page, http://www.mdt.mt.gov/business/contracting/civil/dbe.shtml.

NONDISCRIMINATION COMPLIANCE

Consultants will be subject to Federal and Montana nondiscrimination laws and regulations (see attached notice titled “MDT NONDISCRIMINATION AND DISABILITY

ACCOMMODATION NOTICE”).

If you have any questions, please contact me at (406) 444-7964, or by email at kwilliams@mt.gov. I look forward to receiving your proposal.

Sincerely, Kelly Williams, P.E.

Consultant Design Engineer

Attachment e-copies:

Mary Erchul, ACEC Executive Director-MT Chapter Jason Senn, MDT Consultant Plans Engineer Dustin Rouse, MDT Chief Engineer Roy Peterson, MDT TA Engineer Ryan Dahlke, MDT Preconstruction Engineer MDT Consultant Design Bureau file Dave Holien, MDT Highways Engineer Mike Taylor, Billings District Administrator-MDT Erika Wimmer, MDT Civil Rights Bureau Chief Andy Cullison, MDT Bridge Engineer http://www.mdt.mt.gov/business/contracting/civil/dbe.shtml

Rev. 01/2026

MDT NONDISCRIMINATION AND

DISABILITY ACCOMMODATION NOTICE

Montana Department of Transportation (“MDT”) is committed to conducting all of its business in an environment free from discrimination, harassment, and retaliation. In accordance with State and Federal law MDT prohibits any and all discrimination and protections are all inclusive (hereafter “protected classes”) by its employees or anyone with whom MDT does business:

Federal protected classes State protected classes

Race, color, religion, national origin, sex, age, disability, and genetic information.

Race; color; national origin; familial or marital status; pregnancy, childbirth, or medical conditions related to pregnancy or childbirth;

creed; social origin or condition; genetic information; sex, sexual orientation, gender identification or expression; ancestry; age;

mental or physical disability; political or religious affiliations or ideas; military service or veteran status; vaccination status or possession of immunity passport.

For the duration of this contract/agreement, the PARTY agrees as follows:

(1) Compliance with Regulations: The PARTY (hereinafter includes consultant) will comply with all Acts and Regulations of the United States and the State of Montana relative to Non-Discrimination in Federally and State-assisted programs of the U.S. Department of Transportation and the State of Montana, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.

(2) Non-discrimination:

a. The PARTY, with regard to the work performed by it during the contract, will not discriminate, directly or indirectly, on the grounds of any of the protected classes in the selection and retention of subcontractors, including procurements of materials and leases of equipment, employment, and all other activities being performed under this contract/agreement.

b. PARTY will provide notice to its employees and the members of the public that it serves that will include the following:

i. Statement that PARTY does not discriminate on the grounds of any protected classes.

ii. Statement that PARTY will provide employees and members of the public that it serves with reasonable accommodations for any known disability, upon request, pursuant to the Americans with Disabilities Act as Amended (ADA).

iii. Contact information for PARTY’s representative tasked with handling non-discrimination complaints and providing reasonable accommodations under the ADA.

iv. Information on how to request information in alternative accessible formats.

c. In accordance with Mont. Code Ann. § 49-3-207, PARTY will include a provision, in all of its hiring/subcontracting notices, that all hiring/subcontracting will be on the basis of merit and qualifications and that PARTY does not discriminate on the grounds of any protected class.

(3) Participation by Disadvantaged Business Enterprises (DBEs):

a. If the PARTY receives federal financial assistance as part of this contract/agreement, the PARTY must comply with applicable federal and state laws regarding the DBEs, including but not limited to 49 CFR Part 26.

b. By signing this agreement the PARTY assures that:

The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts.

Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate.

c. PARTY must include the above assurance in each contract/agreement the PARTY enters.

(4) Solicitation for Subcontracts, Including Procurement of Materials and Equipment:

In all solicitations, either by competitive bidding, or negotiation, made by the PARTY for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the PARTY of the PARTY’s obligation under this contract/agreement and all Acts and Regulations of the United States and the State of Montana related to Non-Discrimination.

(5) Information and Reports: The PARTY will provide all information and reports required by the Acts, Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information and its facilities as may be determined by MDT or relevant US DOT Administration to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the PARTY will so certify to MDT or relevant US DOT Administration, as appropriate, and will set forth what efforts it has made to obtain the information.

(6) Sanctions for Noncompliance: In the event of a PARTY’s noncompliance with the Non-discrimination provisions of this contract/agreement, MDT will impose such sanctions as it or the relevant US DOT Administration may determine to be appropriate, including, but not limited to:

a. Withholding payments to the PARTY under the contract/agreement until the PARTY complies; and/or

b. Cancelling, terminating, or suspending the contract/agreement, in whole or in part.

(7) Pertinent Non-Discrimination Authorities:

During the performance of this contract/agreement, the PARTY, for itself, its assignees, and successor in interest, agrees to comply with the following non-discrimination statutes and authorities; including but not limited to:

Federal

- Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21;

- The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601 et seq.), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);

- Sections 162 and 301(g) of the Federal-Aid Highway Act of 1973, (Public Law No. 93-87, 87 Stat. 250, codified at 23 U.S.C. § 324), (prohibits discrimination on the basis of sex);

- Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), (prohibits discrimination on the basis of disability); and 49 CFR Part 27;

- The Age Discrimination Act of 1975, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age);

- Section 520 of the Airport and Airways Improvement Act of 1982, (49 U.S.C. § 47123), (prohibits discrimination based on race, creed, color, national origin, or sex);

- The Civil Rights Restoration Act of 1987, (Public Law No. 100-259), (broadened the scope, coverage, and applicability of Title VI of the Civil Rights Act of 1964, The Age

Discrimination Act of 1975, and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients, and contractors, whether such programs or activities are Federally funded or not);

- Titles II and III of the Americans with Disabilities Act, (42 U.S.C. §§ 12131 through

12189), which prohibits discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities as implemented by Department of Transportation regulations at

49 CFR parts 37 and 38;

- Title IX of the Education Amendments of 1972, as amended, which prohibits discrimination on the basis of sex in education programs or activities (20 U.S.C. § 1681 et seq.).

State

- Mont. Code Ann. § 49-3-205 Governmental services;

- Mont. Code Ann. § 49-3-206 Distribution of governmental funds;

- Mont. Code Ann. § 49-3-207 Nondiscrimination provision in all public contracts.

(8) Incorporation of Provisions: The PARTY will include the provisions of paragraphs one through seven in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and/or directives cited therein.

The PARTY will take action with respect to any subcontract or procurement as MDT or the relevant US DOT Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the PARTY becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the PARTY may request MDT to enter into any litigation to protect the interests of MDT.

In addition, the PARTY may request the United States to enter into the litigation to protect the interests of the United States.

File details come from the government source that posted it. Updated .